PS
FS
DDCV
DCV
RPBFP
FROMFRM
BELOWBEL
ABOVEABV
IAPMO INTERNATIONAL ASSOCIATION OF
PV PLUG VALVE
UNIONUN
HOT WATER RECIRC. RISER
HOT WATER RISER
COMPRESSED AIRCA
SIEMESE FIRE DEPT. CONN.
VTR VENT THROUGH ROOF
REVOLUTIONS PER MINUTERPM
MFR MANUFACTURER
FIXTURE UNIT(FU)
FO FUEL OIL
DRAIND
CONTRACTORCONTR
CO CLEANOUT
CAST IRONCI
AUTOMATIC WET SPRINKLER RISER
SOLENOID VALVE
WEIGHTWGT
VACUUM BREAKERVB
THRUST BLOCKTB
PSI POUNDS PER SQUARE INCH
OFCI OWNER FURNISHED CONTRACTOR
NFPA NATIONAL FIRE PROTECTION
NUMBERNO.
THOUSANDS BTU/HRMBH
POUNDS OR NUMBER#
POUNDS (UNIT OF FORCE)LBS
HOT WATER FIXTURE UNITHWFU
GALLONS PER MINUTE
GALLONS PER HOUR
GPM
GPH
GASG
FLEXIBLE CONNECTIONFC
FEET PER SECONDFPS
DRAINAGE WASTE AND VENTDWV
ARCHITECTARCH
CUBIC FEET PER HOURCFH
CUBIC FEET PER MINUTECFM
CONTINUATIONCONT
ABOVE FINISHED FLOORAFF
DOWNDN
ELEC ELECTRICAL
HW HOT WATER
MECHANICALMECH
PLBG PLUMBING
SPRINKLERSPR
WASTEW
SD STORM DRAIN
VENTV
TYPICALTYP
PT
POINT OF CONNECTIONPOC
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
NORMALLY CLOSEDN.C.
MINIMUMMIN
MAXIMUMMAX
INVERT ELEVATIONI.E.
GATE VALVEGV
HORSEPOWERHP
FLOORFLR
FINISHEDFIN
DOWNSPOUT NOZZLEDSN
DIAMETERDIA
COLD WATER FIXTURE UNITCW(FU)
CONDENSATE DRAINCD
BRAKE HORSEPOWERBHP
ACCESS PANELAP
EXIST EXISTING
MH MANHOLE
CFF CAP FOR FUTURE
BV BALL VALVE
BFV BUTTERFLY VALVE
BWV BACKWATER VALVE
CLG CEILING
HD HUB DRAIN
TT TEST TEE
CHECK VALVECV
DCVA DOUBLE CHECK VALVE ASSEMBLY
DDCVA DOUBLE DETECTOR CHECK
REDUCED PRESSURE PRINCIPLERPBFP
W/ WITH
AFG ABOVE FINISHED GRADE
AD ACCESS DOOR
CONC CONCRETE
FA FLOW ALARM
FDVC
FH
FIRE DEPARTMENT VALVE CABINET
FIRE HYDRANT
ICBO INTERNATIONAL CONFERENCE OF
PS PRESSURE SWITCH
PRESSURE TEMPERATURE TRAP
SOV SHUT-OFF VALVE
LUBRICATED PLUG VALVELP
AMERICANS WITH DISABILITIESADA
BTU BRITISH THERMAL UNIT
CFS CUBIC FEET PER SECOND
CW COLD WATER
DFU DRAINAGE FIXTURE UNIT
HWR HOT WATER RECIRC
DWG DRAWING
MISCELLANEOUS EQUIPMENT
IW INDIRECT WASTE
HOT WATER (140°F)
AUTOMATIC WET SPRINKLERAS
HUB DRAIN
FLOOR SINK W/ GRATE AS SHOWN
FLOOR DRAIN
FIRE ALARM BELL
FIRE DEPARTMENT VALVE CABINET
FIRE DEPARTMENT VALVE
AUTO FIRE SPRINKLER RISER
FIRE DEPARTMENT CONNECTION
THRUST BLOCK
YH
HB
WH
YARD HYDRANT
SYMBOL DESCRIPTION
WALL HYDRANT
HOSE BIBB
BALL VALVE
ECCENTRIC REDUCER
PIPING BELOW GRADE
SANITARY SEWER, WASTE OR SOIL BELOW GRADE OR FLOORSAN
PIPE DROP
PUMPED DISCHARGEPD
D
CA
OD
RD
SD
F
DRAIN LINE
COMPRESSED AIR
OVERFLOW DRAIN PIPING
VENT
WASTE, OR SOIL ABOVE GRADE OR FLOOR
STORM DRAIN
HOT WATER CIRC (122°F)
COLD WATER
FIRE MAIN
BOTTOM CONNECTION - BRANCH LINE
TOP CONNECTION - BRANCH LINE
PIPE DOWN
PIPE UP OR UP & DN
DIRECTION OF FLOW
DIRECTION OF SLOPE
AUTOMATIC AIR VENT
TEST TEE
YARD CLEANOUT
FLOOR CLEANOUT
CLEANOUT/WALL CLEANOUT
THERMOMETER
PRESSURE GAUGE WITH COCK
WATER HAMMER ARRESTOR
AQUASTAT
CONCENTRIC REDUCER
BLIND FLANGE
CAP OR PLUG
FLEXIBLE CONNECTOR
EXPANSION JOINT
PIPE ALIGNMENT GUIDE
PIPE ANCHOR
STRAINER WITH BLOW OFF
STRAINER
UNION
FLOW ALARM
PRESSURE SWITCH
REDUCED PRESSURE BACKFLOW PREVENTER
DOUBLE CHECK VALVE ASSEMBLY
DOUBLE DETECTOR CHECK VALVE ASSEMBLY
OS & Y GATE VALVE WITH TAMPER SWITCH
BACKWATER VALVE
CIRCUIT SETTER
VACUUM RELIEF VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
LUBRICATED PLUG VALVE
ANGLE GATE VALVE
GAS RISER
VENT STACKS
COLD WATER RISER
GATE VALVE
PRESSURE & TEMPERATURE RELIEF VALVE
CHECK VALVE
BUTTERFLY VALVE
SYMBOL DESCRIPTION
GW GREASE WASTE
HOT WATER CIRC (110°F)
HOT WATER (120°F)
140
140
G NATURAL GAS (7"W.C.)
FLOOR CLEANOUTFCO
WCO WALL CLEANOUT
OIL WASTEOW
TP TRAP PRIMER
MEDIUM PRESSURE GAS (2 PSIG TO 5 PSIG)MG
CS CIRCUIT SETTER
WET STANDPIPE RISER
FS
FD
V
G
CW
HW
HWR
OD
RDROOF DRAIN RISER
OVERFLOW DRAIN RISER
COMPRESSED AIR RISER
WASTE STACKW
CA
AUTOMATIC SPRINKLER DRAIN
PLUMBING EQUIPMENT
ICW INDUSTRIAL COLD WATER
EXISTING PIPE(E)
# SHEET NOTE
POINT OF CONNECTION
TAMPER SWITCHTS
ROUGH IN AND CONNECTRI&C
FIRE DEPARTMENT VALVEFDV
EXISTING TO BE REMOVED
ASD
WSP
AS
1. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH PLUMBING SPECIFICATIONS.
2. AS-BUILT RECORD DOCUMENTS: AT PROJECT CLOSEOUT, CONTRACTOR SHALL SUBMIT DETAILED INSTALLATION DRAWINGS, CHANGE ORDERS AND SPECIFICATION CHANGES
TO ARCHITECT FOR APPROVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS.
3. ALL EXCAVATORS MUST COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS INCLUDING NOTIFICATION OF ALL OWNERS OF UNDERGROUND UTILITIES AT LEAST 2 BUSINESS
DAYS, BUT NOT MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION.
4. CONTRACTOR TO COORDINATE INSTALLATION OF GAS SERVICE WITH THE LOCAL UTILITY COMPANY, CONTACT ENGINEERING DEPARTMENT. ALL EXTERIOR GAS PIPING SHALL
BE PAINTED.
