DETAIL LIST DateRevision
Metcom 965
COMMERCIAL VERTICAL CLADDING
CVMET965
E 00 COVER SHEET
E 01 PARAPET AND BALUSTRADE CAPPING 1.0 28.02.2019
E 02 SCUPPER W/ RAINWATER HEAD 1.0 28.02.2019
E 03 SOFFIT 1.0 28.02.2019
E 04 BUTT WINDOW HEAD 1.0 28.02.2019
E 05 BUTT WINDOW SILL 1.0 28.02.2019
E 06 BUTT WINDOW JAMB 1.0 28.02.2019
E 07 RECESSED WINDOW HEAD 1.0 28.02.2019
E 08 RECESSED WINDOW SILL 1.0 28.02.2019
E 09 RECESSED WINDOW JAMB 1.0 28.02.2019
E 10 METERBOX HEAD 1.0 28.02.2019
E 11 METERBOX SILL 1.0 28.02.2019
E 12 METERBOX JAMB 1.0 28.02.2019
E 13 INTERNAL CORNER 1.0 28.02.2019
E 14 EXTERNAL CORNER 1.0 28.02.2019
E 15 SOAKER FLASHING 1.0 28.02.2019
E 16 CHANGE IN CLADDING 1.0 28.02.2019
E 17 CLADDING ABUTMENT 1.0 28.02.2019
E 18 BOTTOM OF CLADDING (FLUSH) 1.0 28.02.2019
E 19 BOTTOM OF CLADDING (RECESSED) 1.0 28.02.2019
E 20 3D WINDOW FLASHINGS 1.0 28.02.2019
E 21 3D RAINWATER HEAD 1.0 28.02.2019
PRE-FINISHED PARAPET CAP FLASHINGNO FIXINGS IN TOP OF FLASHING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER
METALCRAFT METCOM 965VERTICAL CLADDING
METALCRAFT MSS PURLINBY ENGINEER
CONTINUOUS TIMBER PACKING
MIN
. 5.0
0°
DPC TO PROVIDE SEPARATION OFMETAL CAPPING AND TIMBER,SHOWN DASHED
5 GAP
20
15
ALTERNATIVE OPTIONBIRDS BEAK EDGE
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
HEMMED EDGE
STOPENDS TO WALL CLADDING
COMPRESSIBLE FOAM SEAL. REFER TOMRM CODE OF PRACTICE VERSION 3.0/2019 FOR REQUIRMENT.
20mm HORIZONTAL CAVITYBATTEN
Z
CLE
AR
AN
CE
25m
m M
IN.
CLE
AR
AN
CE
25m
m M
IN.
Z
CATEGORY A
1. NORMAL EXPOSURE2. ROOF PITCH >10°
MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH)
MIN. 75mm (VERTICALLY DOWN FACE - PROFILED)
CATEGORY B
1. EXPOSED (HIGHER RISK) & WIND LOAD EXCEEDS 1.5 kPa.2. ROOF PITCH <10°
MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH)
MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)
Z
ALTERNATIVE SOLUTION AS PER MRM CODE OF PRACTICE
SITUATION 1
1. LOW, MEDIUM, HIGH WINDZONES, WHERE ROOF PITCH ≥ 10°
MIN. 50mm
SITUATION 2
1. ALL ROOF PITCHES IN VERY HIGHWIND ZONE2. LOW, MEDIUM, HIGH WIND ZONESWHERE ROOF PITCH ≤ 10°
MIN. 70mmZ
SITUATION 3
1. FOR ALL ROOF PITCHES INEXTRA HIGH WIND ZONES
MIN. 90mm
ACCEPTABLE SOLUTION AS PER E2/ASI
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
PARAPET AND BALUSTRADE CAPPING
E 0128.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
50
25
METALCRAFT METCOM 965VERTICAL CLADDING
METALCRAFT METCOM 965VERTICAL CLADDING
PERMEABLE WALLUNDERLAY, SHOWNDASHED
20mm HORIZONTALCAVITY BATTEN
WALL FRAMING
CAVITY CLOSER
RETURN MEMBRANE INTORAINWATER HEAD
CONTINUOUS MEMBRANEDRESSED THROUGH BASE ANDUP SIDES OF OPENING WITHUPPER EDGES SEALED AGAINSTCLADDING. RETURN ALONG BACKOF RAINWATER HEAD
RAINWATER HEAD
RETURN MEMBRANEAT END OF LIP
MEMBRANE ON ROOFSUBSTRATE
8g WAFER-TEK SCREW
TRUE ROOF LINEBEHIND
PRE FINISHED SELF TAPPINGSCREW WITH RUBBER WASHER
RAINWATER HEADOVERFLOW BELOWOPENING LEVEL,1.5 xDOWNPIPE DIAMETER
PRE FINISHED SELF TAPPING SCREWWITH RUBBER WASHER SEPARATE BATTEN
AND CLADDING WITHDPC AS REQUIRED
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
SCUPPER W/ RAINWATER HEAD
E 0228.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
INTERNAL WALL LINING
METALCRAFT MSS PURLIN BY ENGINEER
20mm HORIZONTAL CAVITYBATTEN
SEPARATE BATTEN ANDCLADDING WITH DPC ASREQUIRED
BARGE BOARD
SOFFIT LINING
METALCRAFTMSS PURLIN BYENGINEER
PRE-FINISHED SELFDRILLING/TAPPING SCREWWITH RUBBER WASHER
INTERNAL CEILING LINING
COMPRESSIBLE FOAM SEAL. REFER TO MRM CODEOF PRACTICE VERSION 3.0 /2019 FORREQUIRMENT.
