Investigation IssuesInvestigation Issues
• Inadequate load capacity due to adesign error
• Why the collapse occurred
• Why the design error went undetectedfor 40 years
• Gusset plate issues related todistortion and corrosion
![Page 3: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/3.jpg)
Summary of Collapse EventsSummary of Collapse Events
2 closed insidesouthbound traffic lanes
2 closed outsidenorthbound traffic lanes
![Page 4: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/4.jpg)
Summary of Collapse EventsSummary of Collapse Events
Construction equipment andvehicles
Piles of aggregate
U10 west node
![Page 5: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/5.jpg)
Summary of Collapse Events
Source: MPD
![Page 6: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/6.jpg)
Deck truss
Southapproach
Northapproach
Summary of Collapse Events
North
![Page 7: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/7.jpg)
![Page 8: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/8.jpg)
![Page 9: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/9.jpg)
![Page 10: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/10.jpg)
Initial Investigation ActivitiesInitial Investigation Activities
• Pre-collapse condition of bridge
– Cracks
– Corrosion
• History of bridge
– Construction
– Inspection
– Fatigue evaluations
– Prior maintenance projects
![Page 11: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/11.jpg)
Source: FHWA
![Page 12: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/12.jpg)
Initial Investigation FindingsInitial Investigation Findings
• Most of the structure was in goodcondition
• Generally well maintained
• Significant attention given to fatigueissues
• Inspected more frequently thanrequired
![Page 13: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/13.jpg)
Initial Investigation FindingsInitial Investigation Findings
• Two previous construction projectshad significantly increased the deadload
• Construction activities on day ofcollapse had concentrated weightover node U10 west
• Physical evidence indicated thatfailure at U10 was initiating event
![Page 14: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/14.jpg)
Initiating EventInitiating Event
• Analysis of surveillance cameracollapse video
• Inspection of bridge components
– Superstructure
– Bearings
– Piers
• Additional analyses corroboratedinspection findings
![Page 15: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/15.jpg)
![Page 16: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/16.jpg)
Fracture and DeformationFracture and Deformation
North
Lowerchords
Upperchord
Upperchord
U10E
U10W
![Page 17: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/17.jpg)
Initialcompressionfailure
Initial tensionfracture
Fracture and DeformationFracture and Deformation
![Page 18: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/18.jpg)
Initial Tension FractureInitial Tension Fracture
North
UpL9/U10W
![Page 19: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/19.jpg)
Gusset Plate ThicknessGusset Plate Thickness
U2 U4 U6 U8 U10 U12 U14
L1L3 L5
L7 L9L11 L13
U0
1/2” thick gusset plate (50 ksi) 10 of 29 gusset plates
5/8” thick gusset plate (50 ksi) 4 of 29 gusset plates
1” thick gusset plate (50 ksi) 13 of 29 gusset plates
1 3/8” thick gusset plate (100 ksi) 2 of 29 gusset plates
![Page 20: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/20.jpg)
Gusset Plate Shear AnalysisGusset Plate Shear Analysis
L1 U2 L3 U4 L5 U6 L7 U8 L9 U10 L11 U12 L13 U14
Gusse
tP
late
D/C
ratio
0.0
0.5
1.0
1.5
2.0
2.5
U2 U4 U6 U8 U10 U12 U14
L3 L5L7 L9
L11 L13L1
U4 U10 L11
![Page 21: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/21.jpg)
Finite Element ModelingFinite Element Modeling
Compressiondiagonal
Tensiondiagonal
Orange and red shading:exceeds yield stress
Stress
Yieldstress
0
Allowable
![Page 22: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/22.jpg)
Factors That Did Not ContributeFactors That Did Not Contribute
• Corrosion damage
• Fracture of a floor truss
• Pre-existing cracking
• Bearings and piers
![Page 23: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/23.jpg)
• 1977 Modification
– Deck thickness increased
– Added over 3 million pounds
• 1998 Modification
– Barriers / deicing system
– Added 1.2 million pounds
• August 1, 2007
– Construction materials concentratedabove U10
Increases in Dead LoadIncreases in Dead Load
![Page 24: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/24.jpg)
Concentrated Construction LoadsConcentrated Construction Loads
Constructionmaterials383,000 lbs
Constructionequipment195,500 lbs