5. DETAILED INVESTIGATION OF EXISTING CONDITIONS ARE PART OF THE CONTRACT WORK. VISIT THE JOB SITE PRIOR TO BID. REVIEW AVAILABLE EQUIPMENT LAYOUTS,
ASSEMBLY DRAWINGS AND INSTALLATION SCHEDULES.
6. CONTRACTOR SHALL COORDINATE ALL UTILITY LINES EXITING OR ENTERING BUILDING WITH DIVISION 2 SPECIFICATIONS AND CIVIL ENGINEER'S UTILITY PLAN DRAWINGS AND
OTHER TRADES.
7. BARRIER FREE REQUIREMENTS: PROVISIONS HAVE BEEN DESIGNED TO PROVIDE FIXTURES IN ACCORDANCE WITH A.D.A., ANSI AND STATE REGULATIONS. CONTRACTOR SHALL
COMPLY WITH ALL REQUIREMENTS AND REPORT TO ARCHITECT OR OWNER'S REPRESENTATIVE WHEN FIELD CONDITIONS PREVENT CORRECT INSTALLATION
8 REFER TO CRAFT CENTER OWNER EQUIPMENT LIST FOR ALL EQUIPMENT REQUIRING PLUMBING CONNECTION.
9. FIRE SPRINKLER CONTRACTOR TO VERIFY ALL LOCATION IN THE CRAFT CENTER FOR HAZARD GROUPS.
10. DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM BASED ON THE REQUIREMENTS OF THE STATE OF OREGON FIRE CODE, INSTALLATION SHALL ALSO COMPLY WITH
REQUIREMENTS OF THE LOCAL FIRE MARSHAL AND THE OWNERS INSURING AGENCY AND THE FIRE SPRINKLER SHALL COMPLY WITH THE STANDARDS OF THE CURRENT
EDITION OF NFPA13.
11. ALL SANITARY AND VENT PIPING SHALL BE SLOPED AT 1/4"FT., EXCEPT WHERE NOTED AT 1/8"FT. TO CLEAR STRUCTURE IN ACCORDANCE WITH OSPSC TABLE 7-5.
12. CONTRACTOR TO COMPLY WITH THE (REDUCTION OF LEAD IN DRINKING WATER ACT) LEAD-FREE NSF STANDARDS NSF/ANSI 372 OR NSF/ANSI 61-G, PUBLIC LAW 111-380
WATER HAMMER ARRESTORWHA
OS & Y GATE VALVE (OUTSIDE SCREW & YOKEGATE VALVE)
FIRE SPRINKLER FLOOR CONTROL VALVE
FIRE HOSE VALVE
OVERFLOW DRAIN
ROOF DRAIN
ROOF RECEPTOR
FLOW SWITCH
DECK DRAIN, PLANTER DRAIN
TRAP PIMER
1% SLOPE
ROOF DRAIN PIPING, THE PIPES FROM ROOF DRAINSD (STORM DRAIN)
PW
PV
PROCESS WASTE
PROCESS VENT
LOW PRESSURE GASLG
IHW INDUSTRIAL HOT WATER
TW
TWR
TEMPERED WATER
TEMPERED WATER RETURN
PDPLANTER DRAIN
DETAIL NO.
SHEET NO.
1
P2
CONN CONNECTION
FEETFT
FUTUREFUT
FLUSH VALVEFV
FLUSH TANKFT
ACT
VALVE ASSEMBLY
PLUMBING AND MECHANICAL
BUILDING OFFICIALS
IRRIGATIONI.R.R.
LAVATORYLAV
ASSOCIATION
INSTALLED
(PETE'S PLUG)
PV PROCESS VENT
OFFICIALS
BACKFLOW PREVENTER
SHEETSHT
SHEET NOTESN
SF SQUARE FEET
STAINLESS STEELS.S.
WATER CLOSETWC
URINALU
YARD BOXY.B.
FFE FINISHED FLOOR ELEVATION
DI DEIONIZED WATER
OXYGEN
ACETYLENE
O2
CSP COMBINATION STAND PIPE
DSP DRY STAND PIPE
CSP COMBINATION STAND PIPE
SHUT OFF VALVE IN CONCRETE YARD BOX
BALANCING VALVE
SOLENOID VALVESV
PRV PRESSURE REDUCING VALVE
RELIEF VALVERV
AUTO FIRE SPRINKLER RISERASR
FHV FIRE HOSE VALVE
FLSW FLOW SWITCH
GALLONSGAL
GAS COCKGC
IHWR INDUSTRIAL HOT WATER RETURN
ACET
1. CODES AND STANDARDS
A. AMERICANS WITH DISABILITIES ACT, (ADA)
B. BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION IN OREGON:
1. 2011 OREGON PLUMBING CODE (OPC) WITH STATE AMENDMENTS.
2. WATER SUPPLY:
A. CONNECTING TO EXISTING SYSTEM IN THE BASEMENT OF EMU.
B. PIPE SIZES ARE BASED ON MAXIMUMS 3 PSI FRICTIONS LOSS FOR COPPER PIPE AT A MAXIMUM VELOCITY OF 8 FPS, AND
PREDOMINANTLY FLUSH TANK TYPE SYSTEM REQUIRING A MINIMUM RESIDUAL PRESSURE OF 15 PSI.
