![Page 1: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/1.jpg)
Practical Tipson Implementing the
Eco-Logical Approach Live WebinarNovember 10, 20162:30 – 3:30 PM EST
![Page 2: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/2.jpg)
2
TThe Implementing Eco-Logical Practitioner’s HandbookKate KurganAASHTO
![Page 3: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/3.jpg)
3
WWelcome to the Webinar!
• All attendees on listen only mode
• Questions can be submitted in ‘chat’ window of your control panel to the right
• Responses provided at the end of webinar
• Poll
![Page 4: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/4.jpg)
4
PPractitioner’s Handbook: Developed through SHRP2 Collaboration
• SHRP2 partnership – AASHTO & FHWA
• Provide technical information in usable format
• Visit our SHRP2 websites
• http://shrp2.transportation.org/Pages/default.aspx
• https://www.fhwa.dot.gov/goshrp2/
![Page 5: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/5.jpg)
5
Second Strategic Highway Research Program (SHRP2) & Its Focus Areas
• Safety: Fostering safer driving through analysis of driver, roadway and vehicle factors in crashes, near crashes, and ordinary driving.• Renewal: Rapid maintenance and repair of the deteriorating infrastructure using already-available resources, innovations, and technologies.• Capacity: Planning and designing a highway system that offers minimum disruption and meets the environmental, and economic needs of the community.• Reliability: Reducing congestion and creating more predictable travel times through better operations.
![Page 6: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/6.jpg)
6
AAASHTO PPractitioner’s HHandbooks
• http://www.environment.transportation.org/center/products_programs/practitioners_handbooks.aspx
New #16
![Page 7: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/7.jpg)
7
RReview Panel for Practitioner’s Handbook• Margaret Barondess, Michigan DOT
• Kendall Wendling, North Central Texas COG
• Sonna Lynn Fernandez, Idaho Transportation Department
• David Williams, FHWA
• Mike Ruth, FHWA
• Marlys Osterhues, FHWA
• William Malley, Perkins Coie LLP
• Kate Kurgan, AASHTO
• Additional AASHTO, FHWA, and Volpe staff
![Page 8: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/8.jpg)
8
TToday’s Agenda• Introduction to Eco-Logical and Overview of Practitioner’s
Handbook Format •Kate Kurgan, AASHTO
• Examples of Applying Eco-Logical•Margaret Barondess, Michigan DOT•Craig Casper, Pikes Peak Area COG• Judy Gates, MaineDOT
• Questions and Answers
![Page 9: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/9.jpg)
9
SSHRP2 Implementing Eco-Logical
• Landscape-scale approach to transportation project development.
• Transportation agencies collaborate during the planning process.
• Lead to agreed-upon mitigation strategies and timely permit decisions.
![Page 10: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/10.jpg)
10
IImplementing Eco-Logical Steps1. Build collaborative partnerships & vision2. Characterize resource status3. Create REF4. Assess effects on conservation5. Identify & Prioritize actions6. Develop crediting strategy7. Develop agreements8. Implement agreements9. Update REF over time
tions
![Page 11: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/11.jpg)
11
CContent
• Overview
• Background Briefing
• Key Issues to Consider
• Practical Tips
• Reference Materials
![Page 12: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/12.jpg)
12
OOverview and Background Briefing
• Overview
• Outlines the goals of Eco-Logical
• Background Briefing•Regulations•Policies•Guidance•Programs (PEL)
![Page 13: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/13.jpg)
13
Key Issues to Consider
• Overview
• Outlines the goals of Eco-Logical
• Background Briefing•Regulations•Policies•Guidance•Programs (PEL)
![Page 14: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/14.jpg)
14
PPractical Tips• Summary
• Goals of each step
• Narrative description
![Page 15: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/15.jpg)
15
EEco--LogicalOnline
• https://www.environment.fhwa.dot.gov/ecological/implementingecologicalapproach/default.asp
![Page 16: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/16.jpg)
16
II-75 Corridor Conservation PlanMargaret BarondessMichigan Department of TransportationEnvironmental Services Section
![Page 17: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/17.jpg)
17
HHow do you get started with the Eco-Logical Approach?
1. Build/strengthen collaborative partnerships
2. Integrate ecosystem status, data, and goals
3. Create a regional ecosystem framework
4. Assess regional ecosystem framework
5. Establish and prioritize ecological actions
6. Develop a crediting strategy
7. Develop programmatic agreements and consultations
8. Implement agreements and deliver projects
9. Update regional ecosystem framework
![Page 18: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/18.jpg)
18
PPractitioner’s HandbookPractical Tips
• Goals & Summary•Geographic areas•Team Responsibilities•Documentation•Mapping Tools•Resources
![Page 19: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/19.jpg)
19
![Page 20: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/20.jpg)
20
SStudy Location
• Maumee Lake Plain
• Glacial lake bed
• Flat, poorly drained soils
• Between two high density urban centers (Detroit and Toledo)
• Abundance of exotic species
![Page 21: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/21.jpg)
21
II-75 Reconstruction
• Busiest truck route
• Aging pavement
• Total reconstruction
• $500 million
• 5 phases
![Page 22: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/22.jpg)
22
TTechnical Advisory
![Page 23: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/23.jpg)
23
• To develop and implement a Collaboratively-based Landscape Scale
Conservation Plan that facilitates rebuilding the I-75 Corridor while
maximizing conservation and restoration outcomes in the region.
GGoal of the Project
![Page 24: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/24.jpg)
24
WWhat were the benefits of building partnerships?
• Regional level data sharing and organization
• Improved resource agency and public perception of MDOT
• Better mitigation options
• More predictable permitting
![Page 25: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/25.jpg)
25
OOutcome of Partnering: Wetland Mitigation
![Page 26: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/26.jpg)
26
OOutcome of Partnering: Public Outreach
![Page 27: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/27.jpg)
27
OOutcome of Partnering: Better Mitigation
• 16,000 state threatened plants in the Right of Way
![Page 28: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/28.jpg)
28
PPartnership Agreements
MDOT/MDNR Master
GIS
MDEQ/MDNR/MDOT Wetland Mitigation
![Page 29: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/29.jpg)
29
WWhat were the key factors of our success?
• A dedicated core team with the right mix of knowledge and skills
• Extensive outreach to state and federal regulatory agencies, non-profit organizations and local experts
• Appealing to a larger sense of purpose in tackling water quality problems in the Western Lake Erie Basin.
• Support from the leadership and project development staff at MDOT
![Page 31: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/31.jpg)
31
EEco-Logical at Work in Long-term MitigationCraig CasperPikes Peak Area Council of Governments
![Page 32: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/32.jpg)
32
HHow do you get started with the Eco-Logical Approach?
1. Build/strengthen collaborative partnerships
2. Integrate ecosystem status, data, and goals
3. Create a regional ecosystem framework
4. Assess regional ecosystem framework
5. Establish and prioritize ecological actions
6. Develop a crediting strategy
7. Develop programmatic agreements and consultations
8. Implement agreements and deliver projects
9. Update regional ecosystem framework
![Page 33: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/33.jpg)
33
PPractitioner’s HandbookPractical Tips
• Goals & Summary•Planning Scenarios• Impact Assessment•Prioritize Actions
![Page 34: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/34.jpg)
34
![Page 35: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/35.jpg)
35
CColorado Springs MPO Planning Boundary
• Test
• Text
• Text
• Text
Colorado
![Page 36: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/36.jpg)
36
59 conservation targets were chosen for the project: 23 plants, 2 amphibians, 3 reptiles, 12 mammals, 9 birds, 3 fish, 5 insects, 1 mollusk, plus CNHP Potential Conservation Areas (PCAs).
Create 3 scenarios: Existing, and 2 futures.
Produce a single land use classification and compatibility scheme that would meet all analysis needs.
Forecast growth to year 2035.
22006-2008Process
![Page 37: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/37.jpg)
37
22009--22012
![Page 38: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/38.jpg)
38
SSHRP2 - 2013-2015Development of Regional Advance Mitigation Plan
“I’ll gladly repay you Tuesday , for a hamburger today” - Wimpy
Project Purpose
• Identify potential conservation impacts and opportunities
• Provide a framework to collaborate on mitigation needs
• Conserve and connect important habitats
• Streamline permitting processes
• Integrate planning and decision making between agencies
• Consider both on-site and off-site mitigation opportunities
• Apply the regional ecosystem framework in decision making process
![Page 39: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/39.jpg)
39
AAgency Involvement
State Agencies
Colorado Department of Local AffairsColorado Parks and WildlifeColorado Open LandsColorado Department of Natural ResourcesColorado Department of Public Health and Environment
Federal Agencies
United States Environmental Protection AgencyUnited States Fish and Wildlife ServiceHousing and Urban DevelopmentBureau Land ManagementArmy Corps of EngineersColorado Department of TransportationMilitary Installations - Fort Carson
Local Agencies and Organizations
Fountain Creek Watershed Flood Control and Greenway DistrictSierra ClubPalmer Land TrustRocky Mountain Field Institute
![Page 40: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/40.jpg)
40
RResource Agency Roles
• Identify potential project opportunities
• Review and identify critical areas
• Identify potential opportunities to collaborate with existing sponsors of other projects
• Identify potential regulatory and non regulatory hurdles and barriers.
![Page 41: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/41.jpg)
41
EEnvironmental Ecosystem Framework MethodologyDevelop a database consisting of:• Transportation data – projects included in the 2040 RTP. • External project data - projects being proposed by other
agencies.• Mitigation data – includes conservation targets such as
wildlife, plants, and habitats.
Classify Mitigation Targets• Bin 1 – Federally listed candidate species• Bin 2 - Critically imperiled rangewide species• Bin 3 – Imperiled rangewide species and wetland and
riparian areas
External Project Data• Projects proposed by Advisory Committee Members and
other agencies.
![Page 42: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/42.jpg)
42
IIdentified Projects
PROJ_ID Project Name
Actual Impact Acres
Total Project Acres
% of Project Creating Impact
% Target Ac in Bin1
% Target Ac in Bin2
% Target Ac in Bin3
Impact Importan
ce
10 Academy Blvd. widening: Drennan Rd to Hwy 115 0.30 377.39 0.1% 0% 0% 100% 0.0
21Black Forest Road Improvements: Woodmen Rd. to HodgenRd. 46.98 793.01 5.9% 0% 0% 100% 4.5
27 Briargate Pkwy./Stapleton Rd. Connection 182.29 765.84 23.8% 0% 0% 100% 17.3
44Eastonville Rd. South Improvements: Meridian Ranch Rd. to Londonderry Dr. 11.58 40.90 28.3% 0% 0% 100% 1.1
52 Fontaine Blvd. Improvements: Easy St. to Marksheffel Rd. 175.31 377.78 46.4% 0% 0.1% 100% 16.7
55 Fountain Creek Regional Trail (#16) Construction 122.74 553.64 22.2% 11% 0% 89% 19.0
57 Fountain Creek Trail Bridge Repair 0.19 0.72 26.1% 100% 0% 0% 0.1
69 Historic Bridges Repair and Restoration 2.10 8.43 24.9% 100% 0% 0% 1.3
70Hodgen Rd. Improvements: Black Forest Rd. to Meridian Rd. and from Eastonville Rd. to Elbert Rd. 4.20 562.14 0.7% 0% 0% 100% 0.4
![Page 43: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/43.jpg)
43
RResults Summary
No of species identified
No of species impacts from RTP
Bin # Description
7 5 1 Federally listed & Candidate Species14 4 2 Critically imperiled rangewide
116 25 3 Imperiled rangewide
137 34Total Number of Mitigation Targets Impacted
• 52 RTP projects impacted one or more conservation targets
• 148 RTP projects did not impact any conservation targets
![Page 44: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/44.jpg)
44
BBenefits Using Regional Ecosystem Framework
1. Provides a framework to develop and prioritize projects that incorporates economic, community and environmental interests
2. Allows for better collaboration, improved understanding and buy in, and increased trust
3. Leads to integrated projects and improved outcomes
4. Provides a structure to identify and address complex issues early on in the planning process
5. Allows for streamlined permitting process for transportation projects
![Page 45: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/45.jpg)
45
LLessons Learned Using Regional Ecosystem Framework
• Make sure all interests are represented
• Use web based conferencing
• Define the roles of participants and goals of the project during kick off meeting
• Learn from past mistakes
• Identify milestones and decision points
• Cost of data and license agreements
• On line mapping tools
![Page 46: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/46.jpg)
46
MMeasures of Success
• Strengthen Collaborative Partnerships
• Getting resource agencies to agree on Regional Advance Mitigation Plan
• Develop agreements with resource agencies
• Eventual development of a Green Infrastructure Plan
![Page 48: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/48.jpg)
48
IImplementing Eco-Logical in a World of Schedules and SalmonJudy Gates, Director, Environmental OfficeMaine Department of Transportation
![Page 49: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/49.jpg)
49
AAtlantic Salmon
![Page 50: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/50.jpg)
50
Route 4
MaineDOT Culvert or Bridge Projects
![Page 51: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/51.jpg)
51
TThe Facts• Schedule (>85% on time) & budget (< 10% vs.
