Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / 41 Dated: 15-09-2016.
To,
All SSA Heads,
Haryana Telecom Circle.
Sub: - Information regarding Procedure for calculating requirement of Batteries Sets for BSNL
Sites (Only CFA Vertical)
In reference to BSNL HQ letter 7-1/2014/NWO-CFA/MSE dated 31.7.2014 and in continuation
to BSNL HQ letter No. 7-1/2013/NWO-CFA/MSE/Ch III dated 27.7.2015 ( Copies attached ) vide
which procedure for calculating requirement of Batteries for replacement and development was
conveyed by BSNL Corporate Office. In this regard, it is requested to send the below noted
information in the prescribed proforma as under to enable this office for arriving at figure i.e. 1 / 6th
of
battery capacity which is to be procured for the year 2016-17.
SSA
Name of
Node/
Exchange
Backup
time
specified
(in Hrs)
Present
Anticipa
ted load
(in
Amp)
Existing
Battery
Capacity
(in AH)
Date
of
install
ation
Battery size
required as
per above
formula (in
AH)
Proposed size
of battery sets
to be procured
It is requested kindly provide the above detail in excel format to this office on mail
[email protected] latest by 17.09.2016 positively.
This has got approval of competent authority.
This is regarding the Battery sets requirement for FY 2015-16 in respect of NWP- CFA
vertical BSNL sites.
1. This office has asked from SSAs the battery requirement for FY 2015-16 on BSNL
sites (CFA vertical only) copy of the letter placed at 2/c along with Excel format in
which field units advised to submitted their requirement with consideration of
following points :
a. The battery shall be taken in to the requirement whose life will be expired
on/before 31.03.2017.
b. The requirement shall be submitted in prescribed excel format with approval of
SSA Heads.
c. SSAs are advised to check the balance battery in store/battery in pipeline. The
same shall be deduct from final requirement.
2. After the consideration of above points, the requirement submitted by the SSAs is
as under :-
SSA 200 AH
400 AH
600 AH
1000 AH
1500 AH
2000 AH
3000 AH
4000 AH
5000 AH Total
Placed at
Ambala 12 0 20 26 0 2 0 4 4 68 13/c
Faridabad 0 1 35 10 0 4 0 0 0 50 18/c
Gurgaon 4 6 67 8 0 0 0 0 0 85 22/c
Hisar 0 2 60 22 0 6 2 0 0 92 25/c
Jind 6 13 5 3 0 2 2 0 0 31 5/c
Karnal 2 2 50 17 2 6 2 0 0 81 35/c
Rewari 0 2 2 21 0 7 0 0 0 32 36/c
Rohtak 40 0 9 14 0 5 3 0 0 71 30/c
Sonipat 0 0 15 6 0 1 0 2 0 24 3/c
Total 64 26 263 127 2 33 9 6 4 534
This office has reconcile
SSA Name Placed at First level scrutinize Remarks
Ambala 18/c 19/c Repetition with
previous year &
additional load
checked.
Faridabad 6/c 7/c
Gurgaon 12/c 13/c
Hisar 8/c 9/c & 23/c
Jind 14/c 15/c
Karnal 16/c 17/c
Rewari 10/c 11/c
Rohtak 4/c 5/c
Sonepat 2/c 3/c
3. BSNL HQ asked the information regarding the installed capacity of Batteries related to
NWO-CFA cell for FY 2015-16 vide letter placed at 20/c and refer the previous letter
placed at 20-1/c to 20-5/c.
4. In reference to point no 3, this office has asked the information of installed capacity of
Batteries related to NWO-CFA cell for FY 2015-16 vide letter placed at 21/c from SSAs
and the summary of information received as under (detail placed at 29/c) :
Installed BTY sets in
SSAs
200 AH
300 AH
400 AH
600 AH
1000 AH
1500 AH
2000 AH
3000 AH
4000 AH
5000 AH
Total
Haryana 288 4 33 735 526 5 146 43 14 19 1813
5. The above detail is to be send BSNL HQ in reference to letter 20/c for procurement process
as “ The battery sets requirement for FY 2015-16 is the 1/6th
of the total installed capacity of
Batteries related to NWO-CFA cell.
