Practical implementation of ALARA and ALARA tools

Vermeersch Fernand

Head of the Unit, Safety, Control and Environment

SCK•CEN, Hermann Debrouxlaan 40, Brussel October 5, 2007

Page 2: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

2

Background to the ALARA conceptThe ALARA procedurePractical implementationCommunication in ALARAToolsOrganisation

Contents

Page 3: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

3

Background to the ALARA conceptRisk and risk reduction

deterministic versus stochastic effects

Probability of health effects

Dose

X0 X1 X2

S0

S1S2

Dose

Expenditure

linear dose-effect relationship no threshold!

law of diminishing returns (glazing)

X1 – X0 S0 – S1

X2 – X1 = X1 – X0 S2 – S1

S2 – S1 < S0 – S1

Page 4: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

4

Background to the ALARA conceptreasonable risk reduction

• never infinite resources available!

need for optimisation

• two points are worthy to note:

• it is not the minimisation of doses at all costs

• even if there is a threshold

Probability of health effects

DoseT

ALARA not applicable

ALARA required

Page 5: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

5

Background to the ALARA conceptTolerable and Residual risk

Tolerable

risk Residual Risk

Dose limit

ALARA Level

Dose

ALARA stakeholders

To reach an agreement on the residual risks

Page 6: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

6

Background to the ALARA conceptStarting points

first: everyone safety conscious

secondly: guidance on interpreting the ALARA principle

• good practice

• real optimisation

(= systematic approach = ALARA procedure)

+ use of cost-benefit analysis

• = decision-aiding techniques

Page 7: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

7

Where can I find some guidance

• ALARA from theory towards practiceCE, report EUR 13796 EN

• Information System on Occupational Exposure (ISOE)WorkshopsPublications

• European ALARA networkWorkshopsRecommendationsNewslettersSub networks

• BVS ALARA training day

Page 8: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

8

How to we organise the work according to ALARA

The plan

The decision

The work

Ideas

Radiation protection

and

ALARA

Page 9: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

9

The ALARA procedure

Definition of the problem

Identification of options, factors and boundary conditions

Quantification of the options

Comparison and selection

Sensitivity analysis

Decision

Decision techniques

ALARA from theory towards practice

EUR 13796 EN

Page 10: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

10

ALARA procedureDefinition of the problem

• Are the actions that we plan justified• What are the actions that are planned

Size of the problemType of action (inspection, maintenance, decommissioning, installation, outage, …)Duration of the workNumber of people involvedLocation of the workFrequency of the actionsSequence of the actions

• What are the radiological risks involved• What are the industrial risks involved

Page 11: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

11

To clearly define your ALARA problemCommunicate !

ALARA analyst

Workers and Technicians• Work duration• Technical realisation

Planner• Work description• Site information

Radiation protection

• Radiological characterisation of the site

Page 12: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

12

Radiological characterisationof the workplace

• History of the site, return of experienceInformation on the use of the siteTypical isotopic vectors

• Radiological measurementscontaminationAir contaminationDose rate measurements (4π)Spectral analysis of sweeps, liquid samples,…Gamma scanning, gamma camera’s

Page 13: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

13

Results of the Radiological characterisation

• Dose rates at worker positions• Dose maps• Contamination levels• Isotopic vectors• Localisation of sources• Determination of the relative

strength of sources

Page 14: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

14

Dose ratesDose rate maps

Dose rate at worker position

Dose rate maps

Localisation of hotspots

Page 15: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

15

• Site history• Geometry

Plans of the siteGeometric scanning or survey

• MaterialsTechnical description of the site

• Technical limitationsTechnical description of the site

Technical characterisation of the workplace

Page 16: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

16

Work description

• Breakdown of the work description in smaller units

Number of peopleLocationDurationTechniques used

"Préparation" du chantier man h� obturation des fenêtres de la piscine RC (7) 2 5� Ventilation mobile BR2 3 8� Stand de découpe (installat ion / check) 3 4� Marquage tuyauteries 2 12

