Download - liquidacion de obra.xls
DATOS DE OBRA
ENTIDAD GOBIERNO REGIONAL HUANUCO
LICITACION Nº 005-2011-GRH
CONTRATO Nº 324-2011-GRH/PR CONTRATO SUPERVISIONNº 432-2011-GRH FECHA V.R. 3/1/2011
MODALIDAD A SUMA ALZADA MONTO SUPERVISION S/. 54,085.00
CONTRATISTA CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISION CONSORCIO SV CONSULTORES
OBRA RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACION HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
MONTO S/. 1,866,744.92
BASE_PRES S/. 1,866,744.92
PRECIOS A MARZO DEL 2011
PLAZO 240 DIAS CALENDARIOS
INICIO 21 DE AGOSTO 2011
TERMINO 16 DE ABRIL 2012
MES 7
MES1 6
MES2 5
MES3 4
OJITO:
MES ANTERIOR 1/29/2012 SOLO EN
FECHA : 2/29/2012
OBRA:
ENTIDAD: GOBIERNO REGIONAL HUANUCO INICIO CONTRACTUAL DE OBRA:. 21 DE AGOSTO 2011
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA TERMINO CONTRACTUAL DE OBRA: 16 DE ABRIL 2012
SUPERVISOR: CONSORCIO SV CONSULTORES PRESUPUESTO CONTRACTUAL: S/. 1,866,744.92
MODALIDAD: A SUMA ALZADA PRESUPUESTO BASE: S/. 1,866,744.92
CONTRATO Nº Nº 324-2011-GRH/PR FECHA DE VALOR REFERENCIAL: MARZO DEL 2011
CONCEPTO TOTAL
1.- AUTORIZADO Y PAGADO
1.1.- AUTORIZADO
1.1.1.- CONTRATO PRINCIPAL 1,581,987.22
1.1.2.- REAJUSTES 10,171.34
1.1.3.- DEDUCTIVOS POR ADELANTO EN EFECTIVO #NAME?
1.1.4.- DEDUCTIVO POR ADELANTO DE MATERIALES 0.00
1.1.5.- IMPUESTO GENERAL A LAS VENTAS #NAME?
TOTAL 1 #NAME?
1.2.- PAGADO
1.2.1.- VALORIZACION CONTRATO PRINCIPAL 1,581,992.71
1.2.2.- REAJUSTES CONTRATO PRINCIPAL 0.00
1.2.3.- DEDUCTIVOS POR ADELANTO EN EFECTIVO 0.00
1.2.4.- DEDUCTIVO POR ADELANTO DE MATERIALES 0.00
1.2.5.- IMPUESTO GENERAL A LAS VENTAS 284,758.70
TOTAL 2 1,866,751.41
SALDO A FAVOR DEL CONTRATISTA (TOTAL1- TOTAL2) #NAME?
2.- ADELANTOS
2.1.- OTORGADOS
2.1.1.- ADELANTO DIRECTO 82,449.93
2.1.2.- IGV DE ADELANTO DIRECTO 14,840.99
2.1.2.- ADELANTO DE MATERIALES 0.00
2.1.2.- IGV DE ADELANTO DE MATERIALES 0.00
TOTAL 1 97,290.92
2.2.- AMORTIZADOS
2.2.1.- ADELANTO DIRECTO 78,720.90
2.1.2.- IGV DE ADELANTO DIRECTO 14,169.76
2.2.2.- ADELANTO DE MATERIALES 0.00
2.1.2.- IGV DE ADELANTO DE MATERIALES 0.00
TOTAL 2 92,890.66
SALDO A FAVOR DEL CONTRATISTA (TOTAL2- TOTAL1) (4,400.26)
3.- FONDOS DE GARANTIA
3.1.- RETENIDOS
3.1.1.- FONDO DE GARANTIA DE VALORIZACION 0.00
TOTAL 1 0.00
3.2.- DEVUELTOS
3.2.1.- FONDO DE GARANTIA DE VALORIZACION 0.00
TOTAL 2 0.00
SALDO A FAVOR DEL CONTRATISTA (TOTAL1- TOTAL2) 0.00
4.- MULTAS
4.1.- AUTORIZADAS
4.1.1.- POR NO PERMITIR EL ACCESO AL CUADERNO DE OBRA 3,734.57
4.1.2.- IMPUESTO GENERAL A LAS VENTAS 672.22
TOTAL 1 4,406.79
4.2.- EJECUTADAS
4.2.1.- POR NO PERMITIR EL ACCESO AL CUADERNO DE OBRA 3,734.51
4.1.2.- IMPUESTO GENERAL A LAS VENTAS 672.21
TOTAL 2 4,406.72
SALDO A FAVOR DEL CONTRATISTA (TOTAL2- TOTAL1) (0.06)
1.- AUTORIZADO Y PAGADO #NAME?
2.- ADELANTOS (4,400.26)
3.- FONDOS DE GARANTIA 0.00
4.- MULTAS (0.06)
SALDO A FAVOR DEL CONTRATISTA #NAME?
RESUMEN DE LIQUIDACION
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE
PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
OBRA:
ENTIDAD: GOBIERNO REGIONAL HUANUCO INICIO CONTRACTUAL DE OBRA:. 21 DE AGOSTO 2011
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA TERMINO CONTRACTUAL DE OBRA: 16 DE ABRIL 2012
SUPERVISOR: CONSORCIO SV CONSULTORES PRESUPUESTO CONTRACTUAL: S/. 1,866,744.92
MODALIDAD: A SUMA ALZADA PRESUPUESTO BASE: S/. 1,866,744.92
CONTRATO Nº Nº 324-2011-GRH/PR FECHA DE VALOR REFERENCIAL: MARZO DEL 2011
CONCEPTO August 2012 September 2012 October 2012 November 2012 December 2012 January 2013 February 2013 March 2013 April 2012 TOTAL
Monto Bruto Valorizado en el Presente Mes : 65,284.41 112,219.78 174,154.33 307,749.97 180,219.68 663,643.64 7,742.85 8,047.26 62,930.79 1,581,992.71
Presupuesto Contractual:
1. Estructuras 61,549.69 109,067.49 138,412.16 142,244.42 92,794.48 102,351.22 0.00 0.00 0.00 646,419.46
2. Arquitectura 0.00 3,152.29 14,783.19 79,841.47 82,605.04 308,250.37 1,427.61 0.00 0.00 490,059.97
3. Instalaciones Sanitarias 0.00 0.00 15,702.72 56,401.46 3,222.00 44,170.52 0.00 0.00 0.00 119,496.70
4. Instalaciones Electricas 0.00 0.00 5,256.26 27,990.05 846.24 69,750.82 0.00 0.00 0.00 103,843.37
5. Mitigación de Impacto Ambiental 3,734.72 0.00 0.00 1,272.57 751.92 10,096.03 939.21 0.00 0.00 16,794.45
6. Mobiliario y Equipamiento 0.00 0.00 0.00 0.00 0.00 129,024.68 5,376.03 8,047.26 62,930.79 205,378.76
Monto por Reajuste en el Presente Mes : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1. Estructuras 0.00
2. Arquitectura 0.00
3. Instalaciones Sanitarias 0.00
4. Instalaciones Electricas 0.00
5. Mitigación de Impacto Ambiental 0.00
6. Mobiliario y Equipamiento 0.00
Amortización del Adelanto Directo en el Presente Mes : 0.00 0.00 0.00 0.00 0.00 0.00 7,742.85 8,047.26 62,930.79 78,720.90
Del Adelanto en efectivo 0.00 0.00 0.00 0.00 0.00 0.00 7,742.85 8,047.26 62,930.79 78,720.90
Amortización del Adelanto de Materiales en el Presente Mes : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1. Estructuras
2. Arquitectura
3. Instalaciones Sanitarias
4. Instalaciones Electricas
5. Mitigación de Impacto Ambiental
6. Mobiliario y Equipamiento
Deducción del Reajuste Que No Corresponde por Adelanto Directo: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1. Estructuras
2. Arquitectura
3. Instalaciones Sanitarias
4. Instalaciones Electricas
5. Mitigación de Impacto Ambiental
6. Mobiliario y Equipamiento
Deducción del Reajuste Que No Corresponde por Adelanto de Materiales: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1. Estructuras
2. Arquitectura
3. Instalaciones Sanitarias
4. Instalaciones Electricas
5. Mitigación de Impacto Ambiental
6. Mobiliario y Equipamiento
Otros: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I.- MONTO FACTURABLE (Sin IGV) 65,284.41 112,219.78 174,154.33 307,749.97 180,219.68 663,643.64 (0.00) 0.00 0.00 1,503,271.81
Monto Retenido por Fondo de Garantia : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fondo de Garantia Valorización 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Multa: 0.00 1,122.20 2,612.31 0.00 0.00 0.00 0.00 0.00 0.00 3,734.51
Retención por Atraso de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,122.20 2,612.31 0.00 0.00
II.- TOTAL RETENCION 0.00 1,122.20 2,612.31 0.00 0.00 0.00 0.00 0.00 0.00 3,734.51
III.- MONTO LIQUIDO SIN IGV ( I - II ) 65,284.41 111,097.58 171,542.02 307,749.97 180,219.68 663,643.64 (0.00) 0.00 0.00 1,499,537.30
IV.- I. G. V. (18.00 %) 11,751.19 19,997.56 30,877.56 55,394.99 32,439.54 119,455.86 0.00 0.00 0.00 269,916.71
V.- MONTO NETO PAGADO AL CONTRATISTA( III + IV ) 77,035.60 131,095.14 202,419.58 363,144.96 212,659.22 783,099.50 0.00 0.00 0.00 1,769,454.00
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
RESUMEN DE VALORIZACIONES PAGADAS
OBRA:
ENTIDAD: GOBIERNO REGIONAL HUANUCO INICIO CONTRACTUAL DE OBRA:.
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA TERMINO CONTRACTUAL DE OBRA:
SUPERVISOR: CONSORCIO SV CONSULTORES PRESUPUESTO CONTRACTUAL:
MODALIDAD: A SUMA ALZADA PRESUPUESTO BASE:
CONTRATO Nº Nº 324-2011-GRH/PR FECHA DE VALOR REFERENCIAL:
CONCEPTO August 2011 September 2011 October 2011 November 2011 December 2011 ########## ########### March 2012 April 2012 TOTAL
Monto Bruto Valorizado en el Presente Mes : 65,284.52 112,219.78 174,157.86 307,750.10 180,219.68 663,634.36 7,742.85 8,047.26 62,930.79 1,581,987.20
Presupuesto Contractual:
1. Estructuras 61,549.79 109,067.49 138,415.69 142,244.55 92,794.48 102,346.46 0.00 0.00 0.00 646,418.46
2. Arquitectura 0.00 3,152.29 14,783.19 79,841.47 82,605.04 308,245.85 1,427.61 0.00 0.00 490,055.45
3. Instalaciones Sanitarias 0.00 0.00 15,702.72 56,401.46 3,222.00 44,170.52 0.00 0.00 0.00 119,496.70
4. Instalaciones Electricas 0.00 0.00 5,256.26 27,990.05 846.24 69,750.82 0.00 0.00 0.00 103,843.37
5. Mitigación de Impacto Ambiental 3,734.73 0.00 0.00 1,272.57 751.92 10,096.03 939.21 0.00 0.00 16,794.46
6. Mobiliario y Equipamiento 0.00 0.00 0.00 0.00 0.00 129,024.68 5,376.03 8,047.26 62,930.79 205,378.76
Monto por Reajuste en el Presente Mes : 389.91 50.44 719.92 1,829.60 1,776.80 5,545.12 17.60 (32.19) (125.86) 10,171.34
1 Estructuras 307.75 0.00 415.25 142.24 185.59 204.69 0.00 0.00 0.00 1,255.52
2 Arquitectura 0.00 50.44 236.53 1,437.15 1,569.50 5,548.43 25.70 0.00 0.00 8,867.75
3 Instalaciones Sanitarias 0.00 0.00 47.11 112.80 0.00 (44.17) 0.00 0.00 0.00 115.74
4 Instalaciones Electricas 0.00 0.00 21.03 111.96 5.92 418.50 0.00 0.00 0.00 557.41
5 Mitigación de Impacto Ambiental 82.16 0.00 0.00 25.45 15.79 191.82 18.78 0.00 0.00 334.00
6 Mobiliario y Equipamiento 0.00 0.00 0.00 0.00 0.00 (774.15) (26.88) (32.19) (125.86) (959.08)
Amortización del Adelanto Directo en el Presente Mes : #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Del Adelanto en efectivo #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Amortización del Adelanto de Materiales en el Presente Mes : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No se otorgaron adelanto de materiales
Deducción del Reajuste Que No Corresponde por Adelanto Directo: #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Del Adelanto en efectivo #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Deducción del Reajuste Que No Corresponde por Adelanto de Materiales: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No se otorgaron adelanto de materiales
Otros: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I.- MONTO FACTURABLE (Sin IGV) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Monto Retenido por Fondo de Garantia : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fondo de Garantia Valorización 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Multa: 0.00 1,122.20 2,612.37 0.00 0.00 0.00 0.00 0.00 0.00 3,734.57
Retención por Atraso de Obra 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Por negar al supervisor acceso al cuaderno de obra 5/1000 xNº dia x V 0.00 1,122.20 2,612.37 0.00 0.00 0.00 0.00 0.00 0.00 3,734.57
II.- TOTAL RETENCION 0.00 1,122.20 2,612.37 0.00 0.00 0.00 0.00 0.00 0.00 3,734.57
III.- MONTO LIQUIDO SIN IGV ( I - II ) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
IV.- I. G. V. (18.00 %) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
V.- MONTO NETO A COBRAR POR EL CONTRATISTA( III + IV ) #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RESUMEN DE VALORIZACIONES AUTORIZADAS
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
21 DE AGOSTO 2011
16 DE ABRIL 2012
S/. 1,866,744.92
S/. 1,866,744.92
MARZO DEL 2011
OBRA:
ENTIDAD: GOBIERNO REGIONAL HUANUCO INICIO CONTRACTUAL DE OBRA:. 21 DE AGOSTO 2011
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA TERMINO CONTRACTUAL DE OBRA: 16 DE ABRIL 2012
SUPERVISOR: CONSORCIO SV CONSULTORES PRESUPUESTO CONTRACTUAL: S/. 1,866,744.92
MODALIDAD: A SUMA ALZADA PRESUPUESTO BASE: S/. 1,866,744.92
CONTRATO Nº Nº 324-2011-GRH/PR FECHA DE VALOR REFERENCIAL: MARZO DEL 2011
MONTO S/. IGV (18.00 %)
MONTO TOTAL
FACTURADO POR EL
CONTRATISTA S/.
MONTO TOTAL A
PAGAR AL
CONTRATISTA S/.
% Avance con
Respesto al Monto
contractual
FECHA DE
CANCELACION
Adelanto Directo 82,449.93 14,840.99 97,290.92 97,290.92 5.21% 1/30/2012
Adelanto de Materiales 0.00 0.00 0.00 0.00%
Valorización Neta Nº 01 65,284.41 11,751.19 77,035.60 #NAME? #NAME?
Valorización Neta Nº 02 111,097.58 19,997.56 131,095.14 #NAME? #NAME?
Valorización Neta Nº 03 171,542.02 30,877.56 202,419.58 #NAME? #NAME?
Valorización Neta Nº 04 307,749.97 55,394.99 363,144.96 #NAME? #NAME?
Valorización Neta Nº 05 180,219.68 32,439.54 212,659.22 #NAME? #NAME?
Valorización Neta Nº 06 663,643.64 119,455.86 783,099.50 #NAME? #NAME?
Valorización Neta Nº 07 0.00 0.00 0.00 #NAME? #NAME?
Valorización Neta Nº 08 0.00 0.00 0.00 #NAME? #NAME?
Valorización Neta Nº 09 0.00 0.00 0.00 #NAME? #NAME?
TOTAL S/. 1,866,744.92 #NAME? #NAME?
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO –
HUÁNUCO
AVANCE FINANCIERO
CONCEPTO
OBRA: RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN: HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO INICIO DE OBRA: 21 DE AGOSTO 2011
ENTIDAD: GOBIERNO REGIONAL HUANUCO FIN DE OBRA: 16 DE ABRIL 2012
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA PLAZO EJECUCION: 240 DIAS CALENDARIOS
SUPERVISOR: CONSORCIO SV CONSULTORES PRESUP. CONTRATADO
CUADRO DE VALORIZACIONES DE OBRA PROGRAMADO EJECUTADO
MES PARCIAL PARCIAL ACUMUL. PARCIAL PARCIAL ACUMUL.
S/. % % S/. % S/.
Aug-2011
Aug-2011 77,035.60 4.13% 4.13% 77,035.60 4.13% 4.13%
Sep-2011 182,250.06 9.76% 13.89% 132,419.34 7.09% 11.22%
Oct-2011 204,095.43 10.93% 24.82% 205,502.11 11.01% 22.23%
Nov-2011 265,194.75 14.21% 39.03% 363,144.98 19.45% 41.68%
Dec-2011 132,012.70 7.07% 46.10% 212,659.21 11.39% 53.07%
Jan-2012 158,904.42 8.51% 54.61% 783,099.47 41.95% 95.02%
Feb-2012 433,791.00 23.24% 77.85% 9,136.56 0.49% 95.51%
Mar-2012 282,946.46 15.16% 93.01% 9,489.17 0.51% 96.02%
Apr-2012 130,514.50 6.99% 100.00% 74,258.33 3.98% 100.00%
Total 1,866,744.92 100.00% 1,866,744.77 100.00%
GRAFICO DE CONTROL DE VALORIZACIONES
PROGRAMADO vs EJECUTADO
S/. 1,866,744.92
0.00%
4.13%
13.89%
24.82%
39.03%
46.10%
54.61%
77.85%
93.01%
100.00%
0.00%
4.13%
11.22%
22.23%
41.68%
53.07%
95.02% 95.51% 96.02% 100.00%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12
VA
LO
RIZ
AC
ION
AC
UM
UL
AD
A
PLAZO DE EJECUCION (MESES)
CONTROL DE VALORIZACIONES DE OBRA
AVANCE PROGRAMADO
AVANCE EJECUTADO
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO CONTRATO: Nº 324-2011-GRH/PR
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA MONTO DEL CONTRATO:
SUPERVISOR : CONSORCIO SV CONSULTORES INICIO DE OBRA: 21 DE AGOSTO 2011
TERMINO CONTRACTUAL: 16 DE ABRIL 2012
PRESUPUESTO
CONTRACTUAL
PARCIAL (S.) VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) % VAL. (S/.) %
1 ESTRUCTURAS 552,494.43 52,606.66 9.52% 93,220.07 16.87% 118,304.01 21.41% 121,576.54 22.01% 79,311.52 14.36% 87,475.61 15.83% 0.00 0.00% 0.00 0.00% 0.00 0.00% 552,494.43 100.00% 0.00 0.00%
2 ARQUITECTURA 418,850.83 0.00 0.00% 2,694.27 0.64% 12,635.20 3.02% 68,240.57 16.29% 70,602.60 16.86% 263,457.99 62.90% 1,220.18 0.29% 0.00 0.00% 0.00 0.00% 418,850.83 100.00% 0.00 0.00%
3 INSTALACIONES SANITARIAS 102,133.93 0.00 0.00% 0.00 0.00% 13,421.13 13.14% 48,206.38 47.20% 2,753.84 2.70% 37,752.58 36.96% 0.00 0.00% 0.00 0.00% 0.00 0.00% 102,133.93 100.00% 0.00 0.00%
4 INSTALACIONES ELECTRICAS, TELEFÓNICAS Y DE COMUNICACIÓN88,755.01 0.00 0.00% 0.00 0.00% 4,492.53 5.06% 23,923.12 26.95% 723.28 0.81% 59,616.08 67.17% 0.00 0.00% 0.00 0.00% 0.00 0.00% 88,755.01 100.00% 0.00 0.00%
5 MITIGACIÓN DE IMPACTO AMBIENTAL 14,354.23 3,192.07 22.24% 0.00 0.00% 0.00 0.00% 1,087.67 7.58% 642.67 4.48% 8,629.08 60.12% 802.74 5.59% 0.00 0.00% 0.00 0.00% 14,354.23 100.00% 0.00 0.00%
6 MOBILIARIO Y EQUIPAMIENTO 175,537.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 110,277.50 62.82% 4,594.90 2.62% 6,878.00 3.92% 53,787.00 30.64% 175,537.40 100.00% 0.00 0.00%
COSTO DIRECTO 1,352,125.83 55,798.73 95,914.34 148,852.87 263,034.28 154,033.91 567,208.84 6,617.82 6,878.00 53,787.00 1,352,125.83 0.00
GASTOS GENERALES 9.00% 121,691.32 5,021.89 8,632.29 13,396.76 23,673.09 13,863.05 51,048.80 595.60 619.02 4,840.83 121,691.32 0.00
UTILIDADES 8.00% 108,170.07 4,463.90 7,673.15 11,908.23 21,042.74 12,322.71 45,376.71 529.43 550.24 4,302.96 108,170.07 0.00
SUB TOTAL 1,581,987.22 65,284.52 112,219.78 174,157.86 307,750.11 180,219.67 663,634.35 7,742.85 8,047.26 62,930.79 1,581,987.22 0.00
FACTOR DE RELACION 1.00000 1,581,987.22 65,284.52 112,219.78 174,157.86 307,750.11 180,219.67 663,634.35 7,742.85 8,047.26 62,930.79 1,581,987.22 0.00
I.G.V 18.00% 284,757.70 11,751.21 20,199.56 31,348.41 55,395.02 32,439.54 119,454.18 1,393.71 1,448.51 11,327.54 284,757.70 0.00
TOTAL PRESUPUESTO 1,866,744.92 77,035.73 4.13% 132,419.34 7.09% 205,506.27 11.01% 363,145.13 19.45% 212,659.21 11.39% 783,088.53 41.95% 9,136.56 0.49% 9,495.77 0.51% 74,258.33 3.98% 1,866,744.92 100.00% 0.00 0.00%
ACUMUL. ACTUAL
RESUMEN DE VALORIZACON DE AVANCE FISICO DE OBRA
SALDO POR
VALORIZARFP
AVANCES FISICO DE OBRA
Feb-12 Apr-12
S/. 1,866,744.92
Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Mar-12DESCRIPCION
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN DE MATERIALES Y HERRAMIENTAS m2 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00
01.01.01.02 CARTEL DE OBRA BANNER (GIGANTOGRAFIA) INCLUYE BASTIDORES Y PARANTES DE MADERA TORNILLO DE 2.40 x 3.60 M. SEGUN DISEÑOund 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
01.02 TRABAJOS PRELIMINARES
01.02.01 DEMOLICIÓN DE VEREDAS m2 232.93 232.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.93 0.00
01.02.02 DEMOLICIÓN DE PISO DE CEMENTO PULIDO m2 343.52 343.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 343.52 0.00
01.02.03 DEMOLICIÓN DE COLUMNAS DE CONCRETO m3 4.70 4.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 0.00
01.02.04 DEMOLICIÓN DE VIGAS DE CONCRETO m3 14.11 14.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.11 0.00
01.02.05 DEMOLICIÓN DE LOSA ALIGERADA m2 349.75 349.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 349.75 0.00
01.02.06 DEMOLICION DE MUROS DE LADRILLO DE ARCILLA m2 231.79 231.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 231.79 0.00
01.02.07 DEMOLICION DE MUROS DE ADOBE m2 40.84 40.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.84 0.00
01.02.08 DEMOLICION DE LOSA DEPORTIVA m2 242.00 242.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 242.00 0.00
01.02.09 DEMOLICIÓN DE CERCO PERIMÉTRICO m2 118.97 0.00 0.00 94.16 0.00 0.00 24.81 0.00 0.00 0.00 118.97 0.00
01.02.10 DESMONTAJE DE PUERTAS DE MADERA und 12.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00
01.02.11 DESMONTAJE DE VENTANAS METÁLICAS m2 79.56 79.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.56 0.00
01.02.12 ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST.= 5 KM.m3 260.69 241.66 0.00 15.06 0.00 0.00 3.97 0.00 0.00 0.00 260.69 0.00
01.02.13 LIMPIEZA DE TERRENO MANUAL m2 1,259.00 1,170.23 0.00 42.53 0.00 0.00 46.24 0.00 0.00 0.00 1,259.00 0.00
01.02.14 TRAZO, NIVELES Y REPLANTEO m2 1,313.81 680.70 0.00 42.53 0.00 274.09 316.49 0.00 0.00 0.00 1,313.81 0.00
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE Y NIVELACIÓN DEL TERRENO CON MAQUINARIA m3 122.02 122.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.02 0.00
01.03.02 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 132.63 43.86 0.00 42.53 0.00 38.56 7.68 0.00 0.00 0.00 132.63 0.00
01.03.03 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 2.30 M m3 543.09 320.36 222.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.09 0.00
01.03.04 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 1.80 M m3 36.00 0.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 0.00 36.00 0.00
01.03.05 EXCAVACION DE ZANJA PARA VIGAS DE CONEXIÓN m3 123.91 25.62 25.72 53.43 0.00 0.00 19.14 0.00 0.00 0.00 123.91 0.00
01.03.06 EXCAVACION PERIMETRAL DE LOSA m3 27.80 0.00 0.00 0.00 0.00 0.00 27.80 0.00 0.00 0.00 27.80 0.00
01.03.07 AFIRMADO DE 4" PARA LOSA DEPORTIVA m2 270.25 0.00 0.00 0.00 0.00 0.00 270.25 0.00 0.00 0.00 270.25 0.00
01.03.08 RELLENO Y COMPACTADO C/EQUIPO LIVIANO, C/MATERIAL PROPIO m3 462.67 0.00 315.17 24.69 0.00 21.52 101.29 0.00 0.00 0.00 462.67 0.00
01.03.09 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 551.44 308.35 212.23 30.86 0.00 0.00 0.00 0.00 0.00 0.00 551.44 0.00
01.03.10 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 547.87 272.53 17.05 96.81 0.00 90.00 71.48 0.00 0.00 0.00 547.87 0.00
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 SOBRECIMIENTOS
01.04.01.01 CONCRETO EN SOBRECIMIENTO 1:8 C:H + 25% PM m3 16.35 0.00 4.51 7.17 0.00 2.36 2.31 0.00 0.00 0.00 16.35 0.00
01.04.01.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 246.08 0.00 77.14 106.79 0.00 32.15 30.00 0.00 0.00 0.00 246.08 0.00
01.04.02 CIMIENTOS
01.04.02.01 CIMIENTOS CORRIDOS; MEZCLA 1:10, C:H + 30% P.M. m3 48.54 0.00 5.09 15.30 0.00 18.15 10.00 0.00 0.00 0.00 48.54 0.00
01.04.03 SOLADOS
01.04.03.01 SOLADOS PARA ZAPATAS h = 10 cm m2 256.16 83.01 120.17 32.94 0.00 12.58 7.46 0.00 0.00 0.00 256.16 0.00
01.04.03.02 SOLADOS PARA VIGA DE CONEXION h = 20 cm m2 60.07 38.07 7.63 14.37 0.00 0.00 0.00 0.00 0.00 0.00 60.07 0.00
01.04.04 LOSA DEPORTIVA
01.04.04.01 CONCRETO FC=175 KG/CM2 EN LOSA DEPORTIVA m3 40.54 0.00 0.00 0.00 0.00 0.00 40.54 0.00 0.00 0.00 40.54 0.00
01.04.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DEPORTIVA m2 66.10 0.00 0.00 0.00 0.00 0.00 66.10 0.00 0.00 0.00 66.10 0.00
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 ZAPATAS: CONCRETO, f´c= 210 kg/cm2 m3 128.06 0.00 82.21 35.86 0.00 6.50 3.49 0.00 0.00 0.00 128.06 0.00
01.05.01.02 ACERO PARA ZAPATAS Fy= 4200kg/cm2 kg 3,025.05 1,092.20 988.01 680.70 0.00 186.56 77.58 0.00 0.00 0.00 3,025.05 0.00
01.05.02 VIGAS DE CONEXIÓN
01.05.02.01 CONCRETO EN VIGAS DE CONEXIÓN F´c= 210kg/cm2 m3 26.31 0.00 16.37 9.94 0.00 0.00 0.00 0.00 0.00 0.00 26.31 0.00
01.05.02.02 ACERO EN VIGAS DE CCONEXIÓN Fy= 4200kg/cm2 kg 2,314.89 0.00 1,059.80 1,255.12 -0.03 0.00 0.00 0.00 0.00 0.00 2,314.89 0.00
01.05.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN m2 26.28 0.00 4.59 21.69 0.00 0.00 0.00 0.00 0.00 0.00 26.28 0.00
01.05.03 COLUMNAS DE ARRIOSTRE
01.05.03.01 CONCRETO EN COLUMNAS DE ARRIOSTRE F´c= 175kg/cm2 m3 9.55 0.00 0.00 0.00 3.71 5.84 0.00 0.00 0.00 0.00 9.55 0.00
01.05.03.02 ACERO EN COLUMNAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 2,179.95 0.00 749.35 148.02 321.75 960.83 0.00 0.00 0.00 0.00 2,179.95 0.00
01.05.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE ARRIOSTRE m2 146.92 0.00 0.00 0.00 57.12 89.80 0.00 0.00 0.00 0.00 146.92 0.00
01.05.04 VIGAS DE ARRIOSTRE
01.05.04.01 CONCRETO VIGAS DE ARRIOSTRE F´c= 175kg/cm2 m3 7.42 0.00 0.00 0.00 3.62 2.80 1.00 0.00 0.00 0.00 7.42 0.00
01.05.04.02 ACERO EN VIGAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 479.49 0.00 0.00 0.00 260.96 188.53 30.00 0.00 0.00 0.00 479.49 0.00
01.05.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE ARRIOSTRE m2 114.19 0.00 0.00 0.00 55.71 36.40 22.08 0.00 0.00 0.00 114.19 0.00
01.05.05 COLUMNAS
01.05.05.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 56.45 0.00 10.13 20.65 12.75 8.38 4.54 0.00 0.00 0.00 56.45 0.00
01.05.05.02 ACERO EN COLUMNAS Fy= 4200kg/cm2 kg 6,280.18 0.00 3,337.55 241.02 1,066.34 1,588.45 46.82 0.00 0.00 0.00 6,280.18 0.00
01.05.05.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 694.60 0.00 110.72 231.14 143.83 170.12 38.79 0.00 0.00 0.00 694.60 0.00
01.05.06 VIGAS
01.05.06.01 CONCRETO EN VIGAS F´c= 210kg/cm2 m3 105.45 0.00 0.00 19.76 51.74 32.14 1.81 0.00 0.00 0.00 105.45 0.00
01.05.06.02 ACERO EN VIGAS Fy= 4200kg/cm2 kg 12,052.90 0.00 0.00 3,398.60 5,432.87 3,019.85 201.58 0.00 0.00 0.00 12,052.90 0.00
01.05.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 860.94 0.00 0.00 236.36 402.54 209.58 12.47 0.00 0.00 0.00 860.94 0.00
01.05.07 RAMPA DE ACCESO
01.05.07.01 CONCRETO EN RAMPA DE ACCESO S F'C=210 KG/CM2 m3 39.06 0.00 0.00 0.00 0.00 0.00 39.06 0.00 0.00 0.00 39.06 0.00
01.05.07.02 ACERO EN RAMPA DE ACCESO F'y = 4200 KG/CM2 kg 462.68 0.00 0.00 0.00 0.00 0.00 462.68 0.00 0.00 0.00 462.68 0.00
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
01.05.07.03 ENCOFRADO Y DESENCOFRADO DE RAMPA DE ACCESO m2 52.47 0.00 0.00 0.00 0.00 0.00 52.47 0.00 0.00 0.00 52.47 0.00
01.05.08 PUENTE DE ACCESO AL MÓDULO II
01.05.08.01 CONCRETO EN PUENTE DE ACCESO S F'C=210 KG/CM2 m3 12.23 0.00 0.00 0.00 0.00 12.23 0.00 0.00 0.00 0.00 12.23 0.00
01.05.08.02 ACERO EN PUENTE DE ACCESO F'y = 4200 KG/CM2 kg 462.71 0.00 0.00 0.00 0.00 462.71 0.00 0.00 0.00 0.00 462.71 0.00
01.05.08.03 ENCOFRADO Y DESENCOFRADO DE PUENTE DE ACCESO m2 57.75 0.00 0.00 0.00 0.00 57.75 0.00 0.00 0.00 0.00 57.75 0.00
01.05.09 LOSA ALIGERADA e = 0.25 M
01.05.09.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 m3 58.33 0.00 0.00 26.57 31.76 0.00 0.00 0.00 0.00 0.00 58.33 0.00
01.05.09.02 ACERO EN LOSA ALIGERADA FY = 4200 KG/CM2 kg 4,845.00 0.00 0.00 2,333.18 2,511.82 0.00 0.00 0.00 0.00 0.00 4,845.00 0.00
01.05.09.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 530.26 0.00 0.00 241.55 288.71 0.00 0.00 0.00 0.00 0.00 530.26 0.00
01.05.09.04 LADRILLO HUECO DE 20 x 30 x 30 CM EN LOSA ALIGERADA und 4,417.07 0.00 0.00 2,012.11 2,404.96 0.00 0.00 0.00 0.00 0.00 4,417.07 0.00
01.05.10 ESCALERAS
01.05.10.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 7.92 0.00 0.00 0.00 7.92 0.00 0.00 0.00 0.00 0.00 7.92 0.00
01.05.10.02 ACERO EN ESCALERA FY = 4200 KG/CM2 kg 658.03 0.00 0.00 0.00 658.03 0.00 0.00 0.00 0.00 0.00 658.03 0.00
01.05.10.03 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 60.04 0.00 0.00 0.00 60.04 0.00 0.00 0.00 0.00 0.00 60.04 0.00
01.06 ESTRUCTURAS DE MADERA Y COBERTURA
01.06.01 ESTRUCTURAS DE MADERA
01.06.01.01 TIJERALES DE MADERA TORNILLO DE 2”X6” S/DISEÑO p2 755.01 0.00 0.00 0.00 0.00 0.00 755.01 0.00 0.00 0.00 755.01 0.00
01.06.01.02 CORREAS DE MADERA TORNILLO 2" x 3" p2 320.20 0.00 0.00 0.00 0.00 0.00 320.20 0.00 0.00 0.00 320.20 0.00
01.06.01.03 FRISOS DE MADERA TORNILLO E=1”x8” p2 64.80 0.00 0.00 0.00 0.00 0.00 64.80 0.00 0.00 0.00 64.80 0.00
01.06.01.04 FRISOS DE MADERA TORNILLO E=1”x3” p2 17.38 0.00 0.00 0.00 0.00 0.00 17.38 0.00 0.00 0.00 17.38 0.00
01.06.02 COBERTURA
01.06.02.01 COBERTURA CON FLEXIFORTE m2 632.41 0.00 0.00 0.00 0.00 0.00 632.41 0.00 0.00 0.00 632.41 0.00
01.06.02.02 CUMBRERA CON FLEXIFORTE m2 25.50 0.00 0.00 0.00 0.00 0.00 25.50 0.00 0.00 0.00 25.50 0.00
01.07 ESTRUCTURAS METÁLICAS