PRE-FINISHEDSOFFIT FLASHING
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FORFLASHING, FIXED INTO SUBSTRATE
PERMEABLE WALL UNDERLAY,SHOWN DASHED
METALCRAFT METCOM 965VERTICAL CLADDING
PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEKSCREW
STOPENDS TO WALL CLADDING
MIN. 50mm
CLA
DD
ING
CO
VE
R
60m
m(M
IN. 35m
m)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
SOFFIT
E 0328.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALL UNDERLAYDRESSED INTO OPENING WITHFLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA PERMEABLE WALLUNDERLAY OVER WINDOW HEADFLASHING, SHOWN DASHED
INTERNAL WALL LINING
METALCRAFT METCOM 965 VERTICALCLADDING
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMBLINER BEHIND
STOPENDS TO HEAD FLASHING,SHOWN DASHED
LINE OF JAMB FLASHING BEHIND
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
CAVITY CLOSER AS REQUIRED TONZBC
DR
IP E
DG
E T
O C
LA
DD
ING
MIN
. 15m
m G
AP
5m
m G
AP M
IN. 75m
m W
ITH
OU
T H
EM
ED
GE
MIN
. 50m
m C
OV
ER
MIN
. 10m
m C
OV
ER
SU
GG
ES
T M
IN. 50m
m
DIM
EN
SIO
N T
O S
UIT
20mm HORIZONTAL CAVITY BATTEN
SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
BUTT WINDOW HEAD
E 0428.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965 VERTICALCLADDING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
PRE-FINISHED WINDOW SILL FLASHING
LINE OF WINDOW JAMBLINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
INTERNAL WALL LINING
STOPENDS TO SILL FLASHING,SHOWN DASHED
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
20mm HORIZONTAL CAVITY BATTEN
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
METALCRAFT MSS PURLIN BYENGINEER
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICEVERSION 3.0 /2019 FOR REQUIRMENT.
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
SEPARATE BATTEN AND CLADDING ASREQUIRED WITH DPC
WINDOW SILL SUPPORT BAR
5m
m G
AP
MIN
. 8m
m C
OV
ER
CLA
DD
ING
CO
VE
R
60m
m(M
IN. 35m
m)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
BUTT WINDOW SILL
E 0528.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PRE-FINISHED WINDOW JAMB FLASHING
DOUBLE GLAZING WINDOW JOINERY
LINE OF SILL FLASHING BELOW
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED FIXING BRACKET WITH PRE-FINISHED POP RIVET BEDDED IN SILICONEOR PRE-FINISHED 8g WAFER-TEK SCREW
METALCRAFT METCOM 965 VERTICALCLADDING
MIN.10mm COVER
5mm GAP
INTERNAL WALL LINING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAYFOR FULL WIDTH/DEPTH SILL
METALCRAFT MSS PURLIN BYENGINEER
SUGGEST MIN.50mm
DIMENSION TO SUIT
PRE-FINISHED SECONDARYFLASHING, IF REQUIRED
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
LINE OF HEAD FLASHING ABOVE
LINE OF HEAD FLASHING ABOVE
SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED
5m
m G
AP
20mm HORIZONTAL CAVITYBATTEN
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
BUTT WINDOW JAMB
E 0628.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALL UNDERLAYDRESSED INTO OPENING WITHFLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA PERMEABLE WALLUNDERLAY OVER WINDOW HEADFLASHING, SHOWN DASHED
INTERNAL WALL LININGMETALCRAFT METCOM 965 VERTICALCLADDING
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMBLINER BEHIND
STOPENDS TO HEAD FLASHING,SHOWN DASHED
LINE OF JAMB FLASHING BEHIND
MIN
. 10m
m C
OV
ER
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED SELF DRILLING /TAPPING SCREW WITH RUBBERWASHER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
SU
GG
ES
T M
IN. 50m
m
DIM
EN
SIO
N T
O S
UIT
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
CAVITY CLOSER AS REQUIRED TONZBC
5m
m G
AP
DR
IP E
DG
E T
O C