3. SANITARY SEWER:
A. BUILDING SEWER SIZE 4 INCHES @ 2 % SLOPE
B. TOTAL CAPACITY 216 DRAINAGE FIXTURE UNITS
C. CONNECTED LOAD 120 D.F.U.
4. STORM DRAIN:
A. RAINFALL INTENSITY 1.3 INCHES/HOUR
B. STORM DRAIN (1) 4 INCH , (1) 6 INCH IS SIZED AT 3 INCHES/HOUR @ 1 % SLOPE
2. GAS SERVICE:
A. MAIN SIZE 2 INCHES
B. MAXIMUM DISTANCE 150 FEET
C. CONNECTED LOAD 4630 CFH
D. DELIVERY PRESSURE: 2 PSI
6. HOT WATER:
A. CIRCULATED? Y
B. CONNECTING TO EXIST DOMESTIC HOT HEAT EXCHANGER SYSTEM.
EMERGENCY SHUT OFF VALVE
EMO
PLUMBING DRAWING LIST
ABBREVIATIONS
GENERAL NOTES
PLUMBING DESIGN CRITERIAP L U M B I N G L E G E N D
FDV
FDC
T
PG
TT
TS TS
CO/WCO
WHA
FCO
YCO
FA
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:00:2
9 P
M
P000
11045
LEGEND ANDABBREVIATIONS- PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
P000 LEGEND AND ABBREVIATIONS - PLUMBING
P001 SCHEDULES - PLUMBING
P150A GROUND LEVEL - NORTH WING - PLUMBING
P150B GROUND LEVEL - HEARTH - PLUMBING
P150C GROUND LEVEL - 1962 ADDITION - PLUMBING
P150D GROUND LEVEL - SOUTHWEST - PLUMBING
P151A LEVEL 1 - NORTH WING - PLUMBING
P151B LEVEL 1 - HEARTH & MILLS CENTER - PLUMBING
P151C LEVEL 1 - 1962 ADDITION - PLUMBING
P151D LEVEL 1 - FOOD SERVICE - PLUMBING
P151mD MEZZANINE - LEVEL 1 SOUTH - PLUMBING
P152A LEVEL 2 - NORTH WING - PLUMBING
P152B LEVEL 2 - HEARTH & MILLS CENTER - PLUMBING
P152C LEVEL 2 - 1962 ADDITION - PLUMBING
P152mB MEZZANINE LEVEL 2 - HEARTH & MILLS CENTER- PLUMBING
P200A ROOF PLAN - NORTHWING- PLUMBING
P200B ROOF PLAN - HEARTH & MILLS CENTER - PLUMBING
P200C ROOF PLAN - 1962 ADDITION - PLUMBING
P200D ROOF PLAN - SOUTHWEST - PLUMBING
P201A UPPER ROOF PLAN - NORTH WING - PLUMBING
P401 ENLARGED EXISTING PLANS - PLUMBING
P601 HOT & COLD WATER RISER DIAGRAM
P602 HOT & COLD WATER RISER DIAGRAM
P603 WASTE AND VENT RISER DIAGRAM - PLUMBING
P604 STORM RISER DIAGRAM (NORTH WING)
P605 FIRE PROTECTION RISER DIAGRAM
P801 DETAILS - PLUMBING
PU000 LEGENDS AND ABBREVIATIONS - PLUMBING
PU001 SCHEDULES - PLUMBING
PU100A UNDERGROUND PLAN - SECTOR A - PLUMBING
PU100B UNDERGROUND PLAN - SECTOR B - PLUMBING
PU100D UNDERGROUND PLAN - SECTOR D - PLUMBING
DP100 DEMO PLAN - GROUND LEVEL - PLUMBING
DP101 DEMO PLAN - LEVEL 1 - PLUMBING
DP101m DEMO PLAN - MEZZANINE LEVEL - PLUMBING
DP102 DEMO PLAN - LEVEL 2 - PLUMBING
DP102m DEMO PLAN - LEVEL 3 - PLUMBING
TAG MANUFACTURER MODEL
SYTEM RECOVERY
(GPM) / INCOMING
STEAM PRESSURE
(PSIG)
MASTER CONTROL PANELELECTRICAL INSTALLATION
LOCATION
APPROX. WEIGHT (LBS.)NOTES
VAC / HZ / PHASE FLA SHIPPING OPERATING
UL LISTED PACKAGED SYSTEM TO INCLUDE THE FOLLOWING MAJOR COMPONENTS PRE-PIPED AND WIRED ON STRUCTURAL STEEL FRAME:
TAG COMPONENT MANUFACTURER MODEL QUANTITY NOTES
NOTES:
1)
2)
3)
4)
5)
6)
7)
8)
9)
Domestic Heat Transfer Package Schedule
FTDW-1 FlowTherm FTDW 45 / 11 460 / 60 / 3 25 INDOOR 5,800 7,250 1-9
MCP-5Master Control Panel
(MCP)FlowTherm N/A 1 ea
UL listed panel in NEMA 1 (minimum) enclosure that includes: lockable main power disconnect handle, individuallockable motor service disconnects for recirculation/condensate/sump pumps, motor overload and short circuitprotection for recirculation/condensate/sump pumps, protected control power transformer(s) on primary & secondarysides, recirculation pump "Hand-Off-Auto" switches, condensate & sump pump "Test-Off-Auto" switches with springreturn to "Off" from "Test", recirculation/condensate/sump pump "Run" lights, condensate & sump pump electricalternating relays and lead pump failure backup, sump pump "High Water Alarm" light with automatic reset, andsingle point power connection for panel.
SP-1 & 2Sump Pumps (Shipped
Loose)Weil No. 2445 2 ea
Cast iron, single-seal, submersible style, sized for 50 GPM @ 27' head, 1 HP, 3450 RPM, 2" discharge, passes 3/4"solids, and 40' power cord length. Weil items shipped loose with skid to be field installed/wired: SP-1 & 2, (4) modelno. 8230 N.O. mechanical floats with 40' cord length and cover mounting bracket, and No. 8805 wet well cover with(2) 20" model no. 8817 pump opening covers.
WH-1 & 2 Domestic Heater Cemline V45SSH1036-DW 2 ea 45 GPM recovery each, 50°F to 140°F, 7# shell pressure, 3/4" O.D. copper tubes with double-wall construction,150# ASME, 0.0005 fouling factor, 45 gallon 316 stainless steel tank, integral bronze circulator, electronic controlvalve, double-solenoid safety relief, vacuum breaker, relief valve, with Cemtrol controller mounted to side of MCP.
CRU-2 Condensate PumpsXylem Domestic
Pump301.5CC 1 ea Bronze fitted pumps, duplex configuration, 36 gallon cast iron receiver, (2) heavy-duty 2-pole float switches, each
pump sized for 30 GPM @ 15# discharge pressure, 1/2 HP, 3500 RPM, ODP motors, dial thermometer, dischargepressure gauges & balance valves for each pump, 2" vent & overflow, 1" drain and 3" inlet.
RP-1Domestic Recirculation
PumpBell & Gossett NBF-36B 1 ea
3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 5 GPM @ 17' head.
TP-1Tempered DomesticRecirculation Pump
Bell & Gossett NBF-36B 1 ea3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 10 GPM @ 27' head.
ET-3 Expansion Tank Wessels TTA-125 1 ea60 gallon tank volume, 150# ASME, pre-charged, FDA approved butyl diaphragm, 1" stainless steel systemconnection, sized at 60# system pressure, 150# maximum tank pressure, 50°F initial temperature, maximumtemperature of 170°F, and system volume of 1,350 gallons of water.
TCV-1 Tempering Valve Heat Timer ETV 1 ea 3-way mixing valve, 1-1/4" system connections, stainless steel body & trim, electronic actuator, wth Heat Timercontroller and module for BMS connectivity mounted to side of MCP.
UL listed package includes a heavy-duty, welded structural steel frame and base built to AWS D1.1 specifications. All components are pre-mounted, piped, wired, and hydro-tested before being paintedFlowTherm's standard gray, water-based enamel. All piping, pipe materials, welding procedures, valves, fittings, and hardware are in accordance with ASME B31.9 standards.
Package includes lot interconnecting headers, piping, fittings, strainers, isolation/balance/check/relief valves, suction diffusers, thermometers, pressure gauges, flex connectors, and steam traps as shown onthe flow diagram.
Domestic heat transfer system is enabled, sequenced and monitored by the Building Management System. BMS contractor to ship skid mounted controllers, temperature sensors & wells, pressure switches &sensors, flow & steam meters, BTU meters, and wiring diagrams to FlowTherm for installation and wiring at fabrication facility. Control panel for local alarms, pilot lights, disconnects, etc. is provided and wiredby FlowTherm. FlowTherm will install wiring & conduit between skid equipment and Master Control Panel. Other devices requiring remote installation are to be supplied, installed and wired by BMS contractorin the field. Steam meter shall be type that requires < 5 pipe diameters up and downstream of device, similar Veris Accelabar.
Power and control wiring to/from FlowTherm panel is by Div. 26 and BMS contractor, respectively.
Skid dimensions shall not exceed 12.5' L x 8' H x 6' W, including the anchor chairs.
42" of service clearance is required in front of the Master Control Panel.
Equipment vents/drains/overflows and other system piping connections to the package are the responsibility of the installing contractor.
Package does not include spring isolators, vibration eliminator mounts, special mounting brackets, special seismic construction, certification, seismic frame calculations, seismic anchorage calculations, orseismic testing, insulation for piping and components, calcium silicate pipe shields or insulated pipe supports. Skid shall be bolted to concrete floor or housekeeping pad.
Condensate piping shall be sloped towards condensate return unit's inlet.
PLUMBING FIXTURES SCHEDULE ELECTRIC WATER HEATER SCHEDULE
BOILER ROOM
FULLWEIGHT
SEE PLAN FOR PIPE SIZE, 12"AFG
SEE PLAN FOR PIPE SIZE
UR-1 URINAL 2" 2" 11/2" 3/4" --- WALL MOUNTED
WALL MOUNTED, ADA---3/4"11/2"2"2"URINALUR-2
SELF-RIMMING, 18 GA. STAINLESS STEEL1/2"1/2"11/2"2"11/2"SINK
--- --- --- --- --- --- --- ---
TP-2
--- --- --- 1/2" ---TP-1
ELECTRONIC TRAP PRIMER --- --- --- 1" --- WALL MOUNTED, WITH TIMER
DSN-1 DOWNSPOUT NOZZEL --- --- --- --- ---
OD-1 LARGE OVERFLOW DRAIN --- --- --- --- ---
RD-1 LARGE ROOF DRAIN --- --- --- --- --- SEE PLAN FOR PIPE SIZE
FS-1 FLOOR SINK3" 3" 11/2"
--- --- HALF GRATE, WITH TRAP PRIMER
FD-2 FLOOR DRAIN
3" 3" 11/2"
--- --- WITH TRAP PRIMER
FD-1 FLOOR DRAIN 2" 2" 11/2" --- --- PROVIDE TRAP PRIMER FROM WATER CLOSET FLUSH VALVE OR TP-1/2
HB-2 INTERIOR HOSE BIBB --- --- --- 1/2"1/2" IN RECESSED BOX
HB-1 INTERIOR HOSE BIBB --- --- --- 3/4" --- -
MS-1 MOP SINK 3" 3" 11/2" 3/4"3/4" WITH RIM & WALL GAURDS
S-2
L-2 LAVATORY WALL MOUNTED, ADA11/4" 11/2" 11/4" 1/2" 1/2"
WC-2 WATER CLOSET INT 4" 2" 1 1/4" --- WALL MOUNTED, FLUSH VALVE, ADA
MANUFACTURER AND MODEL CAPACITYSERVICE REMARKSSIZEITEM
CIRCULATION
MANUFACTURER AND MODEL
MANUFACTURER AND MODEL
TYPE
DSCH.PHASEVOLTSDIA.
