Exploring Daylight MetricsLongyu GuanJemima Unwin

Page 2: PLS 2016: Exploring daylight metrics

Part 1: A look at current daylight metricsPart 2: The potential of volumetric lighting metricsPart 3: Challenges and ongoing research of new metrics

Exploring Daylight Metrics

Page 3: PLS 2016: Exploring daylight metrics

Daylight Factor approach: x 100%

šøš‘–š‘›

šøš‘œš‘¢š‘”Overcast Sky

A look at current daylight metrics

Page 4: PLS 2016: Exploring daylight metrics

š·š¹

Direct Component

External Reflected ComponentInternal Reflected Component

Overcast Sky

A look at current daylight metrics

Daylight Factor approach: x 100%

Page 5: PLS 2016: Exploring daylight metrics

Overcast Sky

A look at current daylight metrics

Daylight Factor approach: x 100%

š·š¹

Direct Component

External Reflected ComponentInternal Reflected Component

Page 6: PLS 2016: Exploring daylight metrics

Overcast Sky

A look at current daylight metrics

Daylight Factor approach: x 100%

š·š¹

Direct Component

External Reflected ComponentInternal Reflected Component

Page 7: PLS 2016: Exploring daylight metrics

Overcast Sky

In real life practiceā€¦Climate-based Daylight Modellingā€¢ Daylight autonomy ā€¢ Useful daylight illuminanceā€¢ Annual sunlight exposure

Climate Data

Similar process & the same ā€œworking planeā€

A look at current daylight metrics

Page 8: PLS 2016: Exploring daylight metrics

Working environment in the 1970s

Working environment nowadays

Page 9: PLS 2016: Exploring daylight metrics

?

Working Planeā€œVisual Performanceā€

Perceived Daylight Adequacy

Whole Spaceā€œVolumetricā€

Page 10: PLS 2016: Exploring daylight metrics

Cylindrical illuminance:

2DISinEcyl

EN 12464-1 (2002)ā€’ā€œWorking planeā€ removedā€’Recommended illuminance on major room surfacesā€’Mean cylindrical illuminance (2011)

The potential of volumetric lighting metrics

Page 11: PLS 2016: Exploring daylight metrics

Cylindrical illuminance:

2DISinEcyl

1.2 m

EN 12464-1 (2002)ā€’ā€œWorking planeā€ removedā€’Recommended illuminance on major room surfacesā€’Mean cylindrical illuminance (2011)

The potential of volumetric lighting metrics

Page 12: PLS 2016: Exploring daylight metrics

Cylindrical illuminance:

2DISinEcyl

1.6 m

EN 12464-1 (2002)ā€’ā€œWorking planeā€ removedā€’Recommended illuminance on major room surfacesā€’Mean cylindrical illuminance (2011)

The potential of volumetric lighting metrics

Page 13: PLS 2016: Exploring daylight metrics

Cubic Illuminance

The potential of volumetric lighting metrics

Page 14: PLS 2016: Exploring daylight metrics

Can we make volumetric lighting metrics simpler?

Cubic Illuminance

The potential of volumetric lighting metrics

Page 15: PLS 2016: Exploring daylight metrics

Exitance

Incident flux

Exitance

The potential of volumetric lighting metrics

Page 16: PLS 2016: Exploring daylight metrics

Incident flux

Exitance

Average exitance of all Room surfaces

Exitance

The potential of volumetric lighting metrics

Page 17: PLS 2016: Exploring daylight metrics

MRSE =

MRSE

Mean Room Surface Exitance (MRSE)

Exitance

The potential of volumetric lighting metrics

Page 18: PLS 2016: Exploring daylight metrics

Why MRSE has good potential as a daylight metric

1. A new term, but established concept

Overcast Sky

MRSEIRC

The potential of volumetric lighting metrics

Page 19: PLS 2016: Exploring daylight metrics

2. Simplicity

ā€¢ One single number

Why MRSE has good potential as a daylight metric

1. A new term, but established concept

The potential of volumetric lighting metrics

Page 20: PLS 2016: Exploring daylight metrics

ā€¢ One single numberā€¢ Can be easily calculated (to a first approximation)

Total flux entering the room()

Room surface area & reflectance ( & R)

š‘€š‘…š‘†šø=š›·š‘…

š“š‘Ÿ (1āˆ’š‘… )

2. Simplicity

Why MRSE has good potential as a daylight metric

1. A new term, but established concept

The potential of volumetric lighting metrics

Page 21: PLS 2016: Exploring daylight metrics

3. Correlates well with electrical lighting guidance

EN12464-1(Lighting of indoor work places)

