PROJECT INFORMATION SESSION
Small Business EnterpriseSR 44 from Lake/Sumter County Line to SR 44/CR 468
Project 427230-1
December 13, 2010
Derek DixonConsultant Project Management
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
PROJECT LOCATIONPROJECT LOCATION
End Project
Begin Project
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
PROJECT LIMITSPROJECT LIMITS
LIMITS: SR 44 - Begin MP 0.000 (Lake/Sumter County Line). CR 468 - End MP 2.468 MITS (Pavement Change East of CR 468/SR44).
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
SPECIFIC PROJECT DETAILSSPECIFIC PROJECT DETAILS
• The Pavement Design Will be Done by The Department
• Restripe the Urban Section to Accommodate a 4.0’ Bicycle Lane
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
PROJECT INFORMATIONPROJECT INFORMATION•Old Construction Projects Numbers – 238040-1 and 238241-1Old Construction Projects Numbers – 238040-1 and 238241-1
•Level of Community Awareness plan : 1
•Stormwater Management District : SJRWMD
•Number if Existing Utilities : Eight –
AT&T - Distribution & Transmission Bright House Networks, LLC City of Leesburg – Electric, Gas and Water Comcast Cable Progress Energy Century Link
Posted and Design Speed : SR 44 – Posted 55 MPH (MP 0.000 to MP 2.220) Posted 45 MPH (MP 2.220 to MP 2.365)
Design Speed (From plans for 238241-1) SR 44 – Design 65 MPH (MP 0.000 to MP 1.600)
Design 45 MPH (MP 1.600 to MP 2.365)
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
IMPORTANT DATESIMPORTANT DATES•Advertisement – January 11th, 2011
•Letters of Interest – Response Deadline January 21st, 2011
•Short-list – February 7th, 2011
•Final Selection – March 31st, 2011
•PE Begin – May 2011
Note: These dates are preliminary and subject to change.
SR 44 From Lake/ Sumter County Line to SR 44/CR 468
CD CONTENTSCD CONTENTS
• Technical Scope
• Straight Line Diagram
• Right-of-Way Maps
• Construction Plans
• Project Information Session Presentation