award) are two of MaineDOT’s “Capstone” performance measures
• Approximately 25% of stream projects per work plan year (~50) require consultation for Atlantic salmon
• Of those 50, about 10 require formal consultation with USFWS
• MaineDOT transportation liaison in place
• 7 consultations were completed by USFWS in 2014
• Section 7 is critical path on 100% of projects intersecting with Atlantic salmon
• Expectations vary widely ; design & construction methods do not
• ~98% of projects qualify for Categorical Exclusions
![Page 52: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/52.jpg)
52
HHow did we apply the Eco-Logical Approach?1. Build/strengthen collaborative partnerships
2. Integrate ecosystem status, data, and goals
3. Create a regional ecosystem framework
4. Assess regional ecosystem framework
5. Establish and prioritize ecological actions
6. Develop a crediting strategy
7. Develop programmatic agreements and consultations
8. Implement agreements and deliver projects
9. Update regional ecosystem framework
![Page 53: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/53.jpg)
53
The Plan 3.0Deliverable/Activity Timeframe
Gap analysis 6/2013 – 8/2013Draft modified REF 8/2013 – 9/2013Draft work flow map 9/2013 – 10/2013Design and construction BMPs 7/2013 – 12/2016
Programmatic Agreement 1/2014 – 3/2016
Draft ecosystem crediting strategy 10/2013 – 6/2016
Implementation Assistance 3/2015, 7/2015, 8/2015
Rank features along a corridor according to risk (Decision Support Tool)
3/2015 - 9/2015
Benefit-cost analyses of stream crossing sizing for habitat and hydrology using T-COAST
3/2015 - 10/2015
Automate DSTDetermine environmental risk gradient
9/2015 - 11/2015
Implementation schedule for full work plan 10/2015 – 12/2015
Final work flow map, crediting vehicle, and Programmatic Biological Assessment
11/2015 – 6/2016
2017
2017
2017
![Page 54: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/54.jpg)
54
![Page 55: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/55.jpg)
55
IImplementation Assistance Process
MaineDOT drafts PBA
FHWA establishes tasks
and schedule
IAP team facilitates 2-day
discussion
FHWA revises tasks and schedule
MaineDOT re-drafts PBA
FHWA Resource Center staff
provide 2-day implementation
assistance
MaineDOT, FHWA, USFWS re-draft
PBA
FHWA, USACE, and USFWS
review “final” PBA
USACE and FHWA formally submit PBA to USFWS
![Page 56: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/56.jpg)
56
HHow Implementing Eco-Logical Improved our Delivery
• We are now planning for a more sequential delivery process.
Safety-condition-
LOS
Scope-budget-schedule
Design Alternativesnegotiation
NEPA-Permitting
Deliver
Safety-condition-
LOS
RISK-alternatives-
BCA
Assurances-scope-budget-
scheduleNEPA Design
Deliver/permitting
Before…
After…
![Page 57: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/57.jpg)
57
WWhat were the key factors of our success?
• Understood our need through clear metrics• Focused, shared goal of a programmatic approach• Engaged our partners in a meaningful way• Dedicated staff advocates to see it through • MaineDOT management support – Chief Engineer• Dedicated Liaison Position (now two!)• USFWS management engagement from the middle
![Page 58: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/58.jpg)
58
• ~60% of the 17-18-19 work plan projects intersecting with ATS will qualify to use the PBO
• Consultation time under PBO cut from >8 mo to <15 days• Including USACE means not having to decide prematurely on
the flavor of funding• Project candidates screened face-to-face 3 years prior to work
plan• MaineDOT management support means we don’t argue
internally about money• Room left for discussions on locations and activities• Generate funding for meaningful species-specific habitat
restoration
WWhat using Eco-Logical delivered…
![Page 60: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/60.jpg)
60
RRecently Updated Practitioner’s Handbooks• 01 Maintaining a Project File and Preparing an Administrative Record for a
NEPA Study
• 02 Responding to Comments on an Environmental Impact Statement
• 03 Managing the NEPA Process for Toll Lanes and Toll Roads
• 06 Consultation Under Section 106 of the National Historic Preservation Act
• 07 Defining the Purpose and Need and Determining the Range of Alternatives for Transportation Projects
• 12 Assessing Indirect Effects and Cumulative Impacts Under NEPA
• 14 Applying the Section 404(b)(1) Guidelines in Transportation Project Decision-Making
![Page 61: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/61.jpg)
61
NNext Practitioner’s Handbooks: Coming Soon!
• Complying with Section 7 of the Endangered Species Act for Transportation Projects – November 2016
• Air Quality – January 2017
![Page 62: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/62.jpg)
62
QQuestions for the Panel?
• All attendees are on mute.
• To submit a question:• In GoTo Webinar control panel on the right of your screen.
•Type your question in the “Question” box.•Press “Send.”
![Page 63: Practical Tips - environment.transportation.orgenvironment.transportation.org/pdf/programs/... · Rank features along a corridor according to risk (Decision Support Tool) 3/2015 -](https://reader034.vdocuments.mx/reader034/viewer/2022050416/5f8c8d2582e29c1de70f138c/html5/thumbnails/63.jpg)
63
CContact Information
• Kate Kurgan, AASHTO•[email protected]•202-624-3635
• David Williams, FHWA•[email protected]•202-366-4074
• Margaret Barondess, Michigan DOT•[email protected]• (517) 335-2621
• Craig Casper, Pikes Peak Area Association of Governments
•[email protected]• (719) 471-7080 x105
• Judy Gates, MaineDOT• [email protected]• (207)-624-3100