Recommendsilluminance on

major room surfaces

Reflectance of room surfaces

Effectively forced a minimum MRSE value

2. Simplicity

Why MRSE has good potential as a daylight metric

1. A new term, but established concept

The potential of volumetric lighting metrics

Page 22: PLS 2016: Exploring daylight metrics

So far we only considered daylighting in a ā€œboxā€ā€¦

However in real lifeā€¦

Page 23: PLS 2016: Exploring daylight metrics

So far we only considered daylighting in a ā€œboxā€ā€¦

However in real lifeā€¦However in real lifeā€¦

Page 24: PLS 2016: Exploring daylight metrics

Problems with MRSE approach:

Challenges and ongoing research of new metrics

MRSE starts to break down when the building is open-planned and geometrically more complicated

Page 25: PLS 2016: Exploring daylight metrics

Essence of MRSE:

MRSE

š„ĀæĀæ

š„ (š™āˆ’ )

š„ (š˜āˆ’ )

š„ĀæĀæ

š„ĀæĀæ

š„ (š—āˆ’ )

Cubic Illuminance

Challenges and ongoing research of new metrics

Page 26: PLS 2016: Exploring daylight metrics

Cubic Illuminance

š„ĀæĀæ

š„ (š™āˆ’ )

š„ (š˜āˆ’ )

š„ĀæĀæ

š„ĀæĀæ

š„ (š—āˆ’ )

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 27: PLS 2016: Exploring daylight metrics

Direct Illuminance

Indirect Illuminance

Cubic IlluminanceIndirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 28: PLS 2016: Exploring daylight metrics

Cubic Illuminance Indirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 29: PLS 2016: Exploring daylight metrics

Indirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 30: PLS 2016: Exploring daylight metrics

Indirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 31: PLS 2016: Exploring daylight metrics

Indirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 32: PLS 2016: Exploring daylight metrics

Average Indirect Illuminance (of the space)

Indirect Illuminance

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 33: PLS 2016: Exploring daylight metrics

Average Indirect Illuminance (of the space)

Challenges and ongoing research of new metrics

Essence of MRSE:

Page 34: PLS 2016: Exploring daylight metrics

A pilot study on the new metrics: ā€¢ The Heelis building (HQ of national trust)

Challenges and ongoing research of new metrics

Page 35: PLS 2016: Exploring daylight metrics

Scale 1 to 7:

ā€¢How is the lighting overall?ā€¢How is the natural lighting overall?ā€¢ Is there any glare from natural lighting?

Plus respondentsā€™ comments Respondentsā€™ working desk can be traced back.

A pilot study on the new metrics: ā€¢ The Heelis building ā€¢ BUS datasets

Challenges and ongoing research of new metrics

Page 36: PLS 2016: Exploring daylight metrics

- Daylight Factors (DF) & Average Indirect Illuminance (AIE)- Overcast Sky with external illuminance of 10,000 lx

A pilot study on the new metrics: ā€¢ The Heelis building ā€¢ BUS datasetsā€¢ Computer simulation (Radiance)

Challenges and ongoing research of new metrics

Page 37: PLS 2016: Exploring daylight metrics

DF: 7.2%AIE: 164 (1.6%)

DF: 2.1%AIE: 75 (0.7%)

DF: 5.2%AIE: 213 (2.1%)

Heelis Building-Data source: Roderic Bunn BSRIA/UCL

1 2 3 4 5 6 7-10%

0%

10%

20%

30%

40%

50%

60%

1 2 3 4 5 6 70%

10%

20%

30%

40%

50%

60%

1 2 3 4 5 6 7-10%0%

10%20%30%40%50%60%

ratings

ppl %

Challenges and ongoing research of new metrics

Page 38: PLS 2016: Exploring daylight metrics

ā€¢ AIE encourages shading + large window

ā€¢ AIE encourages high room surface reflectance

ā€¢ AIE represents daylight in the whole space

ā€¢ Reasons to believe AIE better reflects peopleā€™s perception of daylight adequacy

Challenges and ongoing research of new metrics

Page 39: PLS 2016: Exploring daylight metrics

Difficulties of testing new metrics:

- Data selection

Further research:- More real life case studies- Compare the performance of different daylight metrics- Explore the CBDM potential of new metrics

Metrics can only be reliably tested in many real buildings

- Validity- Comparing different metrics What should I

have for lunch?Pfffffā€¦ just tick the middle score

Challenges and ongoing research of new metrics

Page 40: PLS 2016: Exploring daylight metrics

Thank you & Questions?

[email protected]@ucl.ac.uk