PUMP CAPACITYTYPE
DEPTHGALSLOCATION REMARKS
BASIN CAPACITYITEM HP RPM
HEAD, FTGPM
HEAD, FTGPM
HOT WATER
SERVICE REMARKSVOLTSRPMHPCAPACITY
ITEM PHASE WGT
WALL MOUNTED, FLUSH VALVE---1 1/4"2"4"INTWATER CLOSETWC-1
---1/2"11/4"11/2"(2)11/4"DUAL DRINKING FOUNTAINDF-1 WITH BOTTLE FILLER
------------------------
---
---
WEILSUB, EXISTING EXISTING EXISTING (2) 50 27 1 2"
1BELL & GOSSET 6 1750 12030'INLINE 1/12
PL SERIES---
EAST PENTHOUSE480 3 115 BOCK 50F50 6 KW
25 GPH
T@ 100°ROUTE RELEIF TO FLOOR SINK
L-1 LAVATORY COUNTER MOUNTED11/4" 11/2" 11/4" 1/2" 1/2"
SELF-RIMMING, 18 GA. STAINLESS STEEL1/2"1/2"11/2"2"11/2"SINKS-1
NORTH WING
INTERCEPTOR
MANUFACTURERTYPE
-LIQUID
GREASE
SERVICE REMARKSHWLCAPACITY
ITEM VAC HZ
--- ALL FOOD PREP AREAS, SEE CIVIL DRAWINGS,FOR EXACT LOCATION
11'-4" 5'-10" 7'-10" --- ---2000---UTILITY VAULT
WITH MIXING VALVE1/2"1/2"11/2"2"11/2"FOOT SHOWERFSH-1
5106-2-GA
ZOELLER CO.ELEVATOR
SUB. 24"x24" 24" 50 20 1750 120 1SUMP 40MIGHTY-MATE
W / HIGH LEVEL ALARM1/3
10 --- ---EXPANSION TANK WATTS SET PRECHARGE TO 75 PSI
3450 120 1
(4) 8230 FLOATS WITH 40' CORDS
EXPANSION TANK WESSELS
TTA-12560 PART OF FTDW-1
2445
PROVIDE COVER 8805, (2) 20"8817 PUMP OPENING COVERS,
W / HIGH LEVEL ALARM,
PHMODEL
---
FLA
---
PHASE
---
GPM / INCOMINGSTEAM PSIG
4" 4" 2"
4" 4" 2"
TANK SCHEDULE
SEWAGE EJECTOR/SUMP PUMP SCHEDULE
PUMP SCHEDULE
EQUIPMENT SCHEDULE
SP
2
EWH
1
CP
1
ET
1
SP
1
GI
1
ET
2
PRESSURE DROP TRAP PRIMER
REMARKSHWCWWASTETRAP
ARMDESCRIPTIONITEM VENT
RECOVERY VOLTSSIZE
TANK
WATTSFIXTURE SYSTEM SERVED MODEL NUMBERMANUFACTURER REMARKSPHASE TEMP.
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
NP
AC
KA
GE
4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:00:3
8 P
M
P001
11045
SCHEDULES -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
UP
UP
UP
WC-2
WC-1
WC-1
WC-2
L-1
L-1
2"FD-1
WC-22"FD-1
L-2
MS-1
20.6
18.8
19.5
N P Q R S T U W
22
18
17
V
21
19
20
16.5
VESTIBULE
V002
HEARTH
L001
SURVIVAL CENTER/ STUDENT
INSURGENT
005
MEDIUM CONFERENCE ROOM
023
STUDENT VETERANS CENTER
015
V. SM. CONF
008
SMALL CONF
010
CLUB SPORTS
006
SUSTAINABILITY COALITION
004
ASUO
003
OUTDOOR PROG.& BIKE
CENTER
007
WOMENS CENTER & SWAT
012
CONF. STORAGE
009
?
?
ELEC
020
G.I.
018
GENDER INCLUSIVE
RESTROOM
014
?
?
LGBTQA
022
OFFICE COORDINATOR
003B
LEADERSHIP ADVISOR
003E
ACCOUNTANT
003F
DIRECTOR
006B
STORAGE
006A
OFFICE
012A
?
?
?
?
?
?
CORRIDOR
H015
VESTIBULE
V003
?
?
ASST. COORD.
006C
?
??
?
STAIR 5
S003
STAIR 1
S004
STAIR 4
S002
CORRIDOR
H004
STUDENT STREET
H003
FC / MANIFOLD
013
VENDING
019
OFFICE
007B
RENTAL BIKE STORAGE
007A
?
?
OP OFFICE
007BB
LACTATION/ LIBRARY
012D
STORAGE
012E
OFFICE
015A
ACCOUNTING TECH.
003G
ASUO WALK-UP COUNTER
003A
CIRCULATION
H002
CORRIDOR
H019
FIRE / WATER
016
ELEV
E2
JANITOR
017
?
?
STOR
015AA
L-1
L-1WC-1
WC-1
DF-1
S-1
PD
PD
PD
SP
1
S-1
3" SAN DN
1 1/2" V UP
2"FD-1
WSP-1
CSD-1ASD-1
2"SAN UP
1 1/2"V UP
3"SAN UP
2"SAN UP
SPILL 2"PD TOFLOOR SINK
4"FS-1
FIRE RISERAND GROUNDFLOOR VALVEASSEMBLY
4"FS-1
2 1/2" BACKFLOW
2 1/2"CW DN
F
FFF
TP-1
2" V UP
WH-1 WH-1
WH-1
WH-1
2"V UP
3/4"HWR UP
4"SAN UP
2"V UP
2"SANUP & DN
2"V DN
4"SANUP & DN
1 1/2"V UP
1"HW UP
2"CW UP
6"RDUP & DN(3430 SF)
6"RDUP & DN(6830 SF)
6"RD UP(5300 SF) 6"RD DN
(5300 SF)
6"RD UP(5440 SF)
6"RD DN(5440 SF)
3"RDUP & DN(750 SF)
6"RD UP(3586 SF)
6"DSN SPILLTO PLANTER(3586 SF)
4"SAN UP
2"SAN UP
2"V UP
1 1/2"V UP
4"SAN DN4"SAN UP
2"FD-1
2"V DN
2" SANUP & DN
2"V DN
4"SANUP & DN
2" V UP
1 1/2"V UP
SPILL ASDTO FS
2"FD-1
1"CW UP
TP-2
2"V DN
2"V UP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:00:5
8 P
M
P150A
11045
GROUND LEVEL- NORTH WING -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR A - PLUMBING
KEY PLAN (NTS)
UPUP
20.6
A B C D E F G H
17.0
16.2
15.5
18.8
17.9
17.5
19.5
L M N
18
17
15
13
12
21
19
12.5
14
16
14.2
12.7
12.2
20
STAIR 6 (E)S001
MECH.001B
CARD OFFICE001
STAIR 6 (E)S001
VESTV001
FOYERL001A
??
CARD OFFICE001A
TICKET OFFICE002
CIRCULATIONH002
HEARTHL001
INFOL001B
VESTIBULEV004
HEARTH - SOUTH
L001CMARKET / COFFEE
050
STAIR
S005
STAIR 1 (E)S009
PUB KITCHEN046A
HOLDEN CENTER047
??