LA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
IHT
OU
T H
EM
ED
GE
MIN
. 50m
m C
OV
ER
20mm HORIZONTAL CAVITY BATTEN
SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED
STOP ENDS, SHOWN DASHED
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
RECESSED WINDOW HEAD
E 0728.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965 VERTICALCLADDING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
PRE-FINISHED WINDOW SILL FLASHING
LINE OF WINDOW JAMBLINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TORUN CONTINUOUSLY AROUNDHEAD, SILL AND JAMB
INTERNAL WALL LINING
STOPENDS TO SILL FLASHING,SHOWN DASHED
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
20mm HORIZONTAL CAVITY BATTEN
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
METALCRAFT MSS PURLIN BYENGINEER
COMPRESSIBLE FOAM SEAL. REFER TOMRM CODE OF PRACTICE VERSION 3.0/2019 FOR REQUIRMENT.
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
CLA
DD
ING
CO
VE
R
60m
m(M
IN. 35m
m)SEPARATE BATTEN AND CLADDING
WITH DPC AS REQUIRED
WINDOW SILL SUPPORT BAR
5m
m G
AP
MIN
. 8m
m C
OV
ER
STOPENDS TO WALL CLADDING
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
RECESSED WINDOW SILL
E 0828.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PRE-FINISHED WINDOW JAMB FLASHING
DOUBLE GLAZING WINDOW JOINERY
LINE OF SILL FLASHING BELOW
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
METALCRAFT METCOM 965VERTICAL CLADDING
5mm GAP
MIN. 10mm COVER
INTERNAL WALL LINING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FOR FULLWIDTH/DEPTH SILL
METALCRAFT MSS PURLIN BYENGINEER
SUGGEST 50mm
DIMENSION TO SUIT
PRE-FINISHED SECONDARYFLASHING, IF REQUIRED
LINE OF SILL FLASHING BELOW
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
LINE OF HEAD FLASHING ABOVE
5m
m G
AP
SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED
20mm HORIZONTALCAVITY BATTEN
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
RECESSED WINDOW JAMB
E 0928.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALL UNDERLAY DRESSEDINTO OPENING WITH FLEXIBLE FLASHINGTAPE INSTALLED OVER WRAP TOCORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA PERMEABLE WALL UNDERLAYOVER WINDOW HEAD FLASHING,SHOWN DASHED
METALCRAFT METCOM 965 VERTICALCLADDING
PRE-FINISHED HEAD FLASHINGWITH 15° FALL
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILLAND JAMB
METER BOXSTOPENDS TO HEAD FLASHING,SHOWN DASHED
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED 'U' BRACKET FIXED TOMETERBOX BEFORE INSTALLATION
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
INTERNAL WALL LINING
METALCRAFT MSS PURLINS BYENGINEER
PRE-FINISHED FLAT HEAD WAFER-TEKSCREW FOR FLASHING
CAVITY CLOSER AS REQUIRED TO NZBC
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
5m
m G
AP
DR
IP E
DG
E T
O C
LA
DD
ING
MIN
. 15m
m C
OV
ER
MIN
. 75m
m W
ITH
OU
T H
EM
ED
GE
MIN
. 50m
m C
OV
ER
20mm HORIZONTAL CAVITY BATTEN
SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
METERBOX HEAD
E 1028.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965 VERTICALCLADDING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
METER BOX
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
METALCRAFT MSS PURLIN BYENGINEER
INTERNAL WALL LINING
LINE OF JAMB FLASHING BEHIND
20mm HORIZONTAL CAVITY BATTEN
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FOR FULLWIDTH/DEPTH SILL
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
PRE-FINISHED FLASHING FIXED TOMETAL ANGLE TO BE CONTINUOUSAROUND METER BOX
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED
STOPENDS TO SILL FLASHING, SHOWNDASHED
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION3.0 /2019 FOR REQUIRMENT.
