Transcript
Page 1: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

LE-PROFILE | ver.3 | rev.5.4 | 28-Mar-2012

LINDENBERG-EMIRATES LLC

Page 2: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Company Profile 3~16

About Lindenberg Emirates 3

Scope of Activities 4

Completed Projects 5

Ongoing Projects 6~7

Representation of Lindenberg Anlagen 8

Company Organization Chart 9

Company Manpower Chart 10

Company Reg., PQ & Classification 11~14

Project References 15~16

Lindenberg Power Division 17~33

Division Profile 17~18

Scope of Activities 19

Typical Power Project Organization Chart 20

Featured Projects 21~32

Power Stations 33

Lindenberg Water & Drainage Division 34~46

Division Profile 34~35

Scope of Activities 35

Typical Water Project Organization Chart 36

Featured Projects 37~46

Quality, Health & Safety & Environment 47~48

Company Recourses 49~57

Workforce & Labour Camp 49

Store Facilities 50

Plant, Machinery, Vehicles & Equipments 51

Contact Information 52

Page 3: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

3

About Lindenberg-Emirates

Located in the United Arab Emirates, with

its center of operation and main office in

Abu Dhabi, Lindenberg-Emirates LLC

specializes in Engineering, Procurement,

and Construction (EPC) mode of project

delivery.

Lindenberg-Emirates LLC employs manpower expertise in all aspects of contracting including civil

engineering, pipeline construction, turn-key industrial plants, substations, mechanical and electrical

installations, and services to the electromechanical industry including testing, commissioning,

maintenance and operational activities.

Company Details

Date Established: 20.11.2001

Ownership: UAE Partner 51%, Lindenberg Anlagen (Germany) 49%

Incorporated in: Abu Dhabi, United Arab Emirates

Principal Bankers: Arab Bank for Investment Foreign Trade Mashreqbank National Bank of Abu Dhabi HSBC Bank National Bank of Fujairah

Page 4: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

4

Scope of Activities

Power Related Activities

Construction & Installation of Power Transmission and Distribution Networks

Installation of High Voltage Cables

Substation Turnkey Low, Medium and High Voltage & Package Substation Installation

High & Medium Voltage Switchgear & Transformer Installation

Submarine Cable Installation

Civil & Electro-mechanical General Contracting

Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks

EPC Projects of Water & Sewerage including Pumping Stations

Submarine Pipe Laying

Oil & Gas Related Activities

On Shore and Off Shore Oil and Gas Field Services

Maintenance Services for Oil/Gas Production Utilities

Technical Maintenance for Equipment, Industrial and Petroleum Plant

Repair & Maintenance Works

Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines

Page 5: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Projects Successfully Completed in U.A.E. Project Value (AED)

Power Supply for Presidential Palaces and Hospitals 177 Million

Construction of Water Supply Network to Sadiyat Island 108 Million

Power Supply for Presidential Palaces and Hospitals 103 Million

Construction of Water Transmission Pipeline in Baniyas 94 Million

Construction of Water Transmission Pipeline in Dubai 84 Million

Water Transmission Lines inside Al Reem Island 56 Million

Security & Upgrading of 11kV Electrical Networks 40 Million

Supply of LV Panels Switchgear for Ruwais Housing Complex 29 Million

Power Supply for Palaces and Hospitals Stage3 26 Million

Construction of Water Transmission Line from Sweihan to Remah 26 Million

Transfer of 11kV Load & Primary Substation in Abu Dhabi 19 Million

Modification of Switching Stations in Abu Dhabi 17 Million 5

Page 6: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Ongoing Power & Civil Projects in Abu Dhabi, U.A.E. Project Value (AED)

Replacement of 11 KV Switchgears and Substations 82 Million

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34 Million

Civil Works for Shuweihat S3 Independent Power Plant 29 Million

Supply and Installation of 11kV Package Unit Substation for Braka

Nuclear Power Plant

16.8 Million

Transfer of 11kV Load to New 132/11kV W02 Primary Substation 13.6 Million

Distribution Network Expansion for Farms & Ezabs Belonging to VIP

Customers in Eastern Region

13 Million

Installation of 22kV cables from 132/22 kVA - A Beach Primary to Masdar

City

2 Million

6

Page 7: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Ongoing Water & Drainage Projects in Abu Dhabi, U.A.E. Project Value (AED)