??
??
??
??
MECHANICAL046B
PUB046
"O" LOUNGEL005
SEATINGL005A VEST
V005
MEN032
TELECOM031
ELEV (E)E4
10
1
A B C D E F G H J K L
6
7
8
9
11
3
4
5
M
2
SP
1
2
1
1
MARKET049
MARKET050A
??
SEE SHEET P150C
6
6
4
4
??
4"GW DN
6
4
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:01:1
8 P
M
P150B
11045
GROUND LEVEL- HEARTH -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR B - PLUMBING
SHEET NOTES
NEW RETAIL SPACE PROVIDE 1" COLD WATER STUB FORFUTURE T.I. WORK, PROVIDE INDIVIDUAL METERED FOR EACHRETAIL SPACE.
NEW PUB LOCATION PLUMBING FIXTURES -TBD.PROVIDE 1" COLD WATER STUB FOR T.I. WORK, AND INDIVIDUALMETER.
NEW COFFEE SHOP LOCATION PLUMBING FIXTURES - TBDPROVIDE 1"COLD WATER STUB FOR T.I. WORK, AND INDIVIDUALMETER.
3/4" HOT WATER SUBBED FOR FUTURE T.I. WORK. PROVIDE HOTWATER METER AT EASH RETAIL SPACE.
SEE DOMESTIC COLD WATER RISER DIAGRAM 1/P6.01 FOR NEWAND EXISTING SYSTEMS.
1" COLD WATER STUBBED FOR FUTURE T.I. WORK., PROVIDECOLD WATER METER AT EACH RETAIL SPACE.
1.
2.
3.
4.
5.
KEY PLAN (NTS)
B
6.
UP
UP
F G H J
11.5
10
9
8
7
6
5
4
3
2
0.5
K
L M N
13
12
11
1
9.5
12.5
12.7
12.2
UR-2UR-1WC-1
2"FD-1
WC-2
L-1L-1
L-1
L-1L-1
L-1
2"FD-1
WC-2
WC-1WC-1WC-1WC-1
DF-1
1
1
NOT IN SCOPESEE PACKAGE 1
POC 3/4"HW, 2"CWTO EXISTING UNDERPACKAGE 1
4"SANCAPPED FOR FUTURE T.IPACKAGE 5
EXISTING PIIPING INTHIS AREA WILL NEEDTO BE REROUTED
GI
1
"O" LOUNGEL005
ELEV (E)E4
TELECOM031
MEN032
JANITOR035
ELECTRICAL034
TECHNOLOGY LOUNGEL005C
CIRCULATIONH045
CAMPUS DIGITAL PRINTCENTER
036
CORRIDORH036
ELEVATOR (E)E3
STAIR (E)S008
MAIN ELECTRICAL127
SEATINGL005B
STAIR 3S006
SEATINGL005A
WOMEN033
VESTV005
STAIR (E)S007
SEATINGL005B
2"CW UP
4"SAN UP
2"SAN UP
1/2"TP LINE UP TO ASSEMBLY ABOVE
1/2"TP LINE UP TOASSEMBLY ABOVE
4" SAN UP
2" CW UP
2"SAN UP
3/4"HW, CW UP
E5042
PACKAGE 4SCOPE
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:02:0
9 P
M
P150C
11045
GROUND LEVEL- 1962 ADDITION- PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR C - PLUMBING
SHEET NOTES1. RECONFIGURED RESTROOMS PROVIDE NEW LOW FLOW
PLUMBING FIXRUTES AND RECONNECT TO EXISTING SERVICE.
KEY PLAN (NTS)
C
A B C D E F
10
9
8
7
6
5
4
3
9.5
12.7
12.2
GENERAL MGR045G
MUSIC LIBRARY045K
KWVA045
??
??
??
OFFICE045D
EQUIP045E
RACK ROOM045F
STORAGE043B
SMALL CONFERENCE044
STUDENT RESOURCE STUDIO043
MIXING043A
CALL CENTER040
COMPUTER LAB042
MARKETING041
MECHANICAL038
CORRIDORH038
ELEV MACHINE039D
ELEVATOR (E)E3
STAIR (E)S008
CORRIDORH036
1
WASTE PIPING TO BEREPLACED AND REROUTE ANY KITCHENWASTE LINES TO THENEW GREASE INTERCEPTOR
1/2"HW,2"GW UP
POC 1/2" HWTO EXISTING
CAP 4" SAN AT MAIN
2"V UP
1"CW,3/4"HW,X"G UP
1"CW,3/4"HW,X"G UP
1"CW,3/4"HW,X"G UP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:02:3
1 P
M
P150D
11045
GROUND LEVEL- SOUTHWEST -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR D - PLUMBING
KEY PLAN (NTS)
#KEYED NOTESSEE SHEET P5.01 FOR PLUMBING EQUIPMENT LAYOUT.1.
UPUP
DN UP
UP
20.6
18.8
19.5
M N P Q R S T U W
22
18
17
V
21
19
20
16.5
WC-2
WC-1
WC-1
WC-2
L-1
L-12"FD-1
L-1
L-1
L-1
UR-2
UR-1
S-1
MS-13"V UP
FSH-1
FSH-1
DF-1
WSP-1
CSD-1ASD-1
2"FD-1
3/4"HWRUP & DN
2"V UP
2"V DN
F F
2"V UP
2"V UP
3"SANUP & DN
4"SANUP & DN
X"V UP & DN
2"V DN
4" SANUP & DN
2"V DN
MULTICULTURAL CENTER
109
VSA
109FAPASU KP
109GV SMALL CONF ROOM
112
JAN
113
MENS WASH
114
CORRIDOR
H114
MEDITATION
115
WOMENS WASH
116
TELECOM
117
ELEC
118
CORRIDOR
H118
WOMEN
111
MEN
110
CORRIDOR
H110MEDIUM CONF ROOM
119
CAER
109N
MCC DIRECTOR
109M
MSA
109L
STOR.
109K
BWA
109B
BSU
109AMEDIUM CONF ROOM
104CORRIDOR
H105
CONF STORAGE
107
MECHA
109ENASU
109DLARGE CONF ROOM
108
STAIR 4
S102
BRIDGE
H104
SEATING
121
STAIR 5
S103
6"RD UP(6830 SF)
1 1/2"V DN
PROVIDE 3/4"HW, CWMALE HOSE BIBCONNECTIONS
3/4"HW RPZ,3/4"CW RPZ
1 1/2"V DN
6"RDUP & DN(3430 SF) 6"RD
UP & DN(3586 SF)
6"RD UP(5300 SF)
6"RD DN(5300 SF)
6"RDUP & DN(5440 SF)
3"RDUP & DN(750 SF)
6"RD DN(6830 SF)
2"SAN UP
2"V UP
3"SAN UP
1 1/2"V UP
4"SANUP & DN
2"V DN
E504 1
1 1/2"V DN
2"FD-1
2"SAN UP
4"SAN DN
1"CW UP
1"CW DN
4"SAN UP
3/4"HW & CWUP & DN
2"V UP
E504
3
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:02:5
0 P
M
P151A
11045
LEVEL 1 - NORTHWING -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR A - PLUMBING
KEY PLAN (NTS)
UP
DN
UP
DN
DN
UP
DN
DN
UP
DN
20.6
A B C D E F G H
17.0
16.2
15.5
18.8
17.9
17.5
19.5
L M N
18
17
15
13
21
19
14
16
14.2
12.7
20
PROVIDE 1"RPZFOR HVAC MAKE UP WATER
RELOCATED GAS METER
RECONNECT TO EXISTINGGAS LINE ROUTED TOTAYLOR LOUNGE FIRE PLACES
G
3"FD-1
HB-1
NEW FIRE PROTECTIONRISER, RECONNECT TO EXISTINGSYSTEM
DUCKSTORE102
MECH103
STAIR 7S110?
?