STOPENDS TO WALL CLADDING
CLA
DD
ING
CO
VE
R
60m
m(M
IN. 35m
m)
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
METERBOX SILL
E 1128.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965VERTICAL CLADDING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
METER BOX
TIMBER PACKER
FLEXIBLE FLASHING TAPE OVERPERMEABLE WALL UNDERLAY FORFULL WIDTH/DEPTH SILL
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED JAMB FLASHING FIXEDTO METERBOX BEFORE INSTALLATION
WEATHERSEAL ON BACKING ROD
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
INTERNAL WALL LINING METALCRAFT MSS PURLINBY ENGINEER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
SUGGEST MIN. 50mm
DIMENSION TO SUIT
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
LINE OF HEAD FLASHING ABOVE
LINE OF SILL FLASHING BELOW
20mm HORIZONTAL CAVITYBATTEN
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
METERBOX JAMB
E 1228.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM965 VERTICAL CLADDING
20mm HORIZONTAL CAVITYBATTEN
PRE-FINISHED INTERNALCORNER FLASHING
INTERNAL WALL LINING
PRE-FINISHED FIXINGBRACKET WITH PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
PERMEABLE WALLUNDERLAY, SHOWN DASHED
STRUCTURAL COLUMN BYENGINEER
METALCRAFT MSS PURLINBY ENGINEER
PRE-FINISHED FLAT HEADWAFER-TEK SCREW FORFLASHING
PRE-FINISHED SECONDARYFLASHING
SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED
SUGGEST MIN. 100mm
DIMENSION TO SUIT
SU
GG
ES
T M
IN. 100
mm
DIM
EN
SIO
N T
O S
UIT
PRE-FINISHED FLATHEAD WAFER-TEKSCREW WITH EPDMWASHER
5mm GAP
5m
m G
AP
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
INTERNAL CORNER
E 1328.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT MSS PURLIN BYENGINEER
20mm HORIZONTALCAVITY BATTEN
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
PRE-FINISHED EXTERNALCORNER FLASHING
PERMEABLE WALL UNDERLAY,SHOWN DASHED
METALCRAFT METCOM 965VERTICAL CLADDING
STRUCTURAL COLUMN BY ENGINEER
SEPARATE BATTEN AND FLASHINGWITH DPC AS REQUIRED
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW WITH EPDM WASHER
PRE-FINISHED FIXING BRACKETWITH PRE-FINISHED POP RIVETBEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
5m
m G
AP
SUGGEST MIN. 100mm
DIMENSION TO SUIT
SU
GG
ES
T M
IN. 100
mm
DIM
EN
SIO
N T
O S
UIT
5mm GAP
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
EXTERNAL CORNER
E 1428.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALLUNDERLAY, SHOWN DASHED
METALCRAFT METCOM965 VERTICALCLADDING
PRE-FINISHED FLAT HEADWAFER-TEK SCREW WITHEPDM WASHERINTERNAL WALL LINING
SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED
METALCRAFT MSS PURLINBY ENGINEER
PRE-FINISHED SOAKERFLASHING TO LINE UP WITHWINDOW JAMB ABOVE
20mm HORIZONTAL CAVITYBATTEN
METALCRAFT MSS PURLIN BYENGINEER
SOAKER FLASHING ONLY REQUIRED TOLINE UP WITH WINDOW JAMB ABOVE.REFER TO MRM CODE OF PRACTICEVERSION 3.0 /2019 FOR REQUIRMENT.
