MONTHLY UPDATE2:00 PM CCT
April 23, 2020
PLEASE MUTE YOUR PHONES! (*6)
![Page 2: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/2.jpg)
Agenda• Safety Moment• PSO / Storage• Capacity Planning • Capacity Scheduling• Integrity and Reliability • Marketing & Customer Service• CSI Updates• Billing• Measurement• Rates• Trivia• Q&A
![Page 3: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/3.jpg)
PSO(Planned Service Outage)
![Page 4: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/4.jpg)
![Page 5: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/5.jpg)
![Page 6: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/6.jpg)
STORAGE UPDATE
![Page 7: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/7.jpg)
Storage Updates
• Winter has come to a close. Although we experienced a warmer than average heating season, we were still able to pull the fields down near the 10 year average for testing
• Greatly appreciate customers working with us to get their gas out of the fields
• Currently 3% over the 10-year average • Injected 1Bcf into storage week ending 4/17• Spring storage field testing is complete• Temperatures have ranged from the 20’s to the
80’s over the past month to start the spring off with a roller coaster of injections and withdrawals
-10.00%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
Wk
1W
k 2
Wk
3W
k 4
Wk
5W
k 6
Wk
7W
k 8
Wk
9W
k 10
Wk
11W
k 12
Wk
13W
k 14
Wk
15W
k 16
Wk
17W
k 18
Wk
19W
k 20
Wk
21W
k 22
Wk
23W
k 24
Wk
25W
k 26
Wk
27W
k 28
Wk
29W
k 30
Wk
31W
k 32
Wk
33W
k 34
Wk
35W
k 36
Wk
37W
k 38
Wk
39W
k 40
Wk
41W
k 42
Wk
43W
k 44
Wk
45W
k 46
Wk
47W
k 48
Wk
49W
k 50
Wk
51W
k 52
Wor
king
Gas
%
Southern Star Working Gas
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
10 YR AVG
![Page 8: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/8.jpg)
Capacity Planning
![Page 9: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/9.jpg)
69k (to PMI or NNG Kiowa)
60k (OGT)113k (TW)
150k (NGPL-Mutual)
94% Subscribed
17k (Questar)
AVAILABLE CAPACITY5/1/2020
100k (NNG Kiowa)
18k (PMI)
40k (NGPL Carter)
11k (Sedalia Area)
40k (to NGPL Beaver)
![Page 10: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/10.jpg)
CONSTRAINT OF THE MONTHSB POOL
ALL CONSTRAINTS (3 TOTAL)
Legend
Pipeline
Flow & Direction
Loc. # (Meter #)Location/Meter Name
168112 (15051) TWPL –Hemphill (Del)
Pipeline in Constraint
![Page 11: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/11.jpg)
CAPACITY SCHEDULING
![Page 12: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/12.jpg)
STRAIGHT BLACKWELL
• Straight Blackwell (SB) stems from the western part of our system in Oklahoma and Kansas east to Blackwell Station.
• SB currently operates at a capacity of 263,457 going east and we have multiple large receipt/delivery points in the SB Pool.
• NGPL Beaver (17004) – Delivery Salt Plains (16376/139) – Receipt/Delivery• CIG Floris (15266) – Receipt Rose Valley (17006) – Receipt• ETC Beaver (14653) – Receipt Targa Waynoka (16912) – Receipt
• Currently there are 3 constraints within the SB pool• Straight Blackwell • Waynoka Lateral • Straight Blackwell @ Beaver Deliveries
![Page 13: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/13.jpg)
STRAIGHT BLACKWELL CONSTRAINT
• The Straight Blackwell constraint is currently in place simply to protect overall capacity of the line segment going east into Blackwell Station
• Total Receipts minus Deliveries on the line must equal no greater than 263,467
![Page 14: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/14.jpg)
WAYNOKA LATERAL
• Waynoka Lateral is portion of the segment running south to north in northern Oklahoma. The constraint is in place to protect the operational capacity of the pipe.
• Total Receipts minus Deliveries must net to no greater 355,250
• There are 3 points located in this constraint: • 16912 Targa Waynoka – Receipt • 17005 Rose Valley – Delivery • 17006 Rose Valley – Receipt
![Page 15: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/15.jpg)
STRAIGHT BLACKWELL @ BEAVER DELIVERIES
• Protects the overall capacity of the line segment going west toward NGPL Beaver from points further east (i.e. Rose Valley, Waynoka, etc.)
• Total Deliveries minus Receipts must net to no greater 116,725• So we can only deliver 116,725 to NGPL Beaver if receiving from points outside the constraint • HOWEVER, we can deliver more gas to NGPL Beaver if received from CIG and ETC
• The constraint includes the 3 interconnect points on SB: • NGPL Beaver (17004) – Delivery• CIG Floris (15266) – Receipt • ETC Beaver (14653) – Receipt
![Page 16: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/16.jpg)
LINE N UPDATE
![Page 17: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/17.jpg)
LINE N UPDATE• Rupture 8/6/18 (no injuries, fatalities, ignition of gas, or damage to structures)
• Line returned to service 8/9/18 (under pressure reduction)
• Root Cause – Stress Corrosion Cracking• Return to Service Plan
• EMAT Assessments• Anomaly Excavations• Metallurgical Testing• PHMSA Meeting
• Line N returned to full service 4/16/2020
![Page 18: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/18.jpg)
MARKETING &
CUSTOMER SERVICE
![Page 19: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/19.jpg)
CSI CONTACT LIST
Contact us with questions any timehttps://csimain.southernstar.com/App/InformationalPostings/OtherPostings/ContactUs
![Page 20: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/20.jpg)
CUSTOMER MEETING UPDATE!
Projected Date: August 18-19, 2020
![Page 21: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/21.jpg)
INTERCONNECTS
• Southern Star is planning on creating two new interconnects for 2020.