01.07.01 SUMINISTRO E INSTALACIÓN DE ESTRUCTURAS METÁLICAS PARA LOSA DEPORTIVA (AROS Y POSTES METÁLICOS PARA VOLEY Y BASQUET)GLB 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 1,316.88 0.00 0.00 98.66 798.38 315.08 104.76 0.00 0.00 0.00 1,316.88 0.00
02.02 OBRAS ESPECIALES DE ARQUITECTURA
02.02.01 MESAS DE TRABAJO
02.02.01.01 MESAS DE TRABAJO: CONCRETO F´c= 175 kg/cm2 m3 0.65 0.00 0.00 0.00 0.00 0.00 0.65 0.00 0.00 0.00 0.65 0.00
02.02.01.02 MESAS DE TRABAJO: ACERO Fy= 4200 kg/cm2 kg 36.43 0.00 0.00 0.00 0.00 0.00 36.43 0.00 0.00 0.00 36.43 0.00
02.02.01.03 MESAS DE TRABAJO: ENCOFRADO Y DESENCOFRADO m2 6.46 0.00 0.00 0.00 0.00 0.00 6.46 0.00 0.00 0.00 6.46 0.00
02.02.02 GÁRGOLAS
02.02.02.01 GÁRGOLAS: CONCRETO F´c= 175 kg/cm2 m3 0.02 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0.00 0.00 0.02 0.00
02.02.02.02 GÁRGOLAS: ACERO Fy= 4200 kg/cm2 kg 16.10 0.00 0.00 0.00 0.00 0.00 16.10 0.00 0.00 0.00 16.10 0.00
02.02.02.03 GÁRGOLAS: ENCOFRADO Y DESENCOFRADO m2 0.99 0.00 0.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.99 0.00
02.03 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.01 TARRAJEO PRIMARIO
02.03.01.01 TARRAJEO PRIMARIO, MORTERO C:A, 1:5 m2 306.55 0.00 0.00 0.00 85.53 125.42 95.60 0.00 0.00 0.00 306.55 0.00
02.03.02 TARRAJEO EN EXTERIORES
02.03.02.01 TARRAJEO EN MUROS EXTERIORES m2 400.30 0.00 0.00 0.00 0.00 0.00 400.30 0.00 0.00 0.00 400.30 0.00
02.03.02.02 TARRAJEO EN RAMPA m2 46.80 0.00 0.00 0.00 0.00 0.00 46.80 0.00 0.00 0.00 46.80 0.00
02.03.02.03 TARRAJEO EN PUENTE DE ACCESO m2 57.75 0.00 0.00 0.00 0.00 0.00 57.75 0.00 0.00 0.00 57.75 0.00
02.03.03 TARRAJEO EN INTERIORES
02.03.03.01 TARRAJEO EN MUROS INTERIORES m2 929.05 0.00 0.00 0.00 223.37 413.44 292.24 0.00 0.00 0.00 929.05 0.00
02.03.04 TARRAJEO DE VIGAS
02.03.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 801.20 0.00 0.00 0.00 161.82 352.88 286.51 0.00 0.00 0.00 801.20 0.00
02.03.04.02 VESTIDURA DE ARISTAS EN VIGAS m 671.46 0.00 0.00 0.00 107.60 201.07 362.79 0.00 0.00 0.00 671.46 0.00
02.03.05 TARRAJEO DE COLUMNAS
02.03.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS m2 371.22 0.00 0.00 0.00 47.60 78.16 245.46 0.00 0.00 0.00 371.22 0.00
02.03.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 1,051.52 0.00 0.00 0.00 201.60 473.40 376.52 0.00 0.00 0.00 1,051.52 0.00
02.03.06 TARRAJEO EN MESAS DE TRABAJO
02.03.06.01 TARRAJEO PRIMARIO EN MESAS DE TRABAJO m2 6.46 0.00 0.00 0.00 0.00 0.00 6.46 0.00 0.00 0.00 6.46 0.00
02.03.07 TARRAJEO DE CIELORASOS
02.03.07.01 CIELORRASOS CON MEZCLA DE C:A, 1:5 m2 400.49 0.00 0.00 0.00 197.07 203.42 0.00 0.00 0.00 0.00 400.49 0.00
02.03.07.02 VESTIDURA EN FONDO DE ESCALERA m2 43.92 0.00 0.00 0.00 0.00 0.00 43.92 0.00 0.00 0.00 43.92 0.00
02.03.08 ENCHAPE EN MESAS DE TRABAJO C/CERÁMICO 20 x 20
02.03.08.01 ENCHAPE EN MESAS DE TRABAJO C/CERAMICO 20x20cm m2 6.46 0.00 0.00 0.00 0.00 0.00 6.46 0.00 0.00 0.00 6.46 0.00
02.03.09 DERRAMES
02.03.09.01 VESTIDURA DE DERRAMES EN VANOS Y PUERTAS m2 78.75 0.00 0.00 0.00 21.36 35.12 22.27 0.00 0.00 0.00 78.75 0.00
02.03.10 BRUÑAS
02.03.10.01 BRUÑAS E=1.0 CM EN PARED m 732.44 0.00 0.00 0.00 202.50 308.10 221.84 0.00 0.00 0.00 732.44 0.00
02.04 PISOS Y PAVIMENTOS
02.04.01 FALSO PISO
02.04.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 439.16 0.00 112.92 326.24 0.00 0.00 0.00 0.00 0.00 0.00 439.16 0.00
02.04.02 PISOS
02.04.02.01 PISO DE CERÁMICO .30 x .30 cm m2 64.41 0.00 0.00 0.00 0.00 0.00 64.41 0.00 0.00 0.00 64.41 0.00
02.04.02.02 PISO DE CEMENTO PULIDO BRUÑADO m2 832.70 0.00 0.00 0.00 398.62 0.00 434.08 0.00 0.00 0.00 832.70 0.00
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
02.04.03 VEREDAS
02.04.03.01 EXCAVACIÓN DE ZANJAS PARA SARDINELES DE VEREDAS m3 170.38 0.00 0.00 0.00 0.00 0.00 170.38 0.00 0.00 0.00 170.38 0.00
02.04.03.02 AFIRMADO DE 4" PARA VEREDAS C/EQUIPO m2 268.22 0.00 0.00 0.00 0.00 0.00 268.22 0.00 0.00 0.00 268.22 0.00
02.04.03.03 VEREDA DE CONCRETO DE 4" m2 268.22 0.00 0.00 0.00 0.00 0.00 268.22 0.00 0.00 0.00 268.22 0.00
02.04.03.04 ENCOFRADO Y DESENCOFRADO m2 111.08 0.00 0.00 0.00 0.00 0.00 111.08 0.00 0.00 0.00 111.08 0.00
02.04.03.05 JUNTAS DE CONSTRUCCIÓN EN VEREDAS E = 1" m 88.78 0.00 0.00 0.00 0.00 0.00 88.78 0.00 0.00 0.00 88.78 0.00
02.05 CONTRAZÓCALOS Y ZÓCALOS
02.05.01 CONTRAZOCALOS
02.05.01.01 CONTRAZOCALO CEMENTO FROTACHADO Y PINTADO H = 20 CM m 607.21 0.00 0.00 0.00 161.10 136.56 309.55 0.00 0.00 0.00 607.21 0.00
02.05.02 ZOCALOS
02.05.02.01 ZOCALO DE CERÁMICO DE 20 x 20 m2 306.55 0.00 0.00 0.00 0.00 0.00 306.55 0.00 0.00 0.00 306.55 0.00
02.05.03 JUNTAS DE DILATACIÓN
02.05.03.01 JUNTA DE DILATACION EN LOSA CON BREA m 209.00 0.00 0.00 0.00 0.00 0.00 209.00 0.00 0.00 0.00 209.00 0.00
02.06 CARPINTERIA METALICA
02.06.01 PUERTAS
02.06.01.01 PUERTA METÁLICA m2 227.43 0.00 0.00 0.00 0.00 47.36 180.07 0.00 0.00 0.00 227.43 0.00
02.06.01.02 COLOCACIÓN DE PUERTAS METÁLICAS und 176.52 0.00 0.00 0.00 0.00 0.00 176.52 0.00 0.00 0.00 176.52 0.00
02.06.02 VENTANAS
02.06.02.01 VENTANAS METÁLICAS m2 243.94 0.00 0.00 0.00 0.00 91.87 152.07 0.00 0.00 0.00 243.94 0.00
02.06.02.02 COLOCACIÓN DE VENTANAS METÁLICAS und 59.00 0.00 0.00 0.00 0.00 29.00 30.00 0.00 0.00 0.00 59.00 0.00
02.06.03 BARANDAS Y PASAMANOS
02.06.03.01 BARANDAS METÁLICAS m2 133.52 0.00 0.00 0.00 0.00 0.00 133.52 0.00 0.00 0.00 133.52 0.00
02.06.03.02 COLOCACIÓN DE BARANDAS METÁLICAS m2 133.52 0.00 0.00 0.00 0.00 0.00 133.52 0.00 0.00 0.00 133.52 0.00
02.07 CERRAJERIA
02.07.01 BISAGRAS
02.07.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 228.00 0.00 0.00 0.00 0.00 116.00 112.00 0.00 0.00 0.00 228.00 0.00
02.07.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 126.00 0.00 0.00 0.00 0.00 72.00 54.00 0.00 0.00 0.00 126.00 0.00
02.07.02 MANIJAS
02.07.02.01 MANIJA DE BRONCE DE 4" pza 42.00 0.00 0.00 0.00 0.00 24.00 18.00 0.00 0.00 0.00 42.00 0.00
02.08 CARPINTERIA DE MADERA
02.08.01 CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 MM m2 400.65 0.00 0.00 0.00 0.00 0.00 400.65 0.00 0.00 0.00 400.65 0.00
02.08.02 RODON DE MADERA DE 1/4 DE CIRCULO DE 3/4” x 3/4” m 392.57 0.00 0.00 0.00 0.00 0.00 392.57 0.00 0.00 0.00 392.57 0.00
02.09 CERRADURAS PARA PUERTAS
02.09.01 CERRADURA DE DOS GOLPES pza 4.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0.00
02.09.02 CERRADURA DE TRES GOLPES pza 13.00 0.00 0.00 0.00 0.00 6.00 7.00 0.00 0.00 0.00 13.00 0.00
02.09.03 CERRADURA TIPO BOLA pza 20.00 0.00 0.00 0.00 0.00 14.00 6.00 0.00 0.00 0.00 20.00 0.00
02.09.04 PICAPORTE pza 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
02.10 VIDRIOS, CRISTALES Y SIMILARES
02.10.01 VIDRIOS EN VENTANAS
02.10.01.01 VIDRIO SEMIDOBLE p2 2,624.81 0.00 0.00 0.00 0.00 0.00 2,624.81 0.00 0.00 0.00 2,624.81 0.00
02.11 PINTURA
02.11.01 PINTURA LÁTEX EN INTERIORES m2 1,865.07 0.00 0.00 0.00 0.00 0.00 1,865.07 0.00 0.00 0.00 1,865.07 0.00
02.11.02 PINTURA LÁTEX EN EXTERIORES m2 567.66 0.00 0.00 0.00 0.00 0.00 567.66 0.00 0.00 0.00 567.66 0.00
02.11.03 PINTURA LÁTEX 2 MANOS EN CIELO RASO m2 801.14 0.00 0.00 0.00 0.00 0.00 801.14 0.00 0.00 0.00 801.14 0.00
02.11.04 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 93.92 0.00 0.00 0.00 0.00 0.00 93.92 0.00 0.00 0.00 93.92 0.00
02.11.05 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 243.94 0.00 0.00 0.00 0.00 0.00 243.94 0.00 0.00 0.00 243.94 0.00
02.11.06 PINTURA ÓLEO MATE EN BARANDAS METÁLICAS m2 133.52 0.00 0.00 0.00 0.00 0.00 133.52 0.00 0.00 0.00 133.52 0.00
02.11.07 PINTURA DE MARCACIÓN DE LOSA MULTIDEPORTIVA m 400.95 0.00 0.00 0.00 0.00 0.00 400.95 0.00 0.00 0.00 400.95 0.00
02.12 VARIOS
02.12.01 PIZARRA ACRÍLICA, 5.00x1.20m und 11.00 0.00 0.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 11.00 0.00
02.12.02 LIMPIEZA FINAL DE OBRA m2 581.04 0.00 0.00 0.00 0.00 0.00 0.00 581.04 0.00 0.00 581.04 0.00
03 INSTALACIONES SANITARIAS
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 81.73 0.00 0.00 32.50 49.23 0.00 0.00 0.00 0.00 0.00 81.73 0.00
03.01.02 TRAZO, NIVELES Y REPLANTEO m2 81.73 0.00 0.00 32.50 49.23 0.00 0.00 0.00 0.00 0.00 81.73 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 14.67 0.00 0.00 9.75 4.92 0.00 0.00 0.00 0.00 0.00 14.67 0.00
03.02.02 EXCAVACIÓN DE ZANJAS PARA CUNETAS m3 19.69 0.00 0.00 0.00 19.69 0.00 0.00 0.00 0.00 0.00 19.69 0.00
03.02.03 EXCAVACIÓN DE ZANJA PARA CISTERNA Y TANQUE ELEVADO m3 38.98 0.00 0.00 38.98 0.00 0.00 0.00 0.00 0.00 0.00 38.98 0.00
03.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 24.61 0.00 0.00 0.00 24.61 0.00 0.00 0.00 0.00 0.00 24.61 0.00
03.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 73.33 0.00 0.00 48.72 24.61 0.00 0.00 0.00 0.00 0.00 73.33 0.00
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS
03.03.01.01 SOLADO MEZCLA 1:12, C:H, e = 4" m2 17.40 0.00 0.00 0.00 17.40 0.00 0.00 0.00 0.00 0.00 17.40 0.00
03.04 OBRAS DE CONCRETO ARMADO
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
03.04.01 CIMIENTOS ARMADOS
03.04.01.01 CONCRETO EN CIMIENTOS, f´c= 175 kg/cm2 m3 8.22 0.00 0.00 0.00 8.22 0.00 0.00 0.00 0.00 0.00 8.22 0.00
03.04.01.02 ACERO EN CIMIENTOS Fy= 4200 kg/cm2 kg 3,468.33 0.00 0.00 0.00 3,468.33 0.00 0.00 0.00 0.00 0.00 3,468.33 0.00
03.04.02 CUNETAS
03.04.02.01 CONCRETO EN CUNETAS F´c= 175 kg/cm2 m3 3.94 0.00 0.00 0.00 0.00 0.00 3.94 0.00 0.00 0.00 3.94 0.00
03.04.02.02 ACERO PARA CUNETAS Fy= 4200 kg/cm2 kg 459.13 0.00 0.00 0.00 0.00 0.00 459.13 0.00 0.00 0.00 459.13 0.00
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 156.75 0.00 0.00 0.00 0.00 0.00 156.75 0.00 0.00 0.00 156.75 0.00
03.04.03 COLUMNAS DE SOPORTE DE TUBERÍAS DE BAJADA
03.04.03.01 CONCRETO EN COLUMNAS DE SOPORTE F´c= 175 kg/cm2 m3 0.80 0.00 0.00 0.00 0.00 0.00 0.80 0.00 0.00 0.00 0.80 0.00
03.04.03.02 ACERO EN COLUMNAS DE SOPORTE Fy= 4200 kg/cm2 kg 128.06 0.00 0.00 0.00 0.00 0.00 128.06 0.00 0.00 0.00 128.06 0.00
03.04.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE SOPORTE m2 11.20 0.00 0.00 0.00 0.00 0.00 11.20 0.00 0.00 0.00 11.20 0.00
03.04.04 CISTERNA
03.04.04.01 CONCRETO EN CISTERNA F´c= 210 kg/cm2 m3 7.48 0.00 0.00 0.00 7.48 0.00 0.00 0.00 0.00 0.00 7.48 0.00
03.04.04.02 ACERO EN CISTERNA Fy= 4200 kg/cm2 kg 478.45 0.00 0.00 0.00 478.45 0.00 0.00 0.00 0.00 0.00 478.45 0.00
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE CISTERNA m2 42.93 0.00 0.00 0.00 42.93 0.00 0.00 0.00 0.00 0.00 42.93 0.00
03.04.05 TANQUE ELEVADO
03.04.05.01 CONCRETO EN TANQUE ELEVADO F´c= 210kg/cm2 m3 13.90 0.00 0.00 0.00 13.90 0.00 0.00 0.00 0.00 0.00 13.90 0.00
03.04.05.02 ACERO EN TANQUE ELEVADO Fy= 4200kg/cm2 kg 1,298.26 0.00 0.00 0.00 1,298.26 0.00 0.00 0.00 0.00 0.00 1,298.26 0.00
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE TANQUE ELEVADO m2 158.17 0.00 0.00 0.00 158.17 0.00 0.00 0.00 0.00 0.00 158.17 0.00
03.04.05.04 RELLENO CON GRAVA SELECCIONADA m3 1.65 0.00 0.00 0.00 1.65 0.00 0.00 0.00 0.00 0.00 1.65 0.00
03.05 MUROS Y TABIQUES DE ALBAÑILERIA
03.05.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 5.50 0.00 0.00 0.00 5.50 0.00 0.00 0.00 0.00 0.00 5.50 0.00
03.06 REVOQUES ENLUCIDOS Y MOLDURAS
03.06.01 TARRAJEO PRIMARIO
03.06.01.01 TARRAJEO INTERIOR + IMPERMEABILIZANTE, MORTERO C:A, 1:5 m2 42.93 0.00 0.00 0.00 0.00 0.00 42.93 0.00 0.00 0.00 42.93 0.00
03.06.02 TARRAJEO EN EXTERIORES
03.06.02.01 TARRAJEO EN MUROS EXTERIORES m2 6.75 0.00 0.00 0.00 0.00 0.00 6.75 0.00 0.00 0.00 6.75 0.00
03.06.03 TARRAJEO EN INTERIORES
03.06.03.01 TARRAJEO EN MUROS INTERIORES m2 6.75 0.00 0.00 0.00 0.00 0.00 6.75 0.00 0.00 0.00 6.75 0.00
03.06.04 TARRAJEO DE VIGAS
03.06.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 42.56 0.00 0.00 0.00 0.00 0.00 42.56 0.00 0.00 0.00 42.56 0.00
03.06.04.02 VESTIDURA DE ARISTAS EN VIGAS m 121.60 0.00 0.00 0.00 0.00 0.00 121.60 0.00 0.00 0.00 121.60 0.00
03.06.05 TARRAJEO DE COLUMNAS
03.06.05.01 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 70.27 0.00 0.00 0.00 0.00 0.00 70.27 0.00 0.00 0.00 70.27 0.00
03.06.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 175.68 0.00 0.00 0.00 0.00 0.00 175.68 0.00 0.00 0.00 175.68 0.00
03.06.06 DERRAMES
03.06.06.01 VESTIDURA DE DERRAME EN VANOS Y PUERTAS m 1.64 0.00 0.00 0.00 0.00 0.00 1.64 0.00 0.00 0.00 1.64 0.00
03.07 PISOS Y PAVIMENTOS
03.07.01 FALSO PISO
03.07.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 5.27 0.00 0.00 0.00 0.00 5.27 0.00 0.00 0.00 0.00 5.27 0.00
03.07.02 PISOS
03.07.02.01 PISO DE CEMENTO PULIDO BRUÑADO m2 5.27 0.00 0.00 0.00 0.00 0.00 5.27 0.00 0.00 0.00 5.27 0.00
03.08 CARPINTERIA METALICA
03.08.01 PUERTAS
03.08.01.01 PUERTA METÁLICA m2 1.47 0.00 0.00 0.00 0.00 0.00 1.47 0.00 0.00 0.00 1.47 0.00
03.08.01.02 COLOCACIÓN DE PUERTAS und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.08.02 VENTANAS
03.08.02.01 VENTANAS METÁLICAS m2 1.23 0.00 0.00 0.00 0.00 0.00 1.23 0.00 0.00 0.00 1.23 0.00
03.08.02.02 COLOCACIÓN DE VENTANAS und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.08.03 ESCALERAS
03.08.03.01 ESCALERA DE GATO m2 5.85 0.00 0.00 0.00 0.00 0.00 5.85 0.00 0.00 0.00 5.85 0.00
03.08.03.02 COLOCACIÓN DE ESCALERA DE GATO und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.08.04 REJILLAS DE PROTECCIÓN
03.08.04.01 REJILLAS DE PROTECCIÓN DE CANALETA PLUVIAL m2 72.10 0.00 0.00 0.00 0.00 0.00 72.10 0.00 0.00 0.00 72.10 0.00
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
03.09 CERRAJERIA
03.09.01 BISAGRAS
03.09.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
03.09.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 3.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.00 0.00
03.09.02 MANIJAS
03.09.02.01 MANIJA DE BRONCE DE 4" pza 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 VIDRIO SEMIDOBLE p2 13.23 0.00 0.00 0.00 0.00 0.00 13.23 0.00 0.00 0.00 13.23 0.00
03.11 PINTURA
03.11.01 PINTURA LÁTEX EN INTERIORES m2 49.31 0.00 0.00 0.00 0.00 0.00 49.31 0.00 0.00 0.00 49.31 0.00
03.11.02 PINTURA LÁTEX EN EXTERIORES m2 77.02 0.00 0.00 0.00 0.00 0.00 77.02 0.00 0.00 0.00 77.02 0.00
03.11.03 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 1.47 0.00 0.00 0.00 0.00 0.00 1.47 0.00 0.00 0.00 1.47 0.00
03.11.04 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 1.23 0.00 0.00 0.00 0.00 0.00 1.23 0.00 0.00 0.00 1.23 0.00
03.12 APARATOS Y ACCESORIOS SANITARIOS
03.12.01 INODOROS
03.12.01.01 INODORO TANQUE BAJO BLANCO Y ACCESORIOS und 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
03.12.02 LAVATORIOS Y LAVADEROS
03.12.02.01 LAVATORIO DE PARED BLANCO pza 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
03.12.02.02 LAVADERO DE ACERO INOXIDABLE DE 01 POZA pza 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.12.03 ACCESORIOS SANITARIOS
03.12.03.01 PAPELERA DE LOZA DE COLOR DE 15 X 15 pza 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
03.12.03.02 JABONERA EMPOTRADA COLOR DE LOZA C/ASA DE 15 X 15 CM und 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
03.12.03.03 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO pza 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
03.12.03.04 DUCHAS CROMADAS DE CABEZA GIRATORIA pza 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
03.12.04 COLOCACION DE APARATOS SANITARIOS Y ACCESORIOS SANITARIOS
03.12.04.01 COLOCACION DE APARATOS SANITARIOS und 31.00 0.00 0.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 31.00 0.00
03.12.04.02 COLOCACION DE ACCESORIOS SANITARIOS und 51.00 0.00 0.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 51.00 0.00
03.12.04.03 EXTINGUIDOR - POLVO QUÍMICO 5 KG und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
03.13 SISTEMA DE DESAGUE
03.13.01 SALIDAS DE DESAGUE
03.13.01.01 SALIDA DE DESAGUE EN PVC 4" (INODORO) pto 15.00 0.00 0.00 12.00 3.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00
03.13.01.02 SALIDA DE DESAGUE EN PVC 2" (LAVAT. , LAVAD. Y URINARIOS) pto 25.00 0.00 0.00 16.00 9.00 0.00 0.00 0.00 0.00 0.00 25.00 0.00
03.13.01.03 SALIDA DE DESAGUE EN PVC 3" (SUMIDERO) pto 14.00 0.00 0.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 0.00
03.13.02 REDES DE DESAGUE
03.13.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x1.20m). m 92.20 0.00 0.00 24.35 67.85 0.00 0.00 0.00 0.00 0.00 92.20 0.00
03.13.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 92.20 0.00 0.00 24.35 67.85 0.00 0.00 0.00 0.00 0.00 92.20 0.00
03.13.02.03 TUBERIA DE PVC SAL 4" m 126.80 0.00 0.00 67.95 58.85 0.00 0.00 0.00 0.00 0.00 126.80 0.00
03.13.02.04 TUBERIA DE PVC SAL 3" m 16.20 0.00 0.00 16.20 0.00 0.00 0.00 0.00 0.00 0.00 16.20 0.00
03.13.02.05 TUBERIA DE PVC SAL 2" m 45.40 0.00 0.00 45.40 0.00 0.00 0.00 0.00 0.00 0.00 45.40 0.00
03.13.03 RED DE VENTILACIÓN
03.13.03.01 RED DE VENTILACIÓN EN PVC 2" m 44.60 0.00 0.00 44.60 0.00 0.00 0.00 0.00 0.00 0.00 44.60 0.00
03.13.04 ADITAMENTOS Y ACCESORIOS VARIOS
03.13.04.01 SUMIDERO CON TRAMPA P Y REJILLA DE 3" und 5.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.00 0.00
03.13.04.02 REGISTROS DE BRONCE DE 4" und 16.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 16.00 0.00
03.13.04.03 CODO DE 2" x 45° PVC pza 110.00 0.00 0.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00 110.00 0.00
03.13.04.04 YEE DE 2" PVC pza 35.00 0.00 0.00 35.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 0.00
03.13.04.05 YEE DE 4" CON REDUCCIÓN A 2" pza 47.00 0.00 0.00 47.00 0.00 0.00 0.00 0.00 0.00 0.00 47.00 0.00
03.13.04.06 YEE DE 4" CON REDUCCIÓN A 3" pza 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 0.00
03.13.04.07 YEE DE 3" CON REDUCCIÓN A 2" pza 22.00 0.00 0.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 0.00
03.13.04.08 CODOS DE 2" x 90° PVC pza 35.00 0.00 0.00 35.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 0.00
03.13.05 VARIOS
03.13.05.01 PRUEBA A RED DE DESAGUE GLB 3.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.00 0.00
03.13.05.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 17.00 0.00 0.00 1.00 0.00 14.00 2.00 0.00 0.00 0.00 17.00 0.00
03.14 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
03.14.01 SALIDA DE AGUA FRIA
03.14.01.01 SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 44.00 0.00 0.00 33.00 0.00 11.00 0.00 0.00 0.00 0.00 44.00 0.00
03.14.02 REDES DE ALIMENTACION
03.14.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x0.80m). m 114.77 0.00 0.00 0.00 114.77 0.00 0.00 0.00 0.00 0.00 114.77 0.00
03.14.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 114.77 0.00 0.00 0.00 114.77 0.00 0.00 0.00 0.00 0.00 114.77 0.00
03.14.02.03 TUBERIA PVC CLASE 10 - 3/4" CR SAP m 51.81 0.00 0.00 0.00 51.81 0.00 0.00 0.00 0.00 0.00 51.81 0.00
03.14.02.04 TUBERIA PVC CLASE 10 - 1 1/2" CR SAP m 62.96 0.00 0.00 0.00 62.96 0.00 0.00 0.00 0.00 0.00 62.96 0.00
03.14.03 REDES DE DISTRIBUCION
03.14.03.01 TUBERIA PVC CLASE 10 - 1/2" CR SAP m 68.61 0.00 0.00 68.61 0.00 0.00 0.00 0.00 0.00 0.00 68.61 0.00
03.14.04 ACCESORIOS DE REDES
03.14.04.01 CODO PVC CLASE 10 CR 90° x 1/2" und 65.00 0.00 0.00 30.00 35.00 0.00 0.00 0.00 0.00 0.00 65.00 0.00
03.14.04.02 TEE PVC - CLASE 10 CR 1/2" und 22.00 0.00 0.00 11.00 11.00 0.00 0.00 0.00 0.00 0.00 22.00 0.00
03.14.05 LLAVES Y VALVULAS
03.14.05.01 LLAVE DE COMPUERTA DE BRONCE 1/2" und 8.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00
03.14.05.02 UNION UNIVERSAL und 16.00 0.00 0.00 8.00 0.00 8.00 0.00 0.00 0.00 0.00 16.00 0.00
03.14.05.03 LLAVE PARA LAVADERO TIPO ESFERICA DE 1/2" und 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
03.14.05.04 LLAVE DE RIEGO CON GRIFO DE 1/2" und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
03.14.06 VARIOS
03.14.06.01 CAJA DE CONCRETO P/VALVULA DE COMPUERTA TAPA F° G° pza 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 0.00
03.14.06.02 PRUEBA HIDRAULICA+DESINFECCION GLB 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
03.15 SISTEMA DE AGUA DE LLUVIA - DRENAJE PLUVIAL
03.15.01 TUBERÍA DE BAJADA Y DISTRIBUCIÓN
03.15.01.01 CANALETA DE PLANCHA GALVANIZADA 1/32" m 86.85 0.00 0.00 0.00 0.00 0.00 86.85 0.00 0.00 0.00 86.85 0.00
03.15.01.02 TUBERÍA DE BAJADA PVC-SAL 4" P/LLUVIAS m 64.80 0.00 0.00 0.00 0.00 0.00 64.80 0.00 0.00 0.00 64.80 0.00
03.15.01.03 CODO PVC DE 90° x 4" pza 24.00 0.00 0.00 0.00 0.00 0.00 24.00 0.00 0.00 0.00 24.00 0.00
04 INSTALACIONES ELECTRICAS, TELEFÓNICAS Y DE COMUNICACIÓN
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO m2 1,295.50 0.00 0.00 0.00 1,295.50 0.00 0.00 0.00 0.00 0.00 1,295.50 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION, RELLENO DE ZANJA (0.70 x 0.60 M) m 80.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 80.00 0.00
04.02.02 EXCAVACION DE POZO PARA POSTE pzo 4.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00
04.02.03 EXCAVACION DE POZO PARA PUESTA A TIERRA pzo 2.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00
04.03 TUBERíAS DE PVC
04.03.01 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 40 mm m 15.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00
04.03.02 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 25 mm m 60.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 0.00 0.00 60.00 0.00
04.03.03 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 20 mm m 146.00 0.00 0.00 0.00 146.00 0.00 0.00 0.00 0.00 0.00 146.00 0.00
04.03.04 TUBERIA DE PVC SEL P/INST. ELÉCTRICAS 20 mm m 1,009.00 0.00 0.00 347.45 661.55 0.00 0.00 0.00 0.00 0.00 1,009.00 0.00
04.04 CABLES Y CONDUCTORES
04.04.01 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 16 MM2. ALIMENTADOR m 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
04.04.02 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 6 MM2. ALIMENTADOR m 60.00 0.00 0.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 60.00 0.00
04.04.03 CONDUCTOR DE DUPLEX CU N2XH 2-1 x 4 MM2. SUBALIMENTADOR m 72.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.00 0.00
04.04.04 CONDUCTOR DE CU LSOH 6 MM2. m 92.00 0.00 0.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 92.00 0.00
04.04.05 CONDUCTOR DE CU LSOH 4 MM2. m 878.00 0.00 0.00 0.00 0.00 0.00 878.00 0.00 0.00 0.00 878.00 0.00
04.04.06 CONDUCTOR DE CU LSOH 2.5 MM2. m 2,135.00 0.00 0.00 0.00 0.00 0.00 2,135.00 0.00 0.00 0.00 2,135.00 0.00
04.05 CAJAS DE PASE Y BUZONES DE REGISTRO
04.05.01 CAJA DE PASE, CAJA OCTOGONAL DE Fº Gº PES. DE 100 x 40 mm pto 7.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 0.00 0.00 7.00 0.00
04.05.02 CAJA DE PASE, CAJA CUADRADA DE Fº Gº PES. DE 200 x 200 mm pto 2.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00
04.05.03 BUZÓN DE REGISTRO DE C. A. DE 400 x 400 mm und 7.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 0.00 0.00 7.00 0.00
04.06 EQUIPO DE ALUMBRADO INTERIOR
04.06.01 EQUIPO CON FLUORESCENTES RECTOS T8 -3 x 36 W pto 52.00 0.00 0.00 0.00 0.00 0.00 52.00 0.00 0.00 0.00 52.00 0.00
04.06.02 EQUIPO CON FLUORESCENTES RECTOS T8 -2 x 18 W pto 18.00 0.00 0.00 0.00 0.00 0.00 18.00 0.00 0.00 0.00 18.00 0.00
04.06.03 CENTRO DELUZ EMPOTRADO CON LAMPARA CFL 23 W pto 32.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 32.00 0.00
04.06.04 CENTRO DE LUZ ADOSADO, FAROLA ESFERICA CON LAMPARA CFL 23 W pto 30.00 0.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 30.00 0.00
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
04.06.05 SISTEMA DE LUCES DE EMERGENCIA pto 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 0.00
04.07 EQUIPO DE ALUMBRADO EXTERIOR
04.07.01 EQUIPO DE ALUMBRADO EXTERIOR, FAROLA ESFERICA, POSTE C.A.C. 5 M. cjto 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00 0.00
04.07.02 EQUIPO DE ALUMBRADO LOSA DEPORTIVA, REFLECTORES, POSTE C.A.C. 11 Mcjto 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
04.08 TABLEROS Y SUB TABLEROS
04.08.01 TABLERO GENERAL (TG) und 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
04.08.02 SUB TABLERO DE DISTRIBUCIÓN (STD 1.1) und 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
04.08.03 SUB TABLERO DE DISTRIBUCIÓN (STD 1.2, STD 2.1, STD 2.2) und 3.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00
04.09 SALIDAS DE PARED - INTERRUPTORES
04.09.01 SALIDA DE PARED, P/INTERRUPTOR SIMPLE CAJA RECTANGULAR pto 9.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00 0.00
04.09.02 SALIDA DE PARED, P/INTERRUPTOR DOBLE CAJA RECTANGULAR pto 32.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00 0.00 0.00 32.00 0.00
04.09.03 SALIDA DE PARED, P/INTERRUPTOR TRIPLE CAJA RECTANGULAR pto 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
04.09.04 SALIDA DE PARED, P/INTERRUPTOR CONMUTACIÓN CAJA RECTANGULARpto 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00 0.00
04.10 SALIDAS PARA TOMACORRIENTES
04.10.01 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE CAJA RECTANGULAR pto 18.00 0.00 0.00 0.00 0.00 0.00 18.00 0.00 0.00 0.00 18.00 0.00
04.10.02 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE C/TOMA TIERRA, CAJA RECTANGULAR EN PAREDpto 86.00 0.00 0.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 86.00 0.00
04.11 EQUIPO DE PUESTA A TIERRA
04.11.01 EQUIPO DE PUESTA A TIERRA (PAT-1) und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
04.12 PRUEBAS ELÉCTRICAS FINALES
04.12.01 PRUEBAS DE AISLAMIENTO und 11.00 0.00 0.00 0.00 0.00 0.00 11.00 0.00 0.00 0.00 11.00 0.00
04.12.02 PRUEBAS DE RESISTIVIDAD DE PUESTA A TIERRA und 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 0.00
04.12.03 PRUEBAS DE CONTINUIDAD DE INSTALACIONES INTERIORES und 9.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00 0.00
04.12.04 PRUEBAS DE CORRIENTE Y BALANCEO DE CARGAS und 9.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00 0.00
04.13 TELEFONIA
04.13.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 4.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00
04.13.02 CONDUCTOR DE CU XPT DE 3 PARES (0.64 mm) Y TUBO PVC SEL 20 mm m 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
04.13.03 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 3.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00
04.13.04 TABLERO GENERAL DE TELEFONIA und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
04.14 SISTEMA DE INFORMATICA - DATA
04.14.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (INF) pto 12.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00
04.14.02 CONDUCTOR DE CU UTP - STP 4x24 AWG Y TUBO PVC SEL 25MM m 452.00 0.00 0.00 0.00 0.00 0.00 452.00 0.00 0.00 0.00 452.00 0.00
04.14.03 SALIDA EN PARED CAJA DE PASO (INF) pto 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
04.14.04 PANEL DE CONTROL DE INFORMÁTICA - TABLERO und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
04.15 SISTEMA DE TV - CABLE
04.15.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (TV) pto 15.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 15.00 0.00
04.15.02 CONDUCTOR DE CU COAXIAL RG59 Y TUBO PVC SEL 20 mm m 147.00 0.00 0.00 0.00 0.00 0.00 147.00 0.00 0.00 0.00 147.00 0.00
04.15.03 SALIDA DE PARED, C/CAJA DE PASO (TV) pto 8.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 0.00
04.15.04 PANEL DE CONTROL DE TV - CABLE (TABLERO) und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
04.16 SISTEMA DE ALARMA CONTRA INCENDIOS
04.16.01 SALIDA PARA SENSOR DE HUMO Y ELEVACIÓN DE TEMPERATURA pto 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
04.16.02 CONDUCTOR DE CU FPL-P 2x18AWG Y TUBO PVC SEL 20mm m 97.00 0.00 0.00 0.00 0.00 0.00 97.00 0.00 0.00 0.00 97.00 0.00
04.16.03 SALIDA DE PARED P/CAJA DE PASO (ACI) und 6.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00 0.00
04.16.04 SALIDA DE PARED P/PULSADOR, SEÑAL SONORA Y LUZ ESTROBOSCOPICAund 4.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00 0.00
04.16.05 PANEL DE MANDO AUTOMÁTICO DE ALARMA CONTRA INCENDIOS (ACI) und 2.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00 0.00
04.17 SISTEMA DE AUDIO
04.17.01 SALIDA DE TECHO, CAJA RECTANG. PARA ALTAVOZ DE 6 OHMIOS pto 4.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0.00
04.17.02 CONDUCTOR DE CU XT 2x0.64mm DIAM. Y TUBO PVC SEL 20 mm (AUDIO) m 75.00 0.00 0.00 0.00 0.00 0.00 75.00 0.00 0.00 0.00 75.00 0.00
04.17.03 SALIDA DE PARED P/CAJA DE PASO (AUDIO.) pto 4.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 4.00 0.00
04.17.04 CONTROL EMISOR CON AMPLIFICADOR Y /MICROFONOS (TABLERO) und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
05 MITIGACIÓN DE IMPACTO AMBIENTAL
05.01 PLAN DE MANEJO AMBIENTAL
05.01.01 MONITOREO A LA APLICACIÓN DE NORMAS DE COMPORTAMIENTO GLB 1.00 0.20 0.00 0.00 0.20 0.20 0.40 0.00 0.00 0.00 1.00 0.00
05.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES GLB 1.00 0.20 0.00 0.00 0.20 0.20 0.40 0.00 0.00 0.00 1.00 0.00
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
05.02 PLAN DE FORESTACIÓN Y REFORESTACIÓN
05.02.01 PLANTAS PARA PROTECCIÓN
05.02.01.01 TULIPAN AFRICANO
05.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.01.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 0.00
05.02.01.01.03 SIEMBRA DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 0.00
05.02.01.02 FICUS
05.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.02.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.02.03 SIEMBRA DE PLANTONES und 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.03 CHIFLERO
05.02.01.03.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
05.02.01.03.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 6.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00 0.00
05.02.01.03.03 SIEMBRA DE PLANTONES und 9.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00 0.00
05.02.01.04 ROSAS
05.02.01.04.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.04.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 0.00
05.02.01.04.03 SIEMBRA DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 10.00 0.00
05.02.01.05 BOTÓN DE ORO
05.02.01.05.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 0.00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 0.00 12.00 0.00
05.02.01.05.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.05.03 SIEMBRA DE PLANTONES und 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 20.00 0.00
05.02.01.06 GRASS AMERICANO
05.02.01.06.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 120.00 0.00 0.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 120.00 0.00
05.02.01.06.02 ADQUISICIÓN Y TRANSPORTE DE GRASS sac 16.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 16.00 0.00
05.02.01.06.03 SIEMBRA DE GRASS m2 120.00 0.00 0.00 0.00 0.00 0.00 87.04 32.96 0.00 0.00 120.00 0.00
05.02.01.07 CAMPANILLA AZUL
05.02.01.07.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 10.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 10.00 0.00
05.02.01.07.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 10.00 0.00
05.02.01.07.03 SIEMBRA DE PLANTONES und 10.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 10.00 0.00
05.03 SEÑALIZACIÓN
05.03.01 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 0.30 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00
05.03.02 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 1.00 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00
05.04 MANEJO DE CAMPAMENTO
05.04.01 CONTENEDORES DE RESIDUOS SÓLIDOS und 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00
05.04.02 MICRORELLENO SANITARIO und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
05.04.03 CLAUSURA DE MICRORELLENO SANITARIO und 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
05.04.04 IMPLEMENTACIÓN DE BOTIQUÍN GLB 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
05.04.05 ADQUISICIÓN DE EXTINTOR GLB 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00
05.05 MANEJO DE CANTERA
05.05.01 MANEJO DE ÁREA DE CANTERA DE RIO GLB 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00
05.06 EDUCACIÓN AMBIENTAL
05.06.01 CHARLA AL PERSONAL DE OBRA und 3.00 1.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 3.00 0.00
05.06.02 CHARLA A LOS BENEFICIARIOS und 2.00 1.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00
05.06.03 AFICHES AMBIENTALES und 500.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 0.00 500.00 0.00
05.06.04 POLOS CON LOGOTIPO AMBIENTAL und 100.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 0.00
05.07 PLAN DE SEGURIDAD
05.07.01 CINTAS DE SEGURIDAD PARA PROTECCIÓN DE OBRA rll 5.00 3.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 5.00 0.00
05.08 PROGRAMA DE ABANDONO
05.08.01 CIERRE DE CANTERA DE RIO GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00
05.08.02 TRATAMIENTO AMBIENTAL A LOS ACCESOS DE LA OBRA GLB 1.00 0.25 0.00 0.00 0.00 0.00 0.00 0.75 0.00 0.00 1.00 0.00
06.00 MOBILIARIO Y EQUIPAMIENTO
06.01 MOBILIARIO GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40 0.60 1.00 0.00
06.02 EQUIPAMIENTO CENTRO DE CÓMPUTO GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00
Obra
Ubicación
ITEM DESCRIPCION und PRESUPUESTO August 2011 September 2011 October 2011 November 2011 December 2011 January 2012 February 2012 March 2012 April 2012 Acumulado Saldo
: “RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E. ES`PECIAL NIÑO JESUS DE PRAGA DE HUÁNUCO,
PROVINCIA DE HUÁNUCO, HUÁNUCO”
: Jr. San Martín y Jr. José Crespo y Castillo
RESUMEN GENERAL DE METRADOS
06.03 EQUIPAMIENTO TALLERES GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.96 0.04 0.00 0.00 1.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN DE MATERIALES Y HERRAMIENTAS m2 16.00 61.84 989.44 16.00 989.44 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.01.02 CARTEL DE OBRA BANNER (GIGANTOGRAFIA) INCLUYE BASTIDORES Y PARANTES DE MADERA TORNILLO DE 2.40 x 3.60 M. SEGUN DISEÑOund 1.00 881.49 881.49 1.00 881.49 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0.00
01.02.01 DEMOLICION DE VEREDAS m2 232.93 4.53 1,055.17 232.93 1,055.17 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.02 DEMOLICION DE PISO DE CEMENTO PULIDO m2 343.52 4.13 1,418.74 343.52 1,418.74 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.03 DEMOLICION DE COLUMNAS DE CONCRETO m3 4.70 52.30 245.81 4.70 245.81 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.04 DEMOLICION DE VIGAS DE CONCRETO m3 14.11 52.30 737.95 14.11 737.95 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.05 DEMOLICION DE LOSA ALIGERADA m2 349.75 24.89 8,705.28 349.75 8,705.28 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.06 DEMOLICION DE MURO DE LADRILLO DE ARCILLA m2 231.79 17.43 4,040.10 231.79 4,040.10 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.07 DEMOLICION DE MURO DE ADOBE m2 40.84 4.76 194.40 40.84 194.40 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.08 DEMOLICION DE LOSA DEPORTIVA m2 242.00 3.01 728.42 242.00 728.42 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.09 DEMOLICION DE CERCO PERIMÉTRICO m2 118.97 17.43 2,073.65 0.00 0.00 0.00 0.00 0.00 0.00 94.16 1,641.21 79.15 0.00 0.00 0.00 0.00 0.00 0.00
01.02.10 DESMONTAJE DE PUERTAS DE MADERA und 12.00 8.44 101.28 12.00 101.28 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.11 DESMONTAJE DE VENTANAS METÁLICAS m2 79.56 4.51 358.82 79.56 358.82 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.12 ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST. = 5 KMm3 260.69 11.77 3,068.32 241.66 2,844.31 92.70 0.00 0.00 0.00 15.06 177.26 5.78 0.00 0.00 0.00 0.00 0.00 0.00
01.02.13 LIMPIEZA DE TERRENO MANUAL m2 1,259.00 0.84 1,057.56 1,170.23 982.99 92.95 0.00 0.00 0.00 42.53 35.73 3.38 0.00 0.00 0.00 0.00 0.00 0.00
01.02.14 TRAZO, NIVELES Y REPLANTEO m2 1,313.81 1.90 2,496.24 680.70 1,293.33 51.81 0.00 0.00 0.00 42.53 80.81 3.24 0.00 0.00 0.00 274.09 520.77 20.86
01.03 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00
01.03.01 CORTE Y NIVELACIÓN DEL TERRENO CON MAQUINARIA m3 122.02 2.47 301.39 122.02 301.39 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.02 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 132.63 22.52 2,986.83 43.86 987.73 33.07 0.00 0.00 0.00 42.53 957.78 32.07 0.00 0.00 0.00 38.56 868.37 29.07
01.03.03 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 2.30 M m3 543.09 33.76 18,334.72 320.36 10,815.35 58.99 222.73 7,519.36 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.04 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 1.80 M m3 36.00 28.94 1,041.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 1,041.84 100.00
01.03.05 EXCAVACION DE ZANJA PARA VIGAS DE CONEXION m3 123.91 25.33 3,138.64 25.62 648.95 20.68 25.72 651.49 20.76 53.43 1,353.38 43.12 0.00 0.00 0.00 0.00 0.00 0.00
01.03.06 EXCAVACION PERIMETRAL DE LOSA m3 27.80 22.52 626.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.07 AFIRMADO DE 4" PARA LOSA DEPORTIVA m2 270.25 9.48 2,561.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.08 RELLENO Y COMPACTADO C/EQUIPO LIVIANO, C/MATERIAL PROPIOm3 462.67 27.59 12,765.07 0.00 0.00 0.00 315.17 8,695.54 68.12 24.69 681.20 5.34 0.00 0.00 0.00 21.52 593.74 4.65
01.03.09 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 551.44 12.67 6,986.74 308.35 3,906.79 55.92 212.23 2,688.95 38.49 30.86 391.00 5.60 0.00 0.00 0.00 0.00 0.00 0.00
01.03.10 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 547.87 11.73 6,426.52 272.53 3,196.78 49.74 17.05 200.00 3.11 96.81 1,135.58 17.67 0.00 0.00 0.00 90.00 1,055.70 16.43
01.04 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00
01.04.01 SOBRECIMIENTO 0.00 0.00 0.00 0.00 0.00
01.04.01.01 CONCRETO EN SOBRECIMIENTO 1:8 + 25% P.M. m3 16.35 233.79 3,822.47 0.00 0.00 0.00 4.51 1,054.39 27.58 7.17 1,676.27 43.85 0.00 0.00 0.00 2.36 551.74 14.43
01.04.01.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 246.08 32.36 7,963.15 0.00 0.00 0.00 77.14 2,496.25 31.35 106.79 3,455.72 43.40 0.00 0.00 0.00 32.15 1,040.37 13.06
01.04.02 CIMIENTOS 0.00 0.00 0.00 0.00 0.00
01.04.02.01 CIMIENTOS CORRIDOS; MEZCLA 1:10, C:H + 30% P.M. m3 48.54 160.43 7,787.27 0.00 0.00 0.00 5.09 816.59 10.49 15.30 2,454.58 31.52 0.00 0.00 0.00 18.15 2,911.80 37.39
01.04.03 SOLADOS 0.00 0.00 0.00 0.00 0.00
01.04.03.01 SOLADO MEZCLA 1:12, C:H, PARA ZAPATAS H=10 CM m2 256.16 23.43 6,001.83 83.01 1,944.92 32.41 120.17 2,815.58 46.91 32.94 771.78 12.86 0.00 0.00 0.00 12.58 294.75 4.91
01.04.03.02 SOLADO MEZCLA 1:12, C:H, PARA VIGAS DE CONEXIÓN H=20 CMm2 60.07 41.07 2,467.07 38.07 1,563.53 63.38 7.63 313.36 12.70 14.37 590.18 23.92 0.00 0.00 0.00 0.00 0.00 0.00
01.04.04 LOSA DEPORTIVA 0.00 0.00 0.00 0.00 0.00
01.04.04.01 CONCRETO FC=175 KG/CM2 EN LOSA DEPORTIVA m3 40.54 266.83 10,817.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DEPORTIVA m2 66.10 32.37 2,139.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00
01.05.01 ZAPATAS 0.00 0.00 0.00 0.00 0.00
01.05.01.01 ZAPATAS: CONCRETO, f´c= 210 kg/cm2 m3 128.06 319.85 40,959.99 0.00 0.00 0.00 82.21 26,294.87 64.20 35.86 11,469.82 28.00 0.00 0.00 0.00 6.50 2,079.03 5.08
01.05.01.02 ACERO PARA ZAPATAS Fy= 4200kg/cm2 kg 3,025.05 4.27 12,916.96 1,092.20 4,663.69 36.11 988.01 4,218.80 32.66 680.70 2,906.59 22.50 0.00 0.00 0.00 186.56 796.61 6.17
01.05.02 VIGAS DE CONEXIÓN 0.00 0.00 0.00 0.00 0.00
01.05.02.01 CONCRETO EN VIGAS DE CONEXIÓN F´c= 210 kg/cm2 m3 26.31 313.77 8,255.29 0.00 0.00 0.00 16.37 5,136.41 62.22 9.94 3,118.87 37.78 0.00 0.00 0.00 0.00 0.00 0.00
01.05.02.02 ACERO EN VIGAS DE CONEXIÓN Fy= 4200kg/cm2 kg 2,314.89 4.27 9,884.58 0.00 0.00 0.00 1,059.80 4,525.35 45.78 1,255.12 5,359.36 54.22 -0.03 -0.13 0.00 0.00 0.00 0.00
VALORIZACIONES DE OBRA
December 2011November 2011ITEM DESCRIPCION
September 2011 October 2011PRESUPUESTO CONTRACTUAL
16 DE ABRIL 2012
S/. 1,866,744.92
August 2011
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
VALORIZACIONES DE OBRA
December 2011November 2011ITEM DESCRIPCION
September 2011 October 2011PRESUPUESTO CONTRACTUAL
16 DE ABRIL 2012
S/. 1,866,744.92
August 2011
01.05.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CONEXIÓN m2 26.28 34.28 900.88 0.00 0.00 0.00 4.59 157.35 17.47 21.69 743.53 82.53 0.00 0.00 0.00 0.00 0.00 0.00
01.05.03 COLUMNAS DE ARRIOSTRE 0.00 0.00 0.00 0.00 0.00
01.05.03.01 CONCRETO EN COLUMNAS DE ARRIOSTRE F´c= 175kg/cm2 m3 9.55 257.46 2,458.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.71 955.18 38.85 5.84 1,503.57 61.15
01.05.03.02 ACERO EN COLUMNAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 2,179.95 4.27 9,308.39 0.00 0.00 0.00 749.35 3,199.72 34.37 148.02 632.05 6.79 321.75 1,373.87 14.76 960.83 4,102.74 44.08
01.05.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE ARRIOSTREm2 146.92 34.47 5,064.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.12 1,968.93 38.88 89.80 3,095.41 61.12
01.05.04 VIGAS DE ARRIOSTRE 0.00 0.00 0.00 0.00 0.00
01.05.04.01 CONCRETO VIGAS DE ARRIOSTRE F´c= 175kg/cm2 m3 7.42 257.46 1,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.62 932.01 48.79 2.80 720.89 37.74
01.05.04.02 ACERO EN VIGAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 479.49 4.27 2,047.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.96 1,114.30 54.42 188.53 805.02 39.32
01.05.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE ARRIOSTRE m2 114.19 34.47 3,936.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.71 1,920.32 48.79 36.40 1,254.71 31.88
01.05.05 COLUMNAS 0.00 0.00 0.00 0.00 0.00
01.05.05.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 56.45 331.58 18,717.69 0.00 0.00 0.00 10.13 3,358.91 17.95 20.65 6,847.13 36.58 12.75 4,227.65 22.59 8.38 2,778.64 14.84
01.05.05.02 ACERO EN COLUMNAS Fy= 4200kg/cm2 kg 6,280.18 4.31 27,067.58 0.00 0.00 0.00 3,337.55 14,384.84 53.14 241.02 1,038.80 3.84 1,066.34 4,595.93 16.98 1,588.45 6,846.22 25.29
01.05.05.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 694.60 42.38 29,437.15 0.00 0.00 0.00 110.72 4,692.31 15.94 231.14 9,795.71 33.28 143.83 6,095.52 20.71 170.12 7,209.69 24.49
01.05.06 VIGAS 0.00 0.00 0.00 0.00 0.00
01.05.06.01 CONCRETO EN VIGAS F´c= 210kg/cm2 m3 105.45 306.22 32,290.90 0.00 0.00 0.00 0.00 0.00 0.00 19.76 6,050.91 18.74 51.74 15,843.82 49.07 32.14 9,841.91 30.48
01.05.06.02 ACERO EN VIGAS Fy= 4200kg/cm2 kg 12,052.90 4.43 53,394.35 0.00 0.00 0.00 0.00 0.00 0.00 3,398.60 15,055.80 28.20 5,432.87 24,067.60 45.08 3,019.85 13,377.94 25.05
01.05.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 860.94 38.25 32,930.96 0.00 0.00 0.00 0.00 0.00 0.00 236.36 9,040.77 27.45 402.54 15,397.16 46.76 209.58 8,016.24 24.34
01.05.07 RAMPA DE ACCESO 0.00 0.00 0.00 0.00 0.00
01.05.07.01 CONCRETO EN RAMPA DE ACCESO F´c= 210kg/cm2 m3 39.06 316.10 12,346.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.07.02 ACERO EN RAMPA DE ACCESO Fy= 4200kg/cm2 kg 462.68 4.43 2,049.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.07.03 ENCOFRADO Y DESENCOFRADO DE RAMPA DE ACCESO m2 52.47 38.25 2,006.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.08 PUENTE DE ACCESO 0.00 0.00 0.00 0.00 0.00
01.05.08.01 CONCRETO EN RAMPA DE ACCESO F´c= 210kg/cm2 m3 12.23 306.22 3,745.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.23 3,745.07 100.00
01.05.08.02 ACERO EN RAMPA DE ACCESO Fy= 4200kg/cm2 kg 462.71 4.43 2,049.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 462.71 2,049.81 100.00
01.05.08.03 ENCOFRADO Y DESENCOFRADO DE RAMPA DE ACCESO m2 57.75 38.25 2,208.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.75 2,208.94 100.00
01.05.09 LOSAS ALIGERADAS e=0.25 M 0.00 0.00 0.00 0.00 0.00
01.05.09.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 58.33 293.46 17,117.52 0.00 0.00 0.00 0.00 0.00 0.00 26.57 7,797.23 45.55 31.76 9,320.29 54.45 0.00 0.00 0.00
01.05.09.02 ACERO EN LOSAS ALIGERADA F'y = 4200 KG/CM2 kg 4,845.00 4.35 21,075.75 0.00 0.00 0.00 0.00 0.00 0.00 2,333.18 10,149.33 48.16 2,511.82 10,926.42 51.84 0.00 0.00 0.00
01.05.09.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 530.26 29.23 15,499.50 0.00 0.00 0.00 0.00 0.00 0.00 241.55 7,060.51 45.55 288.71 8,438.99 54.45 0.00 0.00 0.00
01.05.09.04 LADRILLO HUECO DE ARCILLA 20X30X30 CM EN LOSA ALIGERADAund 4,417.07 2.90 12,809.50 0.00 0.00 0.00 0.00 0.00 0.00 2,012.11 5,835.12 45.55 2,404.96 6,974.38 54.45 0.00 0.00 0.00
01.05.10 ESCALERAS 0.00 0.00 0.00 0.00 0.00
01.05.10.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 7.92 324.99 2,573.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.92 2,573.92 100.00 0.00 0.00 0.00
01.05.10.02 ACERO EN ESCALERA FY = 4200 KG/CM2 kg 658.03 4.34 2,855.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 658.03 2,855.85 100.00 0.00 0.00 0.00
01.05.10.03 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 60.04 33.22 1,994.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.04 1,994.53 100.00 0.00 0.00 0.00
01.06 ESTRUCTURAS DE MADERA Y COBERTURAS 0.00 0.00 0.00 0.00 0.00
01.06.01 ESTRUCTURAS DE MADERA 0.00 0.00 0.00 0.00 0.00
01.06.01.01 TIJERAL DE MADERA TORNILLO DE 2" x 6" S/DISEÑO p2 755.01 6.25 4,718.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.01.02 CORREAS DE MADERA TORNILLO DE 2" x 3" S/DISEÑO p2 320.20 6.18 1,978.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.01.03 FRISOS DE MADERA TORNILLO DE 1" x 8" p2 64.80 6.18 400.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.01.04 FRISOS DE MADERA TORNILLO DE 1" x 3" p2 17.38 6.18 107.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.02 COBERTURA 0.00 0.00 0.00 0.00 0.00
01.06.02.01 COBERTURA CON FLEXIFORTE m2 632.41 37.80 23,905.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.02.02 CUMBRERA CON FIBRAFORTE TIPO FLEXIFORTE ONDA 100 e=2.60 MM. L=1.10 m. A=0.52 m .m 25.50 31.88 812.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.07 ESTRUCTURAS METÁLICAS 0.00 0.00 0.00 0.00 0.00
01.07.01 SUMINISTRO E INSTALACIÓN DE ESTRUCTURAS METÁLICAS PARA LOSA DEPORTIVA (AROS Y POSTES METÁLICOS PARA VOLEY Y BASQUET)GLB 2.00 3,217.04 6,434.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 552,494.43
GASTOS GENERALES 9.00% S/. 49,724.50
52,606.66 93,220.07 118,304.01 121,576.54 79,311.52
7,138.048,389.814,734.60 10,647.36 10,941.89
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
VALORIZACIONES DE OBRA
December 2011November 2011ITEM DESCRIPCION
September 2011 October 2011PRESUPUESTO CONTRACTUAL
16 DE ABRIL 2012
S/. 1,866,744.92
August 2011
UTILIDADES 8.00% S/. 44,199.55
SUB TOTAL S/. 646,418.48
FACTOR DE RELACION 1.00000 S/. 646,418.48
I.G.V 18.00% S/. 116,355.33
TOTAL PRESUPUESTO S/. 762,773.81
4,208.53
61,549.79 109,067.49 138,415.69 142,244.55
7,457.61
92,794.48
11,078.96
9.52%
72,628.75
109,067.49
19,632.15
128,699.64
61,549.79
16.87%
9,464.32 9,726.12 6,344.92
138,415.69 142,244.55 92,794.48
24,914.82 25,604.02 16,703.01
163,330.51 167,848.57 109,497.49
21.41% 22.01% 14.36%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 ALMACEN DE MATERIALES Y HERRAMIENTAS m2 16.00 61.84 989.44
01.01.01.02 CARTEL DE OBRA BANNER (GIGANTOGRAFIA) INCLUYE BASTIDORES Y PARANTES DE MADERA TORNILLO DE 2.40 x 3.60 M. SEGUN DISEÑOund 1.00 881.49 881.49
01.02 TRABAJOS PRELIMINARES
01.02.01 DEMOLICION DE VEREDAS m2 232.93 4.53 1,055.17
01.02.02 DEMOLICION DE PISO DE CEMENTO PULIDO m2 343.52 4.13 1,418.74
01.02.03 DEMOLICION DE COLUMNAS DE CONCRETO m3 4.70 52.30 245.81
01.02.04 DEMOLICION DE VIGAS DE CONCRETO m3 14.11 52.30 737.95
01.02.05 DEMOLICION DE LOSA ALIGERADA m2 349.75 24.89 8,705.28
01.02.06 DEMOLICION DE MURO DE LADRILLO DE ARCILLA m2 231.79 17.43 4,040.10
01.02.07 DEMOLICION DE MURO DE ADOBE m2 40.84 4.76 194.40
01.02.08 DEMOLICION DE LOSA DEPORTIVA m2 242.00 3.01 728.42
01.02.09 DEMOLICION DE CERCO PERIMÉTRICO m2 118.97 17.43 2,073.65
01.02.10 DESMONTAJE DE PUERTAS DE MADERA und 12.00 8.44 101.28
01.02.11 DESMONTAJE DE VENTANAS METÁLICAS m2 79.56 4.51 358.82
01.02.12 ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST. = 5 KMm3 260.69 11.77 3,068.32
01.02.13 LIMPIEZA DE TERRENO MANUAL m2 1,259.00 0.84 1,057.56
01.02.14 TRAZO, NIVELES Y REPLANTEO m2 1,313.81 1.90 2,496.24
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE Y NIVELACIÓN DEL TERRENO CON MAQUINARIA m3 122.02 2.47 301.39
01.03.02 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 132.63 22.52 2,986.83
01.03.03 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 2.30 M m3 543.09 33.76 18,334.72
01.03.04 EXCAVACIÓN DE ZANJAS PARA ZAPATAS H = 1.80 M m3 36.00 28.94 1,041.84
01.03.05 EXCAVACION DE ZANJA PARA VIGAS DE CONEXION m3 123.91 25.33 3,138.64
01.03.06 EXCAVACION PERIMETRAL DE LOSA m3 27.80 22.52 626.06
01.03.07 AFIRMADO DE 4" PARA LOSA DEPORTIVA m2 270.25 9.48 2,561.97
01.03.08 RELLENO Y COMPACTADO C/EQUIPO LIVIANO, C/MATERIAL PROPIOm3 462.67 27.59 12,765.07
01.03.09 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 551.44 12.67 6,986.74
01.03.10 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 547.87 11.73 6,426.52
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 SOBRECIMIENTO
01.04.01.01 CONCRETO EN SOBRECIMIENTO 1:8 + 25% P.M. m3 16.35 233.79 3,822.47
01.04.01.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 246.08 32.36 7,963.15
01.04.02 CIMIENTOS
01.04.02.01 CIMIENTOS CORRIDOS; MEZCLA 1:10, C:H + 30% P.M. m3 48.54 160.43 7,787.27
01.04.03 SOLADOS
01.04.03.01 SOLADO MEZCLA 1:12, C:H, PARA ZAPATAS H=10 CM m2 256.16 23.43 6,001.83
01.04.03.02 SOLADO MEZCLA 1:12, C:H, PARA VIGAS DE CONEXIÓN H=20 CMm2 60.07 41.07 2,467.07
01.04.04 LOSA DEPORTIVA
01.04.04.01 CONCRETO FC=175 KG/CM2 EN LOSA DEPORTIVA m3 40.54 266.83 10,817.29
01.04.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DEPORTIVA m2 66.10 32.37 2,139.66
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 ZAPATAS: CONCRETO, f´c= 210 kg/cm2 m3 128.06 319.85 40,959.99
01.05.01.02 ACERO PARA ZAPATAS Fy= 4200kg/cm2 kg 3,025.05 4.27 12,916.96
01.05.02 VIGAS DE CONEXIÓN
01.05.02.01 CONCRETO EN VIGAS DE CONEXIÓN F´c= 210 kg/cm2 m3 26.31 313.77 8,255.29
01.05.02.02 ACERO EN VIGAS DE CONEXIÓN Fy= 4200kg/cm2 kg 2,314.89 4.27 9,884.58
VALORIZACIONES DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 989.44 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 881.49 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.93 1,055.17 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 343.52 1,418.74 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.70 245.81 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.11 737.95 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 349.75 8,705.28 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 231.79 4,040.10 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.84 194.40 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 242.00 728.42 100.00 0.00 0.00 0.00
24.81 432.44 20.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118.97 2,073.65 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 101.28 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.56 358.82 100.00 0.00 0.00 0.00
3.97 46.75 1.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.69 3,068.32 100.00 0.00 0.00 0.00
46.24 38.84 3.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,259.00 1,057.56 100.00 0.00 0.00 0.00
316.49 601.33 24.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,313.81 2,496.24 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.02 301.39 100.00 0.00 0.00 0.00
7.68 172.95 5.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.63 2,986.83 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.09 18,334.72 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 1,041.84 100.00 0.00 0.00 0.00
19.14 484.82 15.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.91 3,138.64 100.00 0.00 0.00 0.00
27.80 626.06 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.80 626.06 100.00 0.00 0.00 0.00
270.25 2,561.97 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 270.25 2,561.97 100.00 0.00 0.00 0.00
101.29 2,794.59 21.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 462.67 12,765.07 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 551.44 6,986.74 100.00 0.00 0.00 0.00
71.48 838.46 13.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 547.87 6,426.52 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
2.31 540.05 14.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.35 3,822.47 100.00 0.00 0.00 0.00
30.00 970.80 12.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 246.08 7,963.15 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
10.00 1,604.30 20.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.54 7,787.27 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
7.46 174.79 2.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 256.16 6,001.83 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.07 2,467.07 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
40.54 10,817.29 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.54 10,817.29 100.00 0.00 0.00 0.00
66.10 2,139.66 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.10 2,139.66 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
3.49 1,116.28 2.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.06 40,959.99 100.00 0.00 0.00 0.00
77.58 331.27 2.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,025.05 12,916.96 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.31 8,255.29 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,314.89 9,884.58 100.00 0.00 0.00 0.00
January 2012 February 2012 March 2012 April 2012 SALDO POR VALORIZARacumulado
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL
VALORIZACIONES DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
01.05.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CONEXIÓN m2 26.28 34.28 900.88
01.05.03 COLUMNAS DE ARRIOSTRE
01.05.03.01 CONCRETO EN COLUMNAS DE ARRIOSTRE F´c= 175kg/cm2 m3 9.55 257.46 2,458.74
01.05.03.02 ACERO EN COLUMNAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 2,179.95 4.27 9,308.39
01.05.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE ARRIOSTREm2 146.92 34.47 5,064.33
01.05.04 VIGAS DE ARRIOSTRE
01.05.04.01 CONCRETO VIGAS DE ARRIOSTRE F´c= 175kg/cm2 m3 7.42 257.46 1,910.35
01.05.04.02 ACERO EN VIGAS DE ARRIOSTRE Fy= 4200kg/cm2 kg 479.49 4.27 2,047.42
01.05.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE ARRIOSTRE m2 114.19 34.47 3,936.13
01.05.05 COLUMNAS
01.05.05.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 56.45 331.58 18,717.69
01.05.05.02 ACERO EN COLUMNAS Fy= 4200kg/cm2 kg 6,280.18 4.31 27,067.58
01.05.05.03 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 694.60 42.38 29,437.15
01.05.06 VIGAS
01.05.06.01 CONCRETO EN VIGAS F´c= 210kg/cm2 m3 105.45 306.22 32,290.90
01.05.06.02 ACERO EN VIGAS Fy= 4200kg/cm2 kg 12,052.90 4.43 53,394.35
01.05.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 860.94 38.25 32,930.96
01.05.07 RAMPA DE ACCESO
01.05.07.01 CONCRETO EN RAMPA DE ACCESO F´c= 210kg/cm2 m3 39.06 316.10 12,346.87
01.05.07.02 ACERO EN RAMPA DE ACCESO Fy= 4200kg/cm2 kg 462.68 4.43 2,049.67
01.05.07.03 ENCOFRADO Y DESENCOFRADO DE RAMPA DE ACCESO m2 52.47 38.25 2,006.98
01.05.08 PUENTE DE ACCESO
01.05.08.01 CONCRETO EN RAMPA DE ACCESO F´c= 210kg/cm2 m3 12.23 306.22 3,745.07
01.05.08.02 ACERO EN RAMPA DE ACCESO Fy= 4200kg/cm2 kg 462.71 4.43 2,049.81
01.05.08.03 ENCOFRADO Y DESENCOFRADO DE RAMPA DE ACCESO m2 57.75 38.25 2,208.94
01.05.09 LOSAS ALIGERADAS e=0.25 M
01.05.09.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 58.33 293.46 17,117.52
01.05.09.02 ACERO EN LOSAS ALIGERADA F'y = 4200 KG/CM2 kg 4,845.00 4.35 21,075.75
01.05.09.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 530.26 29.23 15,499.50
01.05.09.04 LADRILLO HUECO DE ARCILLA 20X30X30 CM EN LOSA ALIGERADAund 4,417.07 2.90 12,809.50
01.05.10 ESCALERAS
01.05.10.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 7.92 324.99 2,573.92
01.05.10.02 ACERO EN ESCALERA FY = 4200 KG/CM2 kg 658.03 4.34 2,855.85
01.05.10.03 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 60.04 33.22 1,994.53
01.06 ESTRUCTURAS DE MADERA Y COBERTURAS
01.06.01 ESTRUCTURAS DE MADERA
01.06.01.01 TIJERAL DE MADERA TORNILLO DE 2" x 6" S/DISEÑO p2 755.01 6.25 4,718.81
01.06.01.02 CORREAS DE MADERA TORNILLO DE 2" x 3" S/DISEÑO p2 320.20 6.18 1,978.84
01.06.01.03 FRISOS DE MADERA TORNILLO DE 1" x 8" p2 64.80 6.18 400.46
01.06.01.04 FRISOS DE MADERA TORNILLO DE 1" x 3" p2 17.38 6.18 107.41
01.06.02 COBERTURA
01.06.02.01 COBERTURA CON FLEXIFORTE m2 632.41 37.80 23,905.10
01.06.02.02 CUMBRERA CON FIBRAFORTE TIPO FLEXIFORTE ONDA 100 e=2.60 MM. L=1.10 m. A=0.52 m .m 25.50 31.88 812.94
01.07 ESTRUCTURAS METÁLICAS
01.07.01 SUMINISTRO E INSTALACIÓN DE ESTRUCTURAS METÁLICAS PARA LOSA DEPORTIVA (AROS Y POSTES METÁLICOS PARA VOLEY Y BASQUET)GLB 2.00 3,217.04 6,434.08
COSTO DIRECTO S/. 552,494.43
GASTOS GENERALES 9.00% S/. 49,724.50
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
January 2012 February 2012 March 2012 April 2012 SALDO POR VALORIZARacumulado
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.28 900.88 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.55 2,458.74 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,179.95 9,308.39 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.92 5,064.33 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.00 257.46 13.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.42 1,910.35 100.00 0.00 0.00 0.00
30.00 128.10 6.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 479.49 2,047.42 100.00 0.00 0.00 0.00
22.08 761.10 19.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.19 3,936.13 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
4.54 1,505.37 8.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.45 18,717.69 100.00 0.00 0.00 0.00
46.82 201.79 0.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,280.18 27,067.58 100.00 0.00 0.00 0.00
38.79 1,643.92 5.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 694.60 29,437.15 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.81 554.26 1.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 105.45 32,290.90 100.00 0.00 0.00 0.00
201.58 893.01 1.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,052.90 53,394.35 100.00 0.00 0.00 0.00
12.47 476.79 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 860.94 32,930.96 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
39.06 12,346.87 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.06 12,346.87 100.00 0.00 0.00 0.00
462.68 2,049.67 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 462.68 2,049.67 100.00 0.00 0.00 0.00
52.47 2,006.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.47 2,006.98 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.23 3,745.07 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 462.71 2,049.81 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.75 2,208.94 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.33 17,117.52 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,845.00 21,075.75 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.26 15,499.50 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,417.07 12,809.50 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.92 2,573.92 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 658.03 2,855.85 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.04 1,994.53 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
755.01 4,718.81 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 755.01 4,718.81 100.00 0.00 0.00 0.00
320.20 1,978.84 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.20 1,978.84 100.00 0.00 0.00 0.00
64.80 400.46 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.80 400.46 100.00 0.00 0.00 0.00
17.38 107.41 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.38 107.41 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
632.41 23,905.10 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 632.41 23,905.10 100.00 0.00 0.00 0.00
25.50 812.94 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.50 812.94 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
2.00 6,434.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 6,434.08 100.00 0.00 0.00 0.00
87,475.61 0.00 0.00 0.00 552,494.43 0.00
7,872.80 0.00 0.00 0.00 49,724.50 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ESTRUCTURAS
UND CANT. P.U. PARCIAL
VALORIZACIONES DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
UTILIDADES 8.00% S/. 44,199.55
SUB TOTAL S/. 646,418.48
FACTOR DE RELACION 1.00000 S/. 646,418.48
I.G.V 18.00% S/. 116,355.33
TOTAL PRESUPUESTO S/. 762,773.81
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
January 2012 February 2012 March 2012 April 2012 SALDO POR VALORIZARacumulado
102,346.46 0.00 0.00 0.00 646,418.48 0.00
0.00 44,199.55 0.006,998.05 0.00 0.00
102,346.46 0.00 0.00 0.00 646,418.48 0.00
18,422.36 0.00 0.00 0.00 116,355.33 0.00
0.00%
120,768.82 0.00 0.00
0.00%
0.00 762,773.81 0.00
15.83% 0.00% 0.00% 100.00%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 1,316.88 49.17 64,750.99 0.00 0.00 0.00 0.00 0.00 0.00 98.66 4,851.11 7.49 798.38 39,256.34 60.63 315.08 15,492.48 23.93
02.02 OBRAS ESPECIALES DE ARQUITECTURA 0.00 0.00 0.00 0.00 0.00
02.02.01 MESAS DE TRABAJO 0.00 0.00 0.00 0.00 0.00
02.02.01.01 MESAS DE TRABAJO: CONCRETO F´c= 175 kg/cm2 m3 0.65 279.49 181.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.02 MESAS DE TRABAJO: ACERO Fy= 4200 kg/cm2 kg 36.43 4.20 153.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.03 MESAS DE TRABAJO: ENCOFRADO Y DESENCOFRADO m2 6.46 37.64 243.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02 GÁRGOLAS 0.00 0.00 0.00 0.00 0.00
02.02.02.01 GÁRGOLAS: CONCRETO F´c= 175 kg/cm2 m3 0.02 256.46 5.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02.02 GÁRGOLAS: ACERO Fy= 4200 kg/cm2 kg 16.10 4.20 67.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02.03 GÁRGOLAS: ENCOFRADO Y DESENCOFRADO m2 0.99 27.61 27.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00
02.03.01 TARRAJEO PRIMARIO 0.00 0.00 0.00 0.00 0.00
02.03.01.01 TARRAJEO PRIMARIO, MORTERO C:A, 1:5 m2 306.55 15.95 4,889.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.53 1,364.20 27.90 125.42 2,000.45 40.91
02.03.02 TARRAJEO EN EXTERIORES 0.00 0.00 0.00 0.00 0.00
02.03.02.01 TARRAJEO EN MUROS EXTERIORES m2 400.30 19.67 7,873.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.02 TARRAJEO EN RAMPA DE ACCESO m2 46.80 22.83 1,068.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.03 TARRAJEO EN PUENTE DE ACCESO m2 57.75 19.67 1,135.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03 TARRAJEO EN INTERIORES 0.00 0.00 0.00 0.00 0.00
02.03.03.01 TARRAJEO EN MUROS INTERIORES m2 929.05 14.39 13,369.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.37 3,214.29 24.04 413.44 5,949.40 44.50
02.03.04 TARRAJEO DE VIGAS 0.00 0.00 0.00 0.00 0.00
02.03.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 801.20 20.31 16,272.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.82 3,286.46 20.20 352.88 7,166.99 44.04
02.03.04.02 VESTIDURA DE ARISTAS EN VIGAS m 671.46 3.61 2,423.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107.60 388.44 16.02 201.07 725.86 29.95
02.03.05 TARRAJEO DE COLUMNAS 0.00 0.00 0.00 0.00 0.00
02.03.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS m2 371.22 30.53 11,333.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.60 1,453.23 12.82 78.16 2,386.22 21.05
02.03.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 1,051.52 3.67 3,859.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.60 739.87 19.17 473.40 1,737.38 45.02
02.03.06 TARRAJEO EN MESAS DE TRABAJO 0.00 0.00 0.00 0.00 0.00
02.03.06.01 TARRAJEO PRIMARIO EN MESAS DE TRABAJO m2 6.46 15.95 103.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.07 TARRAJEO DE CIELORASOS 0.00 0.00 0.00 0.00 0.00
02.03.07.01 CIELORRASOS CON MEZCLA DE C:A, 1:5 m2 400.49 33.15 13,276.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 197.07 6,532.87 49.21 203.42 6,743.37 50.79
02.03.07.02 VESTIDURA EN FONDO DE ESCALERA m2 43.92 25.78 1,132.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.08 ENCHAPE EN MESAS DE TRABAJO C/CERÁMICO 20 x 20 0.00 0.00 0.00 0.00 0.00
02.03.08.01 ENCHAPE EN MESAS DE TRABAJO C/CERAMICO 20x20cmm2 6.46 49.36 318.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.09 DERRAMES 0.00 0.00 0.00 0.00 0.00
02.03.09.01 VESTIDURA DE DERRAMES EN VANOS Y PUERTAS m2 78.75 13.17 1,037.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.36 281.31 27.12 35.12 462.53 44.60
02.03.10 BRUÑAS 0.00 0.00 0.00 0.00 0.00
02.03.10.01 BRUÑAS E=1.0 CM EN PARED m 732.44 2.83 2,072.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 202.50 573.08 27.65 308.10 871.92 42.06
02.04 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00
02.04.01 FALSO PISO 0.00 0.00 0.00 0.00 0.00
02.04.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 439.16 23.86 10,478.36 0.00 0.00 0.00 112.92 2,694.27 25.71 326.24 7,784.09 74.29 0.00 0.00 0.00 0.00 0.00 0.00
02.04.02 PISOS 0.00 0.00 0.00 0.00 0.00
02.04.02.01 PISO DE CERÁMICO .30 x .30 cm m2 64.41 41.17 2,651.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.02.02 PISO DE CEMENTO PULIDO BRUÑADO m2 832.70 24.59 20,476.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 398.62 9,802.07 47.87 0.00 0.00 0.00
02.04.03 VEREDAS 0.00 0.00 0.00 0.00 0.00
October 2011
VALORIZACION DE OBRA ARQUITECTURA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
October 2011
VALORIZACION DE OBRA ARQUITECTURA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
02.04.03.01 EXCAVACIÓN DE ZANJAS PARA SARDINELES DE VEREDASm3 170.38 22.52 3,836.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.03.02 AFIRMADO DE 4" PARA VEREDAS C/EQUIPO m2 268.22 10.89 2,920.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.03.03 VEREDA DE CONCRETO DE 4" m2 268.22 59.14 15,862.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.03.04 ENCOFRADO Y DESENCOFRADO m2 111.08 28.79 3,197.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.03.05 JUNTAS DE CONSTRUCCIÓN EN VEREDAS E = 1" m 88.78 3.64 323.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.05 ZÓCALOS Y CONTRAZÓCALOS 0.00 0.00 0.00 0.00 0.00
02.05.01 CONTRAZOCALOS 0.00 0.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
October 2011
VALORIZACION DE OBRA ARQUITECTURA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
02.05.01.01 CONTRAZOCALO CEMENTO PULIDO H = 20 CM m 607.21 8.37 5,082.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.10 1,348.41 26.53 136.56 1,143.01 22.49
02.05.02 ZOCALOS 0.00 0.00 0.00 0.00 0.00
02.05.02.01 ZOCALO DE CERÁMICO DE 20 x 20 m2 306.55 47.02 14,413.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.05.03 JUNTAS DE DILATACIÓN 0.00 0.00 0.00 0.00 0.00
02.05.03.01 JUNTAS DE DILATACIÓN EN LOSA CON BREA m 209.00 8.67 1,812.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00
02.06.01 PUERTAS 0.00 0.00 0.00 0.00 0.00
02.06.01.01 PUERTA METÁLICA m2 227.43 184.70 42,006.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.36 8,747.39 20.82
02.06.01.02 COLOCACIÓN DE PUERTAS METÁLICAS und 176.52 34.60 6,107.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.02 VENTANAS 0.00 0.00 0.00 0.00 0.00
02.06.02.01 VENTANAS METÁLICAS m2 243.94 139.48 34,024.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.87 12,814.03 37.66
02.06.02.02 COLOCACIÓN DE VENTANAS METÁLICAS und 59.00 38.89 2,294.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.00 1,127.81 49.15
02.06.03 BARANDAS Y PASAMANOS 0.00 0.00 0.00 0.00 0.00
02.06.03.01 BARANDAS METÁLICAS m2 133.52 162.84 21,742.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.03.02 COLOCACIÓN DE BARANDAS METÁLICAS m2 133.52 28.34 3,783.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07 CERRAJERIA 0.00 0.00 0.00 0.00 0.00
02.07.01 BISAGRAS 0.00 0.00 0.00 0.00 0.00
02.07.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 228.00 6.22 1,418.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.00 721.52 50.88
02.07.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 126.00 6.97 878.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 501.84 57.14
02.07.02 MANIJAS 0.00 0.00 0.00 0.00 0.00
02.07.02.01 MANIJA DE BRONCE DE 4" pza 42.00 18.32 769.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 439.68 57.14
02.08 CARPINTERIA DE MADERA 0.00 0.00 0.00 0.00 0.00
02.08.01 CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 mm.m2 400.65 39.06 15,649.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.08.02 RODON DE MADERA DE 1/4 DE CIRCULO DIAMETRO 3/4"x3/4"m 392.57 5.70 2,237.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.09 CERRADURAS PARA PUERTAS 0.00 0.00 0.00 0.00 0.00
02.09.01 CERRADURA DE DOS GOLPES pza 4.00 70.43 281.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 281.72 100.00
02.09.02 CERRADURA DE TRES GOLPES pza 13.00 90.28 1,173.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 541.68 46.15
02.09.03 CERRADURA TIPO BOLA pza 20.00 53.38 1,067.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 747.32 70.00
02.09.04 PICAPORTE und 1.00 11.72 11.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.10 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.00 0.00
02.10.01 VIDRIOS EN VENTANAS 0.00 0.00 0.00 0.00 0.00
02.10.01.01 VIDRIO SEMIDOBLE p2 2,624.81 5.06 13,281.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11 PINTURA 0.00 0.00 0.00 0.00 0.00
02.11.01 PINTURA LÁTEX EN INTERIORES m2 1,865.07 8.74 16,300.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.02 PINTURA LÁTEX EN EXTERIORES m2 567.66 9.11 5,171.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.03 PINTURA LÁTEX 2 MANOS EN CIELO RASO m2 801.14 11.93 9,557.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.04 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 93.92 14.48 1,359.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.05 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 243.94 11.11 2,710.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.06 PINTURA ÓLEO MATE EN BARANDAS METÁLICAS m2 133.52 11.11 1,483.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.07 PINTURA DE MARCACIÓN DE LOSA MULTIDEPORTIVA m 400.95 3.51 1,407.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.12 VARIOS 0.00 0.00 0.00 0.00 0.00
02.12.01 PIZARRA ACRÍLICA, 5.00x1.20m und 11.00 569.14 6,260.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.12.02 LIMPIEZA FINAL DE OBRA m2 581.04 2.10 1,220.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 418,850.83 0.00 2,694.27 12,635.20 68,240.57 70,602.60
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
October 2011
VALORIZACION DE OBRA ARQUITECTURA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
GASTOS GENERALES 9.00% S/. 37,696.57
UTILIDADES 8.00% S/. 33,508.07
SUB TOTAL S/. 490,055.47
FACTOR DE RELACION 1.00000 S/. 490,055.47
I.G.V 18.00% S/. 88,209.98
TOTAL PRESUPUESTO S/. 578,265.45
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
242.48
215.54
3,152.29
3,152.29
567.41
3,719.70
0.64%
1,137.17 6,141.65 6,354.23
1,010.82 5,459.25 5,648.21
14,783.19 79,841.47 82,605.04
14,783.19 79,841.47 82,605.04
2,660.97 14,371.46 14,868.91
17,444.16 94,212.93 97,473.95
3.02% 16.29% 16.86%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 1,316.88 49.17 64,750.99
02.02 OBRAS ESPECIALES DE ARQUITECTURA
02.02.01 MESAS DE TRABAJO
02.02.01.01 MESAS DE TRABAJO: CONCRETO F´c= 175 kg/cm2 m3 0.65 279.49 181.67
02.02.01.02 MESAS DE TRABAJO: ACERO Fy= 4200 kg/cm2 kg 36.43 4.20 153.01
02.02.01.03 MESAS DE TRABAJO: ENCOFRADO Y DESENCOFRADO m2 6.46 37.64 243.15
02.02.02 GÁRGOLAS
02.02.02.01 GÁRGOLAS: CONCRETO F´c= 175 kg/cm2 m3 0.02 256.46 5.13
02.02.02.02 GÁRGOLAS: ACERO Fy= 4200 kg/cm2 kg 16.10 4.20 67.62
02.02.02.03 GÁRGOLAS: ENCOFRADO Y DESENCOFRADO m2 0.99 27.61 27.33
02.03 REVOQUES ENLUCIDOS Y MOLDURAS
02.03.01 TARRAJEO PRIMARIO
02.03.01.01 TARRAJEO PRIMARIO, MORTERO C:A, 1:5 m2 306.55 15.95 4,889.47
02.03.02 TARRAJEO EN EXTERIORES
02.03.02.01 TARRAJEO EN MUROS EXTERIORES m2 400.30 19.67 7,873.90
02.03.02.02 TARRAJEO EN RAMPA DE ACCESO m2 46.80 22.83 1,068.44
02.03.02.03 TARRAJEO EN PUENTE DE ACCESO m2 57.75 19.67 1,135.94
02.03.03 TARRAJEO EN INTERIORES
02.03.03.01 TARRAJEO EN MUROS INTERIORES m2 929.05 14.39 13,369.03
02.03.04 TARRAJEO DE VIGAS
02.03.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 801.20 20.31 16,272.37
02.03.04.02 VESTIDURA DE ARISTAS EN VIGAS m 671.46 3.61 2,423.97
02.03.05 TARRAJEO DE COLUMNAS
02.03.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS m2 371.22 30.53 11,333.35
02.03.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 1,051.52 3.67 3,859.08
02.03.06 TARRAJEO EN MESAS DE TRABAJO
02.03.06.01 TARRAJEO PRIMARIO EN MESAS DE TRABAJO m2 6.46 15.95 103.04
02.03.07 TARRAJEO DE CIELORASOS
02.03.07.01 CIELORRASOS CON MEZCLA DE C:A, 1:5 m2 400.49 33.15 13,276.24
02.03.07.02 VESTIDURA EN FONDO DE ESCALERA m2 43.92 25.78 1,132.26
02.03.08 ENCHAPE EN MESAS DE TRABAJO C/CERÁMICO 20 x 20
02.03.08.01 ENCHAPE EN MESAS DE TRABAJO C/CERAMICO 20x20cmm2 6.46 49.36 318.87
02.03.09 DERRAMES
02.03.09.01 VESTIDURA DE DERRAMES EN VANOS Y PUERTAS m2 78.75 13.17 1,037.14
02.03.10 BRUÑAS
02.03.10.01 BRUÑAS E=1.0 CM EN PARED m 732.44 2.83 2,072.81
02.04 PISOS Y PAVIMENTOS
02.04.01 FALSO PISO
02.04.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 439.16 23.86 10,478.36
02.04.02 PISOS
02.04.02.01 PISO DE CERÁMICO .30 x .30 cm m2 64.41 41.17 2,651.76
02.04.02.02 PISO DE CEMENTO PULIDO BRUÑADO m2 832.70 24.59 20,476.09
02.04.03 VEREDAS
VALORIZACION DE OBRA ARQUITECTURA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET.VAL. (S/.) %
104.76 5,151.05 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,316.88 64,750.99 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
0.65 181.67 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65 181.67 100.00 ### 0.00 0.00
36.43 153.01 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.43 153.01 100.00 ### 0.00 0.00
6.46 243.15 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.46 243.15 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.02 5.13 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 5.13 100.00 ### 0.00 0.00
16.10 67.62 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.10 67.62 100.00 ### 0.00 0.00
0.99 27.33 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.99 27.33 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
95.60 1,524.82 31.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 306.55 4,889.47 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
400.30 7,873.90 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.30 7,873.90 100.00 ### 0.00 0.00
46.80 1,068.44 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.80 1,068.44 100.00 ### 0.00 0.00
57.75 1,135.94 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.75 1,135.94 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
292.24 4,205.33 31.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 929.05 13,369.03 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
286.51 5,818.92 35.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 801.20 16,272.37 100.00 ### 0.00 0.00
362.79 1,309.67 54.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 671.46 2,423.97 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
245.46 7,493.89 66.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 371.22 11,333.35 100.00 ### 0.00 0.00
376.52 1,381.83 35.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,051.52 3,859.08 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
6.46 103.04 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.46 103.04 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.49 13,276.24 100.00 ### 0.00 0.00
43.92 1,132.26 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.92 1,132.26 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
6.46 318.87 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.46 318.87 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
22.27 293.30 28.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.75 1,037.14 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
221.84 627.81 30.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 732.44 2,072.81 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 439.16 10,478.36 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
64.41 2,651.76 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.41 2,651.76 100.00 ### 0.00 0.00
434.08 10,674.03 52.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 832.70 20,476.09 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL
VALORIZACION DE OBRA ARQUITECTURA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
02.04.03.01 EXCAVACIÓN DE ZANJAS PARA SARDINELES DE VEREDASm3 170.38 22.52 3,836.96
02.04.03.02 AFIRMADO DE 4" PARA VEREDAS C/EQUIPO m2 268.22 10.89 2,920.92
02.04.03.03 VEREDA DE CONCRETO DE 4" m2 268.22 59.14 15,862.53
02.04.03.04 ENCOFRADO Y DESENCOFRADO m2 111.08 28.79 3,197.99
02.04.03.05 JUNTAS DE CONSTRUCCIÓN EN VEREDAS E = 1" m 88.78 3.64 323.16
02.05 ZÓCALOS Y CONTRAZÓCALOS
02.05.01 CONTRAZOCALOS
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET.VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
170.38 3,836.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 170.38 3,836.96 100.00 ### 0.00 0.00
268.22 2,920.92 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 268.22 2,920.92 100.00 ### 0.00 0.00
268.22 15,862.53 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 268.22 15,862.53 100.00 ### 0.00 0.00
111.08 3,197.99 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.08 3,197.99 100.00 ### 0.00 0.00
88.78 323.16 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.78 323.16 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL
VALORIZACION DE OBRA ARQUITECTURA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
02.05.01.01 CONTRAZOCALO CEMENTO PULIDO H = 20 CM m 607.21 8.37 5,082.35
02.05.02 ZOCALOS
02.05.02.01 ZOCALO DE CERÁMICO DE 20 x 20 m2 306.55 47.02 14,413.98
02.05.03 JUNTAS DE DILATACIÓN
02.05.03.01 JUNTAS DE DILATACIÓN EN LOSA CON BREA m 209.00 8.67 1,812.03
02.06 CARPINTERIA METALICA
02.06.01 PUERTAS
02.06.01.01 PUERTA METÁLICA m2 227.43 184.70 42,006.32
02.06.01.02 COLOCACIÓN DE PUERTAS METÁLICAS und 176.52 34.60 6,107.59
02.06.02 VENTANAS
02.06.02.01 VENTANAS METÁLICAS m2 243.94 139.48 34,024.75
02.06.02.02 COLOCACIÓN DE VENTANAS METÁLICAS und 59.00 38.89 2,294.51
02.06.03 BARANDAS Y PASAMANOS
02.06.03.01 BARANDAS METÁLICAS m2 133.52 162.84 21,742.40
02.06.03.02 COLOCACIÓN DE BARANDAS METÁLICAS m2 133.52 28.34 3,783.96
02.07 CERRAJERIA
02.07.01 BISAGRAS
02.07.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 228.00 6.22 1,418.16
02.07.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 126.00 6.97 878.22
02.07.02 MANIJAS
02.07.02.01 MANIJA DE BRONCE DE 4" pza 42.00 18.32 769.44
02.08 CARPINTERIA DE MADERA
02.08.01 CIELORASO SUSPENDIDO CON TRIPLEY DE 4' x 8' x 4 mm.m2 400.65 39.06 15,649.39
02.08.02 RODON DE MADERA DE 1/4 DE CIRCULO DIAMETRO 3/4"x3/4"m 392.57 5.70 2,237.65
02.09 CERRADURAS PARA PUERTAS
02.09.01 CERRADURA DE DOS GOLPES pza 4.00 70.43 281.72
02.09.02 CERRADURA DE TRES GOLPES pza 13.00 90.28 1,173.64
02.09.03 CERRADURA TIPO BOLA pza 20.00 53.38 1,067.60
02.09.04 PICAPORTE und 1.00 11.72 11.72
02.10 VIDRIOS, CRISTALES Y SIMILARES
02.10.01 VIDRIOS EN VENTANAS
02.10.01.01 VIDRIO SEMIDOBLE p2 2,624.81 5.06 13,281.54
02.11 PINTURA
02.11.01 PINTURA LÁTEX EN INTERIORES m2 1,865.07 8.74 16,300.71
02.11.02 PINTURA LÁTEX EN EXTERIORES m2 567.66 9.11 5,171.38
02.11.03 PINTURA LÁTEX 2 MANOS EN CIELO RASO m2 801.14 11.93 9,557.60
02.11.04 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 93.92 14.48 1,359.96
02.11.05 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 243.94 11.11 2,710.17
02.11.06 PINTURA ÓLEO MATE EN BARANDAS METÁLICAS m2 133.52 11.11 1,483.41
02.11.07 PINTURA DE MARCACIÓN DE LOSA MULTIDEPORTIVA m 400.95 3.51 1,407.33
02.12 VARIOS
02.12.01 PIZARRA ACRÍLICA, 5.00x1.20m und 11.00 569.14 6,260.54
02.12.02 LIMPIEZA FINAL DE OBRA m2 581.04 2.10 1,220.18
COSTO DIRECTO S/. 418,850.83
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET.VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
309.55 2,590.93 50.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 607.21 5,082.35 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
306.55 14,413.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 306.55 14,413.98 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
209.00 1,812.03 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 209.00 1,812.03 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
180.07 33,258.93 79.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 227.43 42,006.32 100.00 ### 0.00 0.00
176.52 6,107.59 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.52 6,107.59 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
152.07 21,210.72 62.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 243.94 34,024.75 100.00 ### 0.00 0.00
30.00 1,166.70 50.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.00 2,294.51 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
133.52 21,742.40 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.52 21,742.40 100.00 ### 0.00 0.00
133.52 3,783.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.52 3,783.96 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
112.00 696.64 49.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 228.00 1,418.16 100.00 ### 0.00 0.00
54.00 376.38 42.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.00 878.22 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
18.00 329.76 42.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 769.44 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
400.65 15,649.39 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.65 15,649.39 100.00 ### 0.00 0.00
392.57 2,237.65 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 392.57 2,237.65 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 281.72 100.00 ### 0.00 0.00
7.00 631.96 53.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 1,173.64 100.00 ### 0.00 0.00
6.00 320.28 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 1,067.60 100.00 ### 0.00 0.00
1.00 11.72 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11.72 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 ###
2,624.81 13,281.54 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,624.81 13,281.54 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
1,865.07 16,300.71 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,865.07 16,300.71 100.00 ### 0.00 0.00
567.66 5,171.38 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 567.66 5,171.38 100.00 ### 0.00 0.00
801.14 9,557.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 801.14 9,557.60 100.00 ### 0.00 0.00
93.92 1,359.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.92 1,359.96 100.00 ### 0.00 0.00
243.94 2,710.17 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 243.94 2,710.17 100.00 ### 0.00 0.00
133.52 1,483.41 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.52 1,483.41 100.00 ### 0.00 0.00
400.95 1,407.33 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.95 1,407.33 100.00 ### 0.00 0.00
0.00 0.00 0.00 0.00 0.00 ###
11.00 6,260.54 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 6,260.54 100.00 ### 0.00 0.00
0.00 0.00 0.00 581.04 1,220.18 100.00 0.00 0.00 0.00 0.00 0.00 0.00 581.04 1,220.18 100.00 ### 0.00 0.00
263,457.99 1,220.18 0.00 0.00 418,850.83 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : ARQUITECTURA
UND CANT. P.U. PARCIAL
VALORIZACION DE OBRA ARQUITECTURA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
GASTOS GENERALES 9.00% S/. 37,696.57
UTILIDADES 8.00% S/. 33,508.07
SUB TOTAL S/. 490,055.47
FACTOR DE RELACION 1.00000 S/. 490,055.47
I.G.V 18.00% S/. 88,209.98
TOTAL PRESUPUESTO S/. 578,265.45
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET.VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
23,711.22 109.82 0.00 0.00 37,696.57 0.00
21,076.64 97.61 0.00 0.00 33,508.07 0.00
308,245.85 1,427.61 0.00 0.00 490,055.47 0.00
308,245.85 1,427.61 0.00 0.00 490,055.47 0.00
55,484.25 256.97 0.00 0.00 88,209.98 0.00
363,730.10 1,684.58 0.00 0.00 578,265.45 0.00
62.90% 0.29% 0.00% 0.00% 100.00% 0.00%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
03 INSTALACIONES SANITARIAS
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 81.73 1.70 138.94 0.00 0.00 0.00 0.00 0.00 0.00 32.50 55.25 39.77 49.23 83.69 60.23 0.00 0.00 0.00
03.01.02 TRAZO, NIVELES Y REPLANTEO m2 81.73 1.41 115.24 0.00 0.00 0.00 0.00 0.00 0.00 32.50 45.83 39.77 49.23 69.41 60.23 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00
03.02.01 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 14.67 25.33 371.59 0.00 0.00 0.00 0.00 0.00 0.00 9.75 246.97 66.46 4.92 124.62 33.54 0.00 0.00 0.00
03.02.02 EXCAVACIÓN DE ZANJAS PARA CUNETAS m3 19.69 25.33 498.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.69 498.75 100.00 0.00 0.00 0.00
03.02.03 EXCAVACIÓN DE ZANJA PARA CISTERNA Y TANQUE ELEVADO m3 38.98 42.65 1,662.50 0.00 0.00 0.00 0.00 0.00 0.00 38.98 1,662.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 24.61 12.67 311.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.61 311.81 100.00 0.00 0.00 0.00
03.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 73.33 5.09 373.25 0.00 0.00 0.00 0.00 0.00 0.00 48.72 247.98 66.44 24.61 125.26 33.56 0.00 0.00 0.00
03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00
03.03.01 SOLADOS 0.00 0.00 0.00 0.00 0.00
03.03.01.01 SOLADO MEZCLA 1:12, C:H, e = 4" m2 17.40 22.06 383.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.40 383.84 100.00 0.00 0.00 0.00
03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00
03.04.01 CIMIENTOS ARMADOS 0.00 0.00 0.00 0.00 0.00
03.04.01.01 CONCRETO EN CIMIENTOS, f´c= 175 kg/cm2 m3 8.22 281.84 2,316.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.22 2,316.72 100.00 0.00 0.00 0.00
03.04.01.02 ACERO EN CIMIENTOS Fy= 4200 kg/cm2 kg 3,468.33 4.20 14,566.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,468.33 14,566.99 100.00 0.00 0.00 0.00
03.04.02 CUNETAS 0.00 0.00 0.00 0.00 0.00
03.04.02.01 CONCRETO EN CUNETAS F´c= 175 kg/cm2 m3 3.94 263.40 1,037.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.02.02 ACERO PARA CUNETAS Fy= 4200 kg/cm2 kg 459.13 4.33 1,988.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 156.75 32.98 5,169.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.03 COLUMNAS DE SOPORTE DE TUBERÍAS DE BAJADA 0.00 0.00 0.00 0.00 0.00
03.04.03.01 CONCRETO EN COLUMNAS DE SOPORTE F´c= 175 kg/cm2 m3 0.80 268.01 214.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.03.02 ACERO EN COLUMNAS DE SOPORTE Fy= 4200 kg/cm2 kg 128.06 4.33 554.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE SOPORTEm2 11.20 30.50 341.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.04 CISTERNA 0.00 0.00 0.00 0.00 0.00
03.04.04.01 CONCRETO EN CISTERNA F´c= 210 kg/cm2 m3 7.48 308.00 2,303.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.48 2,303.84 100.00 0.00 0.00 0.00
03.04.04.02 ACERO EN CISTERNA Fy= 4200 kg/cm2 kg 478.45 4.33 2,071.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 478.45 2,071.69 100.00 0.00 0.00 0.00
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE CISTERNA m2 42.93 38.20 1,639.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.93 1,639.93 100.00 0.00 0.00 0.00
03.04.05 TANQUE ELEVADO 0.00 0.00 0.00 0.00 0.00
03.04.05.01 CONCRETO EN TANQUE ELEVADO F´c= 210kg/cm2 m3 13.90 345.22 4,798.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.90 4,798.56 100.00 0.00 0.00 0.00
03.04.05.02 ACERO EN TANQUE ELEVADO Fy= 4200kg/cm2 kg 1,298.26 4.40 5,712.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,298.26 5,712.34 100.00 0.00 0.00 0.00
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE TANQUE ELEVADO m2 158.17 34.84 5,510.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 158.17 5,510.64 100.00 0.00 0.00 0.00
03.04.05.04 RELLENO CON GRAVA SELECCIONADA m3 1.65 86.75 143.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.65 143.14 100.00 0.00 0.00 0.00
03.05 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00 0.00 0.00 0.00
03.05.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 5.50 45.98 252.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.50 252.89 100.00 0.00 0.00 0.00
03.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0.00
03.06.01 TARRAJEO PRIMARIO 0.00 0.00 0.00 0.00 0.00
03.06.01.01 TARRAJEO INTERIOR + IMPERMEABILIZANTE, MORTERO C:A, 1:5m2 42.93 35.08 1,505.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.02 TARRAJEO EN EXTERIORES 0.00 0.00 0.00 0.00 0.00
03.06.02.01 TARRAJEO EN MUROS EXTERIORES m2 6.75 19.67 132.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.03 TARRAJEO EN INTERIORES 0.00 0.00 0.00 0.00 0.00
03.06.03.01 TARRAJEO EN MUROS INTERIORES m2 6.75 14.39 97.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
December 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011 September 2011
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
December 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011 September 2011
03.06.04 TARRAJEO DE VIGAS 0.00 0.00 0.00 0.00 0.00
03.06.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 42.56 20.31 864.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.04.02 VESTIDURA DE ARISTAS EN VIGAS m 121.60 3.61 438.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.05 TARRAJEO DE COLUMNAS 0.00 0.00 0.00 0.00 0.00
03.06.05.01 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 70.27 26.79 1,882.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 175.68 3.20 562.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.06.06 DERRAMES 0.00 0.00 0.00 0.00 0.00
03.06.06.01 VESTIDURA DE DERRAME EN VANOS Y PUERTAS m 1.64 13.17 21.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.07 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0.00
03.07.01 FALSO PISO 0.00 0.00 0.00 0.00 0.00
03.07.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 5.27 23.86 125.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.27 125.74 100.00
03.07.02 PISOS 0.00 0.00 0.00 0.00 0.00
03.07.02.01 PISO DE CEMENTO PULIDO BRUÑADO m2 5.27 24.59 129.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00
03.08.01 PUERTAS 0.00 0.00 0.00 0.00 0.00
03.08.01.01 PUERTA METÁLICA m2 1.47 184.70 271.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.01.02 COLOCACIÓN DE PUERTAS und 1.00 34.60 34.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.02 VENTANAS 0.00 0.00 0.00 0.00 0.00
03.08.02.01 VENTANAS METÁLICAS m2 1.23 139.48 171.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.02.02 COLOCACIÓN DE VENTANAS und 1.00 38.89 38.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.03 ESCALERAS 0.00 0.00 0.00 0.00 0.00
03.08.03.01 ESCALERA DE GATO m2 5.85 56.08 328.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.03.02 COLOCACIÓN DE ESCALERA DE GATO und 1.00 73.63 73.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.08.04 REJILLAS DE PROTECCIÓN 0.00 0.00 0.00 0.00 0.00
03.08.04.01 REJILLAS DE PROTECCIÓN DE CANALETA PLUVIAL m2 72.10 95.69 6,899.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.09 CERRAJERIA 0.00 0.00 0.00 0.00 0.00
03.09.01 BISAGRAS 0.00 0.00 0.00 0.00 0.00
03.09.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 2.00 9.99 19.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.09.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 3.00 10.74 32.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.09.02 MANIJAS 0.00 0.00 0.00 0.00 0.00
03.09.02.01 MANIJA DE BRONCE DE 4" pza 1.00 20.41 20.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.10 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00 0.00 0.00 0.00
03.10.01 VIDRIO SEMIDOBLE p2 13.23 5.06 66.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.11 PINTURA 0.00 0.00 0.00 0.00 0.00
03.11.01 PINTURA LÁTEX EN INTERIORES m2 49.31 8.74 430.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.11.02 PINTURA LÁTEX EN EXTERIORES m2 77.02 9.11 701.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.11.03 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 1.47 14.48 21.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.11.04 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 1.23 11.11 13.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12 APARATOS Y ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00
03.12.01 INODOROS 0.00 0.00 0.00 0.00 0.00
03.12.01.01 INODORO TANQUE BAJO BLANCO Y ACCESORIOS und 15.00 112.70 1,690.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.02 LAVATORIOS Y LAVADEROS 0.00 0.00 0.00 0.00 0.00
03.12.02.01 LAVATORIO DE PARED BLANCO pza 15.00 73.50 1,102.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.02.02 LAVADERO DE ACERO INOXIDABLE DE 01 POZA pza 1.00 128.00 128.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
December 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011 September 2011
03.12.03 ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00
03.12.03.01 PAPELERA DE LOZA DE COLOR DE 15 X 15 pza 15.00 8.90 133.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.03.02 JABONERA EMPOTRADA COLOR DE LOZA C/ASA DE 15 X 15 CMund 12.00 16.60 199.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.03.03 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCOpza 12.00 22.10 265.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.03.04 DUCHAS CROMADAS DE CABEZA GIRATORIA pza 12.00 27.00 324.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.04 COLOCACION DE APARATOS SANITARIOS Y ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00 0.00
03.12.04.01 COLOCACION DE APARATOS SANITARIOS und 31.00 32.62 1,011.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.04.02 COLOCACION DE ACCESORIOS SANITARIOS und 51.00 13.04 665.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.12.04.03 EXTINGUIDOR - POLVO QUÍMICO 5 KG und 2.00 138.98 277.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13 SISTEMA DE DESAGUE 0.00 0.00 0.00 0.00 0.00
03.13.01 SALIDAS DE DESAGUE 0.00 0.00 0.00 0.00 0.00
03.13.01.01 SALIDA DE DESAGUE EN PVC 4" (INODORO) pto 15.00 33.72 505.80 0.00 0.00 0.00 0.00 0.00 0.00 12.00 404.64 80.00 3.00 101.16 20.00 0.00 0.00 0.00
03.13.01.02 SALIDA DE DESAGUE EN PVC 2" (LAVAT. , LAVAD. Y URINARIOS)pto 25.00 41.85 1,046.25 0.00 0.00 0.00 0.00 0.00 0.00 16.00 669.60 64.00 9.00 376.65 36.00 0.00 0.00 0.00
03.13.01.03 SALIDA DE DESAGUE EN PVC 3" (SUMIDERO) pto 14.00 31.77 444.78 0.00 0.00 0.00 0.00 0.00 0.00 14.00 444.78 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.02 REDES DE DESAGUE 0.00 0.00 0.00 0.00 0.00
03.13.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x1.20m). m 92.20 16.89 1,557.26 0.00 0.00 0.00 0.00 0.00 0.00 24.35 411.27 26.41 67.85 1,145.99 73.59 0.00 0.00 0.00
03.13.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 92.20 6.79 626.04 0.00 0.00 0.00 0.00 0.00 0.00 24.35 165.34 26.41 67.85 460.70 73.59 0.00 0.00 0.00
03.13.02.03 TUBERIA DE PVC SAL 4" m 126.80 18.10 2,295.08 0.00 0.00 0.00 0.00 0.00 0.00 67.95 1,229.90 53.59 58.85 1,065.19 46.41 0.00 0.00 0.00
03.13.02.04 TUBERIA DE PVC SAL 3" m 16.20 15.68 254.02 0.00 0.00 0.00 0.00 0.00 0.00 16.20 254.02 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.02.05 TUBERIA DE PVC SAL 2" m 45.40 13.72 622.89 0.00 0.00 0.00 0.00 0.00 0.00 45.40 622.89 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.03 RED DE VENTILACIÓN 0.00 0.00 0.00 0.00 0.00
03.13.03.01 RED DE VENTILACIÓN EN PVC 2" m 44.60 12.96 578.02 0.00 0.00 0.00 0.00 0.00 0.00 44.60 578.02 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04 ADITAMENTOS Y ACCESORIOS VARIOS 0.00 0.00 0.00 0.00 0.00
03.13.04.01 SUMIDERO CON TRAMPA P Y REJILLA DE 3" und 5.00 45.79 228.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.02 REGISTROS DE BRONCE DE 4" und 16.00 34.96 559.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.03 CODO DE 2" x 45° PVC pza 110.00 1.58 173.80 0.00 0.00 0.00 0.00 0.00 0.00 110.00 173.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.04 YEE DE 2" PVC pza 35.00 9.69 339.15 0.00 0.00 0.00 0.00 0.00 0.00 35.00 339.15 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.05 YEE DE 4" CON REDUCCIÓN A 2" pza 47.00 10.61 498.67 0.00 0.00 0.00 0.00 0.00 0.00 47.00 498.67 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.06 YEE DE 4" CON REDUCCIÓN A 3" pza 33.00 22.30 735.90 0.00 0.00 0.00 0.00 0.00 0.00 33.00 735.90 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.07 YEE DE 3" CON REDUCCIÓN A 2" pza 22.00 22.30 490.60 0.00 0.00 0.00 0.00 0.00 0.00 22.00 490.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.04.08 CODOS DE 2" x 90° PVC pza 35.00 19.26 674.10 0.00 0.00 0.00 0.00 0.00 0.00 35.00 674.10 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.05 VARIOS 0.00 0.00 0.00 0.00 0.00
03.13.05.01 PRUEBA A RED DE DESAGUE GLB 3.00 268.00 804.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.13.05.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 17.00 140.68 2,391.56 0.00 0.00 0.00 0.00 0.00 0.00 1.00 140.68 5.88 0.00 0.00 0.00 14.00 1,969.52 82.35
03.14 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 0.00 0.00 0.00 0.00 0.00
03.14.01 SALIDA DE AGUA FRIA 0.00 0.00 0.00 0.00 0.00
03.14.01.01 SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 44.00 58.78 2,586.32 0.00 0.00 0.00 0.00 0.00 0.00 33.00 1,939.74 75.00 0.00 0.00 0.00 11.00 646.58 25.00
03.14.02 REDES DE ALIMENTACION 0.00 0.00 0.00 0.00 0.00
03.14.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x0.80m). m 114.77 11.26 1,292.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.77 1,292.31 100.00 0.00 0.00 0.00
03.14.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 114.77 6.79 779.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.77 779.29 100.00 0.00 0.00 0.00
03.14.02.03 TUBERIA PVC CLASE 10 - 3/4" CR SAP m 51.81 4.07 210.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.81 210.87 100.00 0.00 0.00 0.00
03.14.02.04 TUBERIA PVC CLASE 10 - 1 1/2" CR SAP m 62.96 18.39 1,157.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.96 1,157.83 100.00 0.00 0.00 0.00
03.14.03 REDES DE DISTRIBUCION 0.00 0.00 0.00 0.00 0.00
03.14.03.01 TUBERIA PVC CLASE 10 - 1/2" CR SAP m 68.61 3.55 243.57 0.00 0.00 0.00 0.00 0.00 0.00 68.61 243.57 100.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
December 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011 September 2011
03.14.04 ACCESORIOS DE REDES 0.00 0.00 0.00 0.00 0.00
03.14.04.01 CODO PVC CLASE 10 CR 90° x 1/2" und 65.00 16.90 1,098.50 0.00 0.00 0.00 0.00 0.00 0.00 30.00 507.00 46.15 35.00 591.50 53.85 0.00 0.00 0.00
03.14.04.02 TEE PVC - CLASE 10 CR 1/2" und 22.00 10.07 221.54 0.00 0.00 0.00 0.00 0.00 0.00 11.00 110.77 50.00 11.00 110.77 50.00 0.00 0.00 0.00
03.14.05 LLAVES Y VALVULAS 0.00 0.00 0.00 0.00 0.00
03.14.05.01 LLAVE DE COMPUERTA DE BRONCE 1/2" und 8.00 64.52 516.16 0.00 0.00 0.00 0.00 0.00 0.00 8.00 516.16 100.00 0.00 0.00 0.00 0.00 0.00 0.00
03.14.05.02 UNION UNIVERSAL und 16.00 1.50 24.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 12.00 50.00 0.00 0.00 0.00 8.00 12.00 50.00
03.14.05.03 LLAVE PARA LAVADERO TIPO ESFERICA DE 1/2" und 15.00 56.07 841.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.14.05.04 LLAVE DE RIEGO CON GRIFO DE 1/2" und 2.00 47.02 94.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.14.06 VARIOS 0.00 0.00 0.00 0.00 0.00
03.14.06.01 CAJA DE CONCRETO P/VALVULA DE COMPUERTA TAPA F° G° pza 8.00 141.55 1,132.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.14.06.02 PRUEBA HIDRAULICA+DESINFECCION GLB 1.00 369.60 369.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.15 SISTEMA DE AGUA DE LLUVIA - DRENAJE PLUVIAL 0.00 0.00 0.00 0.00 0.00
03.15.01 TUBERÍA DE BAJADA Y DISTRIBUCIÓN 0.00 0.00 0.00 0.00 0.00
03.15.01.01 CANALETA DE PLANCHA GALVANIZADA 1/32" m 86.85 19.52 1,695.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.15.01.02 TUBERÍA DE BAJADA PVC-SAL 4" P/LLUVIAS m 64.80 19.65 1,273.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.15.01.03 CODO PVC DE 90° x 4" pza 24.00 25.43 610.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 102,133.93
GASTOS GENERALES 9.00% S/. 9,192.05
UTILIDADES 8.00% S/. 8,170.71
SUB TOTAL S/. 119,496.69
FACTOR DE RELACION 1.00000 S/. 119,496.69
I.G.V 18.00% S/. 21,509.40
TOTAL PRESUPUESTO S/. 141,006.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 13,421.13
1,207.90
1,073.69
15,702.72
15,702.72
2,826.49
18,529.21
13.14%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
48,206.38 2,753.84
56,401.46 3,222.00
4,338.57 247.85
3,856.51 220.31
56,401.46 3,222.00
10,152.26 579.96
66,553.72 3,801.96
47.20% 2.70%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIAL
03 INSTALACIONES SANITARIAS
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 81.73 1.70 138.94
03.01.02 TRAZO, NIVELES Y REPLANTEO m2 81.73 1.41 115.24
03.02 MOVIMIENTO DE TIERRAS
03.02.01 CORTE Y NIVELACIÓN DE TERRENO MANUAL m3 14.67 25.33 371.59
03.02.02 EXCAVACIÓN DE ZANJAS PARA CUNETAS m3 19.69 25.33 498.75
03.02.03 EXCAVACIÓN DE ZANJA PARA CISTERNA Y TANQUE ELEVADO m3 38.98 42.65 1,662.50
03.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30mm3 24.61 12.67 311.81
03.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON TRANSPORTE m3 73.33 5.09 373.25
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADOS
03.03.01.01 SOLADO MEZCLA 1:12, C:H, e = 4" m2 17.40 22.06 383.84
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CIMIENTOS ARMADOS
03.04.01.01 CONCRETO EN CIMIENTOS, f´c= 175 kg/cm2 m3 8.22 281.84 2,316.72
03.04.01.02 ACERO EN CIMIENTOS Fy= 4200 kg/cm2 kg 3,468.33 4.20 14,566.99
03.04.02 CUNETAS
03.04.02.01 CONCRETO EN CUNETAS F´c= 175 kg/cm2 m3 3.94 263.40 1,037.80
03.04.02.02 ACERO PARA CUNETAS Fy= 4200 kg/cm2 kg 459.13 4.33 1,988.03
03.04.02.03 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 156.75 32.98 5,169.62
03.04.03 COLUMNAS DE SOPORTE DE TUBERÍAS DE BAJADA
03.04.03.01 CONCRETO EN COLUMNAS DE SOPORTE F´c= 175 kg/cm2 m3 0.80 268.01 214.41
03.04.03.02 ACERO EN COLUMNAS DE SOPORTE Fy= 4200 kg/cm2 kg 128.06 4.33 554.50
03.04.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE SOPORTEm2 11.20 30.50 341.60
03.04.04 CISTERNA
03.04.04.01 CONCRETO EN CISTERNA F´c= 210 kg/cm2 m3 7.48 308.00 2,303.84
03.04.04.02 ACERO EN CISTERNA Fy= 4200 kg/cm2 kg 478.45 4.33 2,071.69
03.04.04.03 ENCOFRADO Y DESENCOFRADO DE CISTERNA m2 42.93 38.20 1,639.93
03.04.05 TANQUE ELEVADO
03.04.05.01 CONCRETO EN TANQUE ELEVADO F´c= 210kg/cm2 m3 13.90 345.22 4,798.56
03.04.05.02 ACERO EN TANQUE ELEVADO Fy= 4200kg/cm2 kg 1,298.26 4.40 5,712.34
03.04.05.03 ENCOFRADO Y DESENCOFRADO DE TANQUE ELEVADO m2 158.17 34.84 5,510.64
03.04.05.04 RELLENO CON GRAVA SELECCIONADA m3 1.65 86.75 143.14
03.05 MUROS Y TABIQUES DE ALBAÑILERIA
03.05.01 MURO DE SOGA LADRILLO KING-KONG 18 HUECOS m2 5.50 45.98 252.89
03.06 REVOQUES ENLUCIDOS Y MOLDURAS
03.06.01 TARRAJEO PRIMARIO
03.06.01.01 TARRAJEO INTERIOR + IMPERMEABILIZANTE, MORTERO C:A, 1:5m2 42.93 35.08 1,505.98
03.06.02 TARRAJEO EN EXTERIORES
03.06.02.01 TARRAJEO EN MUROS EXTERIORES m2 6.75 19.67 132.77
03.06.03 TARRAJEO EN INTERIORES
03.06.03.01 TARRAJEO EN MUROS INTERIORES m2 6.75 14.39 97.13
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.73 138.94 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.73 115.24 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.67 371.59 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.69 498.75 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.98 1,662.50 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.61 311.81 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.33 373.25 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.40 383.84 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.22 2,316.72 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,468.33 14,566.99 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
3.94 1,037.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.94 1,037.80 100.00 0.00 0.00 0.00
459.13 1,988.03 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 459.13 1,988.03 100.00 0.00 0.00 0.00
156.75 5,169.62 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 156.75 5,169.62 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.80 214.41 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.80 214.41 100.00 0.00 0.00 0.00
128.06 554.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.06 554.50 100.00 0.00 0.00 0.00
11.20 341.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.20 341.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.48 2,303.84 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 478.45 2,071.69 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.93 1,639.93 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.90 4,798.56 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,298.26 5,712.34 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 158.17 5,510.64 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.65 143.14 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.50 252.89 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
42.93 1,505.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.93 1,505.98 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
6.75 132.77 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.75 132.77 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
6.75 97.13 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.75 97.13 100.00 0.00 0.00 0.00
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIALITEM DESCRIPCION
PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
03.06.04 TARRAJEO DE VIGAS
03.06.04.01 TARRAJEO EN SUPERFICIE DE VIGAS m2 42.56 20.31 864.39
03.06.04.02 VESTIDURA DE ARISTAS EN VIGAS m 121.60 3.61 438.98
03.06.05 TARRAJEO DE COLUMNAS
03.06.05.01 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 70.27 26.79 1,882.53
03.06.05.02 VESTIDURA DE ARISTAS EN COLUMNAS m 175.68 3.20 562.18
03.06.06 DERRAMES
03.06.06.01 VESTIDURA DE DERRAME EN VANOS Y PUERTAS m 1.64 13.17 21.60
03.07 PISOS Y PAVIMENTOS
03.07.01 FALSO PISO
03.07.01.01 FALSO PISO MEZCLA C:H 1:8 e = 4" m2 5.27 23.86 125.74
03.07.02 PISOS
03.07.02.01 PISO DE CEMENTO PULIDO BRUÑADO m2 5.27 24.59 129.59
03.08 CARPINTERIA METALICA
03.08.01 PUERTAS
03.08.01.01 PUERTA METÁLICA m2 1.47 184.70 271.51
03.08.01.02 COLOCACIÓN DE PUERTAS und 1.00 34.60 34.60
03.08.02 VENTANAS
03.08.02.01 VENTANAS METÁLICAS m2 1.23 139.48 171.56
03.08.02.02 COLOCACIÓN DE VENTANAS und 1.00 38.89 38.89
03.08.03 ESCALERAS
03.08.03.01 ESCALERA DE GATO m2 5.85 56.08 328.07
03.08.03.02 COLOCACIÓN DE ESCALERA DE GATO und 1.00 73.63 73.63
03.08.04 REJILLAS DE PROTECCIÓN
03.08.04.01 REJILLAS DE PROTECCIÓN DE CANALETA PLUVIAL m2 72.10 95.69 6,899.25
03.09 CERRAJERIA
03.09.01 BISAGRAS
03.09.01.01 BISAGRAS DE FIERRO; 3"x3", (VENTANAS) pza 2.00 9.99 19.98
03.09.01.02 BISAGRAS DE FIERRO; 3"x3", C/EJE DE 1/2" (PUERTAS) pza 3.00 10.74 32.22
03.09.02 MANIJAS
03.09.02.01 MANIJA DE BRONCE DE 4" pza 1.00 20.41 20.41
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 VIDRIO SEMIDOBLE p2 13.23 5.06 66.94
03.11 PINTURA
03.11.01 PINTURA LÁTEX EN INTERIORES m2 49.31 8.74 430.97
03.11.02 PINTURA LÁTEX EN EXTERIORES m2 77.02 9.11 701.65
03.11.03 PINTURA ÓLEO MATE EN PUERTAS METÁLICAS m2 1.47 14.48 21.29
03.11.04 PINTURA ÓLEO MATE EN VENTANAS METÁLICAS m2 1.23 11.11 13.67
03.12 APARATOS Y ACCESORIOS SANITARIOS
03.12.01 INODOROS
03.12.01.01 INODORO TANQUE BAJO BLANCO Y ACCESORIOS und 15.00 112.70 1,690.50
03.12.02 LAVATORIOS Y LAVADEROS
03.12.02.01 LAVATORIO DE PARED BLANCO pza 15.00 73.50 1,102.50
03.12.02.02 LAVADERO DE ACERO INOXIDABLE DE 01 POZA pza 1.00 128.00 128.00
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
42.56 864.39 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.56 864.39 100.00 0.00 0.00 0.00
121.60 438.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 121.60 438.98 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
70.27 1,882.53 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.27 1,882.53 100.00 0.00 0.00 0.00
175.68 562.18 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 175.68 562.18 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.64 21.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.64 21.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.27 125.74 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
5.27 129.59 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.27 129.59 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.47 271.51 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.47 271.51 100.00 0.00 0.00 0.00
1.00 34.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 34.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.23 171.56 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.23 171.56 100.00 0.00 0.00 0.00
1.00 38.89 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 38.89 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
5.85 328.07 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.85 328.07 100.00 0.00 0.00 0.00
1.00 73.63 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 73.63 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
72.10 6,899.25 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.10 6,899.25 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
2.00 19.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 19.98 100.00 0.00 0.00 0.00
3.00 32.22 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 32.22 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.00 20.41 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.41 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
13.23 66.94 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.23 66.94 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
49.31 430.97 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.31 430.97 100.00 0.00 0.00 0.00
77.02 701.65 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.02 701.65 100.00 0.00 0.00 0.00
1.47 21.29 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.47 21.29 100.00 0.00 0.00 0.00
1.23 13.67 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.23 13.67 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
15.00 1,690.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,690.50 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
15.00 1,102.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,102.50 100.00 0.00 0.00 0.00
1.00 128.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 128.00 100.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIALITEM DESCRIPCION
PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
03.12.03 ACCESORIOS SANITARIOS
03.12.03.01 PAPELERA DE LOZA DE COLOR DE 15 X 15 pza 15.00 8.90 133.50
03.12.03.02 JABONERA EMPOTRADA COLOR DE LOZA C/ASA DE 15 X 15 CMund 12.00 16.60 199.20
03.12.03.03 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCOpza 12.00 22.10 265.20
03.12.03.04 DUCHAS CROMADAS DE CABEZA GIRATORIA pza 12.00 27.00 324.00
03.12.04 COLOCACION DE APARATOS SANITARIOS Y ACCESORIOS SANITARIOS
03.12.04.01 COLOCACION DE APARATOS SANITARIOS und 31.00 32.62 1,011.22
03.12.04.02 COLOCACION DE ACCESORIOS SANITARIOS und 51.00 13.04 665.04
03.12.04.03 EXTINGUIDOR - POLVO QUÍMICO 5 KG und 2.00 138.98 277.96
03.13 SISTEMA DE DESAGUE
03.13.01 SALIDAS DE DESAGUE
03.13.01.01 SALIDA DE DESAGUE EN PVC 4" (INODORO) pto 15.00 33.72 505.80
03.13.01.02 SALIDA DE DESAGUE EN PVC 2" (LAVAT. , LAVAD. Y URINARIOS)pto 25.00 41.85 1,046.25
03.13.01.03 SALIDA DE DESAGUE EN PVC 3" (SUMIDERO) pto 14.00 31.77 444.78
03.13.02 REDES DE DESAGUE
03.13.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x1.20m). m 92.20 16.89 1,557.26
03.13.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 92.20 6.79 626.04
03.13.02.03 TUBERIA DE PVC SAL 4" m 126.80 18.10 2,295.08
03.13.02.04 TUBERIA DE PVC SAL 3" m 16.20 15.68 254.02
03.13.02.05 TUBERIA DE PVC SAL 2" m 45.40 13.72 622.89
03.13.03 RED DE VENTILACIÓN
03.13.03.01 RED DE VENTILACIÓN EN PVC 2" m 44.60 12.96 578.02
03.13.04 ADITAMENTOS Y ACCESORIOS VARIOS
03.13.04.01 SUMIDERO CON TRAMPA P Y REJILLA DE 3" und 5.00 45.79 228.95
03.13.04.02 REGISTROS DE BRONCE DE 4" und 16.00 34.96 559.36
03.13.04.03 CODO DE 2" x 45° PVC pza 110.00 1.58 173.80
03.13.04.04 YEE DE 2" PVC pza 35.00 9.69 339.15
03.13.04.05 YEE DE 4" CON REDUCCIÓN A 2" pza 47.00 10.61 498.67
03.13.04.06 YEE DE 4" CON REDUCCIÓN A 3" pza 33.00 22.30 735.90
03.13.04.07 YEE DE 3" CON REDUCCIÓN A 2" pza 22.00 22.30 490.60
03.13.04.08 CODOS DE 2" x 90° PVC pza 35.00 19.26 674.10
03.13.05 VARIOS
03.13.05.01 PRUEBA A RED DE DESAGUE GLB 3.00 268.00 804.00
03.13.05.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 17.00 140.68 2,391.56
03.14 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
03.14.01 SALIDA DE AGUA FRIA
03.14.01.01 SALIDA DE AGUA FRIA PVC-SAP 1/2" pto 44.00 58.78 2,586.32
03.14.02 REDES DE ALIMENTACION
03.14.02.01 EXCAVACIÓN DE ZANJAS - Promedio(0.50m.x0.80m). m 114.77 11.26 1,292.31
03.14.02.02 RELLENO MANUAL C/MATERIAL PROPIO SELECCIONADO m 114.77 6.79 779.29
03.14.02.03 TUBERIA PVC CLASE 10 - 3/4" CR SAP m 51.81 4.07 210.87
03.14.02.04 TUBERIA PVC CLASE 10 - 1 1/2" CR SAP m 62.96 18.39 1,157.83
03.14.03 REDES DE DISTRIBUCION
03.14.03.01 TUBERIA PVC CLASE 10 - 1/2" CR SAP m 68.61 3.55 243.57
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
15.00 133.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 133.50 100.00 0.00 0.00 0.00
12.00 199.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 199.20 100.00 0.00 0.00 0.00
12.00 265.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 265.20 100.00 0.00 0.00 0.00
12.00 324.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 324.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
31.00 1,011.22 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 1,011.22 100.00 0.00 0.00 0.00
51.00 665.04 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.00 665.04 100.00 0.00 0.00 0.00
2.00 277.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 277.96 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 505.80 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 1,046.25 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 444.78 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.20 1,557.26 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.20 626.04 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.80 2,295.08 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.20 254.02 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.40 622.89 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.60 578.02 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
5.00 228.95 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 228.95 100.00 0.00 0.00 0.00
16.00 559.36 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 559.36 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.00 173.80 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 339.15 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.00 498.67 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 735.90 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 490.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 674.10 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
3.00 804.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 804.00 100.00 0.00 0.00 0.00
2.00 281.36 11.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 2,391.56 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 2,586.32 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.77 1,292.31 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.77 779.29 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.81 210.87 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.96 1,157.83 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.61 243.57 100.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES SANITARIAS
UND CANT. P.U. PARCIALITEM DESCRIPCION
PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
03.14.04 ACCESORIOS DE REDES
03.14.04.01 CODO PVC CLASE 10 CR 90° x 1/2" und 65.00 16.90 1,098.50
03.14.04.02 TEE PVC - CLASE 10 CR 1/2" und 22.00 10.07 221.54
03.14.05 LLAVES Y VALVULAS
03.14.05.01 LLAVE DE COMPUERTA DE BRONCE 1/2" und 8.00 64.52 516.16
03.14.05.02 UNION UNIVERSAL und 16.00 1.50 24.00
03.14.05.03 LLAVE PARA LAVADERO TIPO ESFERICA DE 1/2" und 15.00 56.07 841.05
03.14.05.04 LLAVE DE RIEGO CON GRIFO DE 1/2" und 2.00 47.02 94.04
03.14.06 VARIOS
03.14.06.01 CAJA DE CONCRETO P/VALVULA DE COMPUERTA TAPA F° G° pza 8.00 141.55 1,132.40
03.14.06.02 PRUEBA HIDRAULICA+DESINFECCION GLB 1.00 369.60 369.60
03.15 SISTEMA DE AGUA DE LLUVIA - DRENAJE PLUVIAL
03.15.01 TUBERÍA DE BAJADA Y DISTRIBUCIÓN
03.15.01.01 CANALETA DE PLANCHA GALVANIZADA 1/32" m 86.85 19.52 1,695.31
03.15.01.02 TUBERÍA DE BAJADA PVC-SAL 4" P/LLUVIAS m 64.80 19.65 1,273.32
03.15.01.03 CODO PVC DE 90° x 4" pza 24.00 25.43 610.32
COSTO DIRECTO S/. 102,133.93
GASTOS GENERALES 9.00% S/. 9,192.05
UTILIDADES 8.00% S/. 8,170.71
SUB TOTAL S/. 119,496.69
FACTOR DE RELACION 1.00000 S/. 119,496.69
I.G.V 18.00% S/. 21,509.40
TOTAL PRESUPUESTO S/. 141,006.09
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 1,098.50 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 221.54 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 516.16 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 24.00 100.00 0.00 0.00 0.00
15.00 841.05 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 841.05 100.00 0.00 0.00 0.00
2.00 94.04 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 94.04 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
8.00 1,132.40 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 1,132.40 100.00 0.00 0.00 0.00
1.00 369.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 369.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
86.85 1,695.31 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.85 1,695.31 100.00 0.00 0.00 0.00
64.80 1,273.32 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.80 1,273.32 100.00 0.00 0.00 0.00
24.00 610.32 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 610.32 100.00 0.00 0.00 0.00
37,752.58 0.00
44,170.52 0.00
0.00 0.00 102,133.93 0.00
3,397.73 0.00 0.00 0.00 9,192.05 0.00
3,020.21 0.00 0.00 0.00 8,170.71 0.00
0.00 0.00 119,496.69 0.00
44,170.52 0.00 0.00 0.00 119,496.69 0.00
7,950.69 0.00 0.00 0.00 21,509.40 0.00
52,121.21 0.00 0.00 0.00 141,006.09 0.00
36.96% 0.00% 0.00% 0.00% 100.00% 0.00%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
04 INSTALACIONES ELECTRICAS, TELEFÓNICAS Y DE COMUNICACIÓN
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO m2 1,295.50 2.14 2,772.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,295.50 2,772.37 100.00 0.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00
04.02.01 EXCAVACION, RELLENO DE ZANJA (0.70 x 0.60 M) m 80.00 12.36 988.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 988.80 100.00 0.00 0.00 0.00
04.02.02 EXCAVACION DE POZO PARA POSTE pzo 4.00 35.57 142.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 142.28 100.00 0.00 0.00 0.00
04.02.03 EXCAVACION DE POZO PARA PUESTA A TIERRA pzo 2.00 59.28 118.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 118.56 100.00 0.00 0.00 0.00
04.03 TUBERíAS DE PVC 0.00 0.00 0.00 0.00 0.00
04.03.01 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 40 mm m 15.00 16.89 253.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 253.35 100.00 0.00 0.00 0.00
04.03.02 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 25 mm m 60.00 13.01 780.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 780.60 100.00 0.00 0.00 0.00
04.03.03 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 20 mm m 146.00 13.16 1,921.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.00 1,921.36 100.00 0.00 0.00 0.00
04.03.04 TUBERIA DE PVC SEL P/INST. ELÉCTRICAS 20 mm m 1,009.00 12.93 13,046.37 0.00 0.00 0.00 0.00 0.00 0.00 347.45 4,492.53 34.44 661.55 8,553.84 65.56 0.00 0.00 0.00
04.04 CABLES Y CONDUCTORES 0.00 0.00 0.00 0.00 0.00
04.04.01 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 16 MM2. ALIMENTADORm 15.00 34.95 524.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.02 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 6 MM2. ALIMENTADORm 60.00 19.52 1,171.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.03 CONDUCTOR DE DUPLEX CU N2XH 2-1 x 4 MM2. SUBALIMENTADORm 72.00 14.61 1,051.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.04 CONDUCTOR DE CU LSOH 6 MM2. m 92.00 4.16 382.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.05 CONDUCTOR DE CU LSOH 4 MM2. m 878.00 3.74 3,283.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.04.06 CONDUCTOR DE CU LSOH 2.5 MM2. m 2,135.00 2.43 5,188.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.05 CAJAS DE PASE Y BUZONES DE REGISTRO 0.00 0.00 0.00 0.00 0.00
04.05.01 CAJA DE PASE, CAJA OCTOGONAL DE Fº Gº PES. DE 100 x 40 mmpto 7.00 19.03 133.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 133.21 100.00 0.00 0.00 0.00
04.05.02 CAJA DE PASE, CAJA CUADRADA DE Fº Gº PES. DE 200 x 200 mmpto 2.00 33.70 67.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 67.40 100.00 0.00 0.00 0.00
04.05.03 BUZÓN DE REGISTRO DE C. A. DE 400 x 400 mm und 7.00 187.45 1,312.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,312.15 100.00 0.00 0.00 0.00
04.06 EQUIPO DE ALUMBRADO INTERIOR 0.00 0.00 0.00 0.00 0.00
04.06.01 EQUIPO CON FLUORESCENTES RECTOS T8 -3 x 36 W pto 52.00 193.25 10,049.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.06.02 EQUIPO CON FLUORESCENTES RECTOS T8 -2 x 18 W pto 18.00 151.03 2,718.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.06.03 CENTRO DELUZ EMPOTRADO CON LAMPARA CFL 23 W pto 32.00 54.49 1,743.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.06.04 CENTRO DE LUZ ADOSADO, FAROLA ESFERICA CON LAMPARA CFL 23 Wpto 30.00 77.95 2,338.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.06.05 SISTEMA DE LUCES DE EMERGENCIA pto 8.00 104.34 834.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.07 EQUIPO DE ALUMBRADO EXTERIOR 0.00 0.00 0.00 0.00 0.00
04.07.01 EQUIPO DE ALUMBRADO EXTERIOR, FAROLA ESFERICA, POSTE C.A.C. 5 M. cjto 4.00 722.70 2,890.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.07.02 EQUIPO DE ALUMBRADO LOSA DEPORTIVA, REFLECTORES, POSTE C.A.C. 11 Mcjto 2.00 1,885.03 3,770.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.08 TABLEROS Y SUB TABLEROS 0.00 0.00 0.00 0.00 0.00
04.08.01 TABLERO GENERAL (TG) und 1.00 2,079.38 2,079.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,079.38 100.00 0.00 0.00 0.00
04.08.02 SUB TABLERO DE DISTRIBUCIÓN (STD 1.1) und 1.00 1,062.55 1,062.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,062.55 100.00 0.00 0.00 0.00
04.08.03 SUB TABLERO DE DISTRIBUCIÓN (STD 1.2, STD 2.1, STD 2.2)und 3.00 1,039.95 3,119.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3,119.85 100.00 0.00 0.00 0.00
October 2011
VALORIZACION DE OBRA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
October 2011
VALORIZACION DE OBRA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
04.09 SALIDAS DE PARED - INTERRUPTORES 0.00 0.00 0.00 0.00 0.00
04.09.01 SALIDA DE PARED, P/INTERRUPTOR SIMPLE CAJA RECTANGULARpto 9.00 23.12 208.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.09.02 SALIDA DE PARED, P/INTERRUPTOR DOBLE CAJA RECTANGULARpto 32.00 33.84 1,082.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.09.03 SALIDA DE PARED, P/INTERRUPTOR TRIPLE CAJA RECTANGULARpto 1.00 35.54 35.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.09.04 SALIDA DE PARED, P/INTERRUPTOR CONMUTACIÓN CAJA RECTANGULARpto 4.00 27.12 108.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.10 SALIDAS PARA TOMACORRIENTES 0.00 0.00 0.00 0.00 0.00
04.10.01 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE CAJA RECTANGULARpto 18.00 29.10 523.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.10.02 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE C/TOMA TIERRA, CAJA RECTANGULAR EN PAREDpto 86.00 39.80 3,422.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.11 EQUIPO DE PUESTA A TIERRA 0.00 0.00 0.00 0.00 0.00
04.11.01 EQUIPO DE PUESTA A TIERRA (PAT-1) und 2.00 605.39 1,210.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.12 PRUEBAS ELÉCTRICAS FINALES 0.00 0.00 0.00 0.00 0.00
04.12.01 PRUEBAS DE AISLAMIENTO und 11.00 51.20 563.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.12.02 PRUEBAS DE RESISTIVIDAD DE PUESTA A TIERRA und 8.00 51.06 408.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.12.03 PRUEBAS DE CONTINUIDAD DE INSTALACIONES INTERIORESund 9.00 51.04 459.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.12.04 PRUEBAS DE CORRIENTE Y BALANCEO DE CARGAS und 9.00 63.79 574.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.13 TELEFONIA 0.00 0.00 0.00 0.00 0.00
04.13.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 4.00 30.77 123.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 123.08 100.00 0.00 0.00 0.00
04.13.02 CONDUCTOR DE CU XPT DE 3 PARES (0.64 mm) Y TUBO PVC SEL 20 mmm 20.00 3.68 73.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.13.03 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 3.00 21.41 64.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 64.23 100.00 0.00 0.00 0.00
04.13.04 TABLERO GENERAL DE TELEFONIA und 2.00 580.38 1,160.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.14 SISTEMA DE INFORMATICA - DATA 0.00 0.00 0.00 0.00 0.00
04.14.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (INF)pto 12.00 33.77 405.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 405.24 100.00 0.00 0.00 0.00
04.14.02 CONDUCTOR DE CU UTP - STP 4x24 AWG Y TUBO PVC SEL 25MMm 452.00 10.59 4,786.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.14.03 SALIDA EN PARED CAJA DE PASO (INF) pto 1.00 24.87 24.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 24.87 100.00 0.00 0.00 0.00
04.14.04 PANEL DE CONTROL DE INFORMÁTICA - TABLERO und 1.00 1,059.26 1,059.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.15 SISTEMA DE TV - CABLE 0.00 0.00 0.00 0.00 0.00
04.15.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (TV)pto 15.00 39.12 586.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.15.02 CONDUCTOR DE CU COAXIAL RG59 Y TUBO PVC SEL 20 mmm 147.00 4.30 632.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.15.03 SALIDA DE PARED, C/CAJA DE PASO (TV) pto 8.00 25.01 200.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.15.04 PANEL DE CONTROL DE TV - CABLE (TABLERO) und 2.00 686.06 1,372.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.16 SISTEMA DE ALARMA CONTRA INCENDIOS 0.00 0.00 0.00 0.00 0.00
04.16.01 SALIDA PARA SENSOR DE HUMO Y ELEVACIÓN DE TEMPERATURApto 12.00 123.59 1,483.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.16.02 CONDUCTOR DE CU FPL-P 2x18AWG Y TUBO PVC SEL 20mmm 97.00 3.91 379.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.16.03 SALIDA DE PARED P/CAJA DE PASO (ACI) und 6.00 25.99 155.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.16.04 SALIDA DE PARED P/PULSADOR, SEÑAL SONORA Y LUZ ESTROBOSCOPICAund 4.00 123.46 493.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.16.05 PANEL DE MANDO AUTOMÁTICO DE ALARMA CONTRA INCENDIOS (ACI)und 2.00 752.66 1,505.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
October 2011
VALORIZACION DE OBRA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
04.17 SISTEMA DE AUDIO 0.00 0.00 0.00 0.00 0.00
04.17.01 SALIDA DE TECHO, CAJA RECTANG. PARA ALTAVOZ DE 6 OHMIOSpto 4.00 148.31 593.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 593.24 100.00
04.17.02 CONDUCTOR DE CU XT 2x0.64mm DIAM. Y TUBO PVC SEL 20 mm (AUDIO)m 75.00 4.36 327.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.17.03 SALIDA DE PARED P/CAJA DE PASO (AUDIO.) pto 4.00 32.51 130.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 130.04 100.00
04.17.04 CONTROL EMISOR CON AMPLIFICADOR Y /MICROFONOS (TABLERO)und 1.00 855.56 855.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 88,755.01
GASTOS GENERALES 9.00% S/. 7,987.95
UTILIDADES 8.00% S/. 7,100.40
SUB TOTAL S/. 103,843.36
FACTOR DE RELACION ###### S/. 103,843.36
I.G.V ###### S/. 18,691.80
TOTAL PRESUPUESTO S/. 122,535.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 4,492.53
404.33
359.40
5,256.26
5,256.26
946.13
6,202.39
5.06%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
23,923.12 723.28
27,990.05 846.24
2,153.08 65.10
1,913.85 57.86
27,990.05 846.24
5,038.21 152.32
33,028.26 998.56
26.95% 0.81%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL
04 INSTALACIONES ELECTRICAS, TELEFÓNICAS Y DE COMUNICACIÓN
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO m2 1,295.50 2.14 2,772.37
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION, RELLENO DE ZANJA (0.70 x 0.60 M) m 80.00 12.36 988.80
04.02.02 EXCAVACION DE POZO PARA POSTE pzo 4.00 35.57 142.28
04.02.03 EXCAVACION DE POZO PARA PUESTA A TIERRA pzo 2.00 59.28 118.56
04.03 TUBERíAS DE PVC
04.03.01 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 40 mm m 15.00 16.89 253.35
04.03.02 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 25 mm m 60.00 13.01 780.60
04.03.03 TUBERIA DE PVC SAP P/INST. ELÉCTRICAS 20 mm m 146.00 13.16 1,921.36
04.03.04 TUBERIA DE PVC SEL P/INST. ELÉCTRICAS 20 mm m 1,009.00 12.93 13,046.37
04.04 CABLES Y CONDUCTORES
04.04.01 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 16 MM2. ALIMENTADORm 15.00 34.95 524.25
04.04.02 CONDUCTOR DE CU TRIPLE N2XH 3-1 x 6 MM2. ALIMENTADORm 60.00 19.52 1,171.20
04.04.03 CONDUCTOR DE DUPLEX CU N2XH 2-1 x 4 MM2. SUBALIMENTADORm 72.00 14.61 1,051.92
04.04.04 CONDUCTOR DE CU LSOH 6 MM2. m 92.00 4.16 382.72
04.04.05 CONDUCTOR DE CU LSOH 4 MM2. m 878.00 3.74 3,283.72
04.04.06 CONDUCTOR DE CU LSOH 2.5 MM2. m 2,135.00 2.43 5,188.05
04.05 CAJAS DE PASE Y BUZONES DE REGISTRO
04.05.01 CAJA DE PASE, CAJA OCTOGONAL DE Fº Gº PES. DE 100 x 40 mmpto 7.00 19.03 133.21
04.05.02 CAJA DE PASE, CAJA CUADRADA DE Fº Gº PES. DE 200 x 200 mmpto 2.00 33.70 67.40
04.05.03 BUZÓN DE REGISTRO DE C. A. DE 400 x 400 mm und 7.00 187.45 1,312.15
04.06 EQUIPO DE ALUMBRADO INTERIOR
04.06.01 EQUIPO CON FLUORESCENTES RECTOS T8 -3 x 36 W pto 52.00 193.25 10,049.00
04.06.02 EQUIPO CON FLUORESCENTES RECTOS T8 -2 x 18 W pto 18.00 151.03 2,718.54
04.06.03 CENTRO DELUZ EMPOTRADO CON LAMPARA CFL 23 W pto 32.00 54.49 1,743.68
04.06.04 CENTRO DE LUZ ADOSADO, FAROLA ESFERICA CON LAMPARA CFL 23 Wpto 30.00 77.95 2,338.50
04.06.05 SISTEMA DE LUCES DE EMERGENCIA pto 8.00 104.34 834.72
04.07 EQUIPO DE ALUMBRADO EXTERIOR
04.07.01 EQUIPO DE ALUMBRADO EXTERIOR, FAROLA ESFERICA, POSTE C.A.C. 5 M. cjto 4.00 722.70 2,890.80
04.07.02 EQUIPO DE ALUMBRADO LOSA DEPORTIVA, REFLECTORES, POSTE C.A.C. 11 Mcjto 2.00 1,885.03 3,770.06
04.08 TABLEROS Y SUB TABLEROS
04.08.01 TABLERO GENERAL (TG) und 1.00 2,079.38 2,079.38
04.08.02 SUB TABLERO DE DISTRIBUCIÓN (STD 1.1) und 1.00 1,062.55 1,062.55
04.08.03 SUB TABLERO DE DISTRIBUCIÓN (STD 1.2, STD 2.1, STD 2.2)und 3.00 1,039.95 3,119.85
VALORIZACION DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,295.50 2,772.37 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 988.80 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 142.28 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 118.56 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 253.35 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 780.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.00 1,921.36 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,009.00 13,046.37 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
15.00 524.25 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 524.25 100.00 0.00 0.00 0.00
60.00 1,171.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 1,171.20 100.00 0.00 0.00 0.00
72.00 1,051.92 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 1,051.92 100.00 0.00 0.00 0.00
92.00 382.72 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.00 382.72 100.00 0.00 0.00 0.00
878.00 3,283.72 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 878.00 3,283.72 100.00 0.00 0.00 0.00
2,135.00 5,188.05 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,135.00 5,188.05 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 133.21 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 67.40 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 1,312.15 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
52.00 10,049.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 10,049.00 100.00 0.00 0.00 0.00
18.00 2,718.54 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 2,718.54 100.00 0.00 0.00 0.00
32.00 1,743.68 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 1,743.68 100.00 0.00 0.00 0.00
30.00 2,338.50 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 2,338.50 100.00 0.00 0.00 0.00
8.00 834.72 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 834.72 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
4.00 2,890.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2,890.80 100.00 0.00 0.00 0.00
2.00 3,770.06 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 3,770.06 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,079.38 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,062.55 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3,119.85 100.00 0.00 0.00 0.00
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL
VALORIZACION DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
04.09 SALIDAS DE PARED - INTERRUPTORES
04.09.01 SALIDA DE PARED, P/INTERRUPTOR SIMPLE CAJA RECTANGULARpto 9.00 23.12 208.08
04.09.02 SALIDA DE PARED, P/INTERRUPTOR DOBLE CAJA RECTANGULARpto 32.00 33.84 1,082.88
04.09.03 SALIDA DE PARED, P/INTERRUPTOR TRIPLE CAJA RECTANGULARpto 1.00 35.54 35.54
04.09.04 SALIDA DE PARED, P/INTERRUPTOR CONMUTACIÓN CAJA RECTANGULARpto 4.00 27.12 108.48
04.10 SALIDAS PARA TOMACORRIENTES
04.10.01 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE CAJA RECTANGULARpto 18.00 29.10 523.80
04.10.02 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE C/TOMA TIERRA, CAJA RECTANGULAR EN PAREDpto 86.00 39.80 3,422.80
04.11 EQUIPO DE PUESTA A TIERRA
04.11.01 EQUIPO DE PUESTA A TIERRA (PAT-1) und 2.00 605.39 1,210.78
04.12 PRUEBAS ELÉCTRICAS FINALES
04.12.01 PRUEBAS DE AISLAMIENTO und 11.00 51.20 563.20
04.12.02 PRUEBAS DE RESISTIVIDAD DE PUESTA A TIERRA und 8.00 51.06 408.48
04.12.03 PRUEBAS DE CONTINUIDAD DE INSTALACIONES INTERIORESund 9.00 51.04 459.36
04.12.04 PRUEBAS DE CORRIENTE Y BALANCEO DE CARGAS und 9.00 63.79 574.11
04.13 TELEFONIA
04.13.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 4.00 30.77 123.08
04.13.02 CONDUCTOR DE CU XPT DE 3 PARES (0.64 mm) Y TUBO PVC SEL 20 mmm 20.00 3.68 73.60
04.13.03 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS pto 3.00 21.41 64.23
04.13.04 TABLERO GENERAL DE TELEFONIA und 2.00 580.38 1,160.76
04.14 SISTEMA DE INFORMATICA - DATA
04.14.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (INF)pto 12.00 33.77 405.24
04.14.02 CONDUCTOR DE CU UTP - STP 4x24 AWG Y TUBO PVC SEL 25MMm 452.00 10.59 4,786.68
04.14.03 SALIDA EN PARED CAJA DE PASO (INF) pto 1.00 24.87 24.87
04.14.04 PANEL DE CONTROL DE INFORMÁTICA - TABLERO und 1.00 1,059.26 1,059.26
04.15 SISTEMA DE TV - CABLE
04.15.01 SALIDA DE PARED, CAJA RECTANGULAR Y ACCESORIOS (TV)pto 15.00 39.12 586.80
04.15.02 CONDUCTOR DE CU COAXIAL RG59 Y TUBO PVC SEL 20 mmm 147.00 4.30 632.10
04.15.03 SALIDA DE PARED, C/CAJA DE PASO (TV) pto 8.00 25.01 200.08
04.15.04 PANEL DE CONTROL DE TV - CABLE (TABLERO) und 2.00 686.06 1,372.12
04.16 SISTEMA DE ALARMA CONTRA INCENDIOS
04.16.01 SALIDA PARA SENSOR DE HUMO Y ELEVACIÓN DE TEMPERATURApto 12.00 123.59 1,483.08
04.16.02 CONDUCTOR DE CU FPL-P 2x18AWG Y TUBO PVC SEL 20mmm 97.00 3.91 379.27
04.16.03 SALIDA DE PARED P/CAJA DE PASO (ACI) und 6.00 25.99 155.94
04.16.04 SALIDA DE PARED P/PULSADOR, SEÑAL SONORA Y LUZ ESTROBOSCOPICAund 4.00 123.46 493.84
04.16.05 PANEL DE MANDO AUTOMÁTICO DE ALARMA CONTRA INCENDIOS (ACI)und 2.00 752.66 1,505.32
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
9.00 208.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 208.08 100.00 0.00 0.00 0.00
32.00 1,082.88 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 1,082.88 100.00 0.00 0.00 0.00
1.00 35.54 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 35.54 100.00 0.00 0.00 0.00
4.00 108.48 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 108.48 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
18.00 523.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 523.80 100.00 0.00 0.00 0.00
86.00 3,422.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 3,422.80 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
2.00 1,210.78 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,210.78 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
11.00 563.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 563.20 100.00 0.00 0.00 0.00
8.00 408.48 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 408.48 100.00 0.00 0.00 0.00
9.00 459.36 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 459.36 100.00 0.00 0.00 0.00
9.00 574.11 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 574.11 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 123.08 100.00 0.00 0.00 0.00
20.00 73.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 73.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 64.23 100.00 0.00 0.00 0.00
2.00 1,160.76 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,160.76 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 405.24 100.00 0.00 0.00 0.00
452.00 4,786.68 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 452.00 4,786.68 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 24.87 100.00 0.00 0.00 0.00
1.00 1,059.26 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,059.26 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
15.00 586.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 586.80 100.00 0.00 0.00 0.00
147.00 632.10 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.00 632.10 100.00 0.00 0.00 0.00
8.00 200.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 200.08 100.00 0.00 0.00 0.00
2.00 1,372.12 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,372.12 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
12.00 1,483.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,483.08 100.00 0.00 0.00 0.00
97.00 379.27 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.00 379.27 100.00 0.00 0.00 0.00
6.00 155.94 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 155.94 100.00 0.00 0.00 0.00
4.00 493.84 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 493.84 100.00 0.00 0.00 0.00
2.00 1,505.32 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,505.32 100.00 0.00 0.00 0.00
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : INSTALACIONES ELECTRICAS
UND CANT. P.U. PARCIAL
VALORIZACION DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
04.17 SISTEMA DE AUDIO
04.17.01 SALIDA DE TECHO, CAJA RECTANG. PARA ALTAVOZ DE 6 OHMIOSpto 4.00 148.31 593.24
04.17.02 CONDUCTOR DE CU XT 2x0.64mm DIAM. Y TUBO PVC SEL 20 mm (AUDIO)m 75.00 4.36 327.00
04.17.03 SALIDA DE PARED P/CAJA DE PASO (AUDIO.) pto 4.00 32.51 130.04
04.17.04 CONTROL EMISOR CON AMPLIFICADOR Y /MICROFONOS (TABLERO)und 1.00 855.56 855.56
COSTO DIRECTO S/. 88,755.01
GASTOS GENERALES 9.00% S/. 7,987.95
UTILIDADES 8.00% S/. 7,100.40
SUB TOTAL S/. 103,843.36
FACTOR DE RELACION ###### S/. 103,843.36
I.G.V ###### S/. 18,691.80
TOTAL PRESUPUESTO S/. 122,535.16
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 593.24 100.00 0.00 0.00 0.00
75.00 327.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.00 327.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 130.04 100.00 0.00 0.00 0.00
1.00 855.56 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 855.56 100.00 0.00 0.00 0.00
59,616.08 0.00
69,750.82 0.00
0.00 0.00 88,755.01 0.00
5,365.45 0.00 0.00 0.00 7,987.95 0.00
4,769.29 0.00 0.00 0.00 7,100.40 0.00
0.00 0.00 103,843.36 0.00
69,750.82 0.00 0.00 0.00 103,843.36 0.00
12,555.15 0.00 0.00 0.00 18,691.80 0.00
82,305.97 0.00 0.00 0.00 122,535.16 0.00
67.17% 0.00% 0.00% 0.00% 100.00% 0.00%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : MITIGACIÓN DE IMPACTO AMBIENTAL
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
05 MITIGACIÓN DE IMPACTO AMBIENTAL
05.01 PLAN DE MANEJO AMBIENTAL
05.01.01 MONITOREO A LA APLICACIÓN DE NORMAS DE COMPORTAMIENTOGLB 1.00 1,500.00 1,500.00 0.20 300.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 300.00 20.00 0.20 300.00 20.00
05.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALESGLB 1.00 1,500.00 1,500.00 0.20 300.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 300.00 20.00 0.20 300.00 20.00
05.02 PLAN DE FORESTACIÓN Y REFORESTACIÓN 0.00 0.00 0.00 0.00 0.00
05.02.01 PLANTAS PARA PROTECCIÓN 0.00 0.00 0.00 0.00 0.00
05.02.01.01 TULIPAN AFRICANO 0.00 0.00 0.00 0.00 0.00
05.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.01.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 10.80 108.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.01.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.02 FICUS 0.00 0.00 0.00 0.00 0.00
05.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.02.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 15.80 316.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.02.03 SIEMBRA DE PLANTONES und 20.00 3.22 64.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.03 CHIFLERO 0.00 0.00 0.00 0.00 0.00
05.02.01.03.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 3.76 45.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.03.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 6.00 15.80 94.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.03.03 SIEMBRA DE PLANTONES und 9.00 3.22 28.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.04 ROSAS 0.00 0.00 0.00 0.00 0.00
05.02.01.04.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.04.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 10.80 108.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.04.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.05 BOTÓN DE ORO 0.00 0.00 0.00 0.00 0.00
05.02.01.05.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 3.76 45.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.05.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 4.68 93.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.05.03 SIEMBRA DE PLANTONES und 20.00 3.22 64.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.06 GRASS AMERICANO 0.00 0.00 0.00 0.00 0.00
05.02.01.06.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 120.00 3.76 451.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.06.02 ADQUISICIÓN Y TRANSPORTE DE GRASS sac 16.00 16.98 271.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.06.03 SIEMBRA DE GRASS m2 120.00 3.22 386.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.07 CAMPANILLA AZUL 0.00 0.00 0.00 0.00 0.00
05.02.01.07.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 10.00 3.76 37.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.07.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 5.18 51.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.02.01.07.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.03 SEÑALIZACIÓN 0.00 0.00 0.00 0.00 0.00
05.03.01 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 0.30 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 5.00 57.06 285.30 5.00 285.30 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.03.02 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 1.00 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 2.00 87.06 174.12 2.00 174.12 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.04 MANEJO DE CAMPAMENTO 0.00 0.00 0.00 0.00 0.00
05.04.01 CONTENEDORES DE RESIDUOS SÓLIDOS und 2.00 59.32 118.64 2.00 118.64 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.04.02 MICRORELLENO SANITARIO und 1.00 526.97 526.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.04.03 CLAUSURA DE MICRORELLENO SANITARIO und 1.00 181.27 181.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.04.04 IMPLEMENTACIÓN DE BOTIQUÍN GLB 1.00 769.00 769.00 1.00 769.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.04.05 ADQUISICIÓN DE EXTINTOR GLB 1.00 128.00 128.00 1.00 128.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
December 2011September 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : MITIGACIÓN DE IMPACTO AMBIENTAL
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
December 2011September 2011ITEM DESCRIPCION
October 2011PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
16 DE ABRIL 2012
S/. 1,866,744.92
November 2011August 2011
05.05 MANEJO DE CANTERA 0.00 0.00 0.00 0.00 0.00
05.05.01 MANEJO DE ÁREA DE CANTERA DE RIO GLB 1.00 1,645.28 1,645.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.06 EDUCACIÓN AMBIENTAL 0.00 0.00 0.00 0.00 0.00
05.06.01 CHARLA AL PERSONAL DE OBRA und 3.00 445.00 1,335.00 1.00 445.00 33.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 445.00 33.33 0.00 0.00 0.00
05.06.02 CHARLA A LOS BENEFICIARIOS und 2.00 469.00 938.00 1.00 469.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.06.03 AFICHES AMBIENTALES und 500.00 0.80 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.06.04 POLOS CON LOGOTIPO AMBIENTAL und 100.00 15.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.07 PLAN DE SEGURIDAD 0.00 0.00 0.00 0.00 0.00
05.07.01 CINTAS DE SEGURIDAD PARA PROTECCIÓN DE OBRA rll 5.00 42.67 213.35 3.00 128.01 60.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 42.67 20.00 1.00 42.67 20.00
05.08 PROGRAMA DE ABANDONO 0.00 0.00 0.00 0.00 0.00
05.08.01 CIERRE DE CANTERA DE RIO GLB 1.00 350.00 350.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.08.02 TRATAMIENTO AMBIENTAL A LOS ACCESOS DE LA OBRA GLB 1.00 300.00 300.00 0.25 75.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 14,354.23
GASTOS GENERALES 9.00% S/. 1,291.88
UTILIDADES 8.00% S/. 1,148.34
SUB TOTAL S/. 16,794.45
FACTOR DE RELACION 1.00000 S/. 16,794.45
I.G.V 18.00% S/. 3,023.00
TOTAL PRESUPUESTO S/. 19,817.45
3,192.07
287.29
255.37
3,734.73
3,734.73
672.25
4,406.98
22.24%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,087.67
97.89
87.01
1,272.57
1,272.57
229.06
1,501.63
7.58%
642.67
57.84
751.92
51.41
751.92
135.35
4.48%
887.27
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : MITIGACIÓN DE IMPACTO AMBIENTAL
UND CANT. P.U. PARCIAL
05 MITIGACIÓN DE IMPACTO AMBIENTAL
05.01 PLAN DE MANEJO AMBIENTAL
05.01.01 MONITOREO A LA APLICACIÓN DE NORMAS DE COMPORTAMIENTOGLB 1.00 1,500.00 1,500.00
05.01.02 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALESGLB 1.00 1,500.00 1,500.00
05.02 PLAN DE FORESTACIÓN Y REFORESTACIÓN
05.02.01 PLANTAS PARA PROTECCIÓN
05.02.01.01 TULIPAN AFRICANO
05.02.01.01.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20
05.02.01.01.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 10.80 108.00
05.02.01.01.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20
05.02.01.02 FICUS
05.02.01.02.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20
05.02.01.02.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 15.80 316.00
05.02.01.02.03 SIEMBRA DE PLANTONES und 20.00 3.22 64.40
05.02.01.03 CHIFLERO
05.02.01.03.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 3.76 45.12
05.02.01.03.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 6.00 15.80 94.80
05.02.01.03.03 SIEMBRA DE PLANTONES und 9.00 3.22 28.98
05.02.01.04 ROSAS
05.02.01.04.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 20.00 3.76 75.20
05.02.01.04.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 10.80 108.00
05.02.01.04.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20
05.02.01.05 BOTÓN DE ORO
05.02.01.05.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 12.00 3.76 45.12
05.02.01.05.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 20.00 4.68 93.60
05.02.01.05.03 SIEMBRA DE PLANTONES und 20.00 3.22 64.40
05.02.01.06 GRASS AMERICANO
05.02.01.06.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 120.00 3.76 451.20
05.02.01.06.02 ADQUISICIÓN Y TRANSPORTE DE GRASS sac 16.00 16.98 271.68
05.02.01.06.03 SIEMBRA DE GRASS m2 120.00 3.22 386.40
05.02.01.07 CAMPANILLA AZUL
05.02.01.07.01 TRAZO, REPLANTEO Y LIMPIEZA DEL TERRENO m2 10.00 3.76 37.60
05.02.01.07.02 ADQUISICIÓN Y TRANSPORTE DE PLANTONES und 10.00 5.18 51.80
05.02.01.07.03 SIEMBRA DE PLANTONES und 10.00 3.22 32.20
05.03 SEÑALIZACIÓN
05.03.01 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 0.30 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 5.00 57.06 285.30
05.03.02 LETRERO DE SEÑALIZACIÓN AMBIENTAL (0.50 x 1.00 M) C/BASTIDORES Y PARANTES DE MADERA TORNILLOund 2.00 87.06 174.12
05.04 MANEJO DE CAMPAMENTO
05.04.01 CONTENEDORES DE RESIDUOS SÓLIDOS und 2.00 59.32 118.64
05.04.02 MICRORELLENO SANITARIO und 1.00 526.97 526.97
05.04.03 CLAUSURA DE MICRORELLENO SANITARIO und 1.00 181.27 181.27
05.04.04 IMPLEMENTACIÓN DE BOTIQUÍN GLB 1.00 769.00 769.00
05.04.05 ADQUISICIÓN DE EXTINTOR GLB 1.00 128.00 128.00
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
0.40 600.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00 0.00 0.00
0.40 600.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
20.00 75.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 75.20 100.00 0.00 0.00 0.00
10.00 108.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 108.00 100.00 0.00 0.00 0.00
10.00 32.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 32.20 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
20.00 75.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 75.20 100.00 0.00 0.00 0.00
20.00 316.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 316.00 100.00 0.00 0.00 0.00
20.00 64.40 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 64.40 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
12.00 45.12 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 45.12 100.00 0.00 0.00 0.00
6.00 94.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 94.80 100.00 0.00 0.00 0.00
9.00 28.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 28.98 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
20.00 75.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 75.20 100.00 0.00 0.00 0.00
10.00 108.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 108.00 100.00 0.00 0.00 0.00
10.00 32.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 32.20 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
12.00 45.12 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 45.12 100.00 0.00 0.00 0.00
20.00 93.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 93.60 100.00 0.00 0.00 0.00
20.00 64.40 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 64.40 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
120.00 451.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 451.20 100.00 0.00 0.00 0.00
16.00 271.68 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 271.68 100.00 0.00 0.00 0.00
87.04 280.26 72.53 32.96 106.14 27.47 0.00 0.00 0.00 0.00 0.00 0.00 120.00 386.40 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 10.00 37.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 37.60 100.00 0.00 0.00 0.00
0.00 0.00 0.00 10.00 51.80 100.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 51.80 100.00 0.00 0.00 0.00
0.00 0.00 0.00 10.00 32.20 100.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 32.20 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 285.30 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 174.12 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 118.64 100.00 0.00 0.00 0.00
1.00 526.97 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 526.97 100.00 0.00 0.00 0.00
1.00 181.27 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 181.27 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 769.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 128.00 100.00 0.00 0.00 0.00
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : MITIGACIÓN DE IMPACTO AMBIENTAL
UND CANT. P.U. PARCIALITEM DESCRIPCION
PRESUPUESTO CONTRACTUAL
VALORIZACION DE OBRA
05.05 MANEJO DE CANTERA
05.05.01 MANEJO DE ÁREA DE CANTERA DE RIO GLB 1.00 1,645.28 1,645.28
05.06 EDUCACIÓN AMBIENTAL
05.06.01 CHARLA AL PERSONAL DE OBRA und 3.00 445.00 1,335.00
05.06.02 CHARLA A LOS BENEFICIARIOS und 2.00 469.00 938.00
05.06.03 AFICHES AMBIENTALES und 500.00 0.80 400.00
05.06.04 POLOS CON LOGOTIPO AMBIENTAL und 100.00 15.00 1,500.00
05.07 PLAN DE SEGURIDAD
05.07.01 CINTAS DE SEGURIDAD PARA PROTECCIÓN DE OBRA rll 5.00 42.67 213.35
05.08 PROGRAMA DE ABANDONO
05.08.01 CIERRE DE CANTERA DE RIO GLB 1.00 350.00 350.00
05.08.02 TRATAMIENTO AMBIENTAL A LOS ACCESOS DE LA OBRA GLB 1.00 300.00 300.00
COSTO DIRECTO S/. 14,354.23
GASTOS GENERALES 9.00% S/. 1,291.88
UTILIDADES 8.00% S/. 1,148.34
SUB TOTAL S/. 16,794.45
FACTOR DE RELACION 1.00000 S/. 16,794.45
I.G.V 18.00% S/. 3,023.00
TOTAL PRESUPUESTO S/. 19,817.45
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
0.00 0.00 0.00 0.00 0.00 0.00
1.00 1,645.28 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,645.28 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.00 445.00 33.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,335.00 100.00 0.00 0.00 0.00
1.00 469.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 938.00 100.00 0.00 0.00 0.00
500.00 400.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 400.00 100.00 0.00 0.00 0.00
100.00 1,500.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 1,500.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 213.35 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 1.00 350.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 350.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.75 225.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 300.00 100.00 0.00 0.00 0.00
1,291.88 0.00
8,629.08 802.74 0.00 0.00 14,354.23
64.22 0.00 0.00 1,148.34
0.00
776.62 72.25 0.00 0.00
0.00
10,096.03 939.21 0.00 0.00 16,794.45 0.00
690.33
3,023.00 0.00
10,096.03 939.21 0.00 0.00 16,794.45
1,108.27 0.00 0.00 19,817.45
0.00
1,817.29 169.06 0.00 0.00
0.00
60.12% 5.59% 0.00% 0.00% 100.00% 0.00%
11,913.32
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCOCONTRATO: Nº 324-2011-GRH/PR
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO MONTO DEL CONTRATO:
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA INICIO DE OBRA: 21 DE AGOSTO 2011
SUPERVISOR : CONSORCIO SV CONSULTORES TERMINO CONTRACTUAL:
FORMULA : MOBILIARIO Y EQUIPAMIENTO
UND CANT. P.U. PARCIAL MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
06.00 MOBILIARIO Y EQUIPAMIENTO
06.01 MOBILIARIO GLB 1.00 17,195.00 17,195.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02 EQUIPAMIENTO CENTRO DE CÓMPUTO GLB 1.00 43,470.00 43,470.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03 EQUIPAMIENTO TALLERES GLB 1.00 114,872.40 114,872.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO S/. 175,537.40
GASTOS GENERALES 9.00% S/. 15,798.37
UTILIDADES 8.00% S/. 14,042.99
SUB TOTAL S/. 205,378.76
FACTOR DE RELACION 1.00000 S/. 205,378.76
I.G.V 18.00% S/. 36,968.18
TOTAL PRESUPUESTO S/. 242,346.94
October 2011
VALORIZACION DE OBRA
16 DE ABRIL 2012
December 2011
S/. 1,866,744.92
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL November 2011August 2011 September 2011
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00% 0.00% 0.00%
OBRA : RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
UBICACIÓN : HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CONTRATISTA : CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR : CONSORCIO SV CONSULTORES
FORMULA : MOBILIARIO Y EQUIPAMIENTO
UND CANT. P.U. PARCIAL
06.00 MOBILIARIO Y EQUIPAMIENTO
06.01 MOBILIARIO GLB 1.00 17,195.00 17,195.00
06.02 EQUIPAMIENTO CENTRO DE CÓMPUTO GLB 1.00 43,470.00 43,470.00
06.03 EQUIPAMIENTO TALLERES GLB 1.00 114,872.40 114,872.40
COSTO DIRECTO S/. 175,537.40
GASTOS GENERALES 9.00% S/. 15,798.37
UTILIDADES 8.00% S/. 14,042.99
SUB TOTAL S/. 205,378.76
FACTOR DE RELACION 1.00000 S/. 205,378.76
I.G.V 18.00% S/. 36,968.18
TOTAL PRESUPUESTO S/. 242,346.94
VALORIZACION DE OBRA
ITEM DESCRIPCIONPRESUPUESTO CONTRACTUAL
MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) % MET. VAL. (S/.) %
0.00 0.00 0.00 0.00 0.00 0.00 0.40 6,878.00 40.00 0.60 10,317.00 60.00 1.00 17,195.00 100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 43,470.00 100.00 1.00 43,470.00 100.00 0.00 0.00 0.00
0.96 110,277.50 96.00 0.04 4,594.90 4.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 114,872.40 100.00 0.00 0.00 0.00
saldoJanuary 2012 February 2012 March 2012 April 2012 acumulado
110,277.50 4,594.90 6,878.00 53,787.00 175,537.40 0.00
9,924.98 413.54 619.02 4,840.83 15,798.37 0.00
8,822.20 367.59 550.24 4,302.96 14,042.99 0.00
129,024.68 5,376.03 8,047.26 62,930.79 205,378.76 0.00
129,024.68 5,376.03 8,047.26 62,930.79 205,378.76 0.00
23,224.44 967.69 1,448.51 11,327.54 36,968.18 0.00
152,249.12 6,343.72 9,495.77 74,258.33 242,346.94 0.00
62.82% 2.62% 3.92% 30.64% 100.00% 0.00%
March 2011 August 2011 September 2011 October 2011 November 2011 December 2011 ########## February 2012 March 2012 April 2012
01 Aceite, Lubricantes 717.40 800.97 801.59 799.73 795.62 794.18 793.53 792.13 790.22 787.98
02 Acero de Construcción liso 586.17 570.13 541.66 539.29 534.16 532.38 531.59 522.59 506.05 500.27
03 Acero de Construcción Corrugado 580.80 564.91 536.70 534.35 529.27 527.51 526.73 517.80 501.65 496.88
04 Agregado Fino 917.68 869.12 874.87 878.93 883.24 897.96 909.19 912.46 906.71 902.42
05 Agregado grueso 364.19 337.96 349.42 352.77 356.25 358.07 358.53 359.55 359.01 360.44
06 Alambre y Cable de Cobre Desnudo 926.74 910.78 899.76 870.65 827.45 836.42 837.58 860.62 874.54 856.09
07 Alambre y Cable Tipo TW y THW 668.59 653.51 644.12 620.26 583.24 592.91 593.43 612.88 623.53 608.05
08 Alambre y Cable Tipo WP 870.48 852.10 840.30 810.29 761.96 779.10 780.85 808.75 826.61 803.22
09 Alcantarilla Metal 295.68 291.42 291.85 290.58 287.81 286.85 286.43 285.47 284.19 282.70
10 Aparatos Sanitarios con Griferia 332.94 336.26 336.96 338.25 338.06 337.44 338.18 337.28 339.58 344.29
11 Artef. Alumbrado Exterior 230.11 226.80 227.13 226.14 216.63 211.68 211.40 208.78 205.64 204.68
12 Artef. Alumbrado Interior 279.63 277.79 278.10 277.16 292.52 295.64 295.30 291.98 287.42 286.26
13 Asfalto 1520.49 1718.06 1718.06 1718.06 1718.06 1718.06 1718.06 1718.06 1718.06 1837.23
14 Baldosa Acustica 251.66 259.33 259.33 259.33 259.33 259.33 263.68 263.68 263.68 267.68
16 Baldosa Vinílica 319.36 324.45 324.45 324.45 324.45 324.45 324.45 329.93 346.15 352.48
17 Bloques y Ladrillo 695.84 692.09 700.36 715.62 723.95 725.36 723.10 718.99 711.33 711.42
18 Cable Telefónico 305.36 296.35 291.77 283.97 272.00 282.48 282.19 286.13 293.48 282.26
19 Cable NYY - N2XY 778.19 763.08 751.17 722.36 680.39 689.94 691.70 711.05 724.35 709.06
20 Cemento Asfált ico 1843.02 2064.35 2064.35 2064.35 2064.35 2064.35 2064.35 2064.35 2064.35 2220.00
21 Cemento Portland Tipo I 354.74 354.74 354.74 354.74 354.74 354.74 354.74 354.74 354.74 354.74
22 Cemento Portland Tipo II 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30 367.30
23 Cemento Portland Tipo V 368.10 368.10 368.10 368.10 368.10 368.10 368.10 368.10 368.10 368.10
24 Ceramica Esmaltada y S/Esmaltar 271.92 273.49 273.66 273.44 272.99 267.22 266.77 267.61 266.49 270.38
26 Cerrajería Nacional 356.82 359.44 360.30 360.30 361.03 361.03 361.03 360.06 360.06 360.06
27 Detonante 444.81 521.95 522.72 520.42 515.47 513.75 512.99 511.28 509.01 506.32
28 Dinamita 367.34 365.02 365.54 363.95 407.66 406.30 405.70 404.34 411.72 409.79
30 Dolar mas inflación 358.42 360.63 362.16 361.12 356.94 355.45 354.05 354.43 354.39 355.21
31 Ducto de Concreto 358.30 355.72 355.84 356.76 355.94 355.66 355.55 357.10 357.26 357.75
32 Flete terrestre 423.94 429.18 431.91 431.91 431.91 438.91 438.91 438.91 445.65 445.65
33 Flete aéreo 609.97 616.45 617.77 615.43 609.02 607.09 610.91 621.08 618.30 607.19
34 Gasolina 504.82 537.15 544.05 544.91 560.43 559.57 542.76 545.34 566.90 566.04
37 Herramienta Manual 283.86 279.17 279.28 278.94 281.03 283.46 284.11 285.84 286.86 286.44
38 Hormigón 814.77 766.23 760.88 757.70 757.35 769.13 779.17 778.57 779.80 778.52
39 Índice General de precios al Consumidor 359.92 366.50 367.72 368.88 370.47 371.47 371.10 372.30 375.16 377.15
40 Loseta 391.27 391.68 393.80 394.49 397.23 399.45 402.35 403.55 403.48 404.04
41 Madera en t iras para Piso 351.59 352.76 352.76 352.76 352.76 352.76 352.76 352.76 354.29 353.78
42 Madera imp.para enc/carp 227.69 226.02 226.16 225.74 224.62 224.33 224.05 234.22 233.63 233.03
43 Madera nac para enc/car 735.31 735.70 736.87 736.76 731.41 736.63 735.06 736.94 744.15 740.14
44 Madera terciada para encofrado y carpinteria 345.67 342.47 342.95 343.19 343.24 343.21 343.19 343.51 343.92 345.25
45 Madera terciada para encofrado 313.05 313.14 313.13 312.34 311.66 311.64 311.33 311.27 311.46 311.46
46 Malla de Acero 512.71 491.18 485.41 478.67 476.43 475.65 475.30 475.62 474.59 469.89
47 Mano de obra 427.68 448.29 448.29 448.29 448.29 448.29 448.25 448.25 448.25 448.25
48 Maquinaria y Equipo Nac. 332.16 330.79 330.74 330.64 329.40 328.94 328.71 328.23 327.49 326.76
49 Maquinaria y Equipo Imp. 240.07 238.59 239.12 238.25 235.99 235.02 235.20 234.94 234.24 233.54
50 Marco y tapa fo. fdo. 631.52 628.91 629.18 628.39 626.66 626.07 625.10 623.04 620.22 617.10
51 Perfil de Acero Liviano 368.40 335.17 344.20 340.66 338.40 337.24 336.71 335.06 328.98 323.31
52 Perfil de Aluminio 310.37 309.49 305.48 306.62 303.17 302.67 302.59 277.28 276.66 275.70
53 Petróleo Diesel 780.84 823.89 851.05 855.02 894.76 893.43 864.95 870.25 906.68 906.68
54 Pintura Látex 330.00 338.67 342.17 342.17 346.64 348.58 349.48 349.48 359.83 359.83
55 Pintura Temple 397.54 415.71 407.47 419.19 434.09 438.30 439.57 438.30 443.11 445.60
56 Plancha de Acero LAC 594.11 564.94 565.77 563.30 557.93 556.08 567.20 565.30 562.77 559.82
57 Plancha de Acero LAF 456.41 411.70 412.30 410.50 406.59 405.24 413.22 411.84 410.00 407.85
59 Plancha de Fibro - Cemento 187.35 188.17 188.17 188.17 188.17 188.17 188.17 192.90 192.90 192.90
60 Plancha de Poliuretano 295.50 295.50 295.50 295.50 295.99 295.99 295.99 295.99 295.99 295.99
61 Plancha Galvanizada 347.75 298.84 299.27 297.96 295.13 293.04 290.63 289.66 288.36 286.85
62 Poste de Concreto 407.69 403.22 403.64 402.37 399.62 398.67 386.19 391.46 402.41 399.03
64 Terrazo 231.38 231.38 231.38 231.38 231.38 231.38 231.38 231.38 231.38 231.38
65 Tubería de Acero Negro y/o galv. 291.89 261.85 267.81 263.19 263.10 262.26 261.97 260.92 259.64 258.47
66 Tuberia de PVC para la red de Agua Potable y Alcan 447.70 485.24 485.94 481.03 476.47 474.83 474.17 472.64 470.38 475.44
68 Tubería de Cobre 324.99 330.49 336.20 302.35 310.95 310.29 309.30 299.95 298.65 297.31
69 Tuberia de Concreto Simple 428.87 428.87 428.87 428.87 428.87 428.87 428.87 428.87 428.87 428.87
70 Tuberia de Concreto Reforzado 218.25 218.25 218.25 218.25 218.25 218.25 218.25 218.25 218.25 218.25
71 Tubería de fo.fdo. 515.66 512.68 512.98 512.08 510.12 509.44 508.68 506.99 504.72 502.07
72 Tubería de PVC 342.38 354.98 356.79 351.77 348.06 347.42 344.83 342.06 340.98 343.28
73 Ductos y Acces. Telef. 388.82 410.18 410.79 408.98 405.10 403.75 403.14 401.80 399.99 403.67
77 Válvula de bronce Nac. 281.73 276.73 278.33 276.18 275.23 275.30 274.92 274.34 274.69 274.05
78 Válvula fo.fdo. Nac 461.26 456.95 457.97 456.08 454.87 454.26 454.04 453.53 452.86 452.06
80 Concreto premezclado 104.36 104.11 104.27 104.17 104.22 104.27 104.22 104.32 105.07 105.19
CUADRO DE INDICES UNIFICADOS PARA EL AREA 03
2011 2012
OBRA:
CLIENTE GOBIERNO REGIONAL HUANUCO
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR: CONSORCIO SV CONSULTORES
I.- POR NO PERMITIR EL ACCESO AL CUADERNO DE OBRA AL SUPERVISOR
Nº VALORIZACION MONTO
1 AGOSTO 65284.52
2 SEPTIEMBRE 112219.78
3 OCTUBRE 174157.86
4 NOVIEMBRE 307750.10
5 DICIEMBRE 180219.68
6 ENERO 663634.36
7 FEBRERO 7742.85
8 MARZO 8047.26
9 ABRIL 62930.79
TOTAL 1581987.20
0.00 0.00
0.00 0.00
3734.57
0.00 0.00
0.00 0.00
0.00 0.00
2.00 1122.20
3.00 2612.37
0.00 0.00
DIAS MULTA
0.00 0.00
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE
PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
MULTAS DE OBRA
OBRA:
Fecha Presupuesto March-2011 Ubicación HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
kMONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTE1 1.005 61,549.79 307.75 1.000 109,067.49 0.00 1.003 138,415.69 415.25
2 1.012 0.00 0.00 1.016 3,152.29 50.44 1.016 14,783.19 236.53
3 1.015 0.00 0.00 1.004 0.00 0.00 1.003 15,702.72 47.11
4 1.014 0.00 0.00 1.014 0.00 0.00 1.004 5,256.26 21.03
5 1.022 3,734.73 82.16 1.024 0.00 0.00 1.023 0.00 0.00
6 1.005 0.00 0.00 1.008 0.00 0.00 1.006 0.00 0.00
389.91 50.44 719.92
kMONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTE1 1.001 142,244.55 142.24 1.002 92,794.48 185.59 1.002 102,346.46 204.69
2 1.018 79,841.47 1,437.15 1.019 82,605.04 1,569.50 1.018 308,245.85 5,548.43
3 1.002 56,401.46 112.80 1.000 3,222.00 0.00 0.999 44,170.52 -44.17
4 1.004 27,990.05 111.96 1.007 846.24 5.92 1.006 69,750.82 418.50
5 1.020 1,272.57 25.45 1.021 751.92 15.79 1.019 10,096.03 191.82
6 0.998 0.00 0.00 0.996 0.00 0.00 0.994 129,024.68 -774.15
1,829.60 1,776.80 5,545.12
kMONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTEk
MONTO
VALORIZADO
MONTO
REAJUSTE1 0.999 0.00 0.00 0.996 0.00 0.00 0.995 0.00 0.00
2 1.018 1,427.61 25.70 1.016 0.00 0.00 1.016 0.00 0.00
3 0.997 0.00 0.00 0.991 0.00 0.00 0.990 0.00 0.00
4 1.009 0.00 0.00 1.011 0.00 0.00 1.008 0.00 0.00
5 1.020 939.21 18.78 1.022 0.00 0.00 1.023 0.00 0.00
6 0.995 5,376.03 -26.88 0.996 8,047.26 -32.19 0.998 62,930.79 -125.86
17.60 -32.19 -125.86
IMPACTO AMBIENTAL
ARQUITECTURA
INST SANITARIAS
INST ELECTRICAS
Aug-11
ESTRUCTURAS
Jan-12Nov-11 Dec-11
CALCULO DE REAJUSTES
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE
HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
IMPACTO AMBIENTAL
Sep-11 Oct-11
ESTRUCTURAS
ARQUITECTURA
EQUIPAMIENTO Y MOBILIARIO
MONTO TOTAL DE REAJUSTE
EQUIPAMIENTO Y MOBILIARIO
MONTO TOTAL DE REAJUSTE
Nº
Nº
Nº
IMPACTO AMBIENTAL
FORMULA
INST SANITARIAS
INST SANITARIAS
INST ELECTRICAS
INST ELECTRICAS
ESTRUCTURAS
EQUIPAMIENTO Y MOBILIARIO
Mar-12 Apr-12
MONTO TOTAL DE REAJUSTE
FORMULA
FORMULA
Feb-12
ARQUITECTURA
OBRA:
Fecha Presupuesto March-2011 Ubicación HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
formula 01 ESTRUCTURAS
K = 0.299*(Mr / Mo) + 0.168*(CBr / CBo) + 0.163*(AMr / AMo) + 0.165*(Ar / Ao) + 0.056*(Mr / Mo) + 0.149*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 47 Mano de obra 1 0.299 100.000% 427.680 448.290 0.313 448.290 0.313 448.290 0.313 448.290 0.313 448.290 0.313 448.250 0.313 448.250 0.313 448.250 0.313 448.250 0.313
17 Bloques y Ladrillo 8.929% 695.840 692.090 700.360 715.620 723.950 725.360 723.100 718.990 711.330 711.420
21 Cemento Portland Tipo I 91.071% 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740
05 Agregado grueso 57.055% 364.190 337.960 349.420 352.770 356.250 358.070 358.530 359.550 359.010 360.440
45 Madera terciada para encofrado 42.945% 313.050 313.140 313.130 312.340 311.660 311.640 311.330 311.270 311.460 311.460
A 03 Acero de Construcción Corrugado 4 0.165 100.000% 580.800 564.910 0.160 536.700 0.152 534.350 0.152 529.270 0.150 527.510 0.150 526.730 0.150 517.800 0.147 501.650 0.143 496.880 0.141
M 49 Maquinaria y Equipo Imp. 5 0.056 100.000% 240.070 238.590 0.056 239.120 0.056 238.250 0.056 235.990 0.055 235.020 0.055 235.200 0.055 234.940 0.055 234.240 0.055 233.540 0.054
I 39 Índice General de precios al Consumidor 6 0.149 100.000% 359.920 366.500 0.152 367.720 0.152 368.880 0.153 370.470 0.153 371.470 0.154 371.100 0.154 372.300 0.154 375.160 0.155 377.150 0.156
formula 02 ARQUITECTURA
K = 0.396*(Mr / Mo) + 0.175*(PBLr / PBLo) + 0.067*(AAr / AAo) + 0.103*(CMr / CMo) + 0.083*(DMr / DMo) + 0.176*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 47 Mano de obra 1 0.396 100.000% 427.680 448.290 0.415 448.290 0.415 448.290 0.415 448.290 0.415 448.290 0.415 448.250 0.415 448.250 0.415 448.250 0.415 448.250 0.415
51 Perfil de Acero Liviano 54.857% 368.400 335.170 344.200 340.660 338.400 337.240 336.710 335.060 328.980 323.310
17 Bloques y Ladrillo 37.714% 695.840 692.090 700.360 715.620 723.950 725.360 723.100 718.990 711.330 711.420
40 Loseta 7.429% 391.270 391.680 393.800 394.490 397.230 399.450 402.350 403.550 403.480 404.040
02 Acero de Construcción liso 46.269% 586.170 570.130 541.660 539.290 534.160 532.380 531.590 522.590 506.050 500.270
04 Agregado Fino 53.731% 917.680 869.120 874.870 878.930 883.240 897.960 909.190 912.460 906.710 902.420
44 Madera terciada para encofrado y carpinteria 42.718% 345.670 342.470 342.950 343.190 343.240 343.210 343.190 343.510 343.920 345.250
21 Cemento Portland Tipo I 57.282% 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740
30 Dolar mas inflación 73.494% 358.420 360.630 362.160 361.120 356.940 355.450 354.050 354.430 354.390 355.210
48 Maquinaria y Equipo Nac. 26.506% 332.160 330.790 330.740 330.640 329.400 328.940 328.710 328.230 327.490 326.760
I 39 Índice General de precios al Consumidor 6 0.176 100.000% 359.920 366.500 0.179 367.720 0.180 368.880 0.180 370.470 0.181 371.470 0.182 371.100 0.181 372.300 0.182 375.160 0.183 377.150 0.184
formula 03 INSTALACIONES SANITARIAS
K = 0.347*(Mr / Mo) + 0.105*(CAr / CAo) + 0.089*(MTr / MTo) + 0.244*(Ar / Ao) + 0.052*(DMr / DMo) + 0.163*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 47 Mano de obra 1 0.347 100.000% 427.680 448.290 0.364 448.290 0.364 448.290 0.364 448.290 0.364 448.290 0.364 448.250 0.364 448.250 0.364 448.250 0.364 448.250 0.364
10 Aparatos Sanitarios con Griferia 38.095% 332.940 336.260 336.960 338.250 338.060 337.440 338.180 337.280 339.580 344.290
21 Cemento Portland Tipo I 61.905% 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740 354.740
45 Madera terciada para encofrado 51.685% 313.050 313.140 313.130 312.340 311.660 311.640 311.330 311.270 311.460 311.460
72 Tubería de PVC 48.315% 342.380 354.980 356.790 351.770 348.060 347.420 344.830 342.060 340.980 343.280
A 03 Acero de Construcción Corrugado 4 0.244 100.000% 580.800 564.910 0.237 536.700 0.225 534.350 0.224 529.270 0.222 527.510 0.222 526.730 0.221 517.800 0.218 501.650 0.211 496.880 0.209
49 Maquinaria y Equipo Imp. 19.231% 240.070 238.590 239.120 238.250 235.990 235.020 235.200 234.940 234.240 233.540
30 Dolar mas inflación 80.769% 358.420 360.630 362.160 361.120 356.940 355.450 354.050 354.430 354.390 355.210
I 39 Índice General de precios al Consumidor 6 0.163 100.000% 359.920 366.500 0.166 367.720 0.167 368.880 0.167 370.470 0.168 371.470 0.168 371.100 0.168 372.300 0.169 375.160 0.170 377.150 0.171
Mar-12 Apr-12
0.169 0.169
0.161 0.162
Jan-12
0.169
0.161
Feb-12
0.169
0.161
Nov-11
0.169
0.161
Dec-11
0.169
0.161
0.168
0.156
Sep-11
0.168
0.159
Oct-11
0.169
0.160
k=
AM
2
3
0.168
0.163
Mono
mioFactor (%)
Símbolo Indice DescripciónMono
mioFactor (%)
CALCULO DE REAJUSTES
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE
PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
Símbolo Indice DescripciónMono
mio
Aug-11
0.173 0.173
Factor (%)
2PBL
CB
Símbolo Indice DescripciónAug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12
k=
0.168
0.064
0.103
0.083
0.103
0.083
3
4
5
0.175
0.067
0.103
0.083
0.171
0.083
0.173
0.064
0.103
0.082
0.063
0.103
0.084
0.172
0.063
0.169
0.063
0.103
0.082
0.064
0.103
0.082
0.172
0.064
0.103
AA
CM
DM
0.170
0.063
0.103
0.0820.082
0.063
0.103
0.090
0.105 0.105 0.106 0.106
0.090
Aug-11 Sep-11 Oct-11
0.089
0.106 0.106 0.106
MT 3 0.089 0.091 0.091 0.089 0.089 0.089 0.089
0.1060.106
Nov-11 Dec-11 Jan-12
2
Mar-12 Apr-12Feb-12
CA 0.105
k=
5DM 0.052 0.052 0.052 0.052 0.052 0.051 0.0510.051 0.051 0.051
1.005
1.018 1.016
0.999 0.996 0.9951.000 1.003 1.001 1.002 1.002
1.012 1.016 1.016 1.018 1.019 1.018 1.016
1.015 1.004 1.003 1.002 1.000 0.999 0.997 0.991 0.990
OBRA:
Fecha Presupuesto March-2011 Ubicación HUANUCO, Dist: HUANUCO, Prov: HUANUCO, Dpto: HUANUCO
CALCULO DE REAJUSTES
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE
PRAGA DE HUÁNUCO, PROVINCIA DE HUANUCO – HUÁNUCO
formula 04 INSTALACIONES ELECTRICAS
K = 0.315*(Mr / Mo) + 0.306*(ACr / ACo) + 0.070*(TPHr / TPHo) + 0.057*(CTr / CTo) + 0.081*(Dr / Do) + 0.171*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 47 Mano de obra 1 0.315 100.000% 427.680 448.290 0.330 448.290 0.330 448.290 0.330 448.290 0.330 448.290 0.330 448.250 0.330 448.250 0.330 448.250 0.330 448.250 0.330
12 Artef. Alumbrado Interior 74.837% 279.630 277.790 278.100 277.160 292.520 295.640 295.300 291.980 287.420 286.260
19 Cable NYY - N2XY 25.163% 778.190 763.080 751.170 722.360 680.390 689.940 691.700 711.050 724.350 709.060
62 Poste de Concreto 30.000% 407.690 403.220 403.640 402.370 399.620 398.670 386.190 391.460 402.410 399.030
38 Hormigón 4.286% 814.770 766.230 760.880 757.700 757.350 769.130 779.170 778.570 779.800 778.520
72 Tubería de PVC 65.714% 342.380 354.980 356.790 351.770 348.060 347.420 344.830 342.060 340.980 343.280
68 Tubería de Cobre 29.825% 324.990 330.490 336.200 302.350 310.950 310.290 309.300 299.950 298.650 297.310
18 Cable Telefónico 70.175% 305.360 296.350 291.770 283.970 272.000 282.480 282.190 286.130 293.480 282.260
D 30 Dolar mas inflación 5 0.081 100.000% 358.420 360.630 0.081 362.160 0.082 361.120 0.082 356.940 0.081 355.450 0.080 354.050 0.080 354.430 0.080 354.390 0.080 355.210 0.080
I 39 Índice General de precios al Consumidor 6 0.171 100.000% 359.920 366.500 0.174 367.720 0.175 368.880 0.175 370.470 0.176 371.470 0.176 371.100 0.176 372.300 0.177 375.160 0.178 377.150 0.179
formula 05 MITIGACION DE IPACTO AMBIENTAL
K = 0.336*(Mr / Mo) + 0.061*(PMPr / PMPo) + 0.386*(DMr / DMo) + 0.217*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 47 Mano de obra 1 0.336 100.000% 427.680 448.290 0.352 448.290 0.352 448.290 0.352 448.290 0.352 448.290 0.352 448.250 0.352 448.250 0.352 448.250 0.352 448.250 0.352
54 Pintura Látex 50.820% 330.000 338.670 342.170 342.170 346.640 348.580 349.480 349.480 359.830 359.830
61 Plancha Galvanizada 8.197% 347.750 298.840 299.270 297.960 295.130 293.040 290.630 289.660 288.360 286.850
43 Madera nac para enc/car 40.983% 735.310 735.700 736.870 736.760 731.410 736.630 735.060 736.940 744.150 740.140
48 Maquinaria y Equipo Nac. 17.098% 332.160 330.790 330.740 330.640 329.400 328.940 328.710 328.230 327.490 326.760
30 Dolar mas inflación 82.902% 358.420 360.630 362.160 361.120 356.940 355.450 354.050 354.430 354.390 355.210
I 39 Índice General de precios al Consumidor 4 0.217 100.000% 359.920 366.500 0.221 367.720 0.222 368.880 0.222 370.470 0.223 371.470 0.224 371.100 0.224 372.300 0.224 375.160 0.226 377.150 0.227
formula 06 EQUIPAMIENTO Y MOBILIARIO
K = 0.096*(Mr / Mo) + 0.199*(Mr / Mo) + 0.560*(Dr / Do) + 0.145*(Ir / Io)
MES BASE
Mar-11 IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K IUPC K
M 43 Madera nac para enc/car 1 0.096 100.000% 735.310 735.700 0.096 736.870 0.096 736.760 0.096 731.410 0.095 736.630 0.096 735.060 0.096 736.940 0.096 744.150 0.097 740.140 0.097
H 49 Maquinaria y Equipo Imp. 2 0.199 100.000% 240.070 238.590 0.198 239.120 0.198 238.250 0.197 235.990 0.196 235.020 0.195 235.200 0.195 234.940 0.195 234.240 0.194 233.540 0.194
M 30 Dolar mas inflación 3 0.560 100.000% 358.420 360.630 0.563 362.160 0.566 361.120 0.564 356.940 0.558 355.450 0.555 354.050 0.553 354.430 0.554 354.390 0.554 355.210 0.555
I 39 Índice General de precios al Consumidor 4 0.145 100.000% 359.920 366.500 0.148 367.720 0.148 368.880 0.149 370.470 0.149 371.470 0.150 371.100 0.150 372.300 0.150 375.160 0.151 377.150 0.152
Símbolo Indice DescripciónMono
mioFactor (%)
Símbolo Indice DescripciónMono
mioFactor (%)
Aug-11
Símbolo Indice DescripciónMono
mioFactor (%)
Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12
AC 2 0.306 0.302 0.300 0.294 0.295 0.298 0.298 0.300 0.300 0.297
TPH 3 0.070 0.071 0.071 0.070 0.070 0.070 0.069 0.069 0.069 0.069
k=
CT 4 0.057 0.056 0.056 0.053 0.052 0.053 0.053 0.053 0.054 0.053
Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12
DM 3 0.386 0.388 0.389 0.388 0.384 0.383
0.063
0.381
0.061 0.061 0.061
0.382 0.381
Feb-12 Mar-12
0.382
k=
PMP 2 0.061 0.061 0.062 0.062
Apr-12
0.062
k=
Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12
1.020
1.014 1.014 1.004 1.004 1.007 1.006
0.062
0.996
1.009 1.011 1.008
1.022 1.024 1.023 1.020 1.021 1.019
0.998
1.022 1.023
1.005 1.008 1.006 0.998 0.996 0.994 0.995
OBRA:
CLIENTE GOBIERNO REGIONAL HUANUCO
CONTRATISTA: CONSORCIO NIÑO JESUS DE PRAGA
SUPERVISOR: CONSORCIO SV CONSULTORES
donde :
PRESUPUESTO CONTRACTUAL: 1,866,744.92 Am = %AD x V V = Valorización del Mes
ADELANTO OTORGADO INC IGV S/. 97,290.92 D = %AD x V ( K / Ka - 1 ) %AD = Porcentaje del Adelanto Directo
ADELANTO OTORGADO SIN IGV S/. 82,449.93
SALDO A VALORIZAR S/. 742,355.25
PORCENTAJE 11.11% D = Deducción de reintegro que no corresponde
ADELANTO PAGADO EL : 1/30/2012 Am = Monto Amortizado en Valorizaciones
K=Coeficiente de reajuste de la Valorizacion
Ka=Coeficiente de Reajuste del mes en que se otorgo
del adelanto directo
ka
Nº ###### V Am k D V Am k D V Am k D
1 #NAME? 61,549.79 ###### 1.005 #### 109,067.49 #NAME? 1.000 #### 138,415.69 #NAME? 1.003 #####
2 #NAME? 0.00 ###### 1.012 #### 3,152.29 #NAME? 1.016 #### 14,783.19 #NAME? 1.016 #####
3 #NAME? 0.00 ###### 1.015 #### 0.00 #NAME? 1.004 #### 15,702.72 #NAME? 1.003 #####
4 #NAME? 0.00 ###### 1.014 #### 0.00 #NAME? 1.014 #### 5,256.26 #NAME? 1.004 #####
5 #NAME? 3,734.73 ###### 1.022 #### 0.00 #NAME? 1.024 #### 0.00 #NAME? 1.023 #####
6 #NAME? 0.00 ###### 1.005 #### 0.00 #NAME? 1.008 #### 0.00 #NAME? 1.006 #####
65,284.52 ####### #### 112,219.78 #NAME? #### 174,157.86 #NAME? #####
ka
###### V Am k D V Am k D V Am k D
1 #NAME? 142,244.55 ###### 1.001 #### 92,794.48 #NAME? 1.002 #### 102,346.46 #NAME? 1.002 #####
2 #NAME? 79,841.47 ###### 1.018 #### 82,605.04 #NAME? 1.019 #### 308,245.85 #NAME? 1.018 #####
3 #NAME? 56,401.46 ###### 1.002 #### 3,222.00 #NAME? 1.000 #### 44,170.52 #NAME? 0.999 #####
4 #NAME? 27,990.05 ###### 1.004 #### 846.24 #NAME? 1.007 #### 69,750.82 #NAME? 1.006 #####
5 #NAME? 1,272.57 ###### 1.020 #### 751.92 #NAME? 1.021 #### 10,096.03 #NAME? 1.019 #####
6 #NAME? 0.00 ###### 0.998 #### 0.00 #NAME? 0.996 #### 129,024.68 #NAME? 0.994 #####
307,750.10 ####### #### 180,219.68 #NAME? #### 663,634.36 #NAME? #####
ka
###### V Am k D V Am k D V Am k D
1 #NAME? 0.00 ###### 0.999 #### 0.00 #NAME? 0.996 #### 0.00 #NAME? 0.995 #####
2 #NAME? 1,427.61 ###### 1.018 #### 0.00 #NAME? 1.016 #### 0.00 #NAME? 1.016 #####
3 #NAME? 0.00 ###### 0.997 #### 0.00 #NAME? 0.991 #### 0.00 #NAME? 0.990 #####
4 #NAME? 0.00 ###### 1.009 #### 0.00 #NAME? 1.011 #### 0.00 #NAME? 1.008 #####
5 #NAME? 939.21 ###### 1.020 #### 0.00 #NAME? 1.022 #### 0.00 #NAME? 1.023 #####
6 #NAME? 5,376.03 ###### 0.995 #### 8,047.26 #NAME? 0.996 #### 62,930.79 #NAME? 0.998 #####
7,742.85 ####### #### 8,047.26 #NAME? #### 62,930.79 #NAME? #####
Nº VALORIZACION MONTO
1 AGOSTO 65284.52
2 SEPTIEMBRE 112219.78
3 OCTUBRE 174157.86
4 NOVIEMBRE 307750.10
5 DICIEMBRE 180219.68
6 ENERO 663634.36
7 FEBRERO 7742.85
8 MARZO 8047.26
9 ABRIL 62930.79
TOTAL 1581987.20
#NAME?
#NAME? #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
AMORTIZACION
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
DEDUCCION
#NAME?
RECONSTRUCCIÓN, AMPLIACIÓN Y EQUIPAMIENTO DE LA I.E ESPECIAL NIÑO JESÚS DE PRAGA DE HUÁNUCO, PROVINCIA DE
HUANUCO – HUÁNUCO
EQUIPAMIENTO Y MOBILIARIO
August 2011 September 2011 October 2011
ESTRUCTURAS
ARQUITECTURA
Nº Mes
Mes
ESTRUCTURAS
ARQUITECTURA
INST SANITARIAS
INST ELECTRICAS
IMPACTO AMBIENTAL
INST SANITARIAS
INST ELECTRICAS
EQUIPAMIENTO Y MOBILIARIO
January 2012November 2011 December 2011
TOTAL
TOTAL
Nº MesFebruary 2012 March 2012 April 2012
AMORTIZACIÓN Y DEDUCCIÓN QUE NO CORRESPONDE POR
ADELANTO DIRECTO
IMPACTO AMBIENTAL
TOTAL
ESTRUCTURAS
ARQUITECTURA
INST SANITARIAS
INST ELECTRICAS
IMPACTO AMBIENTAL
EQUIPAMIENTO Y MOBILIARIO