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
SOAKER FLASHING
E 1528.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965 VERTICALCLADDING
PRE FINISHED SELFTAPPING SCREW WITHRUBBER WASHER
20mm HORIZONTAL CAVITYBATTEN
FIBRE CEMENT BOARDBY OTHERS
PRE FINISHED FLASHING,MATERIAL AS PER E2/AS1
PERMEABLE WALL UNDERLAY,SHOWN DASHED
SEPARATE BATTEN ANDCLADDING WITH DPC ASREQUIRED
SUGGEST MIN. 100mm
DIMENSION TO SUIT
SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
CHANGE IN CLADDING
E 1628.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
METALCRAFT METCOM 965VERTICAL CLADDING
WALL FRAMING
PRE FINISHED SELFTAPPING SCREW WITHRUBBER WASHER
DPC
FLASHING, MATERIAL ASPER E2/AS1
20mm HORIZONTAL CAVITYBATTENS
PERMEABLE WALLUNDERLAY, SHOWNDASHED
8g WAFER TEK SCREW
PRE-FINISHED SECONDARYFLASHING
SEPARATE BATTEN ANDFLASHING WITH DPC ASREQUIRED
5m
m G
AP
MASTIC BEAD ONBACKING ROD
RAWLPLUG
FLEXIBLE FLASHING TAPE
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
CLADDING ABUTMENT
E 1728.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALL UNDERLAY, SHOWNDASHED
INTERNAL WALL LINING
METALCRAFT METCOM 965 VERTICALCLADDING
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW FOR FLASHING
CAVITY CLOSER AS REQUIRED TONZBC
PRE-PRIMED SKIRTING
CONCRETE SLAB
METALCRAFT MSS PURLIN BYENGINEER
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER 20mm HORIZONTAL CAVITY BATTEN
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL
3-5
mm
GA
P V
EN
TIL
AT
ION
GA
P
DR
IP E
DG
E T
O C
LA
DD
ING
MIN
. 15m
m G
AP
MIN
. 50m
m L
AP
DPC
25mm
APPLICATION
CLEARANCE AT GARAGE DOOR
35mm SHELTERED AREAS OR CLADDING ABUTTINGA DECK
75mm UNLINED BUILDINGS
100mm LINED BUILDINGS AND DWELLINGS.STONE CHIP GROUND SURFACE
150mm KEPT LAWN GROUND SURFACE
175mm PASTURE GROUND SURFACE
GROUND CLEARANCE IS NECESSARY BETWEEN BOTTOM OFPROFILED METAL CLADDING AND LARGE FLAT SURFACES
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
BOTTOM OF CLADDING (FLUSH)
E 1828.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
PERMEABLE WALL UNDERLAY OVERFLASHING, SHOWN DASHED
METALCRAFT METCOM 965VERTICAL CLADDING
PRE-FINISHED SELF DRILLING / TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL
MIN
. 50m
m L
AP
INTERNAL WALL LINING
PRE-PRIMED SKIRTING
CONCRETE SLAB
CAVITY CLOSER AS REQUIRED TONZBC
5 GAP
20
15
ALTERNATIVE OPTIONBIRDS BEAK EDGE
PRE-FINISHED FLAT HEADWAFER-TEK SCREW FORFLASHING
20mm HORIZONTAL CAVITY BATTEN
3-5
mm
VE
NT
ILA
TIO
N G
AP
MIN
. 75m
m C
OV
ER
SEPARATE BATTEN AND CLADDINGWITH DPC AS REQUIRED
DPC
25mm
APPLICATION
CLEARANCE AT GARAGE DOOR
35mm SHELTERED AREAS OR CLADDING ABUTTINGA DECK
75mm UNLINED BUILDINGS
100mm LINED BUILDINGS AND DWELLINGS.STONE CHIP GROUND SURFACE
150mm KEPT LAWN GROUND SURFACE
175mm PASTURE GROUND SURFACE
GROUND CLEARANCE IS NECESSARY BETWEEN BOTTOM OFPROFILED METAL CLADDING AND LARGE FLAT SURFACES
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev.
1 : 2
1.0
BOTTOM OF CLADDING (RECESSED)
E 1928.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev. 1.0
3D WINDOW FLASHINGS
E 2028.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING
RECESSED WINDOW FLASHINGS
HEAD FLASHING
JAMB FLASHING
SILL FLASHING
ALUMINIUMWINDOWJOINERY
METALCRAFTMETCOM 965VERTICALCLADDING
LIP OF DISCHARGE AT LOWEST POINTOF ROOF
DOWNPIPE
OVERFLOW BELOW OPENING LEVEL, 1.5 xCROSS-SECTION AREA OF DOWNPIPE
METALCRAFT METCOM 965VERTICAL CLADDING
50mm MIN
EITHER SIDE
200mm MIN
.
OPENING
75m
m M
IN.
OP
EN
ING
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of practice version 3.0 / 2019, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms isthe responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailedas a single line for simplicity and is indicative only. Building paper type and method of installation shouldcomply with underlay manufacturers recommendations and NZBC regulations.
ScaleDate Sheet
MetalcraftRoofing
Rev. 1.0
3D RAINWATER HEAD
E 2128.02.2019
Metcom 965
CVMET965
COMMERCIAL VERTICAL CLADDING