Water Transmission Scheme inside Sadiyat Island 577 Million

Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan 180 Million

EPC for 2 Nos. 25 MiG Steel Tanks & associated Civil & Pipeline Works 174.5 Million

Replacement of Existing Sewer Networks Inside Abu Dhabi Island 116 Million

Construction of Sewerage Connections and Related Works in Abu Dhabi 80 Million

Enhancement of Sector Main Loop for Sector E25 in Abu Dhabi City 7 Million

Sheikh Khalifa Interchange, Water Pipeline Diversion 2.8 Million

7

Page 8: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

8

Representation of Lindenberg Anlagen

Lindenberg Emirates represents Lindenberg Anlagen GmbH Germany for its products and services in

the United Arab Emirates.

Lindenberg Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power

Generation System and has international presence in more than 72 countries.

For more information about Lindenberg Anlagen GmbH, please visit www.lindenberg-anlagen.de.

Page 9: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

9

Company Organization Chart

FINANCE &

ACCOUNTS

DEPARTMENT

IT DEPARTMENT

BUSINESS

SYSTEM - ERP

DEPARTMENT

DOCUMENTS

CONTROL

DEPARTMENT

PURCHASING

DEPARTMENT

ESTIMATION &

TENDERING

DEPARTMENT

PLANT /

WORKSHOP

DEPARTMENT

POWER

DIVISION

WATER &

DRAINAGE

DIVISION

CIVIL

DEPARTMENT

FINANCE &

ACCOUNTS

DEPARTMENT

RECRUITMENT

DEPARTMENT

HR / ADMIN

DEPARTMENT

OPERATIONS

DEPARTMENT

CONTRACTS

DEPARTMENT

LEGAL

DEPARTMENT

BUSINESS

DEVELOPMENT

DEPARTMENT

CHAIRMAN

GENERAL

MANAGER

Exec. Secretary /

Doc. Controller

Office Manager

Exec. Sec. / D.C.

Admin Clerk

Senior Administrator

COST CONTROL

DEPARTMENT

PLANNING

DEPARTMENT

HSE

DEPARTMENT

QA/QC

DEPARTMENT

Contracts

Manager

Finance

Director

Recruitment

Manager

HR/Admin

Manager

Operations

Manager

Head of Legal

Department

Business

Development

Director

Commercial

Manager

Estimation

Manager

Plant Manager

Asst. Operations

Manager - LPD

Division Manager -

LWD

Civil Department

Manager

Cost Control

Manager

Planning Department

Manager

HSE Manager

QA/QC Manager

Senior Business

Associate

Document Controller

IT Administrator

and TeamTreasury Manager

Accounts Manager

Sr. Accountants

Accountants

Secretary

Business Systems

Analyst

Procurement Engrs.

Asst. Proc. Engrs.

Purchase Officers

Secretary

Sr. Estimation Engrs.

Estimation Engrs.

Secretary

W/S Superintendent

W/S Administrator

Foremen Mechanics

Mechanics

Storekeeper

PRO Plant

Office Asst.

Projects Manager

Construction Mngrs.

Design Engineers

Project Engineers

T&C Engineers

Sr. Qty Surveyor

Quantity Surveyor

Exec. Secretary

Proj. Support Team

Foremen

Work Crew

Project Managers

Construction Mngrs.

Project Engineers

Sr. Qty. Surveyors

Quantity Surveyors

I & C Engineers

Exec. Secretary

Secretary

Doc. Controller

Proj. Support Team

Foremen

Work Crew

Projects Manager

Construction Mngr.

Design Engineers

Project Engineers

Quantity Surveyors

Proj. Support Team

Foremen

Work Crew

Lead Cost Control

Engineer

Technical Secretary

Sr. Planning Engrs.

Planning EngineersSr. HSE Engineers

HSE Engineers

Sr. Safety Officers

Safety Officers

Male Nurse

QA/QC Engineers

QA/QC Inspectors

Recruitment Assistant

Sr. HR/Admin Officer

Personnel Officer

Asst. Personnel Off’r.

Sr. Administrator

PRO

Doc. Controller

Admin Clerk

Camp Boss

Asst. Camp Boss

Secretary

Business Dev’t.

Associate

Sales Engineer

Secretary

Legal Secretary

Legal Advisor

QHSE Secretary

Page 10: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

10

Company Manpower Chart

Lindenberg has got sufficient manpower, including Chartered Engineers, Certified Accountants,

Certified Electrical and Civil Discipline Technicians to participate and execute Mega Projects with

utmost professionalism and to the satisfaction of our Clients.

