![Page 1: Meeting Agenda 09-18-14 (1)Overview ( 概观 ) (2)Questions from previous week ( 上周遗留问题 ) (3)Optimization Algorithm Update ( 优化更新 )](https://reader036.vdocuments.mx/reader036/viewer/2022082408/56649ec75503460f94bd3df2/html5/thumbnails/1.jpg)
Meeting Agenda 09-18-14
(1) Overview (概观 )
(2) Questions from previous week (上周遗留问题 )
(3) Optimization Algorithm Update (优化更新 )
![Page 2: Meeting Agenda 09-18-14 (1)Overview ( 概观 ) (2)Questions from previous week ( 上周遗留问题 ) (3)Optimization Algorithm Update ( 优化更新 )](https://reader036.vdocuments.mx/reader036/viewer/2022082408/56649ec75503460f94bd3df2/html5/thumbnails/2.jpg)
(1) Overview
• Previous Week and Current Week:– Questions from previous weeks. (上周遗留问题 )– Optimization algorithm update. (优化更新 )– Propose new schedule (新的排程 )
• Tasks in Progress:– Development of GUI and establishing link between SEAS GUI
and algorithm.– Overtime implementation.– Corrections to the proposed schedule.
![Page 3: Meeting Agenda 09-18-14 (1)Overview ( 概观 ) (2)Questions from previous week ( 上周遗留问题 ) (3)Optimization Algorithm Update ( 优化更新 )](https://reader036.vdocuments.mx/reader036/viewer/2022082408/56649ec75503460f94bd3df2/html5/thumbnails/3.jpg)
(2) Previous week questions
• To show a completed scheduling plan for one purchase order. (生成一个订单排程 )
• Input matrix for machine availability. (设备 /材料到位输入矩阵的形式 )
• Algorithm to provide the optimized inputsheet (算法是否可提供优化过后的 inputsheet)
• MATLAB and VBA Bridge (MATLAB和 VBA的连接 )
![Page 4: Meeting Agenda 09-18-14 (1)Overview ( 概观 ) (2)Questions from previous week ( 上周遗留问题 ) (3)Optimization Algorithm Update ( 优化更新 )](https://reader036.vdocuments.mx/reader036/viewer/2022082408/56649ec75503460f94bd3df2/html5/thumbnails/4.jpg)
(3) Optimization Update
• Input sheet format generation– Previously, after every generation the algorithm was
generating a matrix for calculating the KPI which had a format similar to the input matrix used for training the ANN.
– The algorithm now generates an excel sheet which has the format of the input sheets provided by SEAS.
• A schedule for all the 14 work orders has been created. Please refer to excel.