6. In the mean time, BSNL HQ revised the guidelines as under
a. “Decentralised of Procurement of Batteries & Power Plants” instead of NWO-CM cell at
BSNL HQ.
b. Back time for VRLA Batteries capt as
i. Urabn area or critical location like Zonal center = 4 Hours
ii. SDCA (Block HQ) = 6 Hours
iii. Rural areas = 10 Hours
iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,
BSC etc) for replacement of batteries. Minutes of HPPC for vetting the requirement of SMF VRLA Battery sets for the FY 2015-16.
Meeting of HPPC of Haryana Telecom Circle was convened on dated ...06.2015 in the
chamber of SrGM(CFA). Network planning cell of Circle Office has submitted the final
requirement of SMF VRLA Battery sets under development and maintenance activities as detailed
in table below, in accordance to the requirement raised by SSAs & final requirement proposed by
network planning section of Haryana Telecomm Circle for the financial year 2015-16. Is given
below in tabular form.
Table No.1
SSA 400 600 1000 2000 5000 Total
AMB 0 2 2 2 0 6
FBD 1 1 2 0 0 4
GRG 0 0 2 2 2 6
HSR 0 8 2 2 0 12
Jind 0 3 5 0 0 8
KRL 4 4 16 2 0 26
REW 0 1 3 2 0 6
RTK 0 2 1 2 1 6
SPT 1 5 6 0 0 12
Total 6 26 39 12 3 86
While working out the requirement of battery sets under development and maintenance
activities following points have been kept in view.
1. Battery sets in pipeline. 2. All the recovered battery sets in working condition will be re-utilized and adjusted in
demand. 3. Back up time for VRLA Batteries
a) in Urban areas and at Critical locations like Zonal Centres(From Where service of multiple circles are affected), it may be kept as 4 Hours.
b) At Block head quarters (SDCA),It may be kept as 6 Hours. c) In Rural areas (Where AC is not available for long period), it may be kept as 10 Hours.
4. While making Procurement of batteries, charging capacity of power plant must be ensured and required energy audit must be done.
5. Priority should be given to higher node(like Zonal Centre,MSC,TAX,MSU,BSC etc) for replacement of batteries. The other nodes (BTSs,RSUs etc.) should be considered thereafter.
6. The requirement of battery sets under maintenance has been taken into account in respect of battery whose life will expire up to 31-03-2016 due to the reason that procurement in each year is processed nearby in the m/o July-August.
RECOMMENDATIONS
After examining the various reports and information put forth by the planning section, the HPPC
is of the opinion that quantity of battery sets shown in above table is reasonable and
recommended for procurement after observing usual departmental formalities.
DGM (CFA) Addl.GM (Fin) GM (CFA) Sr. GM (CM)
Page 2 of 2
7. Vide BSNL HQ letter no 7-1/2015-NWO-CFA/MSE/Ch.III Dated 07.05.2015 (placed at
31/c) point no 3, Only 1/6th
of the requirement so arrived for each size of Battery (nearest
full integer) can be procured. The calculation for 1/6th
battery sets as under:
BTY Capacity 200 AH
300 AH
400 AH
600 AH
1000 AH
1500 AH
2000 AH
3000 AH
4000 AH
5000 AH
Total
Total 288 4 33 735 526 5 146 43 14 19 1813
1/6th 48 0.66 5.5 122.5 87.66 0.83 24.33 7.16 2.33 3.16 302.2
1/6TH
(Full integer) 48 0 6 122 87 0 24 7 2 3 299
8. It means, 299 battery sets can be consider under CFA vertical for FY 2015-16. 9. The 162 battery sets (HPPC approved) are already rest with MM cell of Haryana for
procurement. Detail of capacity wise as under :
10. Battery sets for HPPC against for the Financial year 2015-16 as under :
Capacity BTY sets
1/6th
299 nos
BTY sets
162 nos
Reaming
BTY sets
200 AH 48 49 0 (-1)
400 AH 6 0 6
600 AH 122 96 26
1000 AH 87 17 70
2000 AH 24 0 24
3000 AH 7 0 7
4000 AH 2 0 2
5000 AH 3 0 3
11. The second level scrutinize on the basis of i. Urabn area or critical location like Zonal center = 4 Hours
ii. SDCA (Block HQ) = 6 Hours
iii. Rural areas = 10 Hours
iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,
BSC etc) for replacement of batteries.
v. Load consideration, discharge rate of Battery sets, effective battery capacity as
per guideline for planning of VRLA BATTERIES vide GL No GL/BAT-04/02
MAR 2007 and sample calculation for switch system (placed at 33/c).
vi. Battery life of 6 years (battery life expired on/before 31-Mar-2016) is
considered.