Center span combinedConstruction load578,500 lbs
![Page 25: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/25.jpg)
Increasing Loads on U10W Gusset PlateIncreasing Loads on U10W Gusset Plate
Dead Load of Original Bridge Design
Construction Materials and Vehicles
Traffic
1977 Added Deck(Less Milled-off Lanes)
Cri
ticalL
oad
on
U10W
GussetP
late
s
1998 Modified Barriers
Total loadat collapse
![Page 26: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/26.jpg)
Increasing Loads on U10W Gusset PlateIncreasing Loads on U10W Gusset Plate
Dead Load of Original Bridge Design
1998 Modified Barriers
Construction Materials and Vehicles
Traffic
1977 Added Deck(Less Milled-off Lanes)
Cri
ticalL
oad
on
U10W
Gusset
Pla
tes
Expected capacityof gusset plates
for proper AASHOdesign
Total loadat collapse
Missing reserve capacityfor proper design
![Page 27: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/27.jpg)
Accident Loads on ½-inch-Thick Gusset PlatesAccident Loads on ½-inch-Thick Gusset Plates
Compressiondiagonal
Tensiondiagonal
Orange and red shading:exceeds yield stress
Stress
Yieldstress
0
Allowable
![Page 28: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/28.jpg)
Accident Loads on 1-Inch-Thick Gusset PlatesAccident Loads on 1-Inch-Thick Gusset Plates
Compressiondiagonal
Tensiondiagonal
Stress
Yieldstress
0
Allowable
![Page 29: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/29.jpg)
• Error not discovered during originalchecks and reviews by:
– Design firm
– State and federal transportation officials
• Other opportunities for detection
– Load ratings
– Annual inspections
Detection of Design ErrorDetection of Design Error
![Page 30: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/30.jpg)
Load RatingsLoad Ratings
• Required when significant changeoccurs that affects load-carryingcapacity
• First load rating performed in 1979
– Pavement overlay project to increasethickness of bridge deck
• Additional load ratings performed in1995 and 1997
– Modifications to barrier system
![Page 31: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/31.jpg)
Load RatingsLoad Ratings
• Load rating programs do not includeor consider gusset plate strength
• If gusset plates had been includedin load ratings– Should have revealed improperly
designed gusset plates
– May have determined that improperlydesigned gusset plates werecontrolling members
![Page 32: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/32.jpg)
Bridge InspectionsBridge Inspections
• Bridge was inspected at a frequencygreater than required by NBIS
• Condition ratings
– Deck
– Superstructure
– Substructure
• Evaluate condition, not designadequacy
![Page 33: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/33.jpg)
2003 Photo
Compressiondiagonal
![Page 34: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/34.jpg)
Gusset Plate DistortionGusset Plate Distortion
• Bowed gusset plates not addressedthrough inspections
• At least one inspector had observedbowing but did not report it
• Lack of specific training referencesto bowing could cause bridgeinspectors to give inadequateattention to this condition
![Page 35: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/35.jpg)
Board Meeting HWY07MH024Board Meeting HWY07MH024
![Page 36: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/36.jpg)
Board Meeting HWY07MH024Board Meeting HWY07MH024Grand River Bridge, source: ODOT
![Page 37: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/37.jpg)
Board Meeting HWY07MH024Board Meeting HWY07MH024Failed Gusset Plate, source: ODOT
![Page 38: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/38.jpg)
Gusset Plate CorrosionGusset Plate Corrosion
• Corrosion not a factor in I-35Wbridge collapse
• Visual inspections alone areinadequate to detect or quantifygusset plate corrosion
• NDE can greatly enhance accuracyof inspections
• Use NDE when appropriate toevaluate gusset plates
![Page 39: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/39.jpg)
Safety RecommendationsSafety Recommendations
• The design error was not initiallydetected during
– Reviews by the design consultant
– Reviews by Federal or Statetransportation agencies
• The design error remainedundetected
– Through subsequent load ratings
– Through annual bridge inspections
![Page 40: Office of Highway Safetysp.bridges.transportation.org/Documents/I35WNTSBInvestigation-MarkBagnard.pdfU2 U4 U6 U8 U10 U12 U14 L1 L3 L5 L7 L9 L11 L13 U0 1/2” thick gusset plate (50](https://reader030.vdocuments.mx/reader030/viewer/2022040115/5e618cb35de74307da221188/html5/thumbnails/40.jpg)
REPORTS AVAILABLE AT:REPORTS AVAILABLE AT:www.ntsb.gov/publictn/h_acc.htm