Presented by Keith
SchaberPresident
![Page 3: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/3.jpg)
ROOFS THROUGHOUTOREGON
CAN, DO, AND SHOULDLAST 25 - 40 YEARS
(Even in low tax rate Districts)
![Page 4: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/4.jpg)
RADICAL IDEAS Insure Roofs
Override Convention Reverse the Roles of Attorneys Enlist Taxpayers as Advocates
![Page 5: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/5.jpg)
RESPONSIBILITYAVERSION FOR ROOFS
ISCONTAGIOUS
![Page 6: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/6.jpg)
WHY DO WE HAVE RESPONSIBILITY ISSUES RIGHT FROM THE START
Every Salesman.... sells his own stuffAND
Every Design Discipline Designs...From Their Own Perspective
ANDEvery Trade That Works on the Roof...
Acts on Their OwnUNLESS
All Parties are Held Responsible for How Their Work & Designs Impact Roof Performance
Wouldn’t This be a Good Time for a Roof Success Co-ordination Meeting with All Parties?
![Page 7: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/7.jpg)
A Roof “Assembly” is: All of the components necessary to keep water out of the building from the “roof” covering.
AndAll of the components necessary to keep water out of the roof “assembly” from the
inside.
WHAT IS A ROOF “ASSEMBLY”?
AND WHAT DOES IT DO?
A roof failure is a failure of any roof assembly component, regardless of it’s location OR who installed it.
![Page 8: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/8.jpg)
CHAPTER 15ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
Oregon Structural Specialty Code
DEFINITIONROOF ASSEMBLY; A system designed
to provide weather protection and resistance to wind loads. A roof assembly
includes the roof deck, vapor retarder, substrate or thermal barrier, insulation
and roof covering.
![Page 9: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/9.jpg)
WHO IS RESPONSIBLE FOR THE ROOF ASSEMBLY?
• Decking, plumbing, sheet metal, seismic anchors, HVAC, electrical, skylights and insulation are part of a ROOF ASSEMBLY.
• Carpenters, Electricians, Welders, HVAC Contractors, Plumbers, Sheet Metal Workers, and General Contractors work impacts the ROOF ASSEMBLIES PERFORMANCE.
• Manufacturers, Mechanical Engineers, Structural Engineers and Architects designs affect the long term performance of the roof assembly.
Roofers play a very small part compared to the whole…..
![Page 10: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/10.jpg)
DISTRICTS ARE CONSTANTLY PRESSURED BY MANY PARTIES
Have you heard of any of these…• Ours is the best- It’s new, cheap, looks good, works well every place and installs in any kind of weather• We’ve got a building to build- We want a roof we can install in any kind of weather.• We’ve got a guaranteed maximum price – we didn’t budget for all the stuff you want• We’ve got to have a roof that looks this way- don’t ruin your schools great design
YOU HAVE THE SAME RIGHTS AS ANY CONSUMER… TO GET WHAT MEETS YOUR NEEDS
![Page 11: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/11.jpg)
What Nobody Wants to Say….
WELL-INTENIONED, SCHOOL BOARDS ACTING WITHOUT
AN INDEPENDENT ADVOCATEARE FREQUENTLY “MISSINFORMED”
![Page 12: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/12.jpg)
REPORT CARDS FOR
ARCHITECTS CONTRACTORS
AND MANUFACTURERS
![Page 13: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/13.jpg)
USE STATISTICS NOT SALES OR COST
FOR ROOF SELECTION
Statistics That Verify Roof Performance
![Page 14: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/14.jpg)
ROOFING FACT
THE MOST COMMON SOURCE FOR “TECHNICAL” INFORMATION COMES FROM SALESMEN WHO CARRY NO
PROFESSIONAL LIABILITY INSURANCEAND HAVE NO CONTRACTURAL
AGREEMENTS WITH THE DISTRICT OR THE ARCHITECTS THEY WORK FOR
![Page 15: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/15.jpg)
1. Seldom meets code for wind, slope, vapor retarder, puncture resistance, and plumbing.
2. Requires additional insulation to be equal in energy efficiency to fully adhered assemblies.
3. Fosters condensation where ponding water occurs without adequate insulation or venting between vapor barrier and roof covering.
