Download - Process Selection and Facility Layout
![Page 1: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/1.jpg)
Group MembersGroup Members
•Muhammad Rizwan Younas•Muhammad Abdullah
•Waqas Hussain
![Page 2: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/2.jpg)
Presentation TitlePresentation Title
Process Selection and Facility Layout
Process Selection and Facility Layout
![Page 3: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/3.jpg)
Process selection Deciding on the way production of goods or
services will be organized
Major implications Capacity planning Layout of facilities Equipment Design of work systems
Process SelectionProcess Selection
![Page 4: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/4.jpg)
Forecasting
Product andService Design
TechnologicalChange
CapacityPlanning
ProcessSelection
Facilities andEquipment
Layout
WorkDesign
Figure 6.1
Process Selection and Process Selection and System DesignSystem Design
![Page 5: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/5.jpg)
• Key aspects of process strategy– Capital intensive – equipment/labor
– Process flexibility
– Technology
– Adjust to changes
– Design
– Volume
– technology
Process StrategyProcess Strategy
![Page 6: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/6.jpg)
TechnologyTechnology
Technology: The application of scientific discoveries to the development and improvement of products and services and operations processes.
Technology innovation: The discovery and development of new or improved products, services, or processes for producing or providing them.
![Page 7: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/7.jpg)
Kinds of TechnologyKinds of Technology Operations management is primarily
concerned with three kinds of technology: Product and service technology Process technology Information technology
All three have a major impact on: Costs Productivity Competitiveness
![Page 8: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/8.jpg)
Technology Competitive AdvantageTechnology Competitive Advantage
Innovations in Products and services
Cell phones PDAs Wireless computing
Processing technology Increasing productivity Increasing quality Lowering costs
![Page 9: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/9.jpg)
Technology AcquisitionTechnology Acquisition Technology can have benefits but … Technology risks include:
What technology will and will not do Technical issues Economic issues
Initial costs, space, cash flow, maintenance Consultants and/or skilled employees Integration cost, time resources Training, safety, job loss
![Page 10: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/10.jpg)
Variety How much
Flexibility What degree
Volume Expected output
Job Shop
Batch
Repetitive
Continuous
Process SelectionProcess Selection
![Page 11: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/11.jpg)
Job shop Small scale
Batch Moderate volume
Repetitive/assembly line High volumes of standardized goods or
services
Continuous Very high volumes of non-discrete goods
Process TypesProcess Types
![Page 12: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/12.jpg)
Process Type
Job Shop Batch Repetitive Continuous(flow)
Job Shop Appliance repair
Emergency room
Ineffective
Batch Commercialbaking
ClassroomLecture
Repetitive Automotiveassembly
Automaticcarwash
Continuous(flow)
Ineffective Steel ProductionWater purification
Figure 6.2
Product and Service Product and Service ProcessesProcesses
![Page 13: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/13.jpg)
Dimension Job Shop Batch Repetitive Continuous(flow)
Job variety Very High Moderate Low Very low
Process flexibility
Very High Moderate Low Very low
Unit cost Very High Moderate Low Very low
Volume of output
Very High Low High Very low
Figure 6.2 (cont’d)Product – Process MatrixProduct – Process Matrix
![Page 14: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/14.jpg)
Product and Process ProfilingProduct and Process Profiling Process selection can involve substantial
investment in Equipment Layout of facilities
Product profiling: Linking key product or service requirements to process capabilities
Key dimensions Range of products or services Expected order sizes Pricing strategies Expected schedule changes Order winning requirements
![Page 15: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/15.jpg)
Automation: Machinery that has sensing and control devices that enables it to operate Fixed automation Programmable automation
AutomationAutomation
![Page 16: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/16.jpg)
• Computer-aided design and manufacturing systems (CAD/CAM)
• Numerically controlled (NC) machines
• Robot
• Manufacturing cell
• Flexible manufacturing systems(FMS)
• Computer-integrated manufacturing (CIM)
AutomationAutomation
![Page 17: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/17.jpg)
Layout: the configuration of departments, work centers, and equipment, with particular emphasis on movement of work (customers or materials) through the system
Product layouts
Process layouts
Fixed-Position layout
Combination layouts
Facilities LayoutFacilities Layout
![Page 18: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/18.jpg)