STAIR (E)S101
ELEVE1
LANDINGH102
BRIDGEH102A
STAIR 4S102
HALLWAYH101
TAYLOR LOUNGE101
STAIR (E)S109
STAIR 2S105
EMU LOBBYL101
SEATINGL005A
FISHBOWL FOOD SERVICESEATING
170
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:03:0
5 P
M
P151B
11045
LEVEL 1 -HEARTH & MILLSCENTER -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR B - PLUMBING
KEY PLAN (NTS)
B
UP
DN
DN
DN
DN
F G H J
11.5
10
9
8
7
6
5
4
3
2
0.5
K
L M N
13
12
11
1
9.5
12.5
12.7
12.2
WC-1
WC-2
UR-1UR-2
L-1 L-1
WC-1 WC-2
2"FD-1
2"FD-1
WC-2L-2
MS-1
4"RD UPTIED OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3"/HR DOWN STREAM.
4"RD DN(1450 SQFT)
3"RD/OD UP(1450 SQFT)
3"RD/OD UP(1450 SQFT)
4"RD DN(1450 SQFT)
4"RD UPTIED OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3"/HR DOWN STREAM.
WCO
TP-2
WHA
4"SAN DN
2"SAN DN
EMU LOBBYL101
FLEXIBLE SPACEL101A
VERY SMALL CONFERENCEROOM
131VERY SMALL CONFERENCEROOM
130
ELEV (E)E4
STAIR (E)S111
STORAGE132
FOOD SERVICE VENDOR 3151
FOUNTAIN COURT SEATING134B
SEATING134C
SEATINGL005A
STAIR 3
S006
FOYER
H134
ROGUE CONFERENCE ROOM(MEDIUM)
140
UMPQUA CONFERENCEROOM (SMALL)
141
JANITOR142
HALLWAYH143 TOILET
144
STAIR (E)S107
V LARGE CONFERENCEROOM STORAGE
145A
VERY LARGE CONFERENCEROOM
145
VERY LARGE CONFERENCEROOM
146
ELEVATOR (E)E3
STAIR (E)S108
CONFERENCE STORAGE147
??
??
STORAGE149A
L-1 L-1
DF-1
POC 3/4"HW,CW &TO EXISTING INCEILING
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:03:2
3 P
M
P151C
11045
LEVEL 1 - 1962ADDITION -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR C - PLUMBING
KEY PLAN (NTS)
C
UP
A B C D E F
10
9
8
7
6
5
4
3
9.5
12.7
12.2
EXISTING RESTROOM,SEE ARCHITECTSDRAWING OFRELOCATED ADA WC'S
(E) ALARM BELL
(E) 2-WAY FDC
PROVIDE 3/4"HOT, 1"COLD WATERCAPPED WITH SUB METERS, 1"GASCAPPED FOR FUTURE T.I. WORK TO BEDETERMINED AT A LATER DATE, EACHRETAIL SPACE TO BE INDIVIDUALLYMETER AND GREASY WASTE LINEROUTED TO NEW GREASE INTERCEPTOR
(E) 2-WAY FDC
(E) HOSE BIB
PROVIDE NEWBACKWATER VALVE
PROVIDE 3/4"HOT, 1"COLD WATERCAPPED WITH SUB METERS, 1" GASCAPPED FOR FUTURE T.I. WORK TO BEDETERMINED AT A LATER DATE, EACHRETAIL SPACE TO BE INDIVIDUALLYMETER AND GREASY WASTE LINEROUTED TO NEW GREASEINTERCEPTOR
PROVIDE 3/4"HOT, 1"COLD WATERCAPPED WITH SUB METERS, 1" GASCAPPED FOR FUTURE T.I. WORK TO BEDETERMINED AT A LATER DATE, EACHRETAIL SPACE TO BE INDIVIDUALLYMETER AND GREASY WASTE LINEROUTED TO NEW GREASEINTERCEPTOR
EXISTING FIXTURES INTO REMAIN IN SERVICE
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:03:3
8 P
M
P151D
11045
LEVEL 1 - FOODSERVICE -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR D - PLUMBING
KEY PLAN (NTS)
DN
UP
DN
UP
DN
20.6
A B C D E F G H
17.0
16.2
15.5
18.8
17.9
17.5
19.5
L M N
18
17
15
13
21
19
14
16
14.2
12.7
20
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:03:5
2 P
M
P151mB
11045
MEZZANINE -LEVEL 1 HEARTH& MILLS CENTER- PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1MEZZANINE FLOOR PLAN - SECTOR B - PLUMBING
KEY PLAN (NTS)
B
A B C D E
10
9
8
7
6
5
4
9.5
PROVIDE 1"RPZ AND ROUTE
1" ICW TO NEW MAU
WC-2
L-1
RECONNECT TOEXISTING SERVICES
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:04:0
4 P
M
P151mD
11045
MEZZANINE -LEVEL 1 SOUTH -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1MEZZANINE FLOOR PLAN - SECTOR D - PLUMBING
KEY PLAN (NTS)
DN UP
DN
20.6
18.8
19.5
M N P Q R S T U W
22
18
17
V
21
19
20
16.5
WC-2
WC-1
WC-1
WC-2
L-1
L-1
2"FD-1L-1
L-1
L-1UR-2
UR-1
MS-1
2"FD-1
S-1
3"V DN
4"V UPTO 4"VTR
2 1/2" V DN
4" SAN DN
4" SAN DN
1 1/2" V DN
2" SAN DN
4" SAN DN
1 1/2"HW UP
DF-1
4" V UP
CSP-1ASD-1WSP-1
S-1
1 1/2"CW UP
3/4"HWR UP
3/4"HWR DN X"CW DN
HB-1
MEN'S CENTER
211
STAIR 4
S202
SUPPLY
213A
NON-TRADITIONAL STUDENT
UNION
212STUDENT ACTIVITIES AND
RESOURCE CENTER
213
COPY CENTER
213B
CHAIR STORAGE
213C
VERY SMALL CONF ROOM
210
STUDENT ACTIVITIES AND
RESOURCE CENTER
213
SEATING STORAGE
214F
TEAM
213D
TEAM
213E
?
?
?
?
MF AUDITORIUM STORAGE
214G
STORAGE
214B AV
214C
MULTI-FUNCTIONAL
AUDITORIUM
214
BRIDGE
H204
?
?
MEN
216
WOMEN
217
OFFICE
223A
CULTURAL FORUM
223
STAIR 5
S203
ELECTRICAL
222
JAN
221
?
?
MEDIUM CONF ROOM
219
STORAGE
218
VESTIBULE
V214E
CORRIDOR
H212
STUDY/ COLLABORATION
H200
CIRCULATION
H201
MEDIUM CONF ROOM
230
4"RD /OD UP(3430 SF)
4"RD/OD UP(3400 SF)
4"RD /OD UP(3430 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE6"RD DN (6830 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THE VERTICALAS PER CODE,6"RD DN (3430 SF)
3"RD/OD UP(750 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THEVERTICAL AS PER CODE,3"RD DN (750 SF)
4"RD/OD UP(3110 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THEVERTICAL AS PER CODE,6"RD DN (5440 SF)
4"RD/OD UP(3586 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE (TYPICAL)6"RD DN (3586 SF)
4"RD/OD UP(5300 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE
6"RD DN (5300 SF)
3"RD/OD UP(840 SF)
3"RDDN(1490 SF)
6"RD DN(3439 SF)
6" OD (6830 SF)
2" V DN
4"SAN UP
2"V UP
4"SAN UP
2"V UP
1/2"TP UPTO ASSEMBLY ABOVE
2"V UP
2"SAN DN
4"SAN UP
1"CW UP
1/2"TP LINE UP TOASSEMBLY ABOVE
4"SAN DN
2"V UP
SPRINKLER LINE UPTO PENTHOUSE
2"FD-1
(2) 1/2" TRAP PRIMERASSEMBLY ABOVE
2"V UP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:04:2
2 P
M
P152A
11045
LEVEL 2 - NORTHWING -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 2 FLOOR PLAN - SECTOR A - PLUMBING
KEY PLAN (NTS)
DN
DN
UP
RD RDRD RD
20.6
A B C D E F G H
17.0
16.2
15.5
18.8
17.9
17.5
19.5
L M N
18
17
15
13
21
19
12.5
14
16
14.2
12.7
20
EXISTING PLUMBING
FIXTURES TO REMAIN
WC-2
L-2 2"FD-1
CIRCULATIONH201
CORRIDORH230
MEDIUM CONFERENCE ROOM231
SEATING
H230A
MEDIUM CONF ROOM
232
SHARED STORAGE233
TCOM / ELEC234
G.I.235
??
