Transcript
Page 1: OM4 OM3 OM2 Proposed Site formation - EPD

LANDSCAPE BLOW-UP PLAN AND SECTIONS

DK 10 / 15 EL DL

NTS

A FIRST ISSUE 07/13

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery – Design and Construction

11.6.3

B REVISED ISSUE 11/14C REVISED ISSUE 10/15

C

Site formation platform to be handover to relevant department

Proposed internal road within Sandy Ridge

OM3

OM2

OM4

B

B

BLOW-UP PLAN BN.T.S.

Section B-BN.T.S.

OM4

OM2

OM3

BLOW-UP PLAN AN.T.S.

Section A-AN.T.S.

OM4OM2

A

A

Shuttle Bus drop-off area

OM4

OM3

Top Related