Qassim University
College of Engineering
GE402
PROJECT : CONSTRUCTIO ROAD
Submitted by : Submitted to :
GROUP ( 2 ) Prof.Tomas Ucol Ganiron Jr
Date : 15 / 3 / 2010
-
7/30/2019 Project in Construction Road
2/18
PROJECT: Construction Road
PRODUCT : Proposal Highway Road From Al-Qassim To Makkah.
-
7/30/2019 Project in Construction Road
3/18
PROBLEM STATEMENT
The project aims to proposal highway road that will used surveying works ,
aggregates and bituminous .
1. What is the effect of highway road ?
1.1 Strength
1.2 Quality of water ratio ( specification )
1.3 Equipment
1.4 Workers
1.5 Tribal constrains
-
7/30/2019 Project in Construction Road
4/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
5/18
A total stationis an electronic/optical instrument used in modern surveying.
The total station is an electronic theodolite (transit) integrated with an
electronic distance meter (EDM) to read distances from the instrument to aparticular point.
-
7/30/2019 Project in Construction Road
6/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
7/18
Soil compactionoccurs when the weight of heavy
machinery compresses the soil, causing it to lose porespace
-
7/30/2019 Project in Construction Road
8/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
9/18
pavement is the durable surface material laid down on an
area intended to sustain vehicular or foot traffic.
-
7/30/2019 Project in Construction Road
10/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
11/18
A sieve analysis is a practice or procedure used (commonly
used in civil engineering) to assess the particle size distribution
of a granular material.
-
7/30/2019 Project in Construction Road
12/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
13/18
The Sand Cone Apparatus is used to determine the in-place density of any soil
that can be excavated to a stable condition with hand tools. This method is
generally limited to materials with a maximum particle size of 2 in (5.1 cm).
-
7/30/2019 Project in Construction Road
14/18
2. What kind of technologies appropriate for this project in the terms of
2.1 Total Station
2. 2 Equipments for :
2.2.1 Compaction
2.2.2 Pavement
2.2.3 Sieve analysis
2.2.4 Sand cone test
2.3 Level Digits
-
7/30/2019 Project in Construction Road
15/18
The Digital Level is a digital height measurement sensor
designed for any job site where fast and accurate height
determination is required.
-
7/30/2019 Project in Construction Road
16/18
3. What are the advantages of proposal highway road ?
Product Summary
This product will connect between two regions , and to minimize the distance
between these regions . The major concern of this product is to facilities the
transportation for pilgrims . The materials needed in the study were collected .
The horizontal and vertical curve have designed to be safely for the drives . The
alignment of the road much enough .
-
7/30/2019 Project in Construction Road
17/18
Project Scope
The project focus on construction road . The type of pavement will use is
flexible type . The designed cross section are sub grade , sub base ,base course and
surface course . The surface contains bitumen base course and bitumen wearing
course .
The Tests
The tests are consist ( Sieve Analysis , CBR , Procter test , Sand equivalent )
Sieve Analysis CBR test Procter test Sand equivalent
-
7/30/2019 Project in Construction Road
18/18
GROUP ( 2 ) :
1- Meshal Al-Moshigh
2- Omar Al-Awad
3- Saleh Al-Belehy
4- Turki Al-Romihy
5- Suliman Al-Tami
6- Mohamed Al-Fozan
7- Abdulaziz Al-Mohemid
8- Abdulmalik Al-Suinea
Compilation , writing , and design by :