![Page 1: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/1.jpg)
2 0 1 2 V O I C E S O F E X P E R I E N C EW h e n I n f r a s t r u c t u r e F a i l s
Natural Hazards Risk Understanding the impacts and the
benefits of mitigation
Presented by
Michael J. Griffin, P.E.
Principal
CCS Group, Inc.
![Page 2: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/2.jpg)
Outline
Natural Hazards Impact to Operations Risk Management Benefits of Mitigation Questions & Answers
![Page 3: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/3.jpg)
Natural Hazards & Impact to Operations
![Page 4: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/4.jpg)
Ref. FEMA 396
![Page 5: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/5.jpg)
Hurricane Risk
![Page 6: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/6.jpg)
Flood Risk
![Page 7: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/7.jpg)
Hurricane Opal – 1995Charlotte Amalie Hospital
Records Storage. (Ref. EQE International)
Hurricane Katrina – 2005Garden Park Medical Center
Cladding & 6” of Flooding(Ref. FEMA 549)
![Page 8: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/8.jpg)
Tornado Risk
![Page 9: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/9.jpg)
Joplin 2011 - St John’s Regional Medical Center
(Ref. Jeff Hower – MO S.A.V.E.)
(Ref. FEMA P-908)
(Ref. FEMA P-908)
(Ref. FEMA P-908)
![Page 10: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/10.jpg)
Earthquake Risk
Shaking IntensityMinimalLow
ModerateHigh
![Page 11: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/11.jpg)
Earthquake Damage
Mineral, VA: M5.8 (2011) Even small EQs can be damaging
![Page 12: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/12.jpg)
Mineral, VA Earthquake M5.8
Small magnitude event
Infrequent activity regionally for moderate and large events
No fatalities
Estimated losses $200-$300 million
Nonstructural damage to Louisa County High School
![Page 13: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/13.jpg)
Louisa County High School
![Page 14: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/14.jpg)
Olive View Hospital - 1971
(Ref. FEMA P-767)
![Page 15: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/15.jpg)
Damage to Finishes, Contents & Operations
(Ref. FEMA P-767)
![Page 16: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/16.jpg)
Olive View Hospital - 1994
(Ref. FEMA P-767)
![Page 17: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/17.jpg)
Damage to Finishes, Contents & Operations
(Ref. FEMA P-767)
![Page 18: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/18.jpg)
Chile Earthquake 2010Hospital Post-Earthquake Performance
(Ref. Mike Mahoney)
![Page 19: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/19.jpg)
Earthquake Performance Expectations for Hospitals
Study by Holmes & Burkett, EERI 8th NCEE – California Hospital Earthquake Performance
Primary purpose - identify levels of ground motion affecting operational performance of hospitals
218 Hospitals or data points that experienced earthquake ground shaking
Pre-1973 Hospitals considered representative of hospitals outside of California to assess performance
![Page 20: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/20.jpg)
Structural Damage
Nonstructural Damage
![Page 21: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/21.jpg)
Risk Management
![Page 22: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/22.jpg)
Risk
How many of you have Risk Management Departments?
How many of you address natural hazards within your risk management departments?
How many of you actually know what the risk is to your organization from natural hazards; i.e., has a comprehensive risk assessment been performed?
![Page 23: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/23.jpg)
Risk to Natural Hazards
RISK = f(HAZARD, VULNERABILITY)
Risk is a function of both the potential hazard (seismic ground motion, flooding potential, extreme wind potential)
and vulnerability (lack of seismic preparedness in structural and nonstructural systems)
![Page 24: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/24.jpg)
Potential Damage Risks
Direct Damage: Physical asset damage Repair and restoration costs
Indirect Damage: Loss of facility operations Loss of service to the community in the time
of greatest need Loss of Good Will Patient evacuation/relocation Loss of life
![Page 25: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/25.jpg)
Natural Hazard Damage Concerns
• Could anyone be hurt by this building or component in an earthquake?
Life Safety – Paramount: Staff, Patients, Visitors
• Could a large property loss result?
Property Loss
• Could the loss of this building or component result in an outage, interruption or loss of use?
Functional Loss – Community Critical Care
![Page 26: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/26.jpg)
Risk Management Process
1. Facility risk assessment:• Desk-top survey $• Rapid visual survey of the facility $$• Comprehensive facility risk assessment of $$$
building and nonstructural components
2. Rank & prioritize risks
3. Develop a Mitigation Plan from the assessment findings and recommendations
4. Capitalize and begin to implement the Mitigation Plan
Remember – reducing risk cannot be achieved overnight. Natural Hazard Mitigation is a long term process.
![Page 27: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/27.jpg)
Structural Components
Structural components resist gravity loads, lateral loads (wind & earthquake), and other types of loads
Structural components include: Roof Floors Beams Columns Braces Concrete / masonry walls
(Load bearing only) Foundation
Ref. FEMA E-74
![Page 28: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/28.jpg)
Nonstructural Components
Nonstructural components include all portions of the facility that are not load-carrying / structural components
Roof Beam
Floor
Column
FootingSlab-on-grade
Ref. FEMA E-74
![Page 29: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/29.jpg)
Structural & Nonstructural Components
Structural systems Designed by civil or structural engineer Structural elements are shown on the construction drawings including the
seismic lateral force resisting systems Construction oversight to ensure bldg conforms to design drawings
Nonstructural systems Specified by design team (architect, mechanical / electrical engineer,
interior designer, IT engineer, fire protection engineer, etc.) Seismic design is via performance specifications TO BE IMPLEMENTED BY
THE RESPECTIVE CONSTRUCTION TRADES Performance specifications provide limited guidance on seismic design for
contractor implementation Little inspection or oversight to ensure proper installation
![Page 30: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/30.jpg)
Where to begin?
Majority of facility cost
![Page 31: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/31.jpg)
Primary Contributors to Nonstructural Damage
1. Code Design PhilosophyLife safety performance
Nonstructural Design Importance Factor:- Life safety system- Contains or transports hazardous
materials- Required to operate/function
following an earthquake event
![Page 32: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/32.jpg)
Primary Contributors to Nonstructural Damage
1. Code Design Philosophy2. Not all components governed by code
- Screens/viewers- Portable or rolling
equipment- Specimen / lab
refrigerators- Critical lab bench
equipment- Desks- Bookcases
Ref. FEMA P-767
![Page 33: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/33.jpg)
Primary Contributors to Nonstructural Damage
1. Code Design Philosophy2. Not all components governed by code3. Design Professional Knowledge
of seismic design & responsibility
![Page 34: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/34.jpg)
Knowledge & Responsibility?
Engineers• Structural• Mechanical• Plumbing• Fire protection• Electrical• Telecom
Architects Building Officials Owners
General Contractor Subcontractors
• Fire Protection• Cladding• Mechanical• Plumbing• Electrical• Drywall• Ceiling• Telecom
Installers Equipment vendors Inspectors Tenants Facility Managers Office Manager
![Page 35: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/35.jpg)
Responsibility?
Ref. FEMA E-74
![Page 36: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/36.jpg)
Primary Contributors to Nonstructural Damage
1. Code Design Philosophy2. Not all components governed by code3. Design Professional Knowledge
of seismic design & responsibility4. Construction quality & enforcement
![Page 37: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/37.jpg)
Nonstructural Component EQ Performance
![Page 38: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/38.jpg)
Benefits of Mitigation
![Page 39: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/39.jpg)
Benefits of Mitigation
1. Life-safety risks significantly reduced and controlled for staff, patients and visitors
2. Repair & recovery costs significantly reduced3. Functionally available to serve the community in time of greatest
need4. Greatest cost-benefits achieved
- FEMA – National Average: $1 cost achieved $4 benefit5. Many mitigation measures are easily implemented by staff6. Largest financial investment within your organization
AND
7. Life-safety risks are significantly reduced and controlled for staff, patients and visitors
![Page 40: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/40.jpg)
Mitigation Options
Do nothing – ignore the riskAccept the riskModify emergency response & business recovery plansAdjust business operations: Relocate critical functions to lower risk facilities Locate non-critical functions to higher facilities
Perform facility strengtheningPerform nonstructural component strengthening and
anchorage improvementsPerform an incremental seismic rehabilitation programCombination of the above
![Page 41: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/41.jpg)
Challenges to Hospital Mitigation
Disruption to operations – 24/7 Operation No swing space Infection Control Temporary relocation of
patients and patient care services
Specialized areas- MRI, X-ray, etc.- Pharmacies- Bio Hazards - Records
Hazardous Materials
Ref. FEMA P-767
![Page 42: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/42.jpg)
Mitigation Measures Straight Forward
Implement good housekeepingmeasures
Relocate contents to lower risk Egress routes
Restrain contents Install proper equipment
anchorage
![Page 43: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/43.jpg)
Mitigation Measures are Straight Forward
Seismic chain restraints? Do it correct the first time!
![Page 44: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/44.jpg)
Mitigation Measures Straight Forward
Missing anchor
Seismic retrofit
UPS - Emergency Battery Backup
![Page 45: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/45.jpg)
Shelving
Ref. FEMA P-767
![Page 46: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/46.jpg)
Refrigerators
Ref. FEMA P-767
![Page 47: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/47.jpg)
Furniture/Shelving Content Restraints
Shelving Part Container Restraints
Small Equipment Base Anchorage
Ref. FEMA P-767
![Page 48: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/48.jpg)
Benefits of Mitigation
1. Life-safety risks significantly reduced and controlled for staff, patients and visitors
2. Repair & recovery costs significantly reduced3. Functionally available to serve the community in time of greatest
need4. Greatest cost-benefits achieved
- FEMA – National Average: $1 cost achieved $4 benefit5. Many mitigation measures are easily implemented by staff6. Largest financial investment within your organization
AND
7. Life-safety risks are significantly reduced and controlled for staff, patients and visitors
![Page 49: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/49.jpg)
Long-term Mitigation Strategies
Do it right the first time from today forward Long-term strategy: New Construction Renovations & remodels New equipment
installations Aging equipment
replacement Use planned facility outages &
equipment maintenance activities as opportunities to effect seismic mitigation
Earthquake mitigation does not happen overnight
![Page 50: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/50.jpg)
Mitigation Resources
FEMA 396: Incremental Seismic Rehabilitation of Hospitals FEMA 577: Design Guide for Improving Hospital Safety in Earthquakes,
Floods, and High Winds: Providing Protection to People and Buildings FEMA E-74
http://www.fema.gov/plan/prevent/earthquake/fema74/ FEMA 412 – Installing Seismic Restraints for Mechanical
Equipment FEMA 413 – Installing Seismic Restraints for Electrical Equipment FEMA 414 –Installing Seismic Restraints for Duct & Pipe ASCE – Earthquake Protection of Building Equipment and
Systems, by Gatscher, McGavin & Caldwell
![Page 51: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/51.jpg)
Final Thoughts
Ensure Design Professionals incorporate seismic design provisions for ANYTHING NEW – additions, renovations, going forward.
Perform construction inspection to verify seismic provisions have been installed correctly – anchorage and bracing.
Incorporate and implement a housekeeping policy to reduce the life-safety risks – reduce clutter.
Review and properly anchor existing equipment when the opportunity is available – maintenance activities, equipment replacements, relocated equipment and furnishings, etc.
![Page 52: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/52.jpg)
Are Ready?
![Page 53: Natural Hazards Risk Understanding the impacts and the ... · building and nonstructural components. 2. Rank & prioritize risks. 3. Develop a Mitigation Plan from the assessment findings](https://reader036.vdocuments.mx/reader036/viewer/2022070916/5fb6ce2949e33e157d7fd1f6/html5/thumbnails/53.jpg)
I F Y O U H AV E A D D I T I O N A L Q U E S T I O N S P L E A S E C O N TA C T M E AT :
M I C H A E L J . G R I F F I N , P. E .( 6 3 6 ) 5 3 2 - 2 1 0 0 E X T. 1 0 5
M I K E . G R I F F I N @ C C S G R O U P S T L . C O M
Questions?