Download - Mark Phillips BSDA/Metro Long-Range Planner
![Page 1: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/1.jpg)
Mark PhillipsBSDA/Metro
Long-Range Planner
![Page 2: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/2.jpg)
The Foundation: Moving Transit Forward
![Page 3: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/3.jpg)
• Study highway corridors from Moving Transit Forward for high performance transit feasibility– I-70, I-64, I-44, I-55– Include nearby major streets
• Select up to two transit projects to advance into project development– Cost-effective, long-term transportation solutions– Affordable and competitive for Federal funding
RTCS: Study Purpose
![Page 4: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/4.jpg)
• Better connecting people and jobs
• Improving mobility and access to economic opportunities for low-income, transit-dependent
• Expanding transportation choice for all
• Supporting the regional economy, strengthening neighborhoods
• Providing cost-effective transit solutions
RTCS: Study Goals and Objectives
![Page 5: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/5.jpg)
Corridor Screening: Population
![Page 6: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/6.jpg)
Corridor Screening: Employment
![Page 7: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/7.jpg)
Corridor Screening: Household Income
![Page 8: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/8.jpg)
Corridor Screening: Activity Centers
![Page 9: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/9.jpg)
Corridor Screening: Top Trips - 2010
![Page 10: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/10.jpg)
RTCS Study Area
![Page 11: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/11.jpg)
Premium performance and service• Minimize travel time and maximize
convenience• Modern vehicles – sleek, attractive,
quiet, energy efficient• Attractive amenities – wi-fi, comfort • Integrated with Metro System• Branded – recognizable; unique
Premium Transit Characteristics
![Page 12: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/12.jpg)
• Modes and service types
- BRT, express bus, rail• Vehicle types
– Multi-door entry– Low-floor boarding– Off-board fare collection– On-board transit information
• Alignments– Exclusive lanes; BAT lanes;
shared HOV; mixed traffic– Queue jumps/bypass lanes
TSP Technology
A Range of Alternatives
![Page 13: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/13.jpg)
A Range of Alternatives• Stations
– Shelters and seating– Landscaped platforms– Safe and secure
• Technology– Transit signal priority– Real-time information, apps
• Convenient operations– Predictable service – rely on frequencies
vs. schedules– Intermodal connectivity – parking;
bike access; transfers; walking
![Page 14: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/14.jpg)
Dec Jan2013
Feb Mar Apr May Jun Jul Aug Sep
Overall Project
Public Inv
Screening
Define Alts
Alt Analysis
Select LPA
Prep for Implement
1 2 3
1
2
3
RTCS Project Schedule
![Page 15: Mark Phillips BSDA/Metro Long-Range Planner](https://reader030.vdocuments.mx/reader030/viewer/2022032708/56812baf550346895d8fe6e0/html5/thumbnails/15.jpg)
THANK YOU!
Mark Phillips, Deputy Project Manager
(314) 982-1400 x.1708
Please stay engaged and informed!
www.movingtransitforward.org/stlrapidtransit