• New System Map has been posted to CSI
![Page 22: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/22.jpg)
OPEN SEASONS(AVAILABLE CAPACITY)
CB-Hemphill and SB Open Season results Current market challengesSubsequently we have posted another open season for CB-Hemphill FTS-P capacity available beginning Sept. 1, 2020ROFR posting for FSS Market Area MSQ 140,184MDWQ 4,284Effective October 1, 2020Bids due by 12:00 noon CST May 7, 2020
![Page 23: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/23.jpg)
CSI UPDATES
![Page 24: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/24.jpg)
CSI UPDATE2020-2021 PROJECTS:
• CSI Update• 2020-2021 Projects:
• Capacity Release Completion (Recalls, Reputs, Awards)• Scheduling Enhancement Project
• Modernize screens with enhanced functionality and reporting
• PNT (Pathed Non-Threaded) Scheduling Model
![Page 25: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/25.jpg)
MOD CHARGES
![Page 27: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/27.jpg)
Modernization Rates
Transportation•Production MR1 and MC1 -
$0.0199•Market MR1 and MC1 -
$0.0049
Storage•MR1 and MC1 - $0.0075
![Page 28: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/28.jpg)
Capacity Release
All MR1 will be assessed to the original capacity holder.
Original capacity holder will able to be make offers with the MR1 and RES being shown as the maximum reservation rate.
If awarded rate is full max rate plus MR1, the total amount will be credited back thru REA or RVA and assessed to the RES or REV of the replacement contract.
If a capacity release contract has overrun charged to them, they will receive MC1 directly.
![Page 29: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/29.jpg)
Capturing MR1 on Offers
The Max Tariff Rate on the offer screen is now a combination of the new MR1 rate and the firm transport RES rate for the area the capacity is being offered.
If a capacity holder would like to recover MR1 charges thru an offer, they can add that to their Minimum Acceptable Rate.
The MR1 charges will be recovered in the REA or RVA credit back rate.
![Page 30: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/30.jpg)
![Page 31: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/31.jpg)
![Page 32: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/32.jpg)
Capacity Release from Discounted Contracts
Any awarded release contract that is replacing capacity from a discounted contract must follow the criteria of the original capacity holder’s discount agreement.
If the capacity release contract does not follow that criteria, Southern Star will increase rate for releasing shipper for that volume from the discounted rate to max and will now also charge MR1.
The releasing shipper has the ability thru the discount indicator of the offer to select if they will accept the additional charges or if they will be responsibility of the replacement shipper.
![Page 33: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/33.jpg)
MEASUREMENT
![Page 34: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/34.jpg)
![Page 35: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/35.jpg)
OUTSTANDING LUG RESULTS!!(LOST AND UNACCOUNTED FOR GAS)
• Latest fuel filing includes spectacular LUG results for 2019 with .09% Loss Rate• Numerous initiatives contribute to this stellar result
• Modernization efforts• Loss identification
• Pipeline purges• Pigging operations• Station Blowdowns
• Communication between field and analysis teams reviewing losses• Monthly Zone Team meetings
• Correcting LUG issues• Repairing leaking valves• Verify/Calibrate meters • Maintaining gas chromatographs
![Page 36: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/36.jpg)
RATES
![Page 37: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/37.jpg)
RATES UPDATE• Fuel Filing (RP20-532)
• Filed 2/19/20, accepted by FERC letter order on 3/10/20
• New fuel reimbursement percentages effective 4/1/20
• Production and Market Area fuel and loss reimbursement percentages both down from last year
• Storage will remain 3.24% as result of stable base rate accepted in last year’s fuel filing (RP19-773)
For the Period4/1/20 4/1/19
to to3/31/21 3/31/20 Change
Production AreaFuel 0.88% 0.82% 0.06%Loss 0.09% 0.19% -0.10%Surcharge -0.01% 0.02% -0.03%Total Production Area 0.96% 1.03% -0.07%
Market AreaFuel 0.73% 0.72% 0.01%Loss 0.09% 0.19% -0.10%Surcharge -0.10% 0.02% -0.12%Total Market Area 0.72% 0.93% -0.21%
StorageBase Fuel and Loss 3.24% 3.24% 0.00%Surcharge 0.00% 0.00% 0.00%Total Storage 3.24% 3.24% 0.00%
![Page 38: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/38.jpg)
RATES UPDATE
![Page 39: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/39.jpg)
1) ON THE OFFER SCREEN, WHAT RATE IS CURRENTLY POSTED AS THE MAXIMUM TARIFF RATE FOR FIRM TRANSPORT RESERVATION IN THE PRODUCTION AREA?
2) WHAT ARE THE 3 CONSTRAINTS WITHIN THE SB POOL?
3) WHAT ARE THE NEW PROD AND MARKET AREA TRANSPORT FUEL RATES EFFECTIVE APRIL 1, 2020?
BONUS: WHAT ARE THE 3 DATES ON THE PSO THAT AFFECT LINE SEGMENT 490 (RAWLINS HESSTON)?
PLEASE SEND ANSWERS TO [email protected] BY END OF BUSINESS DAY FRIDAY 4/24/2020!
* Congratulation to our March WebEx Trivia winner: Malorie Romaine with The Energy Authority
TRIVIA
![Page 41: MONTHLY UPDATE...• Marketing & Customer Service • CSI Updates • Billing • Measurement • Rates • Trivia • Q&A PSO (Planned Service Outage) STORAGE UPDATE Storage Updates](https://reader033.vdocuments.mx/reader033/viewer/2022050605/5fad1b5cd2de3c306a660266/html5/thumbnails/41.jpg)
SAFETY REMINDER
* STAY FIRE-SAFE THIS SUMMER WHEN GRILLING!