Objective of Layout DesignObjective of Layout Design
1. Facilitate attainment of product or service quality
2. Use workers and space efficiently3. Avoid bottlenecks4. Minimize unnecessary material handling costs5. Eliminate unnecessary movement of workers
or materials6. Minimize production time or customer service
time7. Design for safety
![Page 19: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/19.jpg)
Requires substantial investments of money and effort
Involves long-term commitments Has significant impact on cost and
efficiency of short-term operations
Importance of Layout DecisionsImportance of Layout Decisions
![Page 20: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/20.jpg)
Product layouts
Process layouts
Fixed-Position layout
Combination layouts
Basic Layout TypesBasic Layout Types
![Page 21: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/21.jpg)
Product layout Layout that uses standardized processing
operations to achieve smooth, rapid, high-volume flow
Process layout Layout that can handle varied processing
requirements Fixed Position layout
Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed
Basic Layout TypesBasic Layout Types
![Page 22: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/22.jpg)
Raw materialsor customer
Finished item
Station 2
Station 2
Station 3
Station 3
Station 4
Station 4
Material and/or labor
Station 1
Material and/or labor
Material and/or labor
Material and/or labor
Used for Repetitive or Continuous Processing
Figure 6.4 Product LayoutProduct Layout
![Page 23: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/23.jpg)
High rate of output Low unit cost Labor specialization Low material handling cost High utilization of labor and equipment Established routing and scheduling Routing accounting and purchasing
Advantages of Product LayoutAdvantages of Product Layout
![Page 24: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/24.jpg)
Creates dull, repetitive jobs Poorly skilled workers may not maintain
equipment or quality of output Fairly inflexible to changes in volume Highly susceptible to shutdowns Needs preventive maintenance Individual incentive plans are
impractical
Disadvantages of Product LayoutDisadvantages of Product Layout
![Page 25: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/25.jpg)
1 2 3 4
5
6
78910
In
Out
Workers
Figure 6.6A U-Shaped Production LineA U-Shaped Production Line
![Page 26: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/26.jpg)
Dept. A
Dept. B Dept. D
Dept. C
Dept. F
Dept. E
Used for Intermittent processingJob Shop or Batch Processes
Process Layout(functional)
Figure 6.7Process LayoutProcess Layout
![Page 27: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/27.jpg)
Work Station 1
Work Station 2
Work Station 3
Figure 6.7 (cont’d)
Product Layout(sequential)
Used for Repetitive ProcessingRepetitive or Continuous Processes
Product LayoutProduct Layout
![Page 28: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/28.jpg)
Can handle a variety of processing requirements
Not particularly vulnerable to equipment failures
Equipment used is less costly Possible to use individual incentive
plans
Advantages of Process LayoutsAdvantages of Process Layouts
![Page 29: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/29.jpg)
In-process inventory costs can be high Challenging routing and scheduling Equipment utilization rates are low Material handling slow and inefficient Complexities often reduce span of supervision Special attention for each product or customer Accounting and purchasing are more involved
Disadvantages of Process LayoutsDisadvantages of Process Layouts
![Page 30: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/30.jpg)
Fixed Position LayoutsFixed Position Layouts Fixed Position Layout: Layout in which the
product or project remains stationary, and workers, materials, and equipment are moved as needed.
Nature of the product dictates this type of layout Weight Size Bulk
Large construction projects
![Page 31: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/31.jpg)
Cellular Production Layout in which machines are grouped into
a cell that can process items that have similar processing requirements
Group Technology The grouping into part families of items with
similar design or manufacturing characteristics
Cellular LayoutsCellular Layouts
![Page 32: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/32.jpg)
Dimension Functional CellularNumber of moves between departments
many few
Travel distances longer shorter
Travel paths variable fixed
Job waiting times greater shorter
Throughput time higher lower
Amount of work in process
higher lower
Supervision difficulty higher lower
Scheduling complexity higher lower
Equipment utilization lower higher
Table 6.3Functional vs. Cellular LayoutsFunctional vs. Cellular Layouts
![Page 33: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/33.jpg)
Warehouse and storage layouts Retail layouts Office layouts Service layouts must be aesthetically
pleasing as well as functional
Service LayoutsService Layouts
![Page 34: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/34.jpg)
Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements.
Design Product Layouts: Design Product Layouts: Line BalancingLine Balancing
![Page 35: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/35.jpg)
Cycle time is the maximum time allowed at each workstation tocomplete its set of tasks on a unit.
Cycle TimeCycle Time
![Page 36: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/36.jpg)
D
OT = timecycle = CT
rateoutput Desired= D
dayper timeoperating OT
CT
OT = rateOutput
D
OT = timecycle = CT
rateoutput Desired= D
dayper timeoperating OT
CT
OT = rateOutput
Determine Maximum OutputDetermine Maximum Output
![Page 37: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/37.jpg)
task timeof sum = t
CT
t)( =N
Determine the Minimum Number Determine the Minimum Number
of Workstations Requiredof Workstations Required
![Page 38: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/38.jpg)
Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements
A Simple Precedence Diagrama b
c d e
0.1 min.
0.7 min.
1.0 min.
0.5 min. 0.2 min.
Figure 6.10Precedence DiagramPrecedence Diagram
![Page 39: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/39.jpg)
Arrange tasks shown in Figure 6.10 into three workstations. Use a cycle time of 1.0 minute Assign tasks in order of the most number
of followers
Example 1: Example 1: Assembly Line BalancingAssembly Line Balancing
![Page 40: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/40.jpg)
Workstation
TimeRemaining
EligibleAssignTask
RevisedTime Remaining
StationIdle Time
1 1.0
0.9
0.2
a, c
c
none
a
c
-
0.9
0.2
0.2
2 1.0 b b 0.0 0.0
3 1.0
0.5
0.3
d
e
-
d
e
-
0.5
0.3 0.3
0.5
Example 1: SolutionExample 1: Solution
![Page 41: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/41.jpg)
Percent idle time = Idle time per cycle
(N)(CT)
Efficiency = 1 – Percent idle time
Calculate Percent Idle TimeCalculate Percent Idle Time
![Page 42: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/42.jpg)
Assign tasks in order of most following tasks. Count the number of tasks that follow
Assign tasks in order of greatest positional weight.
Positional weight is the sum of each task’s time and the times of all following tasks.
Some Heuristic (intuitive) Rules:
Line Balancing RulesLine Balancing Rules
![Page 43: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/43.jpg)
c d
a b e
f g h
0.2 0.2 0.3
0.8 0.6
1.0 0.4 0.3
Example 2Example 2
![Page 44: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/44.jpg)
Station 1 Station 2 Station 3 Station 4
a b ef
d
g h
c
Solution to Example 2Solution to Example 2
![Page 45: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/45.jpg)
1 min.2 min.1 min.1 min. 30/hr. 30/hr. 30/hr. 30/hr.
Bottleneck
Bottleneck WorkstationBottleneck Workstation
![Page 46: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/46.jpg)
Parallel WorkstationsParallel Workstations
1 min.
2 min.
1 min.1 min. 60/hr.
30/hr. 30/hr.
60/hr.
2 min.
30/hr.30/hr.
Parallel Workstations
![Page 47: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/47.jpg)
Information Requirements:
1. List of departments
2. Projection of work flows
3. Distance between locations
4. Amount of money to be invested
5. List of special considerations
6. Location of key utilities
Designing Process LayoutsDesigning Process Layouts
![Page 48: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/48.jpg)
1 3 2
30
170 100
A B C
Figure 6.12
Example 3: Example 3: Interdepartmental Work FlowsInterdepartmental Work Flows
for Assigned Departmentsfor Assigned Departments
![Page 49: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/49.jpg)
Any Question.????Any Question.????
![Page 50: Process Selection and Facility Layout](https://reader033.vdocuments.mx/reader033/viewer/2022061122/54710113b4af9fda338b4586/html5/thumbnails/50.jpg)