Laborers, 293

Carpenters, 119 Masons, 68

Electrician, 66

Steel Fixers, 59

Drivers - All Discipline, 47

Operators, 46

Cleaners / Office Boy, 30

Charged Hands, 27

Pipe Fitters, 19

Welders, 12

Mechanics, 9

Painters, 6

Data as of Dec-2011

Staff Category (Total: 256) Skilled & Unskilled Workers (Total: 801)

Engineers - All Discipline, 62

Foreman & Supervisors, 46

Project Managers / Dept. Heads, 29

Office Assistants, 17

Secretaries, 14

Land Surveyors, 13

Accountants, 11

Safety Officers, 12

Storekeepers / Timekeepers, 10

Draftsman - All Discipline, 9

Doc Controllers, 7

Officers & Legal Advisors, 6

Administrators, 6

Coordinators, 6

Planning & Cost Control, 4

QA/QC Engineers, 4

Page 11: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

11

Registration / Clients List

Lindenberg is registered / pre-qualified or have submitted tender with the following companies /

government agencies:

1. Abu Dhabi Distribution Company (ADDC)

2. Abu Dhabi Future Energy Company

(MASDAR)

3. Abu Dhabi Gas Industries Ltd. (GASCO)

4. Abu Dhabi Health Services Co. PJSC (SEHA)

5. Abu Dhabi Marine Operating Company

(ADMA-OPCO)

6. Abu Dhabi Ministry of Defense – Military

Works Department

7. Abu Dhabi National Oil Company (ADNOC)

8. Abu Dhabi Oil Refining Company (TAKREER)

9. Abu Dhabi Police General Head Quarters

10. Abu Dhabi Polymers Co. Ltd. (Borouge)

11. Abu Dhabi Sewerage Services Company

(ADSSC)

12. Abu Dhabi Transmission & Despatch

Company (TRANSCO)

13. Abu Dhabi Water & Electricity Authority

(ADWEA)

14. Al Ain Distribution Company (AADC)

15. ALDAR Properties PJSC 20. Municipality of Abu Dhabi

16. Dubai Electricity & Water Authority (DEWA) 21. National Central Cooling Co. PJSC (TABREED)

17. Federal Electricity & Water Authority (FEWA) 22. Sultanate of Oman – Public Authority for Electricity and Water

18. International Petroleum Investment Co. (IPIC) 23. Tourism Development & Investment Company (TDIC)

19. Mubadala Development Company 24. UAE Armed Forces – Special Operations Command

1 2 3 4 5 6

7 8 9 10 11 12

13 14 15 16 17 18

19 20 21 22 23 24

Page 12: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

12

Registration / Clients List

Lindenberg is highly experienced working with the following Project Consultants:

1. Deutsche Energie Consult GmbH (DECON)

2. Dorsch Consult

3. Dr. M. H. Ali El-Saie Consulting Engineers

4. Hyder Consulting Middle East Limited

5. ILF Consulting Engineers

6. Italconsult

7. Lahmeyer International GmbH

8. Mott Macdonald

9. Ozen Levent Power Engineering

Consultancy LLC

10. Parsons Brinckerhoff Power

11. Parsons International Ltd.

12. Tebodin Consultants & Engineers

1 2 3 4

5 6 7 8

9 10 11 12

Page 13: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

13

1. Lindenberg Emirates was one of the 5

prequalified companies for the Sewerage

Tunnel Enhancement Project “STEP Project”

comprising of a 45 km tunnel of 5-meter

diameter at a depth of 40-45 meters which is

expected to be worth of AED 3 Billion. For

this tender, Lindenberg formed a consortium

with Major Korean Construction Companies.

2. Tender No. O-1506, STEP Deep Tunnel Sewer

Contract T-02.

3. Tender No. O-1578, STEP Deep Tunnel Sewer

Contract T-03.

