![Page 1: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/1.jpg)
12/11/2019
1
Michael Culmo, PECME Associates, Inc.
Long-term Performance of ABC
Details
• There is a reason that we use ABC• High traffic volume
• Impacts to the travel time
• Safety of workers and travelers
• So why should we sacrifice durability?• We don’t want to come back in ten years to do it again
• Impacts to travelers will most likely not reduce over time
• AASHTO Technology Implementation Group (TIG)• Established in 2001
• The start of the development of ABC in the US
• Mantra: Get In, Get Out, and Stay Out
• Get in and Get Out• Accelerated Construction
• Reduce impacts
• Stay out• Use high quality prefabrication to extend service life
• Durability is the key
• Major focus on speed• Weekend construction
• Overnight construction
• What about durability?
• Yes and no
• In this workshop, we will look at the history of durability of ABC and how we move forward• Review of in-service performance
• New specifications for durability
• Recommendations to improve durability
![Page 2: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/2.jpg)
12/11/2019
2
•
•
•
•
•
•
•
••
•
•
•
•
•
•
•
•
•
••
•
•
•
•
•
•
•••
•
•
•
••
•
![Page 3: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/3.jpg)
12/11/2019
3
••
•
•
••
•
•
•
•
#of Times Visited
Bridge
No. Bridge Location Type of ABC Method Used
5 C-476 I-84 over Weber Canyon (Site No. 2) Full Depth Precast Concrete Deck Panels with Welded Tie Connection
5 C-477 I-84 over Weber Canyon (Site No. 1) Full Depth Precast Concrete Deck Panels with Welded Tie Connection
5 C-596 Parrish Lane at I-215 Full Depth Precast Concrete Deck Panels with Welded Tie Connection
4 F-94 I-84 WB over Weber River Full Depth Precast Concrete Deck Panels with Welded Tie Connection
5 F-183 I-80 over Highland Drive (near Kimball) Full Depth Precast Concrete Deck Panels with Welded Tie Connection
5 F-749 US-6 Wildlife Crossing at MP 200 Precast Substructures and Full Depth Precast Deck Panels with Welded Tie Connection
4 F-755 SR-89 over RR, Pleasant Grove
Full Depth Precast Concrete Deck
Panels with Welded Tie Connection,
Precast Approach Slabs and Sleeper
Slabs.
2010 Photo 2011 Photo 2016 Photo
![Page 4: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/4.jpg)
12/11/2019
4
2010 Photo 2011 Photo2013 Photo 2016 Photo
2010 Photo 2016 Photo
2016 Photo 2016 Photo
![Page 5: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/5.jpg)
12/11/2019
5
•
•
•
••
•
•
Good
performance
Poor
performance
![Page 6: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/6.jpg)
12/11/2019
6
Good
performance
Fair
performance Fair
performance
#of Times Visited
Bridge
No. Bridge Location Type of ABC Method Used
1 C-389 E 1100 S Street over I-15 (Sam White) SPMT Installation
5 C-573 I-80: Mt Delle to Lambs Canyon SPMT Installation with Precast Approach Slabs
5 C-953 I-215 at 4500 South SPMT Installation
5 C-956 I-80 WB over 300 East SPMT Installation
5 C-957 I-80 WB over 500 East SPMT Installation
5 C-958 I-80 WB over 700 East SPMT Installation
5 C-959 I-80 WB over 900 East SPMT Installation
5 C-960 I-80 WB over 600 East SPMT Installation
5 C-961 I-80 WB On-Ramp over 600 East SPMT Installation
5 C-963 I-80 WB over Highland Drive SPMT Installation
5 C-968 I-215 at 3300 South SPMT Installation
5 F-254 I-80: Mount Delle SPMT Installation with Precast Approach Slabs
•
••
•
•
![Page 7: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/7.jpg)
12/11/2019
7
2009 Photo 2010 Photo2011 Photo2013 Photo
2016 Photo 2009 Photo 2011 Photo2013 Photo 2016 Photo
Method B: Supported at pick
points during deck casting
••••
•••
•
•
![Page 8: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/8.jpg)
12/11/2019
8
•
•
•
•
•
•
•
•
•
•
•
•
2013 Photo2016 Photo
2013 Photo2016 Photo
2013 Photo2016 Photo
![Page 9: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/9.jpg)
12/11/2019
9
•
•
•
•
•
2016 Photo
![Page 10: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/10.jpg)
12/11/2019
10
•
•
•
•
••
•
•
•
•
•
•
••
•
•
••
•
•
•
•
•
•
•
•
•
•
•
![Page 11: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/11.jpg)
12/11/2019
11
••
•
•
•
••
•
•
•
•
•
••
•
•
•
•
•
•
•
•
•
•
•
•
![Page 12: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/12.jpg)
12/11/2019
12
![Page 13: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/13.jpg)
12/11/2019
13
•
•
•
•
• A sampling of some of my favorite ABC Details• Goal: Simplicity of Detailing
• Reduced Costs
• Less problems during construction
![Page 14: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/14.jpg)
12/11/2019
14
• Connect cap piece with CMP Void Connection• Complex details left to one piece
• Simplifies wall panels
• Low moment demand connection
• Easy construction
• Maine DOT Bridge
CIP Footing with Precast Column
• Semi-integral abutment
• Spaced slide shoes• Built level (simple)
• Allows for different jacking systems
• Sliding bearings or Rollers under shoes during slide
• Bridge can be jacked between shoes to allow for permanent bearing installation
• Fewer bearings than conventional construction
![Page 15: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/15.jpg)
12/11/2019
15
•
•
•
2 Beams with Precast Deck
• Eliminates deck connections
• Precast Double Tee for Bridges
• Developed by the PCI NE Bridge Tech Committee
![Page 16: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/16.jpg)
12/11/2019
16
![Page 17: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/17.jpg)
12/11/2019
17
![Page 18: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/18.jpg)
12/11/2019
18
![Page 19: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/19.jpg)
12/11/2019
19
•
•
•
•
•
![Page 20: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/20.jpg)
12/11/2019
20
![Page 21: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/21.jpg)
12/11/2019
21
![Page 22: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/22.jpg)
12/11/2019
22
•
•
•
•
![Page 23: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/23.jpg)
12/11/2019
23
![Page 24: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/24.jpg)
12/11/2019
24
![Page 25: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/25.jpg)
12/11/2019
25
•
•
•
••
•
•
•
![Page 26: PowerPoint Presentation - Accelerated Bridge Construction...12/11/2019 6 Good performance Fair performance Fair performance #of Times Visited Bridge No. Bridge Location Type of ABC](https://reader033.vdocuments.mx/reader033/viewer/2022051321/5ff7a013c8c7156fbe1fb249/html5/thumbnails/26.jpg)
12/11/2019
26
••
•
••
•
•
••
•
•
•
•
••
•••
•
•
••
•• ☺
••
••••