PREFUNCTIONL235
MC MILLAN GALLERY201
MEN203
STAIR 1 (E)
S209
WOMEN204
ART STAGING205
CIRCULATIONH201A
GUMWOOD239
4"SAN UP
4"SAN DN IN CHASECONNECT TOEXISTING IN WALL
1 1/2"CW UP
CONNECT 1 1/2"CWTO EXISTING HEADER &EXTEND UP TOABOVE CEILING
4"RD/OD UP(2225 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE4"RD DN (2225 SF)
4"RD/OD UP(2225 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE6"RD DN (26855 SF)
3"RD/OD UP(460 SF)
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:04:3
7 P
M
P152B
11045
LEVEL 2 -HEARTH & MILLSCENTER -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
KEY PLAN (NTS)
B
E F G H J
11.5
10
9
8
7
6
5
4
3
2
0.5
K
L M N
13
12
11
1
9.5
12.5
12.7
12.2
10
E F G H J K L
11
12
13
14
15
16
17
18
19
20
21
22
M
3"FS-1
RECONNECT VENT TOEXISTING VTR,RECONNECT NEW FLOOR SINKTO EXISTING WASTE SYSTEM
TP-2
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:04:5
1 P
M
P152C
11045
LEVEL 2 - 1962ADDITION -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 2 FLOOR PLAN - SECTOR C - PLUMBING
KEY PLAN (NTS)
C
UP
UP
RD
RDRD
A B C D E
10
9
8
7
6
5
4
3
2
0.5
1
9.5
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:05:0
3 P
M
P152D
11045
LEVEL 2 -SOUTHWEST -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 2 FLOOR PLAN - SECTOR D - PLUMBING
KEY PLAN (NTS)
DN
DN
A B C D E F G H J
11.5
12
12.5
13
14
15
16
17
18
NML
19
20
16.5
KA B C D E F G H
17.0
16.2
15.5
11.5
18.8
17.9
17.5
19.5
L M N
18
17
15
13
12
19
12.5
14
16
14.2
12.7
12.2
20
10
A B C D E F G H J K L
6
7
8
9
11
12
3
4
5
M
2
EXISTING PLUMBINGFIXTURES TO REMAIN
4"RD-1
4"OD -1
(2225 SF)
4"RD-1
4"OD -1
(2225 SF)
L-1
WC-2
EXISTING PLUMBINGFIXTURES TO REMAIN
EXISTING PLUMBINGFIXTURES TO REMAIN
CONNECT 1/2"HWTO EXISTING
NEW 1 1/2"CW FROMBELOW, EXTEND TONEW PLUMBING FIXTURES
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:05:1
8 P
M
P152mB
11045
MEZZANINELEVEL 2 -HEARTH & MILLSCENTER-PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 3 FLOOR PLAN - SECTOR B - PLUMBING KEY PLAN (NTS)
B
DN
16
17
18
21
22
WVUTSRQPNM
19
20
16.5
K
20.6
18.8
19.5
M N P Q R S T U W
22
18
17
V
21
19
16
20
16.5
4"RD-14"OD-12950 SF450 VERT SF(TOTAL 3400 SF)
3"RD-13"OD-1450 SF300 VERT SF(TOTAL 750 SF)
4"RD-14"OD-14325 SF975 VERT SF(TOTAL 5300 SF)
4"RD-14"OD-11990 SF1120 VERT SF(TOTAL 3110 SF)
4"RD-14"OD-1660 SF490 VERT SF(TOTAL 3586 SF)
EWH
1
ET
1
CP
1
MX
1
TP-1
4"FS-1
SEE DETAIL3/4"HWR,1 1/2"HW,1 1/2"CW DN
4" VTR
4" V UPTO 4" VTR4" V DN
WH-1
4"FS-1
SPILL RD & ODTO LOWER ROOF(2436 SF)
TP-2
3"RD-13"OD-1(840 SF)
HB-1
MECHANICAL PENTHOUSE
WEST
R101
MECHANICAL PENTHOUSE
EAST
R103
4"RD/OD UP(2436 SF)
3"RD/OD DN(1490 SF)
4"FS-1
4"FS-1
HB-1
2"V UPTO 2"VTR
2"V DN2"V DN
2"V UPTO 2"VTR,2"V DN
TP-1
2"V UPTO 2"VTR
3"RD/OD UP(1490 SF)
2"V DN
E504
3
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:05:4
6 P
M
P200A
11045
ROOF PLAN -NORTHWING-PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 3 FLOOR PLAN - SECTOR A - PLUMBING
KEY PLAN (NTS)
10
1
A B C D E F G H J K L
6
7
8
9
3
4
5
M
2
(E)4"RD(1430 SQFT)
(E)4"RD(1860 SQFT)
(E) 4" OVERFLOWWILL NEED TO TIEINTO THE EXISTINGROOF SYSTEM
6"RD-16"OD-1(3135 SQFT)
(E) 4"RD(2000 SQFT)
(E) 4"RD(2300 SQFT)
3"RD(1035 SQFT)
4"RD(1567 SQFT)
3"RD-13"OD-1(235 SQFT)(225 VERT. SF)(460 TOTAL SF)
4"RD-14"OD-1(2270 SQFT)
3"RD(1005 SQFT)
3"RD(1005 SQFT)
E504 1
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:06:0
2 P
M
P200B
11045
ROOF PLAN -HEARTH & MILLSCENTER -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
KEY PLAN (NTS)
B
SCALE: 1/8" = 1'-0"1ROOF PLAN - SECTOR B - PLUMBING
GUTTER & DOWNSPOUTBY ARCHITECT/ SPILL TOLOWER ROOF
RD
RD
RD
RD
F G H J
11.5
10
9
8
7
6
5
4
3
2
0.5
K
L M N
13
12
11
1
9.5
12.5
12.7
12.2
PROVIDE 1 1/4"ICWTO MAU
4"RD-14"OD-1(2270 SF)
3"RD-13"OD-1(845 SQFT)
3"RD-13"OD-1(1450 SQFT)
4"RD-14"OD-1(2424 SQFT)
3"RD-13"OD-1(1450 SQFT)
3"RD-13"OD-1(825 SQFT)
3"RD-13"OD-1(845 SQFT)
4"RD-14"OD-1
3"RD-13"OD-1(1750 SF)(195 VERT SF)(1945 TOTAL SF)
3"RD-13"OD-1(360 SF)
3"RD-13"OD-1(900 SF)
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:11:1
5 P
M
P200C
11045
ROOF PLAN -1962 ADDITION -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1ROOF PLAN - SECTOR C - PLUMBING
KEY PLAN (NTS)
C
A B C D E F
10
9
8
7
6
5
4
3
9.5
14.2
12.7
12.2
3"RD
4"RD 4"RD
RECONNECTEXISTING 3/4"GASTO NEW RTU
RECONNECTEXISTING 3/4"GASTO NEW RTU
4"RD4"RD
3"RD
3"RD
3"RD
OVERFLOW SCUPPER
(E) OVERFLOW SCUPPER
(E) OVERFLOW SCUPPER
(E) 4"DOWNSPOUT
4"RD4"RD
NEW CANOPYDOWNSPOUNTS TORECONNECT TO EXISTING
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:11:2
8 P
M
P200D
11045
ROOF PLAN -SOUTHWEST -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
KEY PLAN (NTS)SCALE: 1/8" = 1'-0"1ROOF PLAN - SECTOR D - PLUMBING
20.6
18.8
19.5
M N P Q R S T U W
22
18
17
V
21
19
20
16.5
1
6
7
3
4
5
M
2
4" RD-14"OD-12840 SF590 VERT SF(TOTAL 3430 SF)
4" RD-14"OD-1(2436 SF)
4"VTR
4"VTR
ROOFHYDRANT
ROOFHYDRANT
3"RD-13"OD-1(1490 SF)
4" RD-14"OD-12840 SF590 VERT SF(TOTAL 3430 SF) engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:11:4
0 P
M
P201A
11045
UPPER ROOFPLAN - NORTHWING -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
KEY PLAN (NTS)
SCALE: 1/8" = 1'-0"1ROOF PLAN - SECTOR A - PLUMBING
B C D E
18
19
20
EXISTING DOMESTIC COLD WATER& FIRE PROTECTION BACKFLOWS, METERAND FIRE RISER TO REMAIN
THESE PIPES ARE PART OFPACKAGE 1
CA
(N)4"FS-1
(N)4"FS-1
SP
2
FTDW
1
REPLACINGPUMPS,CONTOLS,COVER ANDPIPING
PORVIDE 1"RPZ AND ROUTE1"ICW TO HVAC EQUIPMENT
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:11:4
8 P
M
P401
11045
ENLARGEDEXISTING PLANS- PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/4" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR D ENLARGED - PLUMBING
4TH- ROOF
3RD FLOOR
MEZZANINE
1ST FLOOR
GROUND FLOOR
WATER ENTRY /MECH. ROOM
CRAFT CENTER (E) RESTROOM PUBMARKET
EXISTING EXISTING FOOD PREP EXISTING
2ND FLOOR
EXISTING RESTROOM EXISTING RESTROOMEXISTING RESTROOM
EXISTING RESTROOM
EXISTING RESTROOM
SMALL RESTROOM RESTROOM RESTROOM
(E) DOMESTIC COLDWATER SERVICE
MARKET/COFFEE
RECONFIGURED KITCHENEXISTING
FOOD PREPPROVIDE NEWHOT & COLDWATER METER
FOOD PREPPROVIDE NEWHOT & COLDWATER METER
FOOD PREPPROVIDE NEWHOT & COLDWATER METER
FOOD PREPPROVIDE NEWHOT & COLDWATER METER
NEW LAVATORY
NEWMENS/WOMENSRESTROOM
NEW 1 1/2"CW
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:11:5
5 P
M
P601
11045
HOT & COLDWATER RISERDIAGRAM
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1HOT AND COLD RISER DIAGRAM
EWH
1
(N) ET-1
(N)ELECTRICWATER HEATER
(N) CP-1
MIXINGVALVE
ROOF / PENTHOUSE
3RD FLOOR
MEZZANINE FLOOR
2ND FLOOR
UPPER ROOF
1ST FLOOR
GROUND FLOOR
1/2"
S-1
3/4"
HB-1
TP-1
3/4"
1 1/2"
3/4"
3/4"
BALANCING VALVE
L-1
L-1
1 1/2"
216
WC
-2
UR
-2
WH
A
UR
-1
SEE
L-1
L-1
L-1
3/4"
217
2"
DF-1224
MS-1
1"
3/4"
3/4"
WH-1
3/4"
S-1
1/2"
HOSEBIBS
RP2'S (2)
3/4"
MS
-1
FS
H-1
1"
116
1/2" 1/2"
FS
H-1
DF
-1
113114
WC
-1
WH
A
WC
-1
WC
-2
111
1"1 1/4"
L-1
L-1
L-1
L-1
L-1
WC
-2
UR
-2
WH
A
UR
-1
WC
-1
WH
A
WC
-1
WC
-2
2"
110
DF-1
L-1
L-1
3/4"
WC
-2
UR
-2
WH
A
UR
-1
2"
1"
2"
2"
1 1/2"
S-1
L-1
L-1
WC
-1
WH
A
WC
-1
WC
-2
1 1/2"
3/4"
2 1/2"
2"
2"
2"
2 1/2"
2 1/2"
3/4"
WH
TP-1
1/2"
S-1
2 1/2"
2 1/2"
L-2
WH
A
WC
-2
1/2"
1 1/2"
MS-1 WH-1
1 1/4"
3/4"
3/4"
3/4"
014 012D 018 017
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:12:0
1 P
M
P602
11045
HOT & COLDWATER RISERDIAGRAM
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1HOT & COLD RISER DIAGRAM
ROOF / PENTHOUSE
3RD FLOOR
MEZZANINE FLOOR
2ND FLOOR
UPPER ROOF
1ST FLOOR
GROUND FLOOR
2"
4" SAV
S-1213
2" FS-1 2" VTR
4"
3"
4"
2"4"
2" 4"
1 1/2" 3"
4"
4" FS-1
4" FS-1
016
2"
3"
FCO MS-1
017
007
S-1
2"2"
2" FD-1
UR
-1
UR
-2
WC
-2
014
L-1
L-1
2"L
-2
WC
-2018
2"
2" FD-1FCO4"
WC
-1
WC
-1
WC
-2
2"4"
S-1
L-1
L-1
2"2"
2" FD-1
DF
-1
013 012D
2" FD-1
L-1
L-1
L-1
2" 3"
111
WC
-1
WC
-1
WC
-2
4"
2" FD-1
L-1
L-1
L-1
3"
117
WC
-1
WC
-1
WC
-2
3"
DF-1
L-1
L-1
2"
UR
-1
UR
-2
WC
-2
110
4"
2"
2"FD-1
UR
-1
UR
-2
WC
-2
1 1/2"
1 1/2"
FSH-1 FSH-1 MS-1
116116 113
2"
2"
3"
DF-1
H212
MS-1
224
2"
L-1
L-1
216
1 1/2"4"
4" VTR
2" VTR 4" VTR
a FSb FS c FS
2" VTR
2"FD-1
2" FD-1
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:12:0
8 P
M
P603
11045
WASTE ANDVENT RISERDIAGRAM -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1WASTE AND VENT RISER DIAGRAM
GROUND FLOOR
ROOF / PENTHOUSE
3RD FLOOR
1ST FLOOR
2ND FLOOR
SCUPPER UPPERROOF TO LOWER ROOF
SEE CIVIL DWGSFOR CONT.
6" STORM
TIE THE OVERFLOW INTOTHE PRIMARY ROOF DRAINON THE VERTICAL AS PER CODE
ROOF DRAINSSIZED AT 1.3"/HR
AFTER OVERFLOW IS TIED INTO THE PRIMARYDRAINS SIZE 3"/HR (TYP.)
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:12:1
5 P
M
P604
11045
STORM RISERDIAGRAM(NORTH WING)
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1STORM RISER DIAGRAM (NORTH WING)
ROOF / PENTHOUSE
3RD FLOOR
MEZZANINE FLOOR
2ND FLOOR
UPPER ROOF
GROUND FLOOR
1ST FLOOR
FHV
FHV
FHV
FHV
FHV
6"
6"
CONNECT TO 2ND FLOORSPRINKLER SYSTEM
TO SECTOR A 3RD FLOORSPRINKLER
FHV
3/4" MHT
2 WAY ROOF HYDRANT
PIV
WSP
FHV
6"
TO FIRST FLOORSPRINKLER SYSTEM
6"2"
FLOOR CONTROL SPRINKLERVALVE ASSEMBLY (TYP)
FHV
FHV
FHV
FHV
FHV
2"
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:12:2
1 P
M
P605
11045
FIREPROTECTIONRISER DIAGRAM
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1FIRE PROTECTION RISER DIAGRAM
VBVB
SCALE:
T
M
M
T
MM
HWS
TWS
TWR HWRCWS
4" STMSUPPLY
1 1/2"
1 1/2"
2 1/2"
2"
1 1/2"2 1/2"1 1/2"
2 1/2"MIN-32"
4"
4"
4"
3"
2"
1 1/2"
2 1/2"
CONDENSATEFROM FTHT-1
VENTOUTSIDEBLDG.
BALANCE VALVE
ET
1"
WH-1 WH-2
2"
CONDENSATEPUMP
MAIN CONDENSATERETURN
HEAT EXCHANGER DIAGRAM FTDW-11
NONE
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
50%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.03.14
3/1
3/2
014 4
:12:2
8 P
M
P801
11045
DETAILS -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET