Local Planning Panel7 August 2019375 Glebe Point Road, Glebe
D/2018/1586
Applicant: Environa Studio
Owner: Lawrence Luk
Architect: Environa Studio
![Page 2: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/2.jpg)
proposalalterations and additions to heritage building including:
• extension, including excavation works, of the existing ground level small bar
• internal alterations to the residential apartments
• addition of rear balconies to apartments within levels 2 and 3
• addition of front and rear dormers for an additional level with access to rooftop terraces
recommendationrefusal
![Page 3: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/3.jpg)
notification information• exhibition period 9 January to 25 January 2019
• 60 owners and occupiers notified
• 1 submission received
3
![Page 4: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/4.jpg)
submissions• privacy and noise impacts from the rooftop terraces
• unsympathetic additions to a heritage item
![Page 5: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/5.jpg)
subject site
submitters
submissions
![Page 6: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/6.jpg)
site
![Page 7: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/7.jpg)
site viewed from cnr of Glebe Point Road & Forsyth Street
site
![Page 8: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/8.jpg)
entrance to apartments entrance to
small bar
site viewed from Forsyth Street & entry points
![Page 9: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/9.jpg)
rear of site viewed from Forsyth Street
![Page 10: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/10.jpg)
rear of subject site & adjoining heritage items
site
![Page 11: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/11.jpg)
Charlton Way street view looking south
![Page 12: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/12.jpg)
existing level 2 terrace looking east (common open space & waste storage)
![Page 13: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/13.jpg)
perspective – 3D model
proposal
![Page 14: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/14.jpg)
perspective – 3D model
![Page 15: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/15.jpg)
proposal
level 1
![Page 16: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/16.jpg)
level 2
![Page 17: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/17.jpg)
level 3
![Page 18: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/18.jpg)
level 4
![Page 19: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/19.jpg)
section plan
![Page 20: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/20.jpg)
materials – level 2 and 3 balconies
clear glass balustrades
balcony flooring in Modwood‘silver gum’
aluminium sliding door in Dulux ‘monument’
![Page 21: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/21.jpg)
materials – dormers and rooftop terraces
aluminium sliding door in Dulux ‘monument’
terrace flooring in Modwood‘silver gum’
rooftop render planter boxes
Lysaght metal cladding in Colorbond ‘basalt’
![Page 22: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/22.jpg)
compliance with key LEP development standards
control existing proposed compliance
height 9m 12.9m works up to 12.1m
no – 34% variation
floor space 1.5:1 1.7:1 2.06:1 no – 37% variation
![Page 23: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/23.jpg)
compliance with key DCP development standards
control existing proposed compliance
height in storeys
2 3 4 no
![Page 24: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/24.jpg)
issues• height
• floor space
• heritage
• amenity
![Page 25: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/25.jpg)
height of building
![Page 26: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/26.jpg)
height of building• height non-compliance results from front and rear dormers, rooftop
terraces and level 3 balcony
• exacerbates existing height non-compliance
• adverse impacts on the heritage item
• clause 4.6 not supported
![Page 27: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/27.jpg)
height in storeys• New upper level and lower ground level addition results in 4 storeys
• non compliance with 2 storey height in storeys DCP control
1234
![Page 28: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/28.jpg)
floor space • floor space non-compliance results from the attic space and bar
extension
• exacerbates floor space non compliance
• adds uncharacteristic features / bulk to heritage item
• clause 4.6 not supported
![Page 29: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/29.jpg)
heritage• unsympathetic additions to a heritage item
• untraditional dormers with aluminium framed doors
• impact to side horizontal parapet wall
• extensive glazing
![Page 30: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/30.jpg)
amenity - privacy• rooftop terraces and balconies create privacy and overlooking impacts
• any further screening would add bulk
![Page 31: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/31.jpg)
amenity – waste management• existing communal waste storage removed
• removal of communal residential waste storage, no clear path of travel to street for collection
• commercial waste storage not demonstrated
![Page 32: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground](https://reader036.vdocuments.mx/reader036/viewer/2022080721/5f7a8980dc9488369b2e09b4/html5/thumbnails/32.jpg)
recommendation
refusal