Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
1
MONALISA at ATF2 First installation report
15 July 09
![Page 2: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/2.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
2
Overview
• Installation progress– ATF2 roof: Initial tests with wooden frame
• Initial test results
– ATF2 FF: Mounted at IP in Final Focus• Vacuum test• Force tests• Tilt tests• Magnet lateral movement tests
![Page 3: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/3.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
3
Good progress• We kept within our proposed schedule
– As set out in ATF2 meeting 17 Jun 09
• All items arrived at KEK 1st July 2009– Brought to ATF2 roof within 15 mins of arrival
• On ATF2 roof– System assembled and retested
• Brought to ATF2 Final focus tunnel – Reassembled at IP Thursday 9th July and
tested
![Page 4: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/4.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
4
On the roof of the ATF2
![Page 5: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/5.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
5
Preliminary tests
• Closed the vacuum system– Pumped out to 25 Pa– Limited by small leak (1 Pa/s)
• Due to lower angled tube• Will be fixed in future by
replacing lower angled tube• Vacuum sufficient for test
programme
• Reassembled wooden frame on ATF2 roof
• Benoit measured vibrations (see his talk)
![Page 6: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/6.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
6
Schematic Layout of Pneumatics • Vacuum in end boxes connected through inner bellows• High pressure only connected to outer bellows chamber
![Page 7: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/7.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
7
Recalibrated force sensors
• Retested force sensor – Applying loads using spring balance
• Force sensor rather noisy– Produces signals up to +/- 10 mV
• Readout with NI USB 6009 ADC (14 bit)– Sampled at 5kSa/s– Used LabVIEW to average 5000 readings
together
![Page 8: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/8.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
8
Forces on frame during pumping
• Cycled bellow chamber pressures– Inner chamber 100 kPa to 25 Pa to 100 kPa– Outer chamber 100 kPa to 140 kPa to 100kPa
• Measured forces– Using recalibrated force sensor
• Independently calculated forces– Based on SMC pressure sensors
• One for each chamber
![Page 9: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/9.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
9
Sensor readout during pumping
![Page 10: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/10.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
10
Over-pressure regulation• Over-pressure regulator does not behave
as we would like
Control Signal /V
Overpressure / kPa
0
40
Vmax0
No response for over-pressure requests less than (50 mbar)
![Page 11: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/11.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
11
Required over-pressure regulation• Would want a straight line relationship
even for very low over-pressure
Control Signal /V
Overpressure / kPa
0
40
Vmax0
![Page 12: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/12.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
12
Into the ATF2 tunnel
![Page 13: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/13.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
13
Tunnel preparation
Terunua-san installed pipe across the inside of the ATF2 final focus tunnel roof
Equipped with 2 hoists
![Page 14: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/14.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
14
Mounting Shintake components• Plate mounted using M30 hooks
• End box mounted using hoist
Cables
![Page 15: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/15.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
15
Mounting QD0 end box• Beeswax was placed on QD0 surface
– To ensure good vibration coupling to magnet
![Page 16: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/16.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
16
End boxes mutually aligned
• Laser light projected along accelerator axis
• Shintake end box – (left-right adjustable)– Moved to match QD0
end box
![Page 17: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/17.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
17
The DBS was hoisted into placeFull assembly completed well
within one day
![Page 18: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/18.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
18
Tilt sensor• Tilt change on Shintake ~5+5 rad
– After MONALISA DBS installed at IP
![Page 19: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/19.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
19
DBS pumped out: with rods in
• Reached 28 Pa with a different pump– vacuum integrity was unaltered
![Page 20: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/20.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
20
Forces measured pumping down when mounted at ATF2 IP
Regulator cycle ~225 s
![Page 21: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/21.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
21
(x,y,z) Physicists coordinates• In the following we’re using the physicists
coordinate frame
Y
X
Z
![Page 22: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/22.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
22
Tracking QD0 motion in Z• Set MONALISA at operational pressure
– Pumped out vacuum vessel– Over-pressure in outer bellowed chamber
• Set up independent tracking of QD0– Used FARO to survey QD0 position changes– Keyence laser meter tracked QD0 mounted
on SD0 base plate
![Page 23: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/23.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
23
KEYENCE tracking QD0 Z
Readout sensor in mV
10 V = 5 mm
1 mV = 0.5 m
Readout with ourADC/LabVIEW DAQ
QD0
Supported from SD0
KEYENCE
![Page 24: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/24.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
24
FARO survey instrument
FARO
Retro
![Page 25: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/25.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
25
Comparison of FARO & KEYENCE
![Page 26: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/26.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
26
FARO compared with KEYENCE
![Page 27: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/27.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
27
FARO tracking X and Z
![Page 28: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/28.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
28
Tracking QD0 motion in Z
![Page 29: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/29.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
29
Tracking QD0 motion in X
![Page 30: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/30.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
30
Left-right QD0 mover tests
![Page 31: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/31.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
31
Left-right QD0 mover tests
![Page 32: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/32.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
32
Left-right QD0 mover tests
DBS spring constant is small enough to let QD0 move freely
![Page 33: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/33.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
33
What to learn from this measurements?
• We are told that static tolerances for QD0:– 100μm in x,y,z
• Our measurements show that even with the current pressure control system we meet this tolerance.
• The low spring constant of the DBS allows the QD0 mover to move the magnet unhindered.
• Dynamic tolerances: vertical: 10 nm, (between Shintake and QD0) horizontal: 500 nm
along beam: 10 μm• The question about dynamic motion and impact on the
Shintake table will be answered in the next two talks.
![Page 34: MONALISA at ATF2 First installation report](https://reader036.vdocuments.mx/reader036/viewer/2022062517/56813b3a550346895da40fbb/html5/thumbnails/34.jpg)
Wed 15 Jul 2009 ATF2 weekly meetingOxford MONALISA
34
Summary & Outlook
• MONALISA vacuum system worked well– Many thanks for the wonderful support we got!
• The next step is to do optics tests with the vacuum system in place to gain calibration constants.
• Our goal is to get first position measurements to the Shintake group late next spring.