Modifications des circuits� Eau de service 2 10� Air comprimé � SOD 3 24 � OD (niet) 2 10

Mise en sécurité NST 2 5 vase d'expansion 2 2

Démantèlement points chauds + autres opérations� Pompe MC n°2 2 2� Herpi's 2 2� Ligne collecte d'effluents 2 3� Déshabillage DDT supérieur 2 4� Déshabillage SPHx 2 4� Spray System 2 5� Déshabillage DDT inférieur (dont L.O. + HDT) 2 3� Piquages tuyauteries primaires 2 3� Déshabillage MBT + évacuation 2 4� Piquages GV 2 3� Démantèlement ligne N² 2 2

Page 17: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

17

Identification of dose reducing options

• What can we do to reduce the dose ?Reduceexposure time

More efficient tools

Better work conditions (light)

Better design of components

Optimising work sequences

Training

Increase distanceMore efficient long handling tools

Better design of components

Optimising work sequences

Training

Move sources

DecontaminationShielding

Introduction of shielding

Better design of the installation towards shielding

Page 18: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

18

Multidisciplinary approach

• BrainstormingDose evaluation and dose reducing optionsWork planning, organization of the work placeReturn of ExperienceExpert of the installationExpert of the specific technological solutions used……….

⇒ Ways to plan the work

Dose reducing options

Page 19: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

19

How efficient are my dose reducing options

• Cost of protectionDirect capital costIndirect capital costOperational costDirect gain

• Radiation dosesCollective doseIndividual doseOccupational versus public doseDose distribution over time

Page 20: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

20

DoseFactors

• Collective dose

• Individual dose

Avoid unequal distribution of the risks

• Avoid dose transfer

Page 21: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

21

Means to assess dose

• Using tables based on the measured dose rates at the worker position

• Dose calculation programs to assess shielding effectiveness

• Work simulation programs

Page 22: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

22

Dose Tables

• AdvantageQuick assessment possible

• DisadvantageStatic, difficult to examine change in the environmentDifficult to investigate dose reducing options, needs a combination with dose calculation programs (MicroShield, MCNP, …) to reassess the dose rates changes.

S = H . T . N

N number of workers

T task duration

H dose rate

Page 23: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

23

Simulation programs

• VR-Domain Rolls Royce Associates• Virtual radiation field Un. Florida• VR-dose Halden VR-centre• HesPi UPM• ErgoDose NNC• CHAVIR (Chantier Virtuel)• VISIPLAN

3D ALARA planning tool (SCK•CEN)

Page 24: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

24

Simulation programs

VRDose IFE Halden

ErgoDose NNC

VISIPLAN 3D ALARA planning tool SCK•CEN

CHAVIR CEA-LIST

Page 25: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

25

Dose analysisVISIPLAN 3D ALARA planning tool

Analysis of individual trajectories

Analysis of scenarios

Scenario comparison

Page 26: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

26

3D Model building

General analysis based on dose maps

Detailed analysis based on trajectory simulation

Voorspelling

Follow up of the dose uptake during the work

meting

Steps in the analysis

Page 27: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

27

Example Fuel loading

Page 28: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

28

ALARA assessment with VISIPLAN 3D ALARA planning tool

Characterization of the siteRadiological

Geometry and materials

Model building Validation of the model

Development of the geometry and source changes in the project

Evaluation of shielding strategiesEvaluation of source reduction techniques

Trajectory definitions Dose evaluation on trajectories

Scenario definition Scenario dose evaluation

Scenario comparison

VISIPLAN

Scenario selection

Page 29: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

29

Decision techniques

• Cost benefit• Cost effectiveness

⇒ De monetary reference value of the avoided unit of exposure man.SV

(More a baseline reference value then an operational tool no regulatory status)

(Belgium 39-2200 Euro/man.mSvdepending on the exposure conditions)

Page 30: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

30

Cost-Benefit

∑=j

jjSY α

DOSE KOST

C

Total cost of an option = Y + C

Optimisation

Page 31: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

31

Sensitivity analysis

• Is my selection of the final scenario influenced by the uncertainties in my base assumptions

• Take into account the uncertainties in Dose measurementsDetermination of the source strengthIsotopic vectorModelling as a wholeAlpha-value

• What if ? analysis

Page 32: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

32

Decision

• ALARA results = support to the decision maker

• Needs a correct representation of

• assumptions

• reliability

• …

• α-waarde

• pre-job studies( dose, dose rates,…)

• The decision needs traceability

Page 33: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

33

Is our job done now ?

• NoCommunicate the strategy or the selected option and the residual risk

Make the workers aware of the residual risk

"Préparation" du chantier man h� obturation des fenêtres de la piscine RC (7) 2 5� Ventilation mobile BR2 3 8� Stand de découpe (installation / check) 3 4� Marquage tuyauteries 2 12

Modifications des circuits� Eau de service 2 10� Air comprimé � SOD 3 24 � OD (niet) 2 10

Mise en sécurité NST 2 5 vase d'expansion 2 2

Démantèlement points chauds + autres opérations� Pompe MC n°2 2 2� Herpi's 2 2� Ligne collecte d'effluents 2 3� Déshabillage DDT supérieur 2 4� Déshabillage SPHx 2 4� Spray System 2 5� Déshabillage DDT inférieur (dont L.O. + HDT) 2 3� Piquages tuyauteries primaires 2 3� Déshabillage MBT + évacuation 2 4� Piquages GV 2 3� Démantèlement ligne N² 2 2

Page 34: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

34

And now, is our job done ?

• No• follow up is needed

Are the doses according to the predicted ones ?If their are discrepancies why is this the case ?Are corrective actions needed and can we install them

Page 35: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

35

Follow up tools

• Operational dosimetry• Feedback reports• Feedback databases

Page 36: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

36

Operational dosimetry

• Close follow up of the dose uptake for the specific actions

• Clear reporting, easier to establish REX

Page 37: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

37

ALARA databases

• Allows to organize the information on the practices and their authorisations

• Allows easy consultation for REX

Page 38: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

38

Implementing ALARA

• In order to implement and use ALARA tools you need to establish a set of procedures describing

The structures and persons within the organisation that are responsible for the ALARA follow upThe extend of the means put into action for a given exposure levelThe hierarchical level of the final decision

Page 39: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

39

ALARA procedure at the SCK•CEN

Schatting van de te verwachten dosis

S (man.mSv) – MID (mSv)

S < 0.5 man.mSv

Lokaal ALARA comité

Aanvrager

ALARA coördinator

Agent SK

Toelating SCK coördinator bij

nieuwe procedure

0.5 man.mSv < S < 5 man.mSv

SCK coördinator

S > 5 man.mSv of MID > 1 mSv

SCK ALARA comité

Vertegenwoordigers installaties

Fysische Controle

Industriële veiligheid

Medische dienst

Page 40: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

40

ALARAprocedure and feedback

put into practice

Planner• Work description• Site information

Radiation protection

• Radiological characterisation of the site

Workers and Technicians

• Work duration• Technical realisation

ALARA analyst BrainstormingEvaluate options

Dec

isio

n

Dose follow upALARA database

REX

Page 41: Practical implementation of ALARA and ALARA tools - bvsabr.be · 1 Practical implementation of ALARA and ALARA tools Vermeersch Fernand Head of the Unit, Safety, Control and Environment

41

Conclusion ALARA

• PrecautionThe existing scientific evidence at this moment for exposures tothe low doses leads us to adopt the LNT approach

• ResponsibilityLimited resourcesResidual risk

• TransparencyDecision based on a compromiseClear indication of the exposure levelsThe applied means put into practice to reduce the dose must be clear and verifiable