4. Poor base of financially responsible contractors with good performance records.
5. Spotty service performance.
Currently, mechanically attached recovers are the cheapest and riskiest to install and poorest in energy conservation in Oregon.
OREGON’S MOST POPULAR“REROOF”/RECOVER FOR SCHOOLS
![Page 16: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/16.jpg)
CONTINUNING EDUCATION CLASSES
FOR ARCHITECTS
CONTRACTORS AND ROOF-RESPONSIBLE DECISION-MAKERS
![Page 17: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/17.jpg)
HIRING “LOCALS”CAN BE A COSTLY
POLICY COMPARED TO CORRECT
SOLUTIONS FOR ROOF LOCATION
![Page 18: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/18.jpg)
MAKING EXCEPTIONSSELDOM, IF EVER
IS A SUCCESSFUL LONG TERM SOLUTION
![Page 19: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/19.jpg)
IN OREGON BEING COOL COSTS,
NOT SAVES,ENERGY AND MONEY
![Page 20: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/20.jpg)
THE NEED FOR FULL DISCLOSUREWHAT YOU DON’T KNOW MAY COST YOU!
1. Has anyone discussed the 3 ways of installing roofs and their impact on
energy or condensation.2. Has anyone discussed roofing over
vented spaces and the needed re-engineering required for cool roofs.
3. Has anyone disclosed how pondingwater on cool roofs can create condensation.
![Page 21: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/21.jpg)
< Re-RoofingSpecific Repairs $4,590Metal Mansard Repair $8,820Re-roofing $802,050Spread over 7 years$815,460
Maintenance Option >Specific Repairs $4,590Maintenance System $156,310Metal Mansard Repair $8,820Re-roofing $45,000Spread over 4 years $214,720
North ClackamasSetting StandardsProvides Phenomenal Options
Options Shouldn’t Be Kept a Secret
![Page 22: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/22.jpg)
WITH ADVOCATE….
North Valley High School 19 Years After Installation
Will Last Another 10-12 Years
![Page 23: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/23.jpg)
WHY DISTRICTS NEED COMMISSIONING
Neither Decking Damage or Advice Were Covered by Manufacturers Warranty
![Page 24: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/24.jpg)
WHY DISTRICTS NEED AN ADVOCATE
Roofer Was Paid by District to Roof Over Gravel With Insurance Money
![Page 25: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/25.jpg)
MANDATORYCODE
ENFORCEMENT
Changing the Code if Necessary
![Page 26: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/26.jpg)
CODES DO NOTAPPLY TO ONE KIND
OF ROOF ASSEMBLY…AND NOT TO
ANOTHER
![Page 27: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/27.jpg)
ROOF ASSEMBLIES IN OREGON NEED VAPOR RETARDERS
This new school had 2 kinds of roof assemblies..The insulation under the built-up roof assembly
had a vapor retarder.The insulation under the metal roof assembly had none..
![Page 28: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/28.jpg)
CODE COMPLIANCE1312.1.4 Moisture Control. A 1-perm vapor retarder shall be installed on the warm side (in winter) in all exterior floors, walls and ceilings of heated buildings.
MOST SCHOOLS IN OREGON ARE HEATED
(There is only one exception which is for insulation installed in ceilings in an existing structure and where ventilation has been provided as specified in Section 1203).
![Page 29: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/29.jpg)
CODE COMPLIANCEROOF DRAINAGESECTION 1504.1
ROOF DRAINAGE. Roofs shall be sloped a minimum of 1 unit vertical in 48 units horizontal (2-percent slope) for drainage unless designed for water accumulation in accordance with Section 1611.2 and approved by the building official. (requires verification to preclude progressive deflection)
SECTION 1504.3Overflow drains and scuppers. Drains must have overflows, the same size as the drain or overflow scuppers three times the size of the drain with minimum height of 4”.
![Page 30: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/30.jpg)
ROOFING FACT
GUARANTEES ARE WRITTEN BYATTORNEYS WHOSE SOLE JOB IS TO LIMIT THEIR EMPLOYER’S
LIABILITY
Your Attorney’s Know Legalese, butThey probably don’t know roofing too well…
![Page 31: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/31.jpg)
ASSURE THAT ATTORNEYS WRITE GUARANTEES THAT PROTECT SCHOOLS’
INTERESTS
![Page 32: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/32.jpg)
ASHLAND EXPERIENCE
Roof Prioritization Were Misidentified by Architect/Salesman Based On The Assumption That New Roofs Had To
Be Better Than Old Ones.
Old Roofs Were Best – New Ones Were Not The Best.
![Page 33: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/33.jpg)
ASHLAND EXPERIENCEPasses Bond Levy With Reroofing Projects
Prioritized by Salesman for Architect With No Budgets For Repairs or Maintenance
Roof recovers developed mold within a few years. The mold, of course, was not covered by their warranty.
![Page 34: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/34.jpg)
ASHLANDS “LUCK”Hailstorm Damages New Roofs
Insurance Paid for Replacement of New RoofsWhich Did Not Meet Code for Impact Resistance
Which Could Have Resulted in Claim Denial
![Page 35: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/35.jpg)
ASHLANDS NEW CONSTRUCTION EXPERIENCEArchitect and General Contractor Told District Their Request For Winter Time
Construction Methods Were Cost Prohibitive
Their Winter Time “Friendly” Roof Resulted in Condensation and Leak Problems. Neither
Were Covered by Warranty.
![Page 36: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/36.jpg)
ASHLAND’S ONGOING EXPERIENCE
•Manufacturer’s refusal to honor warranties for both roofs and roof maintenance systems.
•Architect’s refusal to comply with District’s Standards and reluctance to be responsible for the decisions they forced on District.
•General Contractor’s insistence to stay on schedule at roofs thus districts expense.
•Roofs in District with commissioning in design are out performing roofs with none.
![Page 37: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/37.jpg)
EVERYONE DOING ANYTHING RELATING TO A SCHOOLS’
ROOF…
SHOULD PLAY ON THE SAME TEAM!!
Does it leave room for opinions? YesDoes it leave room for options? Yes
Does it leave room for code violations? No
STATEWIDE STANDARDS
![Page 38: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/38.jpg)
EVERYONE DOING ANYTHING TO A SCHOOLS’ ROOF MUST PROVIDE ROOF THAT:
•Meet Code•Are Correctly Designed•Have proven to last 20 or more years•Are Correctly Installed•Have Realistic Guarantees•Will Not Void Guarantee
STATEWIDE STANDARDS
![Page 39: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/39.jpg)
PERFORMANCE CRITERIA
1. Roof assemblies code compliant for its location for new construction, recovers and reroofing.
2. Roof assemblies that are energy efficient.3. Roof assemblies with a verifiable record of long
term performance of 20 or more years. 4. Practical resistance to vandalism or other roof
traffic.5. Installed by financially responsible contractors
capable of bonding project(s) including verifiable record of exemplary performance.
STATEWIDE STANDARDS
![Page 40: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/40.jpg)
• Request code changes with consistent interpretation andenforcement of codes throughout the state.*
• Gain state support for mandatory roofing education for architects.
• Develop State of Oregon Roof Warranties for manufacturers.*
• Partner with State of Oregon Building Codes Agency, PACE (legislatively-funded insurance carrier for Oregon public agencies), City of Portland, and
OSFMA (Oregon School Facilities Managers Association) to educate and promote common sense, code compliant roofing industry standards
• Conduct education programs for Oregon Bar Association.
THERE ARE SOLUTIONS
![Page 41: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/41.jpg)
PUBLICIZESCHOOLS’
PLIGHT
In the Press and at the Legislature
![Page 42: Presented by Keith Schaber President](https://reader035.vdocuments.mx/reader035/viewer/2022062310/568163c7550346895dd4fa42/html5/thumbnails/42.jpg)
IF WE FAIL TO COMMUNICATE WITH EACH OTHER
THE CHANCES FOR FAILUREINCREASE
EXPOTENTIALLY