Download - Project first prototype
Project First Prototype
Group 4 Takiantong GroupFlies Killer.
Table Description.No
Name
Description Material
Manufacturing Process
Quantity
Unit cost
Total cost
1 Head The head that drilled for assembled the lamp.
Plastic Cutting , Painting
1 13.33
13.33
2 Body1 The part that drilled 2*2 cm^2 around part.
Plastic Cutting , Drilling and painting
1 13.33
13.33
3 Body2 The part that cut form the bottom battle.
Plastic Cutting , Painting
1 13.33
13.33
4 Body3 The part is head of battle for assembled the part.
Plastic Cutting , Painting
1 13.33
13.33
5 Lamp The size of lamp is match to another part.
Glass - 1 75 75
Total 129 bath
Problem
The head of part is difficult to assembled to Lamp.
Solution for second prototype.
Drill on head for little than plug of lamp.
Thank you for attention.