Basic ConceptsBasic Terminologies
Concept of Project Management Introduction to Primavera 3.0 & Maintenance
An IntroductoryPresentation
OnProject Management
& Primavera (Version 3.0)
![Page 2: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/2.jpg)
Basic Concepts
![Page 3: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/3.jpg)
Basic Concepts
What is a Project ???
• Unique, one-time event• Specific start and end dates• Work scope with definable tasks• Allocated resources• Projected budget or cost• Tangible set of deliverables
![Page 4: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/4.jpg)
Challenges in Project Management
Challenges to project management in executing “one offone off” multi-disciplinary projects are different from those encountered in production planning.
Regular Production line
Same environmentSame peopleSame productSame technique
Projects
Different environmentDifferent peopleDifferent productDifferent technique
![Page 5: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/5.jpg)
Basic Terminologies
![Page 6: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/6.jpg)
Basic Terminologies
Activity:Activities represent work to be done in order to complete a project.
OD (Original Duration) and RD (Remaining Duration):The estimated time required to complete an activity iscalled OD. The amount of time left to complete anactivity after it has started is known as RD (RemainingDuration).
![Page 7: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/7.jpg)
Predecessor:The activity that effects start or finish dates ofother activities (successor activities).
Predecessor
Successor
Basic Terminologies
![Page 8: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/8.jpg)
Successor:The activity for which start or finish dates are
dependent on other activities (predecessor activities).
Predecessor
Successor
Basic Terminologies
![Page 9: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/9.jpg)
Relationship: Any sort of connection between two activities is known as relationship. Generally there are four types of relationships:
SS (Start to Start) FS (Finish to Start) FF (Finish to Finish) SF (Start to Finish)
Basic Terminologies
![Page 10: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/10.jpg)
Lag : Lag staggers or delays the relationship of one activity
(predecessor) to another (successor).
Basic Terminologies
![Page 11: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/11.jpg)
SS – Relationship between activities in which the start of a successor activity depends on the start of its predecessor.
Start-to-start
Start-to-start with lag
Predecessor
Successor
Predecessor
SuccessorB
A
B
A
Lag
Basic Terminologies
![Page 12: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/12.jpg)
FS – Relationship in which the start of successor activity depends on the completion of its predecessor activity.
Predecessor
Successor
Predecessor
SuccessorB
A
B
A
Finish-to-start with lag
Finish-to-start
Basic Terminologies
![Page 13: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/13.jpg)
FF – Relationship in which the finish of successor activity depends on the finish of its predecessor activity.
Predecessor
Successor
Predecessor
SuccessorB
A
B
A
Finish-to-Finish with lag
Finish-to-Finish
Lag
Basic Terminologies
![Page 14: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/14.jpg)
SF – Relationship in which the finish of successor activity depends on the start of its predecessor activity.
Predecessor
SuccessorB
A
Start-to-Finish with lag
Start-to-Finish
Predecessor
SuccessorB
A
Lag
Basic Terminologies
![Page 15: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/15.jpg)
ES (Early Start) and EF (Early Finish) dates:
Earliest possible date by which an activity can be started / finished.
LS (Late Start) and LF (Late Finish) dates: Latest possible date by which an activity can be started /
finished.
Basic Terminologies
![Page 16: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/16.jpg)
AS (Actual Start) and AF (Actual Finish) dates:
Actual Start and Actual Finish dates are the dates on which an activity has actually started and finished.
Basic Terminologies
![Page 17: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/17.jpg)
TF (Total Float):Duration, measured in planning units, the activity can be delayed without affecting the project finish date.
Negative or zero Total Float indicates that timely completion of the activity is critical to the completion of the project. Such activities are called Critical Activities.
FF (Free Float):The amount of time, measured in planning units, the early start of an activity can be delayed without delaying early start of a successor activity. Such activities are called Non-critical Activities.
Basic Terminologies
![Page 18: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/18.jpg)
Constraints:Constraints are ground realities that over-rule the logical start and finish time of the activity.
For example: A certain piece of equipment will be received on, say, 25th of March. That equipment’s erection activity cannot be started before 26th of March irrespective of the fact that the foundation will be ready by 15th of March.
So we will simply put a constraint to this activity that it cannot start before 26th of March. Similarly concreting work cannot be easily done in winter months in regions where temperature goes below freezing during winter.
Basic Terminologies
![Page 19: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/19.jpg)
Various types of constraints can be used but most
commonly used are as follows:▫Start No Earlier Than - This type of constraint is applied to restrict that activity to start before a certain date▫Start No Later Than - This type of constraint is applied to restrict that activity from starting beyond a certain date▫Finish No Earlier Than - This type of constraint is applied to restrict
that activity to finish before a certain date.▫Finish No Later Than - This type of constraint is applied to restrict
that activity to finish beyond a certain date.▫Start On - To impose a compulsory start date to that activity.▫Finish On - To impose a compulsory finish to that activity.
Basic Terminologies
![Page 20: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/20.jpg)
Critical Activity: An activity that has potential of delaying a project is called a critical
activity. Such activities possess total float equal to zero or even less.
Critical Path: Chain of critical activities that has potential of delaying a project is called Critical Path.
Critical Path Method (CPM): A network analysis technique used to predict project duration, by
analyzing which sequence of activities (which path) has the least amount of scheduling flexibility (the least amount of float).
Basic Terminologies
![Page 21: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/21.jpg)
Critical Path
Predecessor
Successor
Predecessor
A
CES = 1 EF = 10
OD = 10
FS Lag = 0 ES=15 OD=6 EF=20
FS Lag=0
ES=1 OD=14 EF=14
B
Activity B and C are on critical path because :
1. These are forming the longest chain (14 days + 6 days = 20 days)
2. Any delay in any of the activity on critical path will cause a delay of the whole project
Basic Terminologies
![Page 22: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/22.jpg)
Scheduling:The process of calculating start and end dates of the activities. This process is carried out in two passes i.e. Forward Pass & Backward Pass.
Forward Pass:The process of calculating start and finish dates of each activity starting from the project start date.This process generates early start and early finishdates for each activity.
Basic Terminologies
![Page 23: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/23.jpg)
Backward Pass:The process of calculating finish and start dates of each activity starting from the project finish date.This process generates Late Start and Late Finishdates for each activity.
Data Date:The point in time that separates actual (Historical) data from future (Scheduled) data.
Basic Terminologies
![Page 24: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/24.jpg)
Man-Hours: It is yardstick for measurement of effort. For example, 4
Man-Hour will mean any of the following:▫1 man working for 4 hours▫2 men working for 2 hours▫4 men working for 1 hour
Standard Man-Hours: Estimated effort per unit required to perform a job in
terms of man-hours.
Basic Terminologies
![Page 25: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/25.jpg)
Earned / Achieved Man-Hours: It is amount of work executed in terms of standard man-
hours.
Project / Budgeted Man-Hours: Total number of man-hours required to execute a project.
Actual Man-Hours: It is the man-hours actually utilized to execute work.
Basic Terminologies
![Page 26: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/26.jpg)
Original (Target / Base Line) Plan: A plan showing all activities as foreseen at start of the project.
Latest Forecast Plan: Revised / Updated Plan showing expected dates for balance
activities at certain point in time during project life span.
Efficiency: It is the ratio of earned man-hours to actual man-hours.
Productivity: It is number of work units produced per man-hour spent.
Basic Terminologies
![Page 27: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/27.jpg)
Budgeted Cost: Total estimated cost approved for execution of a project.
Cost at Completion: The expected total cost at completion of an activity or a
project. Cost at completion is estimated periodically during course
of project execution.
Basic Terminologies
![Page 28: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/28.jpg)
Program Evaluation and Review Technique (PERT):
An event oriented network analysis technique used to estimate project duration when there is a higher degree of uncertainty with the individual activity duration estimates. PERT applies the Critical Path Method (CPM) to a weighted average duration estimates.
Gantt Chart: A graphic display of schedule-related information listing project
elements on left side of the chart, dates across the top and activity durations are shown as date-placed horizontal bars. It is also known as Bar Chart.
Basic Terminologies
![Page 29: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/29.jpg)
PERT
![Page 30: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/30.jpg)
GANTT
![Page 31: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/31.jpg)
Cost Center: Cost Center is the lowest identifiable/measurable activity against
which costs incurred can be booked.
Direct Cost: Cost which can be clearly attributed to the activity performed is
know as Direct Cost. That cost is also called Variable Cost because it is dependent on quantity of work performed.
Indirect Cost: Cost which cannot be clearly attributed to specific activity is know as indirect cost . It is also known as Fixed Cost because these are incurred irrespective of the quantity of the work performed.
Basic Terminologies
![Page 32: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/32.jpg)
Resource:
▫Anything that is required to perform an activity is called a resource
▫Resources can be Manpower, Equipment and Materials
Basic Terminologies
![Page 33: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/33.jpg)
Project Management
![Page 34: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/34.jpg)
Objectives of Project Management
•Timely completion of the Project •Budgetary Control so as to complete the Project within the
budgetary provisions established by the Company. •Ensure quality of works as required under the Contract. •Maintain established standards of Health, Safety and
Environment at the work places.
![Page 35: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/35.jpg)
Dependency Cycle
Engineering Procurement Construction
Excellent communication between each phase is extremely important
![Page 36: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/36.jpg)
Project Management Cycle
Plan Organize
DirectControl
![Page 37: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/37.jpg)
Project Management Phases
Two Phases of Project Management:
•Planning•Control
![Page 38: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/38.jpg)
Planning• Identify activities to be done• Identify milestones•Define WBS and OBS•Decide/calculate duration of activities•Decide sequence of activities•Decide resources•Prepare cost budget
![Page 39: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/39.jpg)
Work Breakdown Structure
•Breaking down a long and complex project into work packages of smaller duration and complexity.
•A properly planned WBS delivers the following benefits:▫The project can be planned systematically▫Resources can be effectively scheduled ▫Work teams can be assigned responsibilities▫Costs and budget elements can be compared
![Page 40: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/40.jpg)
Work Breakdown Structure
1. Project
1.1 Construction
1.1.1 Discipline
1.1.1.1 Zone/Area
1.1.1.1.1 Cost Center/Activity
![Page 41: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/41.jpg)
Organization Breakdown Structure
•Represents a project organization structure that matches with WBS.
•Facilitates better control through mini projects within large and complicated projects.
•Defines responsibility for each level of WBS.
![Page 42: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/42.jpg)
Organization Breakdown Structure
PROJECT/SITE MANAGER
AREA I/C
Engr. Civil
Engr. Piping (
Engr. Equip.
AREA I/C #1
Engr. Civil (area #1)
Engr. Piping
Engr. Equip.
Engr. Piping
Engr. Equip.
AREA I/C #2
Engr. Civil Const. Mngr. - Civil
Const. Mngr.- Mech.
Const. Mngr.- Elec.
![Page 43: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/43.jpg)
LEVELS OF PLAN
LEVEL - LEVEL - 11 PLAN: PLAN: Sequence of major phases e.g., E, P & C inter-phase, or Civil, Mechanical & Electrical sequences.
![Page 44: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/44.jpg)
LEVEL-1 PLAN
![Page 45: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/45.jpg)
LEVELS OF PLAN
LEVEL – LEVEL – 22 PLAN: PLAN:Breaks major phases into geographic distribution (Zone/Area)and/or disciplines e.g., Piping, Structure, Foundation, etc.
![Page 46: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/46.jpg)
LEVEL-2 PLAN
![Page 47: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/47.jpg)
LEVELS OF PLAN
LEVEL - LEVEL - 33 PLAN: PLAN: Breaks all discipline activities into Cost Centers
![Page 48: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/48.jpg)
LEVEL-3 PLAN
![Page 49: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/49.jpg)
LEVELS OF PLAN
LEVEL - 4 PLAN: Further breaks down work into smaller activities e.g., material withdrawals from stores, layout, tacking, welding, Q.C checks, etc.
![Page 50: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/50.jpg)
LEVEL-4 PLAN
![Page 51: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/51.jpg)
Resource Allocation & Leveling
Resources required may include:
•Manpower•Tools & Plants•Direct materials•Consumables•Special jigs & fixtures
![Page 52: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/52.jpg)
•Resource requirement should be a smooth curve i.e. ; gradual increase till it reaches its peak, maintains peak for required period and then gradually decrease till project is completed.
•Resource Leveling is done in P3.
Resource Allocation & Leveling
![Page 53: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/53.jpg)
![Page 54: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/54.jpg)
![Page 55: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/55.jpg)
![Page 56: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/56.jpg)
![Page 57: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/57.jpg)
Definition of Maintenance: All actions which have the objective of retaining or
restoring an item in or to a state in which it can perform its required function. These actions include combination of all technical and corresponding administrative, managerial & supervision activities
Types of Maintenance: i. Corrective Maintenance ii. Preventive Maintenance
![Page 58: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/58.jpg)
Corrective Maintenance: Type of maintenance where equipment is maintained after break
down. This maintenance is often expensive because worn equipment can damage other parts & cause multi damages
Preventive Maintenance: Where equipment is maintained before breakdown occurs. This type has many variations & is subject of various researches to
determine best & most efficient way to maintain equipment.
Recent studies have shown that preventive maintenance is effective in preventing age related failures of equipment
![Page 59: Primavera Presentation](https://reader033.vdocuments.mx/reader033/viewer/2022061121/546efe5fb4af9f530f8b45bb/html5/thumbnails/59.jpg)
Thank You Very Much…..