Lindenberg was Prequalified & Tendered for ADSSC’s STEP Project:

Page 14: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

14

Company Classification at Abu Dhabi Department of Planning & Economy

SN Field Scope of Works Category

1. WATER PROJECTS 1. Water Transport Plants & Networks

2. Water Distribution Plants & Networks

1st

1st

2. ELECTRICAL PROJECTS 1. Power Distribution Networks & Plants

2. Communications Networks

2nd

5th

3. SEWERAGE PROJECTS 1. Main Sewerage Networks

2. Sewerage Sub-Networks & House Connections

5th

5th

4. MECHANICAL & ELECTRICAL

WORKS PROJECTS 1. Mechanical and Electrical Works 5th

5. BUILDING PROJECTS 1. All types of Buildings

2. Metallic Constructions

5th

5th

Page 15: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

15

Selected Power & Civil Projects

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status

1

R-99-0157 Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed

2

G-6334 Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery

Energy Storage (42MW) ADWEA AED 142,271,120 23.11.2009 DECON Ongoing

3

G-1882 Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals (Stage-III Phase-III) ADWEA AED 103,122,825 07.08.2005

Lahmeyer

International GmbH Completed

4

D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing

5

D-7150 Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace

in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace ADDC AED 40,667,381 05.05.2008

Ozen Levent

Power Engineering

Consultancy LLC

Completed

6

D-10624 Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu

Dhabi Island ADDC AED 34,028,598 25.05.2010 DECON Ongoing

7

115979C13E Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical

Equipment – Low Voltage (LV) Panels Switchgear ADNOC AED 29,675,361 23.04.2009 - Completed

8

- Shuweihat S3 IPP Civil Work Package 3 Daewoo

E&C AED 29,191,474 27.07.2011

Fichtner Consulting

Engineers Ongoing

9

G-1494 Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals, Stage-III Phase-III, Lot-1 ADWEA AED 25,914,216 05.02.2003

Lahmeyer

International GmbH Completed

10

D-10599 Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi

Island & Eastern Region ADDC AED 19,683,403 10.02.2010 DECON Completed

11

D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed

12

4600037153 Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power

Plant Hyundai E&C AED 16,865,843 27.07.2011 - Ongoing

Page 16: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

16

Selected Water & Drainage Projects

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status

1

N-5807 Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /

Abu Dhabi Island TRANSCO AED 569,594,995 20.01.2008

Tebodin Consultants

and Engineers Ongoing

2

D-10924 Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan ADDC AED 179,999,340 08-01-2012 Tebodin Consultants

and Engineers Ongoing

3

N-6821 EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating

Reservoir Station – Lot D TRANSCO AED 174,524,364 07.03.2010

ILF Consulting

Engineers Ongoing

4

O-1463 Works Associated with the Replacement of Existing Sewer Networks at Some

Sectors Inside Abu Dhabi Island - Category A ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing

5

N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007 Tebodin Consultants &

Engineers Completed

6

D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed

7

O-10841 Construction of Sewerage Connections and Related Works in Abu Dhabi Island

and Main Land - Phase VII ADSSC AED 80,000,000 29-Mar-2012

AECOM Middle East

Ltd. Ongoing

8

CW/119C/

2007

Supply, Installation, Testing and Commissioning of Fiber Cement / Glass

Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated

Works at Various Locations in Emirates of Dubai (1200 mm Dia Pipeline Along

Emirates Road)

DEWA AED 73,794,659 08-Jul-2007 NJS Consultants

Co. Ltd. Completed

9

N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008 Tebodin Consultants

and Engineers Completed

10

N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed

11 D-5630 Urgent Works at Al Qadra Village Owned by

HH Sheikh Mansour Bin Zayed ADWEA AED 16,877,777 15.04.2006 Italconsult Completed

12 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed

Page 17: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Division Profile

Lindenberg Power Division provides expertise in implementing Electromechanical and

Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and

commissioning and maintenance services for diverse industrial projects.

Having the expertise in turnkey contracting on many projects, the Power Division is very familiar

with all criteria necessary for the successful execution of Electromechanical projects. The Power

Division builds these mandatory requirements into all projects:

Reliable and efficient performance

Single-point responsibility

ISO-certified quality control procedures

Proven safety programs

Cost controls and reductions

Productive and on-time scheduling

17

Page 18: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Division Profile

The Power Division provides a dedicated technical and managerial team necessary to design and

construct new facilities or upgrades. By bringing together every aspect of a power project under a

single management team, the division provides economical and efficient solutions to meet the needs

of a diverse industry base.

The project management team comprised of specialists in the design, construction and operation of

complex type of projects. From concept through acceptance, the division provides the optimal

resources, equipment and services to meet all contractual requirements. The EPC team is

accountable for the following critical functions:

Planning, organizing and procedures

Scheduling and tracking

Cost control

Document control

Single-point customer contact

Progress reporting

18

Page 19: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Scope of Activities

Contracting works for Power Networks and Distribution Systems

Underground cable network including jointing, termination, testing and commissioning

Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations, Desalination Plants and Sewerage Treatment Plants

Turnkey contracting works for LV / MV / HV Substations

EPC works for electric generators

Installation and commissioning of auxiliary powers, package substation, control panels and transmission lines

Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire suppression systems.

Control / MCC room fire suppression systems installation

Submarine Cable Installation

Industrial Building Construction

HVAC Works

LV / MV / HV Switchgear and Transformer Installation

Installation and Commissioning of Auxiliary Power Supplies

19

Page 20: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Typical Power Project Organization Chart

20

HEAD OF POWER DIVISION

OFFICE SUPPORT

Coordinator

Secretary

Doc. Controller

Storekeeper

Timekeeper

Watchman

HSE Engineer

QA/QC Engineer

HSE & QA/QC

Planning Engineer

Quantity Surveyor

PLANNING & QS

Civil Engineer

Electrical Engineer

ENGINEERING

Construction Manager /

Project Engineer

CONSTRUCTION

Site Electrical Engineer Testing & Comm. Eng.

Mechanical Foreman

Mechanical Engineer Site Civil Engineer

Civil Foreman Electrical Foreman Draftsmen

Design Coordinator

PROJECT MANAGER

Page 21: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

21

Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals

Contract No. R-99-0157

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 176,957,025

Award Date 08-Feb-2000

Description Supply, Installation, Testing & Commissioning Works

Project was completed.

Page 22: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

22

Featured Projects

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery

Energy Storage (42MW)

Contract No. G-6334

Client Abu Dhabi Water and Electricity Authority (ADWEA)

Value AED 142,271,120

Award Date 23-Nov-2009

Description Design & Construction of 10 Nos. BESS Substation & Installation Testing

Commissioning of NGK Batteries & Supply of Auxiliary Items.

Page 23: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

23

Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces & Hospitals (Stage-III Phase-III)

Contract No. G-1882

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 103,122,825

Award Date 07-Aug-2005

Description Design, Supply, Installation Testing and Commissioning including remote

control monitoring system, ISMS, and Medium Voltage Panels.

Project was completed in May 2010.

Page 24: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

24

Featured Projects

Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations

Contract No. D-6990

Client Abu Dhabi Distribution Company (ADDC)

Value AED 81,991,962

Award Date 03-Jan-2010

Description Design & Construction of 1 New 132/11 kV Substation & Modification of

11 kV Network and Replacement with new 11 kV Switchgear @ 2 nos.

Substation.

Page 25: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

25

Featured Projects

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu

Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace

Contract No. D-7150

Client Abu Dhabi Distribution Company (ADDC)

Value AED 40,667,381

Award Date 05-May-2008

Description Design, Supply, Installation Testing and Commissioning of 11KV

Switching Station & replacement of Switchgears, Control Panels, DC

system in Beach Palace Stations B4, B5 Stations & Standby power plant

in H.H.Shk Khalifa Switching station. Completed in July 2010.

Page 26: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

26

Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals Stage-III Phase-III. Lot-1

Contract No. G-1494

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 25,914,216

Award Date 05-Feb-2003

Description Design, Supply, Installation Testing and Commissioning Works

Project was completed.

Page 27: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

27

Featured Projects

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island &

Eastern Region (2010)

Contract No. D-10599

Client Abu Dhabi Distribution Company (ADDC)

Value AED 19,683,403

Award Date 10-Feb-2010

Description Installation of Underground 11 kV Cables of 112 km & FO Cables of 20

km.

Page 28: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

28

Featured Projects

Supply and Installation of 8 Nos. 415 Volts Diesel Generators

Contract No. G-1206

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 13,039,984

Award Date 10-Apr-2002

Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415

Volts Diesel Generators.

Page 29: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

29

Featured Projects

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear

Contract No. 115979C13E

Client Abu Dhabi National Oil Company (ADNOC)

Value AED 29,675,361

Award Date 23-Apr-2009

Description Supply & Delivery of Low Voltage Panels Switchgear.

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island

Contract No. D-10624

Client Abu Dhabi Distribution Company (ADDC)

Value AED 34,028,598

Award Date 25-May-2010

Description Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.

Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.

Page 30: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

30

Featured Projects

Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant

Contract No. 4600037153

Client Hyundai Engineering & Construction

Value AED 16,865,843

Award Date 27-Jul-2011

Description Commissioning of 18 Nos. 11 kV Package Substations.

Shuweihat S3 IPP Civil Work Package 3

Client Daewoo E&C-Siemens (Consortium)

Value AED 29,191,475

Award Date 20-Jul-2011

Description Civil works which includes excavation, filling, concreting, finishing, waterproofing, structural steel works, etc. for

fuel gas pipelines with sleeper foundations & trenches, storm drain works and site roads with asphalt.

Page 31: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

31

Featured Projects

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu

Dhabi Eastern Region

Contract No. D-9710/C

Client Abu Dhabi Distribution Company (ADDC)

Value AED 10,000,000 per year

Award Date 16-Apr-2009

Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order

Basis.

Modification of Switching Stations in Abu Dhabi Island

Contract No. D-7720

Client Abu Dhabi Distribution Company (ADDC)

Value AED 16,999,999

Award Date 06-Aug-2008

Description Supply, Installation & Commissioning of RMU’s and Modification of

Transformer Panel to Feeder Panel in Switching Stations.

Page 32: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

32

Featured Projects

Transfer of 11kV Load to New 132/11kV W02 Primary Substation in Abu Dhabi Island

Contract No. D-11915

Client Abu Dhabi Distribution Company (ADDC)

Value AED 13,603,107

Award Date 23-Oct-2011

Description Excavation and 11 kV cable laying works in Central Market Area, in order to transfer 11 kV load to new 132/11 kV

W02 Primary Substation.

Installation of 22 kV Cables from 132/22 kVA - A Beach Primary to Masdar City

Client Abu Dhabi Distribution Company (ADDC)

Value AED 2,121,525.65

Award Date 15-Sep-2011

Description Installation & commissioning of 22 kV power cables with 144 fiber optic cables to provide the power supply to the

initial demand for Masdar City Development.

Page 33: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

33

Power Stations

Power Station with Diesel Engine for operation

on Diesel, Crude Oil and HFO

Turnkey Power Stations up to 12 MW

Powered with Diesel, Gas and Dual Fuel Engines

Power Station with Gas Engines Power Station with Dual Fuel Engines

Page 34: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Division Profile

In order to accommodate the brisk developments of UAE’s industry, Lindenberg Water and Drainage

Division was established to provide water and drainage solutions.

The Division has up-to-date working knowledge of and is very well conversant with the requirements

in water supply and water distribution network. The necessary infrastructure, including manpower,

reliable sources of suppliers, equipment are readily available at our disposal.

34

Page 35: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Division Profile

The Water & Drainage Division is acknowledged as the premier provider of the highest quality

professional service in the field of water and drainage facilities; insuring absolute client satisfaction

through the expertise and experience of its people. The division aims to provide new technologies,

processes, and materials to build and deliver water and drainage facilities that are best suitable for

their class & area of usage.

Scope of Activities

Water Pipeline Networks

Water & Irrigation Reservoirs

Water & Sewerage Pumping Stations

Sewage Treatment Plants

Operation & Maintenance of Sewerage Networks and Pumping Stations

35

Page 36: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Typical Water & Drainage Project Organization Chart

36

DIVISION MANAGER

OFFICE SUPPORT

Civil Engineer

Electromech’l Engineer

Inst & Ctrl. Engineer

Planning Engineer

Quantity Surveyor

HSE Engineer

QA/QC Engineer

Coordinator

Secretary

Doc. Controller

Draftsman

Storekeeper

Timekeeper

Construction Manager /

Project Engineer

Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works Water Tank Works (Concrete Construction)

Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew

Civil Work Crew Pipeline Crew Chamber Crew

Site Engineer Site Engineer Site Engineer

CONSTRUCTION

PROJECT MANAGER

HSE & QA/QC PLANNING & QS ENGINEERING

Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman

Page 37: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

37

Featured Projects

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi

Island

Contract No. N-5807

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 569,594,995

Award Date 20-Jan-2008

Description Construction of DI/CS Pipelines

Page 38: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

38

Featured Projects

Water Supply to ADCO & GASCO Facilities at Buhasa and Habshan

Contract No. D-10924

Client Abu Dhabi Distribution Company (ADDC)

Value AED 179,999,340

Award Date 08-Jan-2012

Description Construction of 65 km DN 400~500 DI Pipelines, 2 x 0.5 Million Gallons

Storage Steel Tanks and Pump Station of 7 Million Gallons per day

capacity.

Page 39: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

39

Featured Projects

EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir

Station - Lot D

Contract No. N-6821

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 174,524,364

Award Date 07-Mar-2010

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and

Pipeline Works.

Page 40: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

40

Featured Projects

Works Associated with the Replacement of Existing Sewer Networks at Some Sectors

Inside Abu Dhabi Island - Category A

Contract No. O-1463

Client Abu Dhabi Sewerage Services Company (ADSSC)

Value AED 116,026,699

Award Date 13-Jun-2010

Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and

Manholes Inside Abu Dhabi Island.

Page 41: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

41

Featured Projects

Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C

Contract No. N-2622.1

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 108,118,493

Award Date 22-Jul-2007

Description Supply, Construction, & Installation of Water Supply Network

The Project was completed in June 2009

Page 42: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

42

Featured Projects

Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway

Contract No. D-7310.1

Client Abu Dhabi Distribution Company (ADDC)

Value AED 94,037,448

Award Date 22-May-2008

Description Supply and Replacement of Water Transmission Pipelines

The Project was completed in November 2010

Page 43: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

43

Featured Projects

Water Transmission Lines Inside Al Reem Island – Lot A

Contract No. N-5386

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 56,455,067

Award Date 03-Feb-2008

Description Installation of DI/CS Pipelines

The Project was completed in January 2010

Page 44: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

44

Featured Projects

DN 1000mm Transmission Pipeline from Sweihan to Remah

Contract No. N-4604

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 25,889,764

Award Date 23-Jul-2007

Description Supply, Construction, and Installation of Water Transmission Pipelines

The Project was completed in June 2009

Page 45: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

45

Featured Projects

Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed

Contract No. D-5630

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 16,877,777

Award Date 15-Apr-2006

Description Supply, Construction & Maintain Water Supply Network

The Project was completed in July 2008

Page 46: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

46

Featured Projects

Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)

Contract No. O-1047

Client Abu Dhabi Sewerage Services Company (ADSSC)

Value AED 10,400,000

Award Date 30-Jan-2008

Description Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash

Shuhaib

The Project was completed in July 2009

Page 47: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

QHSE Policy

LINDENBERG implements and maintains an effective QHSE Management System in line with the

requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007.

It is our policy to

Meet or exceed our clients' expectations, the first time and every time, through the application of

proven quality principles at all levels of our business;

Minimize the generation of hazardous & toxic waste, preventing the release of harmful substances

into the environment, while encouraging the reduction, recycling and re-use of materials;

Instilling and promoting safety consciousness to prevent ill health, injury and incidents; and provide a

safe and healthy working environment for our employees, clients, and subcontractors.

We are committed to

Ensuring that adequate resources are made available for QHSE purposes.

Ensuring that QHSE is accepted as a core management activity, given equal priority as other

objectives and management functions, and included in the company business plan.

Promoting a positive QHSE culture within the top management and encouraging active employee

participation in QHSE throughout all levels of the company.

AHMAD ZAABRI

General Manager 47 LE-IMS-Pol | rev. 1

Page 48: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

48

QHSE Certificates & Membership

Lindenberg Emirates is an Integrated Management System (IMS) certified company and has

established, implemented and maintained an effective Quality, Occupational Health & Safety and

Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004

and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met.

British Safety Council OHSAS 18001:2007 ISO 14001:2004 ISO 9001:2008

Page 49: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Workforce and Labour Camp

Lindenberg-Emirates LLC employs almost 800 Skilled and Unskilled Labors. Labor Camps with all

modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of

the health & safety of the workforce.

49

Camp Location Size No. of Rooms Current No. of

Occupants

Al Faya 1,300 m2 96 600

Magenta Camp (rented) 46 264

Al Ain 400 m2 28 45

Data as of 10-Oct-2011

Page 50: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Store Facilities

Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m2 are operational at Mussafah to

help in storing & preserving the materials received for different projects, also used for storage of our

standard erection tools required during installation/ commissioning activities.

50

Page 51: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Plant, Machineries, Vehicles and Equipment

Lindenberg Emirