Download - Operations Committee - CivicWeb
AGENDA
Operations CommitteeWednesday, April 21, 2010 - 4:00 p.m.
City Hall - Council Chambers
Committee Members Councillor G. Beach, Chair Councillor H. Noble Councillor L. Severson Mayor D.L. Henderson, Ex-Officio
Areas of Responsibility Operations Fire Museum Library Board Cemetery Board St. Lawrence Lodge Mgmt.Board L,L&G Health Unit
CRCA Airport Board Arena Advisory Board Visual/Performing Arts Committee PLMG BMAAC
Page
CORRESPONDENCE1. Brockville Police
Re: Community Policing Safety Zones
2. Brockville Police Re: Overnight Parking Restrictions in the Waterfront/Tunnel Bay Area
3. Brockville Municipal Accessible Advisory Committee (BMAAC) Recommendations Memo from Sandra Seale, City Clerk
STAFF REPORTS1. 2010-063-04
Brockville Cemetery Board - Pet Cemetery Issues
2. 2010-051-04 Replacement of Fire Department Breathing Air Compressor
3. 2010-066-04 2009 Fire Department Annual Report
4. 2010-055-04 Water and Wastewater Treatment Quarterly Report January - March 2010
5. 2010-062-04 Brockville Memorial Centre Lobby Reorganization
6. 2010-064-04 Painting of Centre, Lane and Edge Line Pavement Markings
3
4
5-11
12-15
16-20
21-59
60-66
67-68
69-70
Page 1 of 70
Operations Committee Wednesday, April 21, 2010
Page
CONSENT AGENDA
Page 2 of 70
1:1 t•I’I 4’A I ! ! WQice..INTERNAL CORRESPONDENCE
os /{,/
To: ConalCosgroveDirector of Operations
From: Adrian GeraghtyChief of Police
Date: February 12, 2010
Dear Conal:
RE: Operations Committee Meeting
I understand that Councillor Noble will be bringing forward a motion to the OperationsCommittee on February 16, 2010 with reference to areas south of Water Street andincluding Water Street to be designated as a Community Policing Safety Zone.
As we are aware there are costs associated with setting up Community Safety Zonesversus no cost to closing Block House Island to vehicular traffic.
As of January 1, 2010 the set fines for various infractions under the Highway Traffic Acthave increased and with more aggressive enforcement from our new Community OrientedPolice Unit I believe this can be controlled.
My concern on the Community Policing Safety Zone is where do we say no as otherresidents will want them in their neighbourhoods.
Chief of Police
AG/he
{ItemDescription} Page 3 of 70
_______
ciabô,s -%-: 4’A I !! WpDice..
INTERNAL CORRESPONDENCE
To: From:
Date: March 23, 2010
OPERATIONS COMMITTEE MEETING APRIL 21, 2010
Overnight Parking Restrictions in the Waterfront/Tunnel Bay Area:
On February 25, 2010 I was instructed by the Police Services Board to provide a report andrecommendations on the above overnight parking restrictions in the water front I Tunnel Bayarea.
• In October, 2009 several complaints were received at the Brockville Police Service withreference to erratic driving on Block House Island. Our new C.O.P. Unit was deployedto this area resulting in several charges being laid for stunt driving, mischief and otherrelated offences.
• In January, 2010 I attended a Council Meeting when it was suggested that the gatesleading to the Island be closed each and every night as they are during the summermonths.This suggestion was defeated at council and sent back to the Police Services Board.
• Presently there are “No Parking” signs erected at the entrance to the Island with timelines from 11:00 p.m. to 6:00 a.m..
• I do not recommend further “No Parking” signs to be erected due to the fact that thePolice cannot and will not enforce “Selective Enforcement ofNo Parking”.
• The majority of our complaints are on the parking area just south of the entrance wherethe young people congregate and act as spectators to the stunt driving and otherinfractions.
We, the Brockville Police Service, will continue to monitor this area and with the new finesystem in January of this year it will become very costly to the driver if he or she chooses tocommit an offence.
I do believe that by placing extra No Parking signs on the Island we are punishing the people whoenjoy the scenery and also some networking.
1
drianChief of Police
{ItemDescription} Page 4 of 70
City of BrockvilleClerk’s Department
MemoTo: Standing Committees
From: Sandra Seale, City Clerk
CC: BMAAC
Date: April 14, 2010
Re: BMAAC Recommendations for 2009-2010
Under the Ontarians with Disabilities Act, 2001, each year, the Council of every municipalityshall prepare an Accessibility Plan.
The 2009-2010 Accessibility Plan was approved by Council at the meeting of held March 9,2010. At this meeting, the Clerk was directed to forward each of the recommendationscontained in the 2009-2010 Accessibility Plan to the appropriate standing committee in Aprilfor review and direction.
Please see the BMAAC Recommendations for 2009-2010 attached. Each recommendationhas been assigned to the appropriate standing committee.
The Brockville Municipal Advisory Committee will work with City Staff on any of therecommendations outlined in the plan.
I
I
{ItemDescription} Page 5 of 70
BM
?U
AIC
RE
CO
MM
EN
DA
TIO
NS
FO
R2009-2010
Tim
eF
ram
e!C
ost
ing
Sta
ndin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
(if
appl
icab
le)
Tra
nsp
ort
atio
nC
reat
ion
ofa
Tra
nsit
Use
rD
o’s
/Don
’tL
ist
to20
10-
Pri
ori
tyA
Ope
rati
ons
be
po
ste
don
both
the
co
nv
en
tio
nal
and
Para
transi
tsy
ste
ms
BM
AA
Cis
wil
lin
gto
cre
ate
wit
hC
ity
staff
Wou
ldas
sist
inen
suri
ngdr
iver
,pas
senger
,an
dci
tyex
pect
atio
nsar
em
etan
dth
atsa
fety
isa
top
prio
rity
for
all
use
rsT
ran
spo
rtat
ion
The
Win
ter
Co
ntr
ols
Opera
tions
Poli
cy
in20
10-
Pri
ori
tyA
Opera
tions
regard
sto
snow
rem
oval
at
the
city
opera
ted
transi
tsto
p/t
ransfe
rp
oin
tat
Co
urt
Ho
use
be
Meet
wit
hcit
yo
ffic
ials
pri
ori
tized
for
snow
rem
oval.
BM
AA
Chas
met
and
pri
vate
ow
ners
hip
inth
epast
wit
hci
tyo
ffic
ials
and
un
ders
tan
dto
dis
cuss
issue
an
d
restr
ain
tsof
our
sy
ste
mB
MA
AC
would
like
tocre
ate
solu
tion
meet
wit
hpri
vate
ow
ners
hip
gro
ups
at
the
oth
er
tran
sfe
rpoin
tsto
cre
ate
aso
luti
on
that
benefi
tsal
lu
sers
of
ou
rsy
ste
m
Tra
nsfe
rpoi
nts
atth
eP
ower
Cen
tre,
the
Bro
ckvi
lleS
hopp
ing
Cen
tre
Cus
tom
erse
rvic
est
and
ard
san
dac
cess
ibil
ity
tobu
ildi
ngst
and
ard
sco
uld
forc
esu
chis
sues
tobe
add
ress
edan
dB
MA
AC
wan
tsto
bepr
oact
ive
inth
isar
ea
Item
has
bee
na
onac
cess
ibil
ity
plan
sinc
e20
05
Our
Goa
l:A
cces
sibi
lity
AR
eali
ty
{ItemDescription} Page 6 of 70
Tim
eF
ram
e!C
ost
ing
Sta
ndin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
(if
appl
icab
le)
Tra
nsp
ort
atio
nA
tele
phone
info
rmat
ion
syst
embe
inpla
ce
for
2010
-P
riori
tyA
Ope
rati
ons
indi
vidu
als
tore
ceiv
ein
form
atio
nas
tochanges
inro
ute
s/
main
tenance
of
buses
on
Meet
wit
hC
ity
transit
the
co
nv
en
tio
nal
bus
syste
m,
and
this
sy
ste
mo
ffic
ials
tocreate
be
up
date
das
needed,
eff
ecti
ve
sy
ste
m
BM
AA
Cun
ders
tand
sth
atch
anges
have
and
will
occu
ras
are
sult
ofm
aint
enan
cesc
hed
ule
set
c.bu
tre
aliz
eho
wim
port
ant
this
info
rmat
ion
will
beto
the
use
rsof
the
syst
em.
Thi
sw
illas
sist
inth
ep
roce
ssof
havi
nguse
rsfe
elm
ore
com
fort
able
inus
ing
the
conv
enti
onal
syst
emP
hy
sica
lA
llM
unic
ipal
was
hroo
mfa
cili
ties
are
mad
e20
10-
Pri
ori
tyB
Ope
rati
ons
accessib
le.
Rota
ryFi
eld
House:
BM
AA
Cre
co
mm
en
ds
accessib
ilit
yupgrades
to$8
000
the
facil
ity
at
the
Ro
tary
Fiel
dH
ouse
BM
AA
Cco
ntin
ueto
wor
kw
ithS
enio
rM
anag
emen
tT
eam
ofth
eC
ityof
Bro
ckvi
lleto
deve
lop
and
impl
emen
tan
audi
t pro
cess
ofal
lci
tybu
ildi
ngs
and
that
BM
AA
Cco
ntin
ueto
prov
ide
reco
mm
enda
tion
sas
toth
epr
iori
ties
for
acce
ssib
ilit
y
Item
has
bee
non
acce
ssib
ilit
ypl
ansi
nce
2007
Our
Goa
l:A
cces
sibi
lity
AR
eali
ty
{ItemDescription} Page 7 of 70
Tim
eF
ram
e!C
ost
ing
Sta
ndin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
(if
appl
icab
le)
Ph
ysi
cal
BM
AA
Cco
nti
nue
work
ing
wit
hci
tyof
fici
als
to20
10-
Pri
ori
tyA
Sig
nag
e:O
pera
tion
sw
ork
on
the
pro
ject
sat
the
Jam
es
Aul
d$
10
00
buil
din
gan
dth
eaccess
thro
ughout
Met
wit
hci
tyo
ffic
ials
Blo
ckhouse
Isla
nd
tog
oo
ver
audit
BM
AA
Cre
com
men
ds
that
Blo
ckhouse
Isla
nd
chec
kli
st,
and
crea
ted
be
mad
eaccess
ible
by:
det
aile
dli
stin
gof
item
sto
be
com
ple
ted
.In
stal
ling
access
ible
sig
nag
e.
Cre
atin
gaccess
ible
curb
cuts
toth
epic
nic
are
aan
dp
lay
gro
un
dare
a.
Acc
essi
ble
do
ors
tofa
cili
tyan
du
pg
rad
es
tow
ash
room
s.
Acc
essi
ble
Pic
nic
Tab
les
be
pu
tin
par
ks
espec
iall
yin
term
sof
repla
cem
ent
ofex
isti
ng
table
s.
Rep
air
the
exis
tin
gtr
iphazard
sal
ong
the
pat
hw
ays
that
are
pre
val
ent
BM
AA
Cpr
ovid
eth
eci
tyw
ithan
Aud
itw
itha
deta
iled
list
ofpr
iori
ties
Ph
ysi
cal
BM
AA
Cre
com
men
ds
the
foll
owin
g2
01
0-
Pri
ori
tyA
Oper
atio
ns
impro
vem
ents
toth
eB
rock
vill
eA
rts
Cen
tre:
Ex
amin
efi
re/e
mer
gen
cyex
itp
roced
ure
san
den
sure
innew
seat
ing
char
tth
atth
eex
itro
ute
san
dpla
ns
are
clea
rly
def
ined
and
explo
reposs
ible
alte
rnat
ives
for
exit
s Our
Goa
l:A
cces
sibi
lity
AR
eali
ty
{ItemDescription} Page 8 of 70
Tim
eF
ram
e!C
ost
ing
Sta
ndin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
(if
appli
cable
)
Ph
ysic
al
That
the
Cit
yof
Bro
ck
vil
lecre
ate
adoor
2010
-201
5-
Pri
ori
tyA
ccessib
leO
pera
tions
repla
cem
ent
pro
gra
mso
that
all
ex
teri
or
doors
BD
oors
-
be
repla
ced
wit
hauto
mati
cdoors
$15,
000-
$25,
000
Leg
isla
tion
forb
uild
ing
will
bem
ade
byap
prox
imat
ely
2015
,an
dB
MA
AC
feel
sth
atbe
ing
proa
ctiv
ein
this
area
will
bene
fit
the
city
inth
elo
ngru
n
Item
has
bee
non
acce
ssib
ilit
ypl
ansi
nce
2008
Ph
ysi
cal
The
band
shell
at
Hard
yP
ark
be
mad
e20
10-2
011
-P
rio
rity
Opera
tions
accessib
lefo
rin
div
idu
als
who
use
Bw
heelc
hair
s,scoote
rs,
or
have
mobil
ity
issu
es
BM
AA
Cw
ould
reques
tth
atan
esti
mat
edco
stof
this
proj
ect
beco
mpl
eted
byth
eC
ity.
Sho
uld
this
enta
ilth
ehi
ring
ofan
engi
neer
ing
firm
,th
ism
oney
coul
dbe
take
nfr
omth
eB
MA
AC
capi
tal
acco
unt
BM
AA
Cw
illex
plor
eot
her
alte
rnat
ives
such
asin
volv
ing
scho
ols
tode
velo
pth
epr
ojec
t
Item
has
bee
non
acce
ssib
ilit
ypl
ansi
nce
2007
Ou
rG
oal:
Acc
essi
bili
tyA
Rea
lity
{ItemDescription} Page 9 of 70
.T
ime
Fra
me!
Co
stin
gS
tandin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
(if
appl
icab
le)
Ph
ysi
cal
BM
AA
Cre
com
men
ds
toth
eC
ity
that
the
2010-2
011
-P
riori
tyA
cces
sible
Oper
atio
ns
foll
owin
gac
cess
ibil
ity
con
cern
sw
ith
resp
ect
toC
Doo
rs:
the
Bro
ckvi
lle
You
thA
rena:
$1
5,0
00
.A
cces
sib
led
oors
(poss
ibly
alre
ady
fun
ded
thro
ugh
Enab
lin
gA
cces
sibil
ity
Fund)
.A
cces
sib
lepar
kin
gsp
aces
atth
efr
ont
ofbu
ildi
ng.
An
acce
ssib
lese
atin
gar
eaat
the
south
wes
t_co
rner
_o
fth
e_ar
ena
Ph
ysi
cal
BM
AA
Cre
com
men
ds
the
com
ple
tion
of2
01
0-
Pri
ori
tyA
Oper
atio
ns
exis
ting
pro
ject
sat
the
Bro
ckvi
lle
Mem
oria
lC
entr
ew
hich
hav
eno
tb
een
com
ple
ted
.C
urb
Cu
tsfo
rth
em
ain
entr
ance
ofth
ebu
ildi
ng.
Curb
Cuts
/Ram
pat
the
fire
exit
son
the
Nor
thsi
de
ofth
ebu
ildi
ng
Item
has
bee
non
acce
ssib
ilit
ypl
ansi
nce
2005
Ph
ysi
cal
That
all
city
buil
din
gs
hav
ev
isu
alal
arm
syst
em2
01
0-
Pri
ori
tyA
Mem
oria
lO
per
atio
ns
wit
hfl
ashin
gli
ghts
,w
ith
the
prio
riti
esb
ein
gth
eC
entr
eB
rock
vill
eP
ubli
cL
ibra
ry,
the
Bro
ckvi
lle
Art
ses
tim
ate:
Cen
tre,
and
the
Bro
ckvi
lle
Mem
oria
lC
ivic
$4
-5,0
00
Cen
tre
BM
AA
Cw
ould
bew
illin
gto
wor
kw
ithth
ese
faci
litie
sto
ensu
reth
ispr
ojec
tis
com
plet
ed
Item
has
bee
non
acce
ssib
ilit
ypl
ansi
nce
2005
Our
Goa
l:A
cces
sibi
lity
AR
eali
ty
{ItemDescription} Page 10 of 70
Tim
eF
ram
e!C
ost
ing
Sta
ndin
gB
arri
erD
escr
ipti
on
Imp
lem
enta
tio
nE
stim
ate
Com
mit
tee
.(i
fap
pli
cable
)P
hy
sical
Inst
all
audio
an
dti
me
signals
toass
ist
the
2010
-P
rio
rity
AA
ppro
x.
cost
Opera
tions
heari
ng
impair
ed,
mobil
ity
chall
enged,
and
ou
ro
f$10,0
00
per
larg
ese
nio
r’s
dem
ogra
phic
inb
ein
gable
toin
ters
ecti
on
navig
ate
ou
rci
tyin
ters
ecti
ons
ina
safe
manner
BM
AA
Ch
ascr
eate
da
prio
riti
zed
listin
gof
traf
fic
inte
rsec
tion
sw
ithin
the
city
that
are
criti
calac
cess
poin
tsto
vari
ous
loca
tion
s,an
dar
ehe
avil
yuse
dby
pede
stri
ans.
BM
AA
Ch
ascr
eate
da
prio
riti
zed
listf
orci
tyof
fici
als
tore
view
.T
ransport
ati
on
Recogniz
eth
echan
ge
ino
pera
tio
nof
the
2009
-201
0-
Pri
ori
tyO
pera
tions
Para
-tra
nsi
tsy
stem
wil
lb
eta
kin
gpla
ce
inth
eA
com
ing
year.
BM
AA
Cw
ould
be
wil
lin
gto
ass
ist
inan
ycapacit
yto
en
sure
the
levels
of
serv
ice
are
co
nti
nu
ed
for
the
co
min
gy
ears
Tra
nsp
ort
ati
on
BM
AA
Cw
ou
ldli
ke
tow
ork
wit
hci
tyo
ffic
ials
to20
10-
Pri
ori
tyA
Opera
tions
cre
ate
abus
stop
at
the
Via
Tra
inS
tati
on,
ensu
ring
the
bus
stop
ispla
ced
appro
pri
ate
ly
tofu
ture
upgra
des
that
are
made
toth
at
faci
lity
.E
ase
of
access
toal
ltr
ansp
ort
ati
on
modes
iscr
itic
alto
mak
ing
aci
tyaccess
ible
.
Our
Goa
l:A
cces
sibi
lity
AR
eali
ty
{ItemDescription} Page 11 of 70
April 12, 2010
Report to the Operations Committee - April 21, 2010
2010-063-04Brockville Cemetery Board CM. LarocquePet Cemetery Issues SecretarylTreasurer
Brockville Cemetery Board
RECOMMENDATION
THAT Report Number 2010-063-04, Brockville Cemetery Board — Pet Cemetery Issuesbe received for information purposes.
BACKGROUND
In a letter dated October 09, 2008 from a Mr. Don Flemming, Compliance Officer withthe Ministry of Small Business and Consumer Services, Cemeteries Regulation Unitthe Brockville Cemeteries Board were put on notice that burying of pets may not beallowed. Following this series of dialogues and e-mails and were involved indetermining a process whereby we could change the City’s by-law and incorporate theestablishment of a Pet Cemetery. We were led through the process on how to go aboutthis and in so doing we were to provide public notice, signage, etc.
There are three separate grounds for burying pets, known as Pet Cemetery “A”, “B”,and :C”
On January 27, 2009 Council passed the appropriate amending by-law. This and othersupporting documents were forwarded to the Ministry. Despite all of what has beendone we have now received a letter from the Registrar, Mr. Michael D’Mello that wecannot have a Pet Cemetery contained within the boundaries of Brockville Cemetery.
ANALYSIS
It seems now that the required path in resolving the issues is as follows:
• The three Pet Cemetery Locations as suggested by The Registrar, MichaelD’Mello, will have to be segregated and removed from the land description ofthe Human Cemetery portion. To do this each of these Pet Cemeteries willhave to be surveyed by a licensed Ontario Land Surveyor (OLS)
• An application will have to be authorized by Council and submitted to theministry to CLOSE Off these locations from the Human Cemetery. Oncedone, the separately identified Pet Cemeteries can continue as separate
{ItemDescription} Page 12 of 70
Report 2010-063-04Brockville Cemetery BoardPet Cemetery Issues Page 2
entities. This separate Pet Cemetery entity could be operated by The City, aprivate Entrepreneur or by the Brockville Cemetery Board.
• These future separately identified Pet Cemeteries cannot enjoy the use of anymonies or interest earned from the Perpetual Care Reserve Fund. As aconsequence the Pet Cemeteries will have to stand alone as their own costcenter earning their own revenue and absorbing their own costs.
• The cost of moving through the suggested close/paper separation procedureis estimated to be in the order of $15,000 for surveys, title searches anddocument preparation.
The options for a path forward are:
1. Ask the Registrar to simply allow the Board to cease burying pets without thework and cost of a paper exercise that would remove (on paper) the pet lotsfrom the human parameters. This option would sustain the Registrars opinionabout the public interest being served in maintaining separation. It wouldhowever, in the opinion of the Board not be in the public interest to incur costsmerely for a paper exercise.
2. Proceed on our own with an application to Close and Separate.
3. Wait, and take no action to determine if the Registrar will provide and officialorder to “Close and Separate”
Options 2 and 3 would incur the cost of the paper exercise.
In the meantime, the Board has ceased burying pets. This action will undoubtedly raisesome questions and public relations issues among the citizens of Brockville.
We will keep you apprised as further developments occur.
C.M. Larocque B. CasselmanSecretary, Brockville Cemetery Board City Manager
{ItemDescription} Page 13 of 70
MinutesOf the
Cii or Bocv BOARDAt its meeting of
Monday April 12, 2010Call to order:
By Muriel Greene at 11:00 AM.
Attendance:
Muriel Greene, Doug Grant, Darryl Cuthbert, Brian Porter, Bob Casselman City Manager, Superintendent, DaleTrickey Secretary/Treasurer, Mike Larocque.
Regrets,Absent: Mike Lebel, Marvin Graves
Chairperson’s Remarks:
Muriel Greene welcomed Bob Casselman to the meeting to discuss the Pet Cemetery Issue with Mr. Michael D’Mello,Registrar of the Provincial Cemeteries Branch.
After twenty minutes had passed, Secretary/Treasurer, M. Larocque called the Ministry in Toronto to ascertain why theRegistrar had not yet shown up. The administrative assistant indicated he was not coming today as there must have beensome mix up in the date. They will Call M. Larocque at home later in the day to indicate when they will be coming.
Chair, Muriel Green availed of the opportunity to discuss issues among ourselves and asked Secretary/Treasurer, M.Larocque to give the Board an update on the recent discussions he had with The City Manager Bob Casselman and the CitySolicitor, John Simpson on March 18, 2010 at 2:00 PM
Mr. Larocque summarized those discussions as follows:
I. He reminded that the Board had made a previous verbal commitment by phone With the Registrar, Michael D’Mellothat the Board would we would proceed with an application to “Close and Separate” the Pet Cemetery areas and that theRegistrar under these conditions would allow the Board to continue the burial of pets.
2. He advised that the meeting with the City Manager and City solicitor produced a consensus that the high costof surveys, land titles search and document preparation was probably not in the best “Public Interest” in so far aseconomics was concerned. Pursuant to this it was felt that City Council might not want to entertain such costsand that we should not proceed with a voluntary application to “Close” unless we were officially ordered to do so.
3. It was recognized and agreed at the City administration meeting that if we were not going to proceed voluntarily withthe application then we should not continue the burying of pets.
4. The Secretary/Treasurer advised the Cemetery Board by phone that same day to cease burial of pets.
5. The City meeting group had hoped that we would next talk to the Registrar when he came to Brockvilleto consider the practicality of not conducting a costly paper exercise and seek his permission to allow us toquit burying without all of the expense.
6. If the Registrar doesn’t go for this and then officially orders the Board to “Close” then we are right back tocost and paper exercise.
7. Following that, if and when the “Closure/Separation” process goes through then the Pet Cemetery functions are \finished.
8. City Council would then have to decide if they want a Pet Cemetery either on the separated properties or onsome other property. City Council would then consider if they wanted to operate it themselves, have the CemeteryBoard operate it as a separate and distinct function, or farm/contract it out to a private entrepreneur.
{ItemDescription} Page 14 of 70
29. A separate budget and accounting system should be developed and a cost benefit analysis done by the City to
determine the financial practicality.
It was discussed and identified at this Cemetery Board meeting that there is a public relations issue with which we now haveto contend as people will be wanting an explanation why we are no longer burying pets. It was agreed that theSecretary/Treasurer would prepare a report for the next Operations Committee Meeting of the city on April 21 at 4:00 tobring Council up to date.
City Manager, Bob Casselman concurred generally with the summary provided by the Secretary/Treasurer and advised thathe himself had a few questions for the Registrar when we meet with him.
It was agree that the next regular meeting of the Cemetery Board scheduled for Wednesday April 21 ,be cancelled in order toallow the Board members time to attend the Operations Committee Meeting at City Hall.
ACTION REQUIRED: C. M. Larocque
ADJOURNMENT:On motion of Brian Porter the meeting was adjourned at 12:00 PM
Carried.
NEXT MEETING
Wednesday, May 18 2010 at 2:00
C. M. Larocque Muriel GreeneSecretary/Treasurer Chairman
{ItemDescription} Page 15 of 70
March 23, 2010REPORT TO OPERATIONS COMMITTEE - APRIL 21, 2010
2010-051-04REPLACEMENT OF FIRE DEPARTMENT C. DWYREBREATHING AIR COMPRESSOR DEPUTY FIRE CHIEF
RECOMMENDED:
THAT council supports the purchase of a new breathing air compressor to be utilizedas an integral part of the Respiratory Protection Program of the Fire Department.
THAT the quotation received from M & L Supply Fire & Safety, for a Scott Simple AirCompressor model # AC0404364111 in the amount of $26,295.10 be accepted.
THAT the funds in the amount of $25,000.00 that were approved during the 2010 BudgetProcess and the additional $1,295.10 from the departments Operational Equipmentaccount be used toward this purchase.
PURPOSE:
The Brockville Fire Department has been at the forefront in developing a RespiratoryProtection Program, our program formed in the early 1980’s in conjunction with our JointOccupational Health & Safety Committee has consistently provided our employees witha high quality air supply to be used with our breathing apparatus in both emergency andtraining evolutions. In addition to our own department air supply needs, we haveprovided many of the surrounding area fire (SCBA), police (dive teams) departments aswell as the St. Lawrence College pre-service Fire Fighter Program (SCBA) withbreathing air when required.The breathing air compressor is the most important component of our fire departmentRespiratory Protection Program. A breathing air compressor is designed to deliver aquality supply of air with a variety of built-in safety features. A breathing air compressoris one of three parts to the air supply system. The primary function of this equipment is topurify, remove moisture content to a desired level and then pressurize the purified airsupply to 4500 to 6000 PSI. The remainder of the system is made up of a storage bank offour cascade cylinders and a filling station where the stored /purified air is transferred tothe air bottles used on the back packs worn by firefighters in their fire suppression duties.The air supply that is used by firefighters is required to meet or exceed all recognizedrespiratory air standards as set out by CSA Zi 80.1-00 breathing air standards.The present system owned and operated by the fire department has had the air fillingstation replaced in 2007. The cascade storage cylinders are original equipment andremain in good condition. The compressor/purification system has been taken out ofservice and the estimate for repairs exceed the value of the equipment.
{ItemDescription} Page 16 of 70
Page 2
BACKGROUND:
The fire department has been using the same compressor for over twenty five years andhas been experiencing repeat mechanical problems for the past five or six years. InFebruary of this year a major mechanical breakdown shut the system down completelyforcing our department to rely on a neighboring fire department for a reliable supply ofbreathing air. To fully evaluate the necessary repairs required to our compressor it had tobe disconnected and removed from the present location — the evaluation identified thatthe cost of repairs and a total rebuild of the unit was not a feasible solution with theexpected working/life remaining on the unit.At the present time a loaner compressor unit has been obtained and installed in the firestation until a replacement compressor is purchased.To meet the established standards that our Respiratory Protection Program has set for theprotection of our own employees, and to comply with federal standards, it is importantthat we maintain a reliable air purification system. Our present program requires us tochange the air in each of our self contained breathing apparatus (SCBA) on a quarterlyschedule. Additional compressed air is necessary during or after any emergency situationor training sessions.As previously mentioned, we fill air bottles for other fire & police departments, the St.Lawrence College Pre-service Fire Fighter program, other city departments, privateindustry and services within the city — a reliable operating system is a must.
ANALYSIS/OPTIONS:
Quotations have been received from six (6) suppliers of breathing air compressors thatwill fit into our existing air purification system. Prices range from $26,295.00 to$34,555.35 - the quotations received were for three (3) different brand names of aircompressor - Scott, CompAir/Mako and Jordair (4). All models will satisfactorily fit intoour existing system.The quotations include a Carbon Monoxide and moisture monitoring system that is a newrequirement in 2010 and would have to have been added to any existing air compressorduring this year to meet federal standards.All quotations include installation/set-up, staff training and the first air sample test.The safety requirements and considerations in having a reliable operational aircompressor/purification system make the replacement of the present unit a priority forthis department.Quotations are attached.
{ItemDescription} Page 17 of 70
Page 3
FINANCIAL CONSIDERATIONS:
The replacement of the compressor/air purification unit was inevitable. Thisadministration has attempted to keep it operational at a minimal cost over the past fiveyears with expectation that it might have lasted until 2011.With the funding of $25,000 specified in the Budget Process an additional $1,295.10 ofthe costs will be taken from the department 2010 - Operational Equipment Account.
CONCLUSION:
It is recommended that we accept the lowest of the quotations received — being that fromM & L Supply Fire & Safety in the amount of $26,295.00 for a Scott Simple AirCompressor, model #AC040436441 11.
C. Dwyre B. CasselmanDeputy Fire Chief City Manager
L rJL4—Donna Cyr 1
Director of Finance
{ItemDescription} Page 18 of 70
BREATHING AIR COMPRESSOR QUOTATIONS 2010
M&L SUPPLY FIRE & SAFETY- Scott Simple Air Compressor AC04043641 11
3 Phase, 10 HP, 6000 PSI, CO & Dew Point Monitor SystemSet up, Training, and Air Sample included $23,270.00
Taxes $1,861.60$1,163.50
Total $26,295.10
COMPAIR CANADA INC.- CompAir MAKO Breathing Air Compressor BAMO6H-E3
14 CFM, 6000 PSI, 3 Phase 60Hz motor $19,511.00Carbon Monoxide & Moisture Monitor $3,977.00Installation, start up, initial air sample & training $1,170.00
$24,658.00Taxes $1,972.64
$1,232.90Total $27,863.54
PSI COMPRESSORS INC.- Jordair Air Kat 6-1214-3E
10 HP, (230/3/60), 4 stage, 6000PSIG, 15.87 CFM $21,708.00CO Monitor with Calibration Kit, Installation included $3,997.00Air Sample $375.00
$26,080.00Taxes $2,086.40
$1,304.00Total $29,470.40
{ItemDescription} Page 19 of 70
ACKLANDS GRAINGER INC.Jordair Air Kat 6 -1214-3E6,000 PSI, 13 CFM, 3 Phase, 10 HP $22,618.00CO Monitor & regulator $3,855.92
$26,473.92Taxes $1,323.70
$2,117.91$29,915.53
Installation, start up, air sample $1,875.90Taxes $93.79
$150.07Total $32,035.29
LEVITT-SAFETYJordair Air Kat 6-1214-3EVertical, 3 phase, 13 SCFM, 10 HP $24,995.00JCOM-5 CO Monitor $2,495.00JCOM-H Regulator for CO monitor $899.95Installation & Labour $500.00Air Quality Analysis $375.00
$29,264.95Taxes $1,463.25
$2,341.19Total $33,069.39
CANADIAN SAFETY EOUIPMENT INC.Jordair FireKat 6 1214-3 EU Compressor10 HP, 15.8 SCFMIncludes Carbon monoxide monitor & calibration kitAir test, installation freight and training $30,579.97
Taxes $1,528.99$2,446.39
Total $34,555.35
{ItemDescription} Page 20 of 70
April 14, 2010
REPORT TO THE OPERATIONS COMMITTEE —April 21, 2010
2010-066-04
2009 FIRE DEPARTMENT ANNUAL REPORT
RECOMMENDATION
H. JONESFIRE CHIEF
That Report #2010-066-04, 2009 Fire Department Annual Report be received forinformation purposes.
PURPOSE
This report outlines the various activities and achievements accomplished during2009. The intent of this report is to keep the Committee, Council and the publiccurrent with the programs performed by the Brockville Fire Department.
BACKGROUND
This report is being submitted to Council in accordance with Brockville City Bylaw 12-87 — Fire Department Establishing and Regulating By-law.
POLICY IMPLICATIONS
There are no policy implications at this time.
FINANCIAL CONSIDERATIONS
There are no policy implications at this time.
-onie7’
B. CasselmanCity Manager
{ItemDescription} Page 21 of 70
2009
ANNUAL REPORT
BROCKVILLE FIRE DEPARTMENT
{ItemDescription} Page 22 of 70
0BROCKVILLECY OF THE 1000 ISLANDS
FIRE PREVENTION DIVISIONA t ADMINISTRATION DIVISION
Fire StatIon #1 Fl RE D EPA R i IVI L iN I Fire StatIon #261 Perth St. 360 Lauder Blvd.
Brockvllle, Ont. K6V 5C6 BrockiiIIe, Ont. K6V 6C5Tel: (613)498-1363 Tel (613)498-1261Fax:(613)498-1411 Fax: (613) 342-7791
April 7, 2010
His Worship Mayor David Henderson, and Members ofCity Council
City Hall1 King Street WestBrockville, ONK6V7A5
Mayor Henderson and Members of Council:
I am pleased to present the 2009 Annual Report of the Brockville FireDepartment. This report outlines the activities and achievements which wouldnot be possible without the on-going support of Council and the expertise,dedication and hard work of all our staff.
We look forward to the many challenges that 2010 will present as we strive tokeep our City as fire safe as possible.
Respectfully SL/
/
Brockville
“I r..T-4. r.— r..
{ItemDescription} Page 23 of 70
Bro
ckvi
lleFi
re. D
epar
tmen
t
[
Tra
inin
gO
ffic
er-
1j
Chie
fF
ire
Pre
ven
tion
Off
icer
-1
]
Fir
eC
hief
_________________
__________
[A
dmin
.C
oord
inato
r][
Cha
plai
n1
[oeP
uC
hief
Fir
eS
uppre
ssio
n
Cre
w3
[C
apta
ins
-2
May
oran
dC
ounc
il
[C
ity
Man
ager
[E
IrenC
YP
lannin
g
_____
IF
ire
ITra
inin
g
LPre
ven
tionJ
L_____
____
[Fir
eP
reven
tion
Off
icer
-1
j.
[Fir
eP
reven
tion
Sec
reta
ry-
1j
—
Com
munic
atio
ns
[sP
atc
hers
-4j
[P
art-
tim
eD
isoat
cher
s-
3j
Pla
toon
“A”
Cre
w1
rapta
ins2
]
4P
lato
on
“B”
Cre
w2
Cre
w4
[Cata
ins
-2]
LPtamn
s-2]
[Fir
efig
hte
rs-5
] [F
iret
ighte
rs-5
j[F
ire
Fig
hte
rs-5
] [F
ire
Fig
hte
rs-5
] )
{ItemDescription} Page 24 of 70
BROCKVILLE FIRE DEPARTMENTSENIORITY LIST
Name Rank Employment Date
Harry Jones Fire Chief June 01, 1977Chris Dwyre Deputy Chief March 02, 1981Sara Lee Adrriin. Coordinator March 17, 1980Linda McLennan Secretary— Fire Prey. June 12, 1989
Randy Burke Chief Fire Prey. Officer July 29, 1981John Paul Captain July22, 1985John Inglis Captain January 05, 1987Elise Runions Dispatcher January 05, 1987Greg Healy Fire Prey. Officer September 08,1987Rob Ashton Captain July 17, 1989Craig Mason Captain July 17, 1989Greg Watt Captain July 17, 1989Royal Metcalfe Captain July 31, 1989Renny Rayner Training Officer January 02, 1990Peter Jonker Captain September 23,1991Travis Cauley Captain September 30,1991Doug Pert Firefighter October25, 1993Kyle Karasiuk Firefighter August 19, 1996Dan Culhane Firefighter December 16, 1996Kevin Harper Firefighter January 06, 1997Dave Scott Firefighter October 26, 1998Dave Collins Firefighter February 01, 1999Scott Smith Firefighter August 07, 2000Dan Reitsma Firefighter September 03,2002Rob van den Bosch Firefighter September 03,2002Matt Tyo Firefighter April 14, 2003Brian McCarthy Firefighter September 29,2003Ryan Wells Firefighter June 10, 2004Scott Steele Firefighter June 21, 2004Scott Hayward Firefighter July 05, 2004John Bain Firefighter September 16,2004Travis Brennan Firefighter September 08,2005Greg Clements Firefighter September 12,2005David MacLeod Dispatcher May 01, 2006Stewart DeJong Firefighter November 15, 2007Sarah Durant Dispatcher March 31, 2008Tyler Ducharme Firefighter July 9, 2009Justin Jager Firefighter July 10, 2009Jason Merkley Dispatcher August 3, 2009
{ItemDescription} Page 25 of 70
Personnel Changes in 2009
June 30, 2009June 30, 2009July 1,2009July 1,2009July 6, 2009July 6, 2009July 9, 2009
July 10, 2009
August 3, 2009September 8, 2009
September 12,2009 -
October 13,2009
November 15, 2009-
- Captain R. Metcalfe retired- Captain M. Bailey retired- Firefighter T. Cauley promoted to Captain- Firefighter C. Mason promoted to Captain- Dispatcher G. Slater retired- Captain R. Rayner became Training Officer- T. Ducharme commenced employment as a
Probationery Firefighter- J. Jager commenced employment as a Probationery
Firefighter- J. Merkley commenced employment as a Dispatcher- Firefighter T. Brennan was promoted to First Class
FirefighterFirefighter G. Clements was promoted to First ClassFirefighterDispatcher S. Durant was promoted to Third ClassDispatcherFirefighter S. DeJong was promoted to Second ClassFirefighter
{ItemDescription} Page 26 of 70
FIRE PREVENTION DTVISION
1%
2009 YEAR END REPORT
To: Harry Jones, Fire Chief
From: Randy Burke, Chief Fire Prevention Officer
Date: March 10, 2010
{ItemDescription} Page 27 of 70
Table of Contents
TOPIC PAGE
2009 Inspection Program.2
Re-Inspections 3
Major Occupancy Inspections 3
Occupancy Definitions 3 & 4
Inspection Orders 4
Plans Reviews 4
Fire Safety Plans Review 4
2009 Fire Investigations 5
2009 Public Education Presentations 5
2009 Fire Prevention Generated Income 6
2009 Fire Prevention Training & Education Activity 7
2009 Home Fire safety Awareness Program Report Attached
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 1{ItemDescription} Page 28 of 70
2009 INSPECTION PROGRAM
Complaint inspections are conducted as the result of a complaint regarding a possible Fire Codeviolation. All complaint inspections are followed up with correspondence in the form of a letteror a note to file. We are required by legislation to do complaint inspections (FPPA)
Request inspections are usually conducted for a new occupancy, licensing or sale of a property.There is a fee for such inspections. Again, legislation dictates we do requested inspections.
Inservice inspections are conducted by the firefighters under the direction of the fire preventiondivision. The reports are prepared by the captains and forwarded to fire prevention for approvaland mailing. The firefighters conduct the initial re-inspection and any follow-up beyond that isconducted by fire prevention.
Routine inspections are conducted when concerns come to our attention by other means (i.e. —
home inspection program, retrofit, general enquiry, etc.)
Investigation inspections are conducted as the result of a fire response.
Inspections
During 2009 a total of 219 property inspections were conducted through the fire preventiondivision. This number does not include inspections of outdoor fireplaces.
Breakdown by Inspection type:Complaints 35Investigation 1Requests (fee) 37Routine 47Inservice 99
Outdoor Fireplaces: In addition to the above noted inspections, 38 outdoor fireplaces wereinspected and approved. See re-inspections below for more information.
NOTE: A number of complaint inspections led to some serious fire safety hazards beingobserved by the inspector which caused the filing of Section 15 Notices under the Fire Protectionand Prevention Act, 1997 (FPPA), known as an “Immediate Threat to Life”. These notices createan increased workload and are time consuming for the inspectors as the inspector must meet thecriteria set out in the FPPA. In 2009, 7 immediate threats to life were recognized and dealt withby the fire prevention division. One of these inspections resulted in one building being orderedclosed under the authorization of the Ontario Fire Marshal.
Task Force Inspections
A fire department inspector was part of a city task force that included 2 city police officers, theAGCO liquor inspector and the Health Unit tobacco inspector. Cursory inspections were done ofliquor-licensed restaurants/bars in both May and October and these 24 cursory inspections areincluded in the total inspection numbers listed above.
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 2{ItemDescription} Page 29 of 70
Re-inspections
The inspection numbers above do not include the 213 follow-up re-inspections that took placeto ensure compliance with the Ontario Fire Code. The Inservice inspections created 72 reinspections while the two fire prevention officers completed 141 re-inspections.
This number does not include outdoor fireplace re-inspections which sometimes required 2 reinspections for each fireplace to get compliance with the city standard for installation.
Major Occupancy Inspections
Occupancy means the use or intended use of a building or part thereof for the shelter or supportof persons, animals or property. Major occupancy means the principal occupancy for which abuilding or part thereof is used or intended to be used, and includes the subsidiary occupanciesthat are an integral part of the principal occupancy. Occupancy type definitions are includedbelow.
Breakdown by Occupancy:Assembly (A) 83Care &Treatment(B) 4Residential (C) 85Business & Personal (D) 4Mercantile (E) 37Industrial (F) 6
Breakdown by Property type:Residential(in retrofit and apartment bldgs.) 67Restaurants & food service 83Assembly (arenas & halls) 11Schools 15Health Care 5Hotels/Motels 6Rooming, boarding, lodging 7Commercial & retail 15Industry 4Mixed occupancies 6
Occupancy Definitions:
Assembly occupancy means the occupancy or the use of a building, or part thereof, by agathering ofpersons for civic, political, travel, religious, social, educational, recreational or likepurposes or for the consumption of food or drink.
Business andpersonal services occupancy means the occupancy or use of a building or partthereof for the transaction of business or the rendering or receiving of professional or personalservices.
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 3{ItemDescription} Page 30 of 70
Care and treatment occupancy means an occupancy in which persons receive special care andtreatment.Care occupancy means an occupancy in which persons receive secial or supervisory carebecause of cognitive or physical limitations, but does not include a dwelling unit.Care or detention occupancy means the occupancy or use of a building or part thereof bypersons who (a) are dependent on others to release security devices to permit egress, (b) receivespecial care and treatment, or (c) receive supervisory care.
Industrial occupancy means the occupancy or use of a building or part thereof for assembling,fabricating, manufacturing, processing, repairing or storing of goods and materials.
Mercantile occupancy means the occupancy or use of a building or part thereof for thedisplaying or selling of retail goods, wares or merchandise.
Residential occupancy means the occupancy or use of a building or part thereof by persons forwhom sleeping accommodation is provided but who are not harboured or detained to receivemedical care or treatment or are not involuntarily detained.
Inspection Orders
A total of 5 Inspection Orders were issued in 2009 against tenants or property owners.Inspection orders are issued when certain life and fire safety issues cannot be specifically dealtwith under the Ontario Fire Code regulation. One order dealt with the closing of a building whilethe other 4 were issued to deal with hoarding issues. Two hoardings also required the issuance ofan linmediate Threat to Life order as well (Section 15 Posting of the FPPA). The orders requiredre-inspections to ensure compliance and these re-inspection numbers are included above.
Electrical Inspection Orders
Observations during an inspection may cause an inspector to issue an Electrical Inspection Orderto the Electrical Safety Authority (ESA) for a follow-up inspection by the ESA to ensure thewiring in a building is in compliance with the Electrical Code. A total of 3 Electrical InspectionOrders were issued this year.
Plans Reviews
28 Plans Reviews were also conducted by the fire prevention division. These reviews are done inregards to fire access routes to building as well as proper hydrant placement. Plans are scaled andcomments returned to the Planning Department. Site inspections are required in some instancesto verify drawing specifications.
Fire Safety Plans Reviews
Changes in the 2007 Ontario Fire Code has required the updating of a large number of fire safetyplans required for specified properties. To assist property owners/tenants in meeting theirresponsibilities, a new fire safety plan template was developed by the chief fire preventionofficer and is offered on a CD format to owners for a fee. 25 Fire Safety Plan reviews werecompleted in 2009, with many being sent back for changes. Some fire safety plans are reviewed2 or 3 times before approval by the chief fire official is achieved. Unfortunately, this is a verytime consuming process for the chief fire official approving these plans.
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 4{ItemDescription} Page 31 of 70
FIRE iNVESTIGATIONS
We are pleased to report that very few fire investigations had to take place this year. There were4 fire investigations done; 2 structural fires and 2 vehicle fires. One of the vehicle fires causedsevere damage to the residence it was parked adjacent to; therefore the structure was notinvestigated. Both vehicle fires were investigated by the police and appeared to be arson.
No injuries or deaths resulted from these fires.
2009 PUBLIC EDUCATION PRESENTATIONS
25 scheduled presentations were conducted by Fire Prevention staff during 2009, reaching anaudience of 905 people.
The presentations were generated as the result of fire safety concerns within the variousorganizations in the city, or through a direct request for staff training in fire safety procedures.These presentations usually involved fire department apparatus (i.e. fire extinguisher tutor, 9-1-1simulator, fire safety videos) and in some cases required hands-on training for those involved.
The people involved in these public education sessions range from pre-school children tostudents at the college level, health care workers, seniors’ groups and employees from manyareas of the workforce; including industry and the food service sector.
As part of our public education program, a large quantity of brochures, books, and other firesafety teaching materials were distributed at community events which were coordinated throughfire prevention and attended by both fire prevention personnel and the firefighters. Theseincluded such events as school fairs, Canadian Tire Days, Home Depot’s Fire Safety AwarenessDay, St. Lawrence Park’s Beach Party and other community events held throughout the city. Insome cases, firefighters allowed young children to sit behind the wheel of the fire truck andexplained the fire fighting equipment on the trucks to both children and adults. The firefightersare always well received at community events and enjoy the interaction with the general public.When possible, our walkabout Sparky was in attendance to further promote fire safety education.
A large selection of fire safety videos is available through the fire prevention office and alongwith being used in several of our presentation, these videos are also loaned out to schools andbusinesses and organizations upon request.
During fire prevention week, two contests were run in the elementary schools. One of thesecontests was developed by fire prevention and more than 800 entry forms were circulated to theschools. Another contest developed by the Fire Marshal’s Public Fire Safety Council was alsodistributed to the schools by this division. These contests were developed to encourage thetesting and maintenance of smoke alarms and escape planning in the home.
During the Fall “change your clock, change your battery” smoke alarm campaign, the firefightersare involved in an in-service program where they attend every classroom in the city’s schoolsand change the battery in the smoke alarm teaching aide plaque that was donated to everyclassroom. The batteries are provided by the fire department free of charge. This allows an
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 5{ItemDescription} Page 32 of 70
opportunity for the firefighters to speak with the students to remind them of the importance ofhaving their parents check their smoke alarm at home and change the battery where required.
Not included in the above numbers are the many public service announcements which arepublished in local newspapers and aired on Brockville’s two radio stations. Fire safety messageswere delivered through the media to Brockville residents and the large surrounding areathroughout the year, with particular emphasis during Fire Prevention Week in October andduring the vulnerable Christmas holiday season.
Although the fire prevention division oversees the public education effort, the fire fighting crewsare involved when and where possible.
2009 FIRE PREVENTION GENERATED INCOME
The following is a breakdown of the income generated (billed) by the fire prevention division in2009:
File Search Requests: 43 @ $23.00 989.00
Fire Safety Plan CD’s 3 @ $10.50 31.507@$10.75 75.25
Occupant Load Plaques 1 @ $20.50 20.50I c $20.75 20.75
Requested Inspections 7 @ $94.00 564.009 @ $96.00 864.00l@$124.00 124.004@$134.00 402.00I @$190.00 190.0011 @ $50 BACLA 550.00
Emergency Placards 88 @ $1.00 88.00
TOTAL $4147.00
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 6{ItemDescription} Page 33 of 70
FIRE PREVENTION TRAINING & EDUCATION
A number of training courses and seminars were attended by fire prevention staff throughout2009. These included;
Chief Fire Prevention Officer: - 2 certification courses at the Ontario Fire College- FPO Seminar at the Ontario Fire College- Residential Sprinkler Seminar re changes to Bldg Code- Hoarding Seminar — Part 1- Accessibility for Ontarians with Disabilities Act Training
Fire Prevention Officer: - I certification course at the Ontario Fire College- OMFPOA Training Symposium- Accessibility for Ontarians with Disabilities Act Training
Fire Prevention Secretary: - Accessibility for Ontarians with Disabilities Act Training
Throughout the year, fire prevention staff provided training in house to the on-duty fire crews inthe areas of in-service inspections and report writing, as well as on the Home Fire SafetyAwareness Program. As requested, each crew was provided with refresher courses to assist themwith their annual inspection duties. 8 training sessions were provided to on-duty personnel in2009.
MEETINGS
Fire prevention staff spends a great deal of their time in meetings with other agencies or city staffas well as on the telephone answering inquiries to fire safety issues. In 2009, the chief tireprevention officer attended over 180 meetings on behalf of the fire department. Theseincluded a number of meetings for Project Encore at the Arts Centre, as well as the proposed TallShips Landing project.
These meeting numbers do not include phone meetings that take place on a regular basis withengineers and architects on building projects, or with the Office of the Fire Marshal. A great dealof the fire prevention office’s time is spent on the telephone responding to requests forinformation on fire safety requirements for buildings and other general fire safety information.We also do a number of inspection assists with other fire departments in our area.
Quarterly meetings of the Ontario Municipal Fire Prevention Officers Association (OMFPOA)were attended this year by the fire prevention officers, where training sessions are provided andinformation is shared amongst attending municipalities.
Court proceeding took up a large amount of fire prevention officers’ time; not only in filing courtdocuments and writing prosecutor briefs, but both officers went to trial this year on 2 separateoccasions.
Brockville Fire Department Fire Prevention Division 2009 Year End Report Page 7{ItemDescription} Page 34 of 70
HOME FIRE SAFETY AWARENESSPROGRAM
L)
2009 YEAR EN]) REPORT
To: Barry Jones, Fire Chief
From: Randy Burke, Chief Fire Prevention Officer
Date: January 6, 2010
{ItemDescription} Page 35 of 70
HOME FIRE SAFETY AWARENESS PROGRAM - 2009 REPORT
I am pleased to provide you with a 2009 year end report on our Department’s ongoing
Home Fire Safety Awareness Program. This was the third year of the program. A one
page synopsis is attached for your perusal.
In 2009, a total of 1183 homes were approached and of those, 607 residents welcomed
the firefighters to conduct a fire safety inspection of their home. Access was denied to 43
homes in the city. This number is up from the previous two years. As you recall, poor
weather affected the number ofhouses visited last year.
As in past years, homeowners who were not home at the time of the firefighters’ visit
were left a notice indicating they could contact this Department if they wished to set up
an appointment for an inspection. A few homeowners have called to request an
inspection and the captain in charge of that area of the city was informed and requested to
follow up. The program ran from mid May to mid October.
Smoke Alarms
Of the 607 homes inspected last year, 67 did not have a smoke alarm on each level of the
home, and 22 did not have a working smoke alarm in the sleeping area. Firefighters
replaced a total of 20 smoke alarm batteries where required. This was done at no cost to
the home owner.
7.7% of the homes had smoke alarms installed in locations that were not appropriate. The
firefighters advised or assisted occupants with the re-location of the alarms. Hopefully,
this will assist in the reduction of nuisance alarms which, as you are aware, is one of the
goals of this program. 85% of residents of the homes inspected said they regularly test
their smoke alarms.
20 smoke alarms were temporarily installed (on loan) in those homes that did not have a
smoke alarm outside the sleeping area. This practice ensures the firefighters meet our
2Home Safety Awareness ProgramJanuary 6, 2010
{ItemDescription} Page 36 of 70
Department’s policy of never leaving a home without a working smoke alarm. In somecases, where possible, alarms were relocated to protect the sleeping area.
Home Escape Planning
60% of the residents of the homes inspected stated they had a home escape plan, however
only 38% of that group actually practised their plan.
Accessory Apartments in the Home
Fifteen properties were indicated to have accessory apartments in the residence and a
follow-up is being done by Fire Prevention for Fire Code compliance.
Batteries
Firefighters recorded a total of 20 batteries having been installed as part of this program.
This service is provided free of charge to homeowners. This battery program is not only
greatly appreciated by the public, but it also relieves the firefighters of the responsibility
of handling money, making correct change, and preparing receipts.
3Home Safety Awareness ProgramJanuary 6, 2010
{ItemDescription} Page 37 of 70
SUMMARY
Since the program commenced on May 15, 2007, a total of 2984 residences were
approached to conduct a home safety inspection. Of the dwelling units visited to date,
1625 homes have been accessed for inspection. 103 homes were not inspected as access
to the property was denied.
With respect to the firefighters conducting these inspections, we continue to hear positive
feedback from them. The feedback from Brockville residents indicates the program is
still being well received by the community at large.
We are pleased to report that a small percentage of our homes were found to be lacking in
the area of required smoke alarms and only a small number were recommended for re
location of alarms.
Escape planning remains an area of concern with 40% of homes having no escape plan,
and of those that do have a plan in place for their families (verbal or written), only 38%
stated they actually practise it.
I trust this report provides the information you require.
/,
/<‘
Randy Burke, Chief Fire Prevention Officer
4Home Skry Awarcnes ProgramJanuary O, 201()
{ItemDescription} Page 38 of 70
HOME SAFETY AWARENESS PROGRAM
2009 SYNOPSI
2009
_______
Number of residences approached 1183
Number of homes not accessed 576
Number of homes denying access to firefighters 43
Number of homes inspected 607
Of the 607 homes inspected in 2009, the following data was collected:
Smoke Alarms:
Number of homes without a smoke alarm on every level 68
Number of homes without a smoke alarm in sleeping area 23
Number of homes with smoke alarms not properly installed 61
Number of homes requiring smoke alarms to be relocated 47
Number of homeowners not testing smoke alarms regularly 88
Escape Planning:
Number of homes without a fire escape plan
Number of homes with fire escape pian who practice their plan
Accessory Apartments:
Number of homes found to have accessory apartments 15* (2.5%) 23 (1.4%)
Batteries:
Number of batteries installed during the inspections 20 (3.5%) 91(5.6%)
* This number only represents accessory apartments in the homes visited.Others were noted and will be investigated further, but firefighters did not do an inspection of these premises.
5Home Safety Awareness ProgramJanuary 6, 2010
To Date
2984
1359
103
1625
114 (7%)
35 (5.7%)
92 (5.6%)
91(5.6%)
184(11.3%)
663 (41%)
391 (35%)
(11%)
(3.8%)
(10%)
(7.7%)
(14.5%)
241 (40%)
138 (38%)
{ItemDescription} Page 39 of 70
2009 EQUIPMENT UPGRADES & REPLACEMENTSAnd FIRE STATION REPAIRS
During 2009 the fire department continued to upgrade and replace our aging Hurst Jawsof Life equipment to meet today’s standards and expectations for automobile extrication.- a new Hurst Triple Pump Power unit was purchased, this power supply allows for
simultaneous line operation for three rescue tools, Meaning that three rescue workershave the advantage of operating from the same power unit without alternating use,changing out tools or flipping any levers. Tools can be exchanged on one line withoutinterrupting the operation of the second or third line.
- the power supply line coupling system on our main set of extrication equipment wasreplaced by a user friendly Streamline Coupling system which simplifies theconnecting and disconnecting of hydraulic rescue tools and saves valuable time at therescue scene. It is our intention during 2010 to change the coupling system on oursmaller hydraulic system - a combination extrication tool. By changing thecoupling systems on the remainder of our tools all of our equipment will be compatiblewith the tools used by surrounding fire departments.
- the air bag rescue system has been replaced by a Hurst/Vetter Airbag 67 System thenew system has two airbags, one with the capability to lift 21 ton and the other 34 ton.
The replacement of Self Contained Breathing Apparatus in our Respiratory ProtectionProgram is an ongoing project. Three Scott 75 SCBA units were purchased this year,bringing the total number of replaced units to-date to fifteen.
The protective clothing — Bunker Gear replacement program is another of the on-goingrequired annual purchases. Under normal working conditions the bunker gear has aprojected life expectancy of eight to ten years. This year the department purchased a totalof five sets of bunker gear, three replacement sets and two sets for new employees. Theproduct line used at BFD is the Globe GX7 model.
The department purchased materials and a staff member designed and constructed aBunker Gear Drying Rack as part of our equipment maintenance program. A FireFighter Survival training simulator was also designed and built by staff members.
A much needed refurbishment - body work! paint job was completed on Tele-Squrt 2,a 1996 Pierce Quantum model, 65’ ladder, front line response vehicle.
Safety concerns have been addressed and alterations were completed early in 2009 in theupper level of the hose tower and some additional shelving for storage was installed inthe Annex at Station One.
The exterior door and window trim along with the fire escape of the training tower wererepainted at Station 2.
{ItemDescription} Page 40 of 70
BROCKVILLE FIRE DEPARTMENT - ST. LAWRENCE COLLEGEPRE-SERVICE FIRE FIGHTER PROGRAM PARTNERSHIP
The partnership between the City of Brockville, the Brockville Fire Department and St.Lawrence College with the Pre-service Fire Fighter program was established inSeptember of 2004.
A number of our staff are hired by the college as instructors and teaching assistantsduring their off duty hours.
Three of the present staff members of this department are graduates of the SLC program.
The program is set up where the fire department is compensated by the college for use ofthe Station 2 — training tower by daily use.
- apparatus and equipment by the hours of operation- fuels and consumable products are billed at cost.- specialty training courses.- compressed breathing air — by the bottle per fill.
During 2009 the college was charged the following fees:
- Station facilities use = $3,077 00- Apparatus & equipment use = $4,861.50- Fuels & consumable products = $147.59- Specialty courses $4,696.00- SCBA breathing air/fills = $1,509.50
Total = $14,291.59
Please see attached letter from Beverlie DietzeSLC Campus Dean
{ItemDescription} Page 41 of 70
20
St. LawrendCollege
January27, 2009V
To Whom It May Concern:2288 Parkedale AvenueBrockvill., ON K6V 5X3
Re: Partnership between Brockville Fire Department and T613-345-0660 F 613-345-2231
St. Lawrence College Pre-Service Firefighter Program . 2 Belmont StreetCornwall, ON K614 411
V
T613-933-6080 F613-837-1523
100 Portsmouth AvenueThe partnership between the Brockville Fire Department and St. Lawrence Kjaoa, ON K7LSA6College, Brockville is integral to St. Lawrence College being able to offer T 613-544-5480 F 613-545-3920
the Pre-Service Firefighter Program in this community.ww.Lstiawrenca#oIIsge.ca
The relationship established in this partnership allows students to haveaccess to firefighters who provide the students with opportunities todiscuss how the theoretical elements being taught in the classroom areimplemented in the field. The firefighters, Captains, Deputy Chief andFire Chief provide input into the curriculum outcomes and theimplementation of the practical training exercises that the Pre-ServiceFirefighter students are required to achieve throughout their program.Many of the Brockville Fire Department staff support our faculty inaccessing the knowledge, skills and abilities of our students relative to theprescribed curriculum. They also are involved in the Program AdvisoryCommittee. This input is essential to ensuring we produce qualitygraduates.
In addition to the human resource expertise that we have access to, the useof the training facilities at the fire station is essential to the program. Inessence, without access to both the firefighter professionals and thefacilities, St. Lawrence College, Brockville would not be able to offer thisprogram. This partnership is essential to our program.
If you require further information, please feel free to contact me.
Yours truly,
7- l3everlie Dietze, Ph.D.V
V
Campus Dean V
V
V
{ItemDescription} Page 42 of 70
-4-n
a0
(0
-l a1. a—
30(0 po
00
C3
-I
0.
00
&l.
30
—C) 0
at,
4,
p43(.
3
44)
?.(3
)_‘
0 00 a
-a •0-
0%
4(3
)a
o0
coD
ow
coz
{ItemDescription} Page 43 of 70
Z<
-n0
oCD
0Z
3 30>
iii
-I C-
cnC, CD
C) CDD)
05•.
Cl)
z D)(j)
5.0
C)c
W -‘ 0 C)
£13
p-
-<ii
=C
-l
‘I—
—I’
CDQ
)D
Cl)
hC
D0
011
1%)
-C
e
CDii
CD-4
.II
CD
Ii0-
;:i.
110
CD z0
—.
IJ1I
1%)
IIIIC
Dli
ii-,
°-<
liii
1101
1(.
liii
0C
o
Ill
{ItemDescription} Page 44 of 70
Bro
ckvi
lle
Fir
eIn
cide
ntR
eport
2009
Inci
dent
Ala
rmD
ate
Loc
atio
nP
roper
tyC
lass
Pro
bab
leC
ause
Est
imat
edL
oss
Num
ber
09-3
Jan.
1,20
0939
6K
ing
StW
est
Det
ache
dD
wel
ling
Ele
ctri
cal
fail
ure
$2,5
00.0
009
-5Ja
n.2,
2009
84P
earl
St.
Wes
tM
ulti-
Uni
tD
wel
ling
Una
tten
ded
$100
0.00
Oth
erU
nint
entio
nal
Cau
se,
not
09-1
1Ja
n.4,
2009
Geo
rge
St.
&C
hase
St.
Smal
lT
ruck
clas
sifi
ed$4
00.0
0U
sed
orpl
aced
tocl
ose
to09
-41
Jan.
19,
2009
1291
Cal
ifor
nia
Ave
Mfg
:Jo
bPr
intin
gco
mbu
stab
les
$500
.00
09-6
1Ja
n.30
,20
0915
40C
ount
yR
d2
Det
ache
dD
wel
ling
Rou
tine
mai
ntan
cede
fici
ency
$100
.00
09-6
7Ja
n.31
,20
0928
0B
rock
St.
Det
ache
dD
wel
ling
Una
tten
ded
$5,0
00.0
009
-76
Feb.
5,20
0939
7B
rock
St.
Smal
lT
ruck
Ele
ctri
cal
failu
re$1
00.0
009
-90
Feb
.12
,20
091
Mag
edom
aD
r.Sm
all
Tru
ckE
lect
rica
lfa
ilure
$2,0
00.0
0
09-9
6Fe
b16
,20
0944
Sev
enoa
ksA
ve.
Det
ache
dG
arag
eU
nint
entio
nal,
Cau
seun
dete
rmin
ed$3
5,00
0.00
09-1
06F
eb19
,20
09Fi
rst
Ave
.&
Rey
nold
sD
r.H
ydro
/Tel
epho
neP
ole
Ele
ctri
cal
failu
re$1
,000
.00
Impr
oper
hand
ling
ofig
initi
onso
urce
or09
-131
Mar
.5,
2009
850
Kyl
eC
ourt
-U
nit
18M
ulti-
Uni
tD
wel
ling
igin
ated
obje
ct$1
00.0
009
-155
Mar
.20
,20
091
Mag
edom
aD
r.T
rash
/Rub
bish
Con
tain
erS
uspe
cted
vand
alis
m$0
.00
09-1
62M
ar.
24,
2009
10C
entr
alA
ve.
Wes
tT
rash
/Rub
bish
Con
tain
erU
nint
entio
nal,
Cau
seun
dete
rmin
ed$0
.00
09-2
02A
pr.
19,
2009
251
Nor
thA
ugus
taR
d.O
pen
Lan
dU
ndet
erm
ined
$0.0
009
-206
Apr
.20
,20
0916
6P
earl
St.
Eas
tS
choo
l-
Ele
men
tary
Sus
pect
edyo
uth
vand
alis
m$0
.00
09-2
09A
pr.
26,
2009
104
Abb
ott
St.
Det
ache
dD
wel
ling
Ele
ctri
cal
failu
re$5
0,00
0.00
09-2
50M
ay16
,20
0928
Fer
guso
nD
r.D
etac
hed
Gar
age
Use
dfo
rpu
rpos
eno
tin
tend
ed$1
.00
09-2
60M
ay20
,20
0936
2C
ente
nnia
lR
d.D
etac
hed
Dw
ellin
gS
uspe
cted
arso
n.$1
00,0
00.0
009
-269
May
.27
,20
0912
5S
tew
art
Blv
d.M
all
Und
eter
min
ed$1
00.0
009
-270
May
.28
,20
0958
4S
tew
art.
Blv
d.H
ydro
/Tel
epho
neP
ole
Ele
ctri
cal
failu
re$1
,000
.00
09-2
72M
ay.
28,
2009
166
Pea
rlSt
.E
ast
Sch
ool
-E
lem
enta
ryS
uspe
cted
yout
hva
ndal
ism
$50.
0009
-286
Jun.
3,20
0918
46C
ount
yR
d.2
Det
ache
dD
wel
ling
Rou
tine
mai
ntan
cede
fici
ency
$0.0
0Im
prop
erha
ndlin
gof
igin
ition
sour
ceor
09-3
27Ju
n.24
,20
0912
81M
illw
ood
Ave
.-
Uni
t44
Att
ache
dD
wel
ling
igin
ated
obje
ct$5
,000
.00
09-3
43Ju
n.29
,20
0918
50C
ount
yR
d.2
Bar
nU
ndet
erm
ined
$0.0
009
-350
Jul.
3,20
0932
9Fi
rst
Ave
.A
utom
obile
Und
eter
min
ed$3
,500
.00
09-3
51Ju
l.3,
2009
102
Cha
rles
St.
Smal
lT
ruck
Sus
pect
edva
ndal
ism
$10,
000.
0009
-352
Jul.
3,20
0910
2C
harl
esSt
.S
emi-
Det
ache
dD
wel
ling
c “$1
50,0
00.0
009
-364
Jul.
6,20
0925
1N
orth
Aug
usta
Rd.
Cou
ntry
Clu
bS
uspe
cted
vand
alis
m$5
00.0
0
{ItemDescription} Page 45 of 70
09-3
75Ju
l.14
,20
0923
99P
arke
dale
Ave
.T
heat
re-
Mot
ion
Pic
ture
Sus
pect
edyo
uth
vand
alis
m$5
00.0
009
-385
Jul.
18,
2009
550
Kin
gSt
.W
est
Con
stru
ctio
nM
echa
nica
lfa
ilure
$250
,000
.00
09-3
86Ju
l.19
,20
0910
Gar
den
St.
-U
nit
2M
ulti-
Uni
tD
wel
ling
Sus
pect
edva
ndal
ism
$1,0
00.0
009
-389
Jul.
21,
2009
698
Hig
hway
401
Wes
tA
utom
obile
Ele
ctri
cal
failu
re$5
00.0
0Im
prop
erha
ndli
ngof
igin
ition
sour
ceor
09-4
31A
ug.
15,
2009
91L
isto
nA
ve.
Att
ache
dD
wel
ling
igin
ated
obje
ct$5
0.00
Oth
erU
nint
entio
nal
Cau
se,
not
09-4
34A
ug.
16,
2009
Par
kSt
.&
Cen
tral
Ave
Oth
ersp
ecia
lty
vehi
cle
clas
sifi
ed$1
,000
.00
09-4
39A
ug.
18,
2009
101
Har
tley
St.
Det
ache
dD
wel
ling
Sus
pect
edva
ndal
ism
$200
.00
Oth
erU
nint
entio
nal
Cau
se,
not
09-4
64S
ept.
1,20
0933
5S
tew
art
Blv
d.A
utom
obile
clas
sifi
ed$5
00.0
0U
sed
orpl
aced
tocl
ose
to09
-487
Sep
t.16
,20
0911
Has
tins
Dr.
Mul
ti-U
nit
Dw
ellin
gco
mbu
stab
les
$3,0
00.0
009
-497
Sep
t.24
,20
0969
9H
ighw
ay40
1W
est
Tra
iler
Mec
hani
cal
failu
re$5
,000
.00
09-5
03S
ept.
30,
2009
696
Hig
hway
401
Wes
tA
utom
obile
Und
eter
min
ed.
$100
.00
09-5
60N
ov.
8,20
0919
42P
arke
dale
Ave
.Sm
all
Tru
ckE
lect
rica
lfa
ilure
$1,0
00.0
009
-618
Dec
.12
,20
0923
99P
arke
dale
Ave
.Sm
all
Tru
ckM
echa
nica
lfa
ilure
$500
.00
09-6
44D
ec.
25,
2009
19B
isle
yC
res.
Det
ache
dD
wel
ling
Rou
tine
mai
ntan
cede
fici
ency
$0.0
0
{ItemDescription} Page 46 of 70
OFM
Pro
per
tyC
lass
Rep
ort
2009
Pro
pert
yC
lass
Gro
upN
umbe
rof
inci
dent
sE
stim
ated
Los
s
Gro
upA
Ass
embl
y5
1,05
0.00
Gro
upB
Car
ean
dD
eten
tion
0
Gro
upC
Res
iden
tial
17352951.0
0
Gro
up0
Bus
ines
san
dP
erso
nal
Ser
vice
s0
Gro
upE
Mer
cant
ile
110
0.00
Gro
upF
Indu
stri
al1
500.
00
Str
uctu
res/
Pro
pert
ies
not
clas
sifi
edby
O.B
.C.
82,
000.
00
Veh
icle
s14
282,
100.
00
Tot
al:
4663
8,70
1.00
Sel
ecte
dQ
uer
yC
rite
ria:
Sta
rtT
ime:
Thu
Jan
0100
:00:
00E
ST
2009
End
Tim
e:T
huD
ec31
23:5
9:59
ES
T20
09
2Q
uery
Cri
teri
aS
elec
ted.
29M
ar20
1012
:37:
36P
age
1of
1
{ItemDescription} Page 47 of 70
OFM
Inci
dent
Typ
eR
eport
2009
OFM
Inci
dent
Typ
eT
otal
1Fi
re42
2E
xplo
sion
(inc
ludi
ngdu
ring
fire,
excl
udin
gco
des
3an
d11
-13)
0
3N
OL
OS
SO
UT
DO
OR
fire
(see
excl
usio
ns)
9
11O
verp
ress
ure
Rup
ture
(no
fire
,e.
g.st
eam
boile
rs,
hotw
ater
)I
12M
uniti
onE
xplo
sion
-(n
ofir
e,e.
g.bo
mbs
,dy
nam
ites
)0
13O
verp
ress
ure
Rup
ture
-g
aspi
pe(n
ofi
re)
0
21O
verh
eat
(no
fire
,e.
g.en
gine
s,m
echa
nica
lde
vice
s).
17
22P
oton
Sto
ve(n
ofi
re)
12
23O
pen
air
burn
ing/
unau
thor
ized
cont
roll
edbu
rnin
g(n
oun
cont
roll
edfi
re).
6
24O
ther
Coo
king
/toa
stin
g/sm
oke/
stea
m(n
ofi
re)
35
25L
ight
ning
(no
fire
).
.0
26F
irew
orks
(no
fire
).
I
29O
ther
pre
fire
cond
itio
ns(n
ofi
re)
7
31A
larm
Sys
tem
Equ
ipm
ent
-M
alfu
nctio
n99
32A
larm
Sys
tem
Equ
ipm
ent
-A
ccid
enta
lac
tiva
tion
(exc
.co
de35
)81
33H
uman
-M
alic
ious
inte
nt,
pran
k10
29M
ar20
1012
:39:
29P
age
1of
5
{ItemDescription} Page 48 of 70
OFM
Inci
dent
Typ
eT
otal
34H
uman
-P
erce
ived
Em
erge
ncy
30
35H
uman
-A
ccid
enta
l(a
larm
acci
dent
ally
acti
vate
dby
pers
on)
58
36A
utho
rize
dco
ntro
lled
burn
ing
-co
mpl
aint
2
37C
Ofa
lse
alar
m-
perc
eive
dem
erge
ncy
(no
CO
pres
ent)
16
38C
Ofa
lse
alar
m-
equi
pmen
tm
alfu
nctio
n(n
oC
Opr
esen
t)16
39O
ther
Fal
seFi
reC
all
7
53C
Oin
cide
nt,
CO
pres
ent
(exc
fals
eal
arm
s)5
41G
asL
eak
-N
atur
alG
as10
42G
asL
eak-P
ropan
e1
43G
asL
eak
-R
efri
gera
tion
1
44G
asL
eak
-M
isce
llan
eous
0
45Sp
ill-
Gas
olin
eor
Fuel
5
46Sp
ill-
Tox
icC
hem
ical
0
47Sp
ill-
Mis
cell
aneo
us2
48R
adio
-act
ive
Mat
eria
lP
robl
em0
49R
uptu
red
Wat
er,
Ste
amP
ipe
6
50P
ower
Lin
esD
own,
Arc
ing
4
51B
omb,
Exp
losi
veR
emov
al,
Sta
ndby
0
29M
ar20
1012
:39:
29P
age
2of
5
{ItemDescription} Page 49 of 70
OFM
Inci
dent
Typ
eT
otal
54S
uspi
ciou
ssu
bst
ance
0
57Pu
blic
Haz
ard
noac
tion
requ
ired
2
58Pu
blic
Haz
ard
call
fals
eal
arm
3
59O
ther
Publ
icH
azar
d3
61V
ehic
leE
xtri
catio
n3
921
illeg
algr
owop
erat
ion
(no
fire
)0
62V
ehic
leC
ollis
ion
34
922
Ille
gal
drug
oper
atio
n(n
ofi
re)
0
63B
uild
ing
Col
laps
e0
910
Ass
isti
ngot
her
FD:
Mut
ual
Aid
0
64C
omm
erci
al/I
ndus
tria
lA
ccid
ent
0
911
Ass
isti
ngot
her
FD:
Aut
omat
icA
id0
65H
ome/
Res
iden
tial
Acc
iden
t0
912
Ass
isti
ngot
her
FD:
Fire
Pro
tect
ion
Agr
eem
ent
0
66P
erso
ns
Tra
pped
inE
leva
tor
3
913
Ass
isti
ngot
her
FO:
Oth
er0
67W
ater
Res
cue
2
92A
ssis
ting
Pol
ice
(exc
921,
922)
2
29M
ar20
1012
:39:
29P
age
3of
5
{ItemDescription} Page 50 of 70
OFM
Inci
dent
Typ
eT
otal
68W
ater
Ice
Res
cue
1
93A
ssis
ting
Oth
erA
genc
ies
(exc
921
922)
V
1
69O
ther
Res
cue
0
701
Oxy
gen
adm
inis
tere
d6
702
CP
Rad
min
iste
red
V
7
703
Def
ibri
llato
rus
ed1
71A
sphy
xia,
Res
pira
tory
Con
ditio
nV
3
73S
eizu
reV
6
74E
lect
ric
Sho
ck0
75T
raum
atic
Sho
ckV
0
76C
hest
pain
sor
susp
ecte
dhe
art
atta
ckV
6
82B
urns
V0
84M
edic
alA
idN
otR
equi
red
onA
rriv
al5
85V
ital
sign
sab
sent
,D
OA
V
14
601
Tre
nch
resc
ue(n
onfi
re)
0
94O
ther
Publ
icS
ervi
ce11
602
Con
fine
dsp
ace
resc
ue(n
onfi
re)
0
96C
all
canc
elle
don
rout
e5
29M
ar20
1012
:39:
29P
age
4of
5
{ItemDescription} Page 51 of 70
OFM
Inci
dent
Typ
e
Hig
han
gle
resc
ue(n
onfi
re)
0
Inci
dent
not
foun
d1
Low
angl
ere
scue
(non
fire
)0
Ass
ista
nce
not
requ
ired
byth
eot
her
agen
cy1
Ani
mal
resc
ue0
Oth
erR
espo
nse
6
Res
cue
noac
tion
requ
ired
1
Res
cue
fals
eal
arm
I
603 97
604 98
605 99 698
699
Tot
al
86A
lcoh
olor
drug
rela
ted
6
88A
ccid
ent
oril
lnes
sre
late
d-
cuts
,fr
actu
res,
pers
onfa
inte
d,et
c.15
89O
ther
Med
ical
/Res
usci
tato
rC
all
16
898
Med
ical
/res
usci
tato
rca
llno
acti
onre
quir
ed9
899
Med
ical
/res
usci
tato
rca
llfa
lse
alar
m1
Tot
al:
658
Sel
ecte
dQ
uery
Cri
teri
a:S
tart
Tim
e:T
huJa
n01
00:0
0:00
ES
T20
09E
ndT
ime:
Thu
Dec
3123
:59:
59E
ST
2009
2Q
uery
Cri
teri
aS
elec
ted
.
29M
ar20
1012
:39:
29P
age
5of
5
{ItemDescription} Page 52 of 70
Brockville Fire DepartmentCrew Activities 2009
The Fire Fighting division conducts activities such as; training, fire prevention,maintenance, and emergency response.
Training
Training is conducted on various topics based on the needs analysis of eachindividual crew member. All subject matter regarding fire fighting operations arepart of the annual planner. Topics such as; auto extrication, hazardous materialsresponse, fire fighter survival, accountability, electrical safety is completedthroughout the year.Specialized rescue training (confined space, trench, high angle, ice water, andelevator) is conducted annually by the Training officer.
Fire Prevention
Activities are coordinated through the Fire Prevention division. In serviceinspections include occupancies such as; schools, health care facilities, andrestaurants. Public education programs include the Home Smoke Alarminspection. Crews attend schools to conduct fire drills and discuss fire safety withstudents. Public relations events combine fire truck displays, and fire safetyliterature distributed to the members of the community. Tours of the fire stationsare conducted on a regular basis for school children, and other organizationsincluding; brownies, beavers, guides and scouts. Preplanning of high riskoccupancies, equips the responders with vital information to formulate aneffective plan to mitigate any, emergency.
Maintenance
Fire fighting staff perform maintenance on a daily basis. The fire stations andvehicles are cleaned as required. Vehicle and equipment checks are conductedweekly. All motorized equipment is operated and compartments are checked forfunction, cleanliness and inventory accuracy. SCBA (Self contained breathingapparatus) are maintained according to manufactures specifications. Field levelmaintenance and bench tests are performed in house by certified staff members.
{ItemDescription} Page 53 of 70
Emergency Resgonse
The fire fighting division responds to various emergency situations such as; fires,motor vehicle accidents, hazmat incidents, medical assist calls, activated alarms,carbon monoxide detector activations, natural gas leaks, electrical wires arcingand open burning complaints.
Public assistance calls include installing smoke alarms for the elderly, strangeodours, burst pipes, and a variety of other situations.
{ItemDescription} Page 54 of 70
S
2009
CR
EW
AC
TIV
ITY
SUM
MA
RY
Jan
Feb
Mar
Apr
May
June
July
Aug
Sep
tO
ctN
ovD
ecT
OT
AL
CR
EW
IH
OU
RS
Tra
inin
g17
212
524
5.5
201
158.
537
123.
570
.75
82.5
148
216.
514
11,
721.
25Fi
reP
rey.
00
044
.542
.546
3357
80.5
581
7.5
370
Mai
nten
ance
111.
2594
.591
124.
510
5.5
197.
588
.511
894
.595
84.5
861,
290.
753,
382.
00C
RE
W2
Tra
inin
g13
216
3.5
204.
518
170
.561
.514
3.5
110.
511
1.5
138
225
681,
609.
50Fi
rePr
ey.
04.
54.
50
36.5
27.2
546
5734
.511
4.5
65.5
939
9.25
Mai
nten
ance
155
159.
518
1.5
133.
518
5.25
125.
510
795
100
124.
514
1.75
147
1,65
5.50
3,66
4C
RE
W3
Tra
inin
g17
717
1.5
157
136
113.
555
.513
569
92.5
136.
527
494
1,61
1.50
Fire
Pre
y.0
40.
537
51.5
33.7
551
.510
653
1744
.524
422.
75M
aint
enan
ce14
010
4.5
130
9711
216
8.5
9599
.511
114
2.5
147
156
1,50
33,
537.
25C
RE
W4
Tra
inin
g14
5.75
156.
510
6.5
170
120.
542
.574
53.2
510
5.5
157.
512
0.5
921,
344.
50Fi
reP
rey.
07.
54
2134
4962
.572
87.2
536
.518
19.2
541
1M
aint
enan
ce19
513
4.75
194
143.
515
9.25
165.
516
013
3.25
142
144.
514
3.25
179
1,89
43,
650
Oth
ers
Tra
inin
g12
.538
.50.
512
.52
36.5
411
2126
41.5
23.5
229.
5
Res
po
nse
Mhr
s.(a
llC
rew
s)21
517
111
414
218
515
322
912
612
095
139
201
1,89
0
Sum
mar
yA
vera
geH
ours
per
CR
EW
Tra
inin
g1,
572
hrs
Fir
eP
reven
tion
401
hrs
Mai
nten
ance
1,58
6h
rsE
mer
gR
esponse
473
hrs
{ItemDescription} Page 55 of 70
Brockville Fire DepartmentTraining Division Summary 2009
Fire Department personnel attended a total of 12 courses conducted at theOntario Fire College in 2009. The average course is 3-5 days in duration.Personnel also attended 25 seminars, which are considered to be 1-2 daysduration.
Division
Fire Fighting - 9 courses 14 participantsFire Prevention - 3 courses 3 participants
Conferences/Seminars
Administration - 7 10 participantsFire Fighting - 6 53 participantsFire Prevention - 5 6 participantsTraining - 5 5 participantsCommunications - I 1 participantMechanical - I I participant
Specialty Training
Designated Officer 2 participantsIAFF Hazmat Operations 13 participantsAuto Extrication 26 participants
Training Officer Instruction to the Fire Fighting Division
Confined Space 28 participantsAODA * 41 participants*(Accessibility for Ontarians with Disabilities Act)
{ItemDescription} Page 56 of 70
/
External Agencies Training 2009
During the calendar year of 2009, the Training Division conducted 5 trainingsessions on Confined Space Awareness, 2 sessions on Respiratory Protectionand 2 sessions on Trench Rescue.A total of 150 participants received training. Course participants attended fromthe following organizations:
Trillium Health Care ProductsTown of Carleton Place Public WorksParks Canada - Rideau Canal3M CanadaProctor & GambleSt Lawrence CollegeGreenfield EthanolRoss Labs
Confined Space Awareness
Course 09/01 11 participantsCourse 09/02 11 participantsCourse 09/03 12 participantsCourse 09/04 19 participantsCourse 09/05 18 participants
Total 71 participants
Respiratory Protection
Course 09/0 1 26 participantsCourse 09/02 15 participants
Total 41 participants
Trench Rescue
Course 09/01 19 SLC studentsCourse 09/02 19 SLC students
Total 38 participants
{ItemDescription} Page 57 of 70
COMMUNICATIONS DIVISION
The Brockville Fire Dispatch and Communications Centre receivesemergency calls for all Fire Departments in Leeds and Grenville with theexception of Gananoque. “Fire Dispatch” also provides logistical supportduring each emergency that the fire departments attendS
In 2009 the Communications Centre received just over 3,600 emergencycalls which resulted in 2,380 fire department responses. It also receivedand monitored almost 2,500 (2,497) monthly alarm tests that are requiredby the Ontario Fire Code.
Brockville—2009 Emergency Responses — 656(includes 94 emergency medical responses)
United Counties of Leeds and Grenville —
2009 Emergency Responses — 1,239(includes 344 emergency medical responses)
Prescott —
2009 Emergency Responses — 141(includes 16 emergency medical responses)
The communications and logistical support provided by “Fire Dispatch”varies depending on the severity of each call. The average length of timeper incident (from time of call to time last unit cleared) is approximately 48minutes, 55 seconds. This does not include the time required to completethe reports that must be submitted to each responding fire department orthe Fire Marshal’s Office.
The figures noted above do not included the hundreds of calls receivedfrom residents for the “after hours” servióe of City Works, Animal Control,Water Treatment and the City’s Transit System.
The Centracom II consoles presently in use at Fire Dispatch are overtwenty (20) years old and will be replaced in 2010. Additional informationwill be forthcoming as the project moves forward.
{ItemDescription} Page 58 of 70
LE
ED
SA
ND
GR
EN
VIL
LE
-M
ON
TH
LY
DIS
PA
TC
HA
CT
IVA
TIO
NS
2009
JAN
FEB
MA
RA
PRM
AY
JUN
EJU
LY
AU
GS
EP
TO
CT
NO
VD
EC
EAR
toD
AT
E5
514
412
44
97
32
574
1710
1610
118
78
1914
413
2211
1021
1313
1416
173
1624
1618
2322
1814
1523
19
1211
78
95
33
9230
2432
2325
2615
1921
281
2117
2521
3518
1513
2726
811
64
411
67
81
8320
1921
2616
2817
1316
237
MO
NT
HL
YT
OT
AL
148
109
163
141
146
140
123
159
137
100
9412
315
8366
.51%
BR
OC
KV
ILL
E68
6144
4560
6763
5541
4350
5965
627
.57%
PR
ES
CO
TT
911
915
913
1512
1511
1210
141
5.92
%
GA
NA
NO
QU
E
MO
NT
HL
YT
OT
AL
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
225
181
216
201
215
220
201
226
193
154
156
192
N/A
YE
AR
TO
DA
TE
TO
TA
L22
540
662
282
310
3812
5814
5916
8518
7820
3221
8823
8023
8010
0%
Mon
thly
Ala
rmT
ests
Mon
itore
d16
313
615
618
416
415
714
615
916
419
915
915
1Y
ear
toD
ate
Tot
al16
329
945
563
980
396
011
0612
6514
2916
2817
8719
38
AT
HE
NS
AU
GU
STA
1311
14E
DW
AR
DSB
UR
GH
/CA
RD
INA
L22
612
EL
IZA
BE
TH
TO
WN
IKIT
LE
Y20
1530
FRO
NT
OF
YO
NG
E5
812
KE
MPT
VIL
LE
2818
20L
EE
DS
AN
D10
00IS
LA
ND
S23
1637
ME
RR
ICK
VIL
LE
811
6R
IDE
AU
LA
KE
S24
1918
1938
{ItemDescription} Page 59 of 70
April 9, 2010
REPORT TO OPERATIONS COMMITTEE — APRIL 21, 2010
2010-055-04WATER & WASTEWATER TREATMENT CONAL COSGROVE, P. ENG.QUARTERLY REPORT DIRECTOR OF OPERATIONS(JAN. - MAR. 2010) EDWARD MALCOMNSON
WASTEWATER SYSTEMS SUPERVISORDON RICHARDS
WATER SYSTEMS SUPERVISOR
RECOMMENDED
THAT Report 2010-055-04 Water & Wastewater Treatment Quarterly Report (Jan. —
Mar. 2010) be received for information purposes.
PURPOSE
This report covers the months of January, February and March 2010. The intent of thereport is to keep the Committee, Council, and the public current with performance andmajor operational aspects of both the Water Treatment Plant/Trunk Distribution Systemand the Water Pollution Control Centre (wastewater treatment system), including anynotable highlights, MOE Inspections and adverse conditions.
BACKGROUND
This report is submitted Quarterly, and this report represents the first quarter of 2010.
ANALYSIS/OPTIONS
A. WATER TREATMENT PLANT & TRUNK WATER DISTRIBUTION SYSTEM
The City continues to be in compliance with the Water Treatment Plant’s Certificate ofApproval (C of A), in addition to the Ontario Safe Drinking Water Act and Regulations.Please refer to Attachment A — Brockville Drinking Water System PerformanceAssessment Report to review the treatment and bacteriological sampling results.
The 2009 WTP Annual Reports (Section 11 and Schedule 22) for both the WTP City ofBrockville Drinking-Water System and for the Township of Elizabethtown-Kitley WaterDistribution System were prepared as per 0. Reg. 170/03.
Adverse Water Quality Incidents: There was one adverse water quality incident in themonth of March. On March 10th, 2010 there was an adverse water quality incidentrelated to test results from Hydrant #162 on Convay Crescent. The Water Distributioncrew flushed the water mains in the areas and re-sampling confirmed that no additionalcorrective action was required. Adverse water quality reports were filed with the Ministryof Health and Spills Action Centre.
{ItemDescription} Page 60 of 70
2010-055-04W & WW Treatment Quarterly Report (Jan. — Mar. 2010) Page 2
Items of Note:
1. Main Plant
• Annual servicing completed on all diesel engine equipment. Main plantdiesel engines #1 & #2 required turbo unit replacement. TSSA fuel andappliance inspection completed by Tandet Industrial on all diesel engineand standby generators. Inspection report indicated fuel tanks and supplylines for main plant, low lift and Parkedale diesel engines require upgradesto comply with TSSA standard. Approximate cost of upgrades is$20,000.00. Upgrades will be budgeted in the 2011 capital budget.
• Main control panel for Low Lift pumps and flocc tank valves wereupgraded due to the age of equipment. Contractor designed, fabricatedand installed new control panel.
• Annual maintenance completed on gas chlorination disinfectionequipment.
• Vibration analysis inspections completed on all motors and pumps.
• New sample pumps installed for flocc water, clear well, reservoir chlorineresidual analyzers.
• Annual load testing completed on main plant 100KW generator and 200KW portable generator.
2. Parkedale Booster Station & Reservoir:
• Vibration analysis inspections completed on all motors and pumps.
3. Filters:• Surface wash supply piping disassembled and new Victaulic clamps
installed.
• Core sampling conducted to inspect filter media uniformity.
• Annual maintenance completed on filter surface wash agitators.
4. Overhead Tank:• No new updates
5. Elizabethtown-Kitley Distribution System:• Vibration analysis inspections completed on Lily Bay booster station
motors and pumps.
{ItemDescription} Page 61 of 70
2010-055-04W & WW Treatment Quarterly Report (Jan. — Mar. 2010) Page 3
6. Low Lift Pumg Station:• Vibration analysis inspections completed on all motors and pumps.
Inspection revealed major problem with low lift electric motor #1. Motorremoved from service, new 100 HP motor purchased and installed.
7. Drinkini Water Quality Management System:• Prepared draft amendments to the DWQMS Operation Plan to reflect
organizational restructuring.
8. MOE Inspections:• Dan White (DW Inspector — MOE) conducted the Annual Inspection for the
City of Brockvill&s Drinking Water System (Water Treatment andDistribution) on January 27th & 28th 2010. (See attached report).
9. Samjlinp
• All regulatory annual sampling for schedule 23 & 24 complete.
• All regulatory weekly bacti sampling for Brockville and Elizabethtowncomplete.
• All regulatory quarterly sampling for THM’s Nitrate, Nitrite for Brockvilleand Elizabethtown complete.
• MOE DWSP sampling complete.
B. WASTEWATER TREATMENT PLANT
The 2009 WPCC Annual Summary Report for Council was prepared, approved byCouncil and submitted to the MOE in March 2010.
Please refer to Attachment B — Brockville WPCC Sewage Plant PerformanceAssessment Report for all Operational Data for the Quarter. In regards to compliance ofcarbonaceous 5-day Biochemical Oxygen Demand (cBOD5), as of the end of March the12 month revolving average effluent characteristics (concentration and loading) forCBOD5 are 50.94 mg/L and 891.40 kg/day respectively and remain out of compliancewith the Certificate of Approval.
Items of Note:
1. Main Pumping Station:
• Pumps & Motors: A vibration analysis was completed on all pumps andmotors.
{ItemDescription} Page 62 of 70
2010-055-04W & WW Treatment Quarterly Report (Jan. — Mar. 2010) Page 4
Bypasses: On January 25th, 2010 there was a bypass at the MainPumping Station due to heavy rain and snow melt. Approximate volume ofthe bypass was 1200 m3. MOE was notified of the event. Chlorination wasestablished and samples taken.
2. Pumping Stations:
• Elizabeth Street Pumping Station: On January 28th and February 28th
2010 there was a pump blockage due to a rag in the check valve. Noissues to report.
• Riverview Drive Pumping Station: On February 1st 2010 there was apump blockage due to a towel in the impeller. No issues to report.
• Leachate Pumping Station: On March 13th, 2010 WPCC Staff respondedto the Leachate Pumping Station due to a meter chamber high level alarmdue to infiltration. On March 31St the forcemain was cleaned.
• Georgina Street Pumping Station: On March 14th and March 16th, 2010there was a pump blockage due to a towel in the impeller. No issues toreport.
• Central Avenue Pumping Station: WPCC Staff are continuing to gatherdata and monitor the situation at this station. The volume of dischargeentering the station is causing the pumps to run continuously.
3. Primary Clarifiers: Continuing with upgrades to Primary Clarifier #2. The VFD onthe distribution channel blower was replaced and the unit placed back in service.
4. Screen & Degrit: The VFD on inlet blower #2 faulted and the blower has beentaken out of service. WPCC Staff and contractor working on the issue.
5. Disinfection: Both Sodium Hypochlorite pumps had rebuild kits installed.
6. TSSA Digester Gas Audit: Response report submitted to TSSA on January 28th,
2010. Some corrective actions have been completed. WPCC Staff have been incontact with TSSA to advise them of our recent management changes.
7. Power Outages:
• On January 21st, 2010 there was brief power outage at the WPCC. Noissues to report.
• On January 25th, 2010 there was a power outage at Broome PumpingStation. WPCC Staff brought the portable generator on site until thepower was restored (approx. 5-6 hours). No issues to report.
• On Febwary 31d, 2010 there was a power outage at the LeachatePumping Station. Communication was lost due to a loose contact on afuse holder. Repairs were made and communication restored.
• On Febwary 26th, 2010 there was a power outage at Chelsea StreetPumping Station. No issues to report.
{ItemDescription} Page 63 of 70
2010-055-04W & WW Treatment Quarterly Report (Jan. — Mar. 2010) Page 5
8. Plant Inspection: The MOE completed their annual plant inspection on January14th, 2010. A draft report was received for review and comment. We are stillwaiting on the final report.
10. National Pollutant Release Inventory (NPRI) Report: The 2009 NPRI Reportwas submitted to Environment Canada on March 315t, 2010.
II. TSSA fuel and Appliance Inspections: These inspections were completed by anoutside authorized contractor on all diesel engine and standby generators.Repairs and recommendations are being coordinated through the City’s fleetdivision.
POLICY IMPLICATIONS
No policy implications at this time.
FINANCIAL CONSIDERATIONS
No financial considerations at this time.
CONCLUSION
Director of OperaS ns Wastewater Systems Supervisor
D. ichards D. CyrWater Systems Supervisor Director of Finance
B. C sselmanCity Manager
{ItemDescription} Page 64 of 70
U)UI
Z U)
E E2
UI j
< Hiz0Ui H
zu
00F-< .1Z0w<cr
HU)ZC/)0LLJ(l)
U)
QujHODZ
0LL
LIJZ-J-J
L1J
0<
LLJ(I)
CD
0CN0)00C’4
>-I—
0
>-o000
000
<1-0<0<00>-co
0
UI—UU000U)0UI
z
>.
0
I—
I—
UJI—U
0
0-I
550
00 0 —
00 0 ü
U)U) — <I
>- : zD 0
-J Z —<I-I-Z I
00 —0UU
DO ujo_o_ 0
‘) 0 D CO ) (C) W CC) (.5
UI> •CD—N.O)00 CDN.N-N-N.CDCD
‘xILl LU--.- -(910 00 0C)1N-U)CCCD(N 0
C0-ZO’N-) 0DX;CJC’J0(C)U)e.5
I jU’•‘)(/)LJ.. CDC’)CDO)N..5O)CD00C02 CDN.N.CDr:O)0I UI 000000000000 U) 0O-
<C’) N- 0 CD 0 (C) N- C’) (C) C’) C-
<1020 ,
N. C’) N. N. C’) C’) C’) N. N. N. N. N. (N C’)
og
> CD CD (C) N. C’) N- (C) (C) U) U) CD
0 I—U)
WLLI
(9 (C) -0 N. CD 0) N- CD N. CD (fl 0
—-z10• .5CCN-CO 0-<—U)I---0CDI-..C.4CD0,-CDCD(, —01-0 •000N-U)C’)ID00< U 00 CD CC) CD 000CC) CD CCC
-WU - N.CDN.00000CDN.CDN.0C00ZU 2 CDCC)c)CDC.500UJWo-... CD0CD00(N0u
5 E N. C’) C’) N. C’) 00C’)C’) N. N. (.5
__r_N- 0000 C’) 00000 N- 0
— N.00•)N.N.
U) 00 N. 0) (C) C’) C’) 00 0) CC)c0
<0 0)0)N.00)U)C—CDCDCDN-0 0
00 -CDU)(DC’)CN 0Z N. 0000 N. 0(00) 0) CN (.5—
N-CDCDN-0U)CNOUCDO) CD.0)N.00U)U)CD00CDCD0)U) C
<•1F-O
Q UICDC’)000N-0)0U)0
OC’)CNO).-0000)u)-. 0 UCDCDC’)N.0N.C’)0)O0U)0 U) N- CC) 00000 C’) II) N-’.)0 0-.U)
N. — 000000000 N. 0) —
< 0)C’)N-CDCCCDCDN.CDCD0)N.N.N-.-
0 0) 00 N. CC’) 00000 (N CD
4.00N..50-00N-00 N.
)- CDN-CDC’)C’)U)CC)0N-N.LC) N< C0c’)CDU)00000 00 0N.CDN.0)N.0OC’)0S0 Co
0N.C1N.0
LU,.
> N. 0000)0 N. CO — C’)COC’) (5 0U) 1’) 0 N. 0) N. 00 00 N. (0 0
OC’ICD 00)CDN.
00 00000000000(Cr-. —0(9 . 0 N. — — N. N. (N(jU
00)0) N- 000000 0((5 0DC’)C000N-00N-
000)U)0tCDCDN.C’)0CN. CC) N. N. 0) N. 0) N- 0) C’)s
f-U.
0)
N- N- N.
— 0)0N.O)N.C’)C’) N-
00(C)(DUO000
CD —
CC’JCN
00)N. CD N
(C)CDCC)C’) N. CC)
CC)
00 N.0) N-0CC’)N. N. N.
00 CNCN 0)
N. CDCC’)
C’) N- C’)CCC
00 NN-
00)0)
00 NN. C’) N.CC) 0) CD
C’)
CC) N. —CD CD CN. N. 0)
N. 0)10— 00)
IN. 00
LUN. N. 0)CD CD
-0 N.ZN.CN0I00N-= 00CC)
CL:0)0 N- CD
U
00I-
N.000
000
1- N. N. N.
U
C’)IzUI
00
- 0)N.0N.N.CDC’)C’.-C ON.UCC)C() ICC) CC) CC) CC)
< ca
I- ‘
CU)C)))- 0 N. N. 0CC) 00 N. CD N. N. C’4
UCDC’)C’).-C’)C’)C’)N-CD N(IIØC’1CNC(4N.CN N.N.
0
_______
0)’(50)CC)C’CC’)C’J0)—0)N- 0CCC’) N- CD N- CD N. CD CC) N- 0) -‘ 0) N
<OCNU)..CCCCDN-CC) OCD
I- 4.0 N. N. N. N. CC N. — CN C’) N. N.
U)Z0>1-Q.ø.JZ>lL:z <UJ<0000DDD<Q.0 0Z0U)<’<
{ItemDescription} Page 65 of 70
AT
fAC
HM
EN
TB
BR
OC
KV
ILL
ED
RIN
KIN
GW
AT
ER
SYST
EM
PER
FOR
MA
NC
EA
SS
ES
SM
EN
TR
EP
OR
T
CIT
YO
FB
RO
CK
VIL
LE
EL
IZA
BE
TH
TO
WN
-KIT
LE
YB
AC
TE
RIO
LO
GIC
AL
SAM
PLIN
GM
onth
Tot
alV
olum
eA
vg.
Dai
lyA
vg.
Fl2
WD
SA
vg.
FOR
Tot
alF
low
Avg
.D
aily
WD
SA
vg.
FCR
BR
OC
KV
ILL
E_W
OS
EZK
WD
S20
10T
reat
ed(M
L)
Flo
w(M
LId
)R
esid
ual
(mg/
L)
(mgI
L)
(ML
)F
low
(ML
Id)
(mgI
L)
ECT
CH
PCE
CT
CH
PCJA
N35
5.11
11.4
60.
451.
168.
730.
281.
0244
4428
1212
844outo
f44S
afe
44outo
f44S
afe
29
outo
f29S
afe
l2outo
fl2S
afe
l2outo
fl2S
afe
8o
uto
f8S
afe
FEB
322.
4511
.52
0.46
1.17
7.49
0.27
1.01
4444
2812
128
44outo
f44S
afe
44outo
f44S
afe
25O
uto
f28
Saf
el2
Outo
fl2S
afe
l2O
uto
fl2S
afe
8o
uto
f8S
ate
MA
R33
2.10
10.7
10.
461.
159.
580.
311.
0155
5535
1515
1065
out
of55
Saf
e55
out
of55
Saf
e35
Out
of35
Saf
e15
Out
of15
Saf
e15
Out
oti
SS
ate
10outo
f10
Saf
e
FCR
-F
ree
Chl
orin
eR
esid
ual
WD
S-
Wat
erD
istr
ibut
ion
Sys
tem
EZ
K-
Tow
nshi
pof
Eli
zabe
thto
wn-
Kit
ley
EC
-Eco
liTC
-T
otal
Col
ifor
m
{ItemDescription} Page 66 of 70
April 16, 2010
REPORT TO OPERATIONS COMMITTEE — APRIL 21, 2010
2010-062-04 C. COSGROVE, P. ENG.MEMORIAL CENTRE LOBBY REORGANIZATION DIRECTOR OF OPERATIONS
L. WHITEMANAGER OF STRATEGIC INITIATIVES
RECOMMENDATION
THAT Council accept this report for information purposes only.
PURPOSE
To inform Council of the plan for the reorganization of the Memorial Centre lobby.
BACKGROUND
For many years, the Brockville and Area Sports Hall of Fame individual and teamplaques lined the east wall of the Community Hall at the Brockville Memorial Centre. Asthe Hall underwent a major renovation recently, it was necessary to take the plaquesdown temporarily. Staff consulted with the Arena Advisory Commiffee and the SportsHall of Fame Committee at a meeting to consider a new location for the plaques.
The Committees came to a consensus that the plaques should not be returned to theCommunity Hall so that the plaques are accessible to the public when the hall is not inuse.
ANALYSIS
The Committees met with Staff including Valerie Harvey, Rick Pankhurst, DarleneBuffett and Lesley White. The following reorganization of the lobby was decided:
1. The individual Sports Hall of Fame Plaques be placed on tracks on the southside of the lobby where the current Wall of Honour and Donor plaques areplaced.
2. The Wall of Honour and Donor Plaques be relocated to the north wall of thelobby entrance where the hockey trophy showcase is currently located.
3. The team Sports Hall of Fame Plaques will be placed on the east wall of thelobby entrance where the notice board now sits.
4. The notice board will be removed and replaced by a new advertising signage thatwill include the room assignments. This board will provide the City an ongoingrevenue source.
5. The hockey trophy showcase will be removed. Ownership of the showcase willbe determined and the showcase will be returned. The management of theBrockville Braves have been consulted and have agreed to this move.
{ItemDescription} Page 67 of 70
Report 2009-062-04Memorial Centre Lobby Reorganization Page 2
6. Two showcases will be built in the arena on the east wall north of the CommunityHall windows to provide a trophy case for the following organizations: BrockvilleBraves, Brockville Tikis, Brockville Angels, St. Lawrence Speedskating Club,Brockville Figure Skating Club and the Brockville Minor Hockey Association. Allshowcases will be uniform in design and size. The showcases will be assignedby lottery to the groups.
7. The candy machines will be removed from the lobby and not replaced.8. The video games will be removed from the lobby entrance and not replaced.9. The drink machines will be relocated to the east end of the lobby in front of the
canteen window during the summer months to allow access to the Skateparkusers and then to the arena in the winter months.
10.The yearly Braves team pictures will remain in the lobby.11. The St. Lawrence College Schooner hockey team photos will be returned to the
College.
POLICY IMPLICATIONS
There are no policy implications.
FINANCIAL CONSIDERATIONS
The cost of building the new showcases and the tracks for the individual Sports Hall ofFame plaques will be funded through the RinC funding as part of the generalrehabilitation of the Memorial Centre.
CONCLUSION
The goal of this reorganization was to relocate the Sports Hall of Fame plaques from theCommunity Hall to a more accessible area so that they can be enjoyed will be achievedthrough this project.
,1/5Th
_____________
L. White, Bt.i et Officer C’Cosgrove, Direçr of Operations
__________________________
D. Cyr, Director of Finance B. Casseln, City Manager
{ItemDescription} Page 68 of 70
April 14, 2010
REPORT TO OPERATIONS COMMITTEE — April 21, 2010
2010-064-04PAINTING OF CENTRE, LANE AND EDGELINE PAVEMENT MARKINGSCONTRACT NO. 2010-02
RECOMMENDED
C. J. COSGROVE, P. ENG.DIRECTOR OF OPERATIONS
VALERIE HARVEYSUPERVISOR OF TRANSPORTATION
THAT Council accept the tender from Imperial Line Marking Services Ltd. in the amount ofSixteen Thousand, Three Hundred Twenty Dollars and Five Cents($1 6,320.05), excludingGST, for the painting of centre, lane and edge pavement markings; and
That this work be charged to account 3390-3610-3010.
PURPOSE
To retain the services of a contractor for the painting of centre, lane and edge linepavement markings.
BACKGROUND
The Operations Department calls tender for this work annually. This contract is limited tocentre, lane and edge line pavement markings only as the City does not have thenecessary equipment to complete this work. Public Works are responsible for turningarrows, stop lines and other miscellaneous hand work painting. Pavement markings arerequired to ensure safe driving conditions and proper traffic operations.
ANALYSIS/OPTIONS
The Engineering Division opened tenders on Tuesday, April 6, 2010 with the followingresults:1. Provincial Maintenance $18,655.002. Imperial Line Marking $16,320.05
In accordance with the City’s Purchasing By-law, approval by Council is required
FINANCIAL CONSIDERATIONS
{ItemDescription} Page 69 of 70
Report 2010-064-04Painting of Centre, Lane and EdgePavement MarkingsContract No. 2010-02 Page 2
There are sufficient funds, $16, 879.00, available in the Public Work’s 2010 OperatingBudget in account 3390-3610-3010 to accommodate the work. The 2010 tender is 0.4%higher than the 2009 tender price.
CONCLUSION
It is recommended that the tender from Imperial Line Marking Services Ltd. be accepted.
C.J. Cosgrove, P.4 Valerie HarvDirector of Operat6ns Supervisor of ransportation
D.CyrDirector of Finance City Manager
{ItemDescription} Page 70 of 70