BTY capacity 200 AH 600 AH 1000 AH Total
Total 49 96 17 162
12. After apply the above parameters, SSA wise requirement came out as under :
SSA 200 300 400 600 1000 2000 3000 4000 5000 Total
AMB 3 2 0 2 2 2 0 0 0 11
FBD 0 0 1 1 3 0 0 0 0 5
GRG 0 0 0 0 3 2 0 0 2 7
HSR 0 0 0 8 2 2 0 0 0 12
Jind 0 0 0 3 5 0 0 0 0 8
KRL 1 2 4 4 17 2 0 0 0 30
REW 0 0 0 1 3 3 0 0 0 7
RTK 6 4 0 2 1 2 0 0 1 16
SPT 0 0 1 5 6 0 0 0 0 12
Total 10 8 6 26 42 13 0 0 3 108
13. Vide point number 10, 200 AH=10 & 300 AH=8 not to be consider for FY 2015-16,
Capacity BTY sets
1/6th
299 nos
BTY sets
162 nos
Reaming
BTY sets
Requirement
of SSAs
200 AH 48 49 0 0
400 AH 6 0 6 6
600 AH 122 96 26 26
1000 AH 87 17 70 42
2000 AH 24 0 24 13
3000 AH 7 0 7 0
4000 AH 2 0 2 0
5000 AH 3 0 3 3
90
14. Therefore, 90 nos battery sets may be consider for HPPC against FY 2015-16, SSAs wise
detail as under.
SSA 400 600 1000 2000 5000 Total
AMB 0 2 2 2 0 6
FBD 1 1 3 0 0 5
GRG 0 0 3 2 2 7
HSR 0 8 2 2 0 12
Jind 0 3 5 0 0 8
KRL 4 4 17 2 0 27
REW 0 1 3 3 0 7
RTK 0 2 1 2 1 6
SPT 1 5 6 0 0 12
Total 6 26 42 13 3 90
15. The above list of 90 nos of battery sets follows the following norms
i. Urabn area or critical location like Zonal center = 4 Hours
ii. SDCA (Block HQ) = 6 Hours
iii. Rural areas = 10 Hours
iv. Priority should be given to higher node (like Zonal center, MSC, TAX, MSU,
BSC etc) for replacement of batteries.
v. Load consideration, discharge rate of Battery sets, effective battery capacity as
per guideline for planning of VRLA BATTERIES vide GL No GL/BAT-04/02
MAR 2007 and sample calculation for switch system (placed at 33/c).
vi. Battery life of 6 years (battery life expired on/before 31-Mar-2016) is
considered.
vii. Matching with previous year allotment of battery sets to SSAs.
viii. Battery sets under 1/6th
of the total installed battery sets.
List of battery sets (90 nos) SSA wise against the FY 2015-16 placed at 34/c is
submitted for approval & further processing for HPPC of Haryana circle please.
Network Planning Section
Haryana Telecom Circle,Ambala
Tel.: 0171 – 2603257
E-mail :[email protected]
____________________________________________________________________
The meeting of HPPC of Haryana Telecom Circle for requirement of SMF VRLA Battery sets in r/o CFA Vertical for the FY 2015-16 is scheduled to be held in the chamber of Sr.GM(CFA) on dated 10.06.2015 at 11:00 Hrs. All the HPPC members are requested to make it convenient to attend the meeting at scheduled date & time.
(N.K Singla)
AGM (NWP-CFA)
UO Note No: - HR / NWP-117 / Battery Requirement / 2015-16 /37 Date: - 08-06-2015
To
Members of HPPC
O/o CGMT HR Ambala
Haryana Telecom Circle
1. Sr. GM (Trans) 2. Sr GM (CFA)
3. GM (Fin)
4. DGM (CFA)
This is regarding the Battery requirement under CFA vertical for the financial
Year 2016-17.
1. As per BSNL HQ letter No 7-1/2014/NWO-I-CFA/MSE Dated 16.03.2015 (placed at 20/c) vide which 1/6th of the installed battery capacity shall be
taken as requirement for FY 2015-16. 2. Accordingly the detail of installed battery capacity collected from SSAs and
summarised placed at 28/c.
3. SSA wise, make wise and Capacity wise summary is placed at 29/c and
also under please.
Installed BTY sets in
SSAs
200 AH
300 AH
400 AH
600 AH
1000 AH
1500 AH
2000 AH
3000 AH
4000 AH
5000 AH
Total
AMB 49 0 6 101 89 0 19 1 2 5 272
FBD 0 0 1 49 34 0 16 0 0 0 100
GRG 8 0 4 133 30 0 7 2 0 2 186
HSR 20 0 4 118 58 0 34 12 4 2 252 Jind 39 0 4 44 52 0 4 6 2 0 151
KRL 20 4 7 160 81 2 21 8 0 0 303
REW 4 0 0 43 80 3 11 4 2 0 147
RTK 119 0 3 41 74 0 17 10 0 8 272
SPT 29 0 4 46 28 0 17 0 4 2 130
Total 288 4 33 735 526 5 146 43 14 19 1813
4. As per BSNL HQ guidelines referred vide point no 2, the calculation for
1/6th of the installed battery capacity shall be taken as requirement for FY 2015-16 is as under please.
BTY Capacity
200 AH
300 AH
400 AH
600 AH
1000 AH
1500 AH
2000 AH
3000 AH
4000 AH
5000 AH
Total
Installed
battery sets
in SSAs
288 4 33 735 526 5 146 43 14 19 1813
1/6 of the
Battery
Sets
48 0.66 5.5 122.5 87.66 0.83333 24.3333 7.16667 2.33333 3.16667 302.2
1/6TH
(Full
integer) 48 1 6 123 88 1 24 7 3 4 305
1/6th as per
requirement
collected
55 0 0 123 88 1 24 7 3 4 305
1/6 th final
BTY sets 55 0 0 144 77 0 21 2 2 4 305
Note: This office has also collected the actual requirement from SSAs and on
the basis of that following adjustment is to be needed to meet the total 1/6th of installed battery sets i.e. 305. a. The battery sets of 300AH=1 & 400AH=6 considered in the 200 AH (7 nos)
due to no requirement of 300AH & 400AH battery sets received from SSA. b. The battery sets for 1000AH=11, 1500AH=1, 2000AH=3, 3000AH=5 &
4000AH=1 (TOTAL 21) are considered in 600AH due to 1/6th battery sets more than actual requirement.
5. As per above calculation, now only 305 battery sets may be procured under
CFA vertical for FY 2015-16.
6. 162 Battery sets under CFA vertical (HPCC approved) are pending against the FY 2014-15 at the level of MM cell.
7. Requirement of remaining (305-162 = 143) 143 nos of battery sets against
the FY 2015-16 is as under please.
SSA 200 AH
600 AH
1000 AH
2000 AH
3000 AH
4000 AH
5000 AH Total
AMB 2 7 7 0 2 2 0 20
FBD 0 2 13 2 0 0 0 17
GRG 0 4 0 0 0 0 2 6
HSR 0 7 3 4 0 0 0 14
Jind 0 4 7 0 0 0 0 11
KRL 0 15 12 4 0 0 0 31
REW 0 4 13 7 0 0 0 24
RTK 4 2 2 2 0 0 2 12
SPT 0 3 3 2 0 0 0 8
Total 6 48 60 21 2 2 4 143
8. SSA Wise details of 1/6th of the installed battery i.e. 305 is as under
SSA 200 AH
600 AH
1000 AH
2000 AH
3000 AH
4000 AH
5000 AH Total
AMB 14 33 24 0 2 2 0 75
FBD 0 2 13 2 0 0 0 17
GRG 0 25 0 0 0 0 2 27
HSR 2 28 3 4 0 0 0 37
Jind 5 4 7 0 0 0 0 16
KRL 3 43 12 4 0 0 0 62
REW 0 4 13 7 0 0 0 24
RTK 25 2 2 2 0 0 2 33
SPT 6 3 3 2 0 0 0 14
Total 55 144 77 21 2 2 4 305
In reference to above, the proposed requirement of battery set quantity
of 143 no,s (mentioned in table under point no 8) for F/Y 2015-16 is
submitted for kind consideration and approval please.
If the above proposal is to be agree,
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-09-2016.
To,
SSA Head Sonepat
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Ref. no. S-3/PLG/Exch. Equip./SPT/16-17/IV/52 Dated 01-.09.2016
Kindly refer to your office letter above vide which the revised requirement of Batteries set have
been sent as an annexure. But the said annexure was not enclosed with the letter.
After following the BSNL HQ norms for calculation of requirement of batteries in r/o CFA
Verticals, there are slight changes in the batteries requirement submitted by your SSA which have been
analyzed/corrected as enclosed annexure and in this regards it is again requested to comment on the
revised analyzed requirement and resubmit the enclosed annexure with your comments duly signed
latest by 09.09.2016 forenoon on mail [email protected].
Encl:-As Above
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.
To,
SSA Head Sonipat
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After
detail examination,a brief summary has been given as annexure
Details of the requirement projected and requirement being considered along with the reasons
for rejection/Capacity change are mentioned in detailed annexure attached.
It is therefore, requested to go through the above details of your SSA. If any there is any
objection in the requirement under consideration then same may be analyzed at SSA level and proposed
changes with justification will be discussed in Circle office as per schedule given below:-
Jind & Sonipat SSA Dated :- 03.09.16
Otherwise, the requirement as shown in annexure will be treated as final.
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.
To,
SSA Head Jind
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After
detail examination,a brief summary has been given as annexure
Details of the requirement projected and requirement being considered along with the reasons
for rejection/Capacity change are mentioned in detailed annexure attached.
It is therefore, requested to go through the above details of your SSA. If any there is any
objection in the requirement under consideration then same may be analyzed at SSA level and proposed
changes with justification will be discussed in Circle office as per schedule given below:-
Jind & Sonipat SSA Dated :- 03.09.16
Otherwise, the requirement as shown in annexure will be treated as final.
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.
To,
SSA Head Karnal
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After
detail examination, a brief summary is given below.
Details of the requirement projected and requirement being considered along with the reasons
for rejection/Capacity change are mentioned in detailed annexure attached.
It is therefore, requested to go through the above details of your SSA. If any there is any
objection in the requirement under consideration then same may be analyzed at SSA level and proposed
changes with justification will be discussed in Circle office on 02.09.2016
Otherwise, the requirement as shown in annexure will be treated as final.
SSA Capacity Battery Projected Battery consider
Karnal 200 AH 2 1
Karnal 400 AH 2 0
Karnal 600 AH 50 20
Karnal 1000 AH 17 8
Karnal 1500 AH 2 0
Karnal 2000 AH 6 3
Karnal 3000 AH 2 0
Karnal 4000 AH 0 0
Karnal 5000 AH 0 0
Total 81 32
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 29-08-2016.
To,
SSA Head Ambala
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Requirement in r/o batteries submitted by your SSA in r/o CFA Vertical for FY 2016-17. After
detail examination, a brief summary is given below.
SSA Capacity Battery Projected Battery consider
Ambala 200 AH 12 7
Ambala 400 AH 0 0
Ambala 600 AH 20 8
Ambala 1000 AH 22 10
Ambala 2000 AH 2 6
Ambala 3000 AH 0 0
Ambala 4000 AH 2 1
Ambala 5000 AH 4 0
Total 62 32
Details of the requirement projected and requirement being considered along with the reasons
for rejection/Capacity change are mentioned in detailed annexure attached.
It is therefore, requested to go through the above details of your SSA. If any there is any
objection in the requirement under consideration then same may be analyzed at SSA level and proposed
changes with justification will be discussed in Circle office on 02.09.2016
Otherwise, the requirement as shown will be presented to HPCC for further consideration.
S.K Kakkar
DGM(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.
To,
SSA Head Ambala
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Ref:-S-3/Plg/Exch. Equipment/SPT/16-17/IV/26 Dated 05.07.16
Kindly refer to your office letter mentioned above under reference vide which Battery
requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your
SSA following shortcomings have been noticed.
Total Requirement
Submitted
Under Consideration Not Considered Remarks
Mentioned below
1) Most of the location Battery required is not justified as per load of the exchange, needs to be
reviewed .
2) Almost in all the location under details of equipment column only RSU and RSU+BTS is
mentioned no detail of equipment is given.
3) The sites where scrapping Memo and Estimate No. is written as under process, the same
should be submitted early.
It is once again requested to review the battery requirement as submitted and remove the
shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under
consideration will only be treated.
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.
To,
SSA Head Sonipat
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Ref:-S-3/Plg/Exch. Equipment/SPT/16-17/IV/26 Dated 05.07.16
Kindly refer to your office letter mentioned above under reference vide which Battery
requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your
SSA following shortcomings have been noticed.
Total Requirement
Submitted
Under Consideration Not Considered Remarks
Mentioned below
4) Battery required is not justified as per load of the exchange, needs to be reviewed .
5) Almost in all the location under details of equipment column only RSU and RSU+BTS is
mentioned no detail of equipment is given.
6) The sites where scrapping Memo and Estimate No. is written as under process, the same
should be submitted early.
It is once again requested to review the battery requirement as submitted and remove the
shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under
consideration will only be treated.
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 09-08-2016.
To,
SSA Head Jind
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Ref:-CP-06/JD/2014-15 Dated 12.07.16
Kindly refer to your office letter mentioned above under reference vide which Battery
requirement in r/o NWP-CFA Vertical have been submitted. While analyzing the requirement of your
SSA following shortcomings have been noticed.
Total Requirement
Submitted
Under Consideration Not Considered Remarks
31 4 27 Mentioned below
7) Battery required is not justified as per load of the exchange for e.g at S.No. 2 Gatuali
Exchange load of exchange given is 10 A and battery required is 400A.
8) Almost in all the location details of equipment in exchange is not given whereas it is
specially desired to submit the details of existing equipment.
9) The sites where scrapping Memo and Estimate No. is written as under process, the same
should be submitted early.
It is once again requested to review the battery requirement as submitted and remove the
shortcomings and submit the requirement latest by 12.08.16, otherwise the battery shown under
consideration will only be treated.
Som Chand
AD(NWP-CFA)
this office letter of even no. dated 21.06.2016 followed by reminder letter dated 14.07.2016
vide which it was requested to submit the requirement of Battery Sets in r/o CFA segment under
Development and Maintenance for the FY 2016-17.Even after a lapse of last date your SSA have not
submitted the requirement.
Due to non submission of requirement this office is unable to process the requirement of other
SSAs whose have submitted the requirement timely, this is causing delay in whole process due to non
submission by your SSA. Therefore, it is once again requested to submit the requirement as per
prescribed Performa with in two days from the date of issue of this letter via email at
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
Reminder letter-2
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 / Dated: 02-08-2016.
To,
SSA Heads FBD/KRL/RTK
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Kindly refer to this office letter of even no. dated 21.06.2016 followed by reminder letter dated
14.07.2016 vide which it was requested to submit the requirement of Battery Sets in r/o CFA segment
under Development and Maintenance for the FY 2016-17.Even after a lapse of last date your SSA have
not submitted the requirement.
Due to non submission of requirement this office is unable to process the requirement of other
SSAs whose have submitted the requirement timely, this is causing delay in whole process due to non
submission by your SSA. Therefore, it is once again requested to submit the requirement as per
prescribed Performa with in two days from the date of issue of this letter via email at
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /6 Dated: 14-07-2016.
To,
All SSA Heads,
Haryana Telecom Circle.
Sub: - Installation of New Batteries Sets where LVD in Power Plants is available.
This is regarding the Installation of new Batteries at sites where LVD is available in power
plants so that New Battery may remain healthy during their life time. In case of missing/ faulty LVDs
chances of healthy battery going faulty may increase.
It becomes the responsibility of the SSA to keep the batteries in healthy environment and in
case of non compliance of the instructions as stated above, the responsibility of concerned person may
kindly be fixed.
Encl:- As Above.
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Correspondence/ Dated: 28-07-2016.
To,
All SSA Heads,
Haryana Telecom Circle.
Sub: - Battery sets lying in Store and its utilization thereof:-.
Your Kind attention is drawn towards the battery sets lying in store unutilized .In this regard,
following information is required in the below prescribed Performa to be submitted so that batteries
sets may be effectively utilized.
S.No SSA Capacity
of
Battery
in Store
(In AH)
Quantity of
Battery
Date of
receiving
in Store
Pertaining to
CFA/CM/other
Vertical
Action
plan to
Utilize the
spare
battery
Target
date to
Utilize.
The above information has been desired by Worthy CGMT Haryana during the weekly meeting
held on 28.07.2016.Hence the above information may be reached to this office by mail at
[email protected] latest by 02.08.2016 i.e before next meeting scheduled at 04.08.2016.
S.K Kakkar
DGM(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
Reminder letter
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /6 Dated: 14-07-2016.
To,
All SSA Heads,
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Kindly refer to this office letter of even no. dated 21.06.2016 (Copy Enclosed) vide which it
was requested to submit the requirement of Battery Sets in r/o CFA segment under Development and
Maintenance for the FY 2016-17 latest by 28.06.2016 but till date only Sonipat & Jind SSAs have
submitted the requirement (though detail of scrapping memo number is incomplete from both of
SSAs Jind & Sonipat. It is noted that without scrapping memo number, requirement of Battery
sets not be considered).
Therefore, it is once again requested to submit the requirement as per prescribed Performa latest
20.07.2016 for assessing the requirement for Batteries under CFA Vertical is already delayed.
Requirement should be submitted on mail at [email protected].
Encl:- As Above.
Som Chand
AD(NWP-CFA)
Network Planning Section
Haryana Telecom Circle, Ambala
Tel.: 0171 – 2603257
Fax: 0171-2603708
E-mail:[email protected]
No. CGMT/HR / NWP-117 / Battery Requirement / 2016-17 /2 Dated: 21-06-2016.
To,
All SSA Heads,
Haryana Telecom Circle.
Sub: - Requirement of Battery Sets in r/o NWP- CFA under Development and Maintenance for
the FY 2016-17.
Kindly arrange to submit the requirement of Battery Sets under Development and Maintenance
for the FY 2016-17 in r/o NWP-CFA as per Annexure 1 & 2 (Enclosed) to [email protected].
BSNL HQ already issued guideline for calculating Battery Capacity requirement for
replacement vide letter No. 7-1-2014-NWO-CFA/MSE dated 31-7-2014 and Revision of back up time
and policy for procurement of VRLA batteries contained in BSNL Hq letter No. 7-1-2013-NWO-
CFA/MSE (Ch.II) dated 14-3-2014 (Copies enclosed) should be followed for submission of
requirement.
While furnishing the requirement following points should be ensured:-
1. The format of Excel file is not to be changed.
2. The quantity submitted under maintenance, has been worked out only against Battery sets which
are expired & going to be life expire before 31.03.2017.
3. Requirement should be submitted with the approval of SSA Head.
4. Requirement should be submitted in the format enclosed as Annexure 1, &2
5. Requirement should be submitted latest by 28-6-2016, failure of which no reminder will be
issued and requirement will be treated as Nil at your own risk and responsibility.
6. The batteries may be listed only CFA vertical.
7. Estimate numbers should be provided for battery requirement under replacement &
development.
8. A certificate is to be given that all batteries already received have been fully utilized and at
present no battery is lying with SSA Store.
Encl :
1. BSNL HQ letters referred above.
2. Annexure 1,2
S.K Kakkar
DGM(NWP-CFA)
Annexure-1
File No.: - Dated ..................
To
DGM (CFA)
O/o CGMT, Haryana Telecom Circle,
Ambala - 133001
Sub: - Requirement in r/o CFA Battery Sets under Development and Maintenance for the FY
2016-17.
The following is the consolidated requirement of Battery Sets under Development and
Maintenance for the FY 2016-17 in r/o NWP-CFA. (Refer detail attached and emailed as attachment
MS Excel file as annexure 1-3).
Battery
Capacity
Requirement
Under Dev.
Requirement
Under Mtce.
Total
Requirement
Remarks if any
A B C D=B+C E
Certified that:
(i) The procedure for calculating requirement of Batteries for replacement contained in
BSNL Hq letter No. 7-1-2014-NWO-CFA/MSE dated 31-7-2014 and Revision of back
up time and policy for procurement of VRLA batteries contained in BSNL Hq letter No.
7-1-2013-NWO-CFA/MSE (Ch.II) dated 14-3-2014 have been followed.
(ii) The quantity submitted under maintenance, has been worked out only against Battery
sets which are expired & going to be expire before 31.03.2017.
(iii) The detail estimate for all the batteries have been completed and provided in the detailed
annexure
(iv) The all batteries already received, have been fully utilized and at present no battery is
lying with SSA Store.
(v) It is certified that the above requirement of batteries is for BSNL Sites only in respect to
NWP-CFA vertical.
(vi) The above requirement has duly approved by IFA of SSA & SSA Head.
Name ________________
Designation________________
Email ____________________
Mobile Number_____________