Missouri Public Service CommissionSmart Grid Technical Conference
IEC 61850
Burns & McDonnell Transmission and Distribution
Chad StilwellTelecommunications and Network Engineering
November 29th, 2011
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Smart Grid Communication
• Today we monitor:– Power plants– Transmission lines– Transmission substations
• Provides limited distribution feeder information.• Smart Grid requires communication to extend
further into grid:– Multiple locations on distribution feeder – Customer premise
• One solution may not work for entire service territory
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 High Level Overview
• Information is described in a common way across all devices
• All information is available to all devices • Information is shared in real time over a
common communications bus
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 High Level Overview
• Common Information Model (CIM) • Substation Configuration Language (SCL)• Object oriented communications protocols
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Common Information Model
• No longer vendor specific method for representing data in registers
• Common way of describing data and quality of the information
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 Objects
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
GOOSE
• Event coordination protocol• One way – devices advertise know
information• Any other devise subscribes to channel• Unconfirmed• Status updates sent when event occurs• User defined data in each message• LEAN and FAST (tripping)
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Manufacture Message Specification (MMS)
• Metering/Status/Control protocol• Object oriented standardized information
per device type • Time stamp and quality information with
each object• Polled or report by exception • Derivative of UCA
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Sampled Values (SV)
• Process Bus• Real-time transfer of currents and voltages• Same transport model as GOOSE• Constant period between messages • 80 to 256 samples per second
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Common Information Model
• IED Capability Description (ICD)• Configured IED Description (CID)• Substation Configuration Description (SCD)
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
System Configuration Language (SCL)
• Data architecture– Station one-line – Control logic– Communication – Settings come directly from model (ICD)– XML based
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
System Configuration Language (SCL)
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Object Oriented Protocols
• Object Oriented Substation Event (GOOSE)
• Manufacture Message Specification (MMS)
• Sampled Values (SV)
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 = More Documentation?
• Substation configuration tool– Electronic model of substation – Validation / what if scenarios
• Decrease wiring/elementary/schematic diagrams
• Net decrease in manually created documentation
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 and Security
• Within control house -> CIP compliance methods are well established
• In the substation yard -> It is possible but not as well tested by audits– The NERC interpretation to PacifiCorp in
February 2009,approved by FERC (Docket No. RM06-22-000) on April 20, 2010 outlines some clarifications to “six sided” physical security for critical cyber assets.
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 and Security
• Clarifies that alternative measures to "control" physical access may comprise both physical as well as logical measures.
• Acceptable alternative nonphysical control measures may include, for example, data encryption for protection and circuit monitoring for detection of unauthorized physical access or tampering.
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
Vendor Interoperability
• It is getting better • GOOSE and MMS messaging are
interoperable • Configuration methods are not – vendors
support the standard to varying degrees• New generation of devices have IEC
61850 built into hardware architecture from the start
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
On-going 61850 Development
• IEC 61850-90-1– Extensions to IEC-61850 to address inter-
substation communication on WAN– IEEE 1588v2 Precision Time Protocol (PTP)
www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2011 Burns & McDonnell
IEC 61850 – Additional Developments
• Power Quality• Weather Forecasting Data• Hydroelectric Power Plants• Wind Generation (61400-25)• High Voltage Switchgear (62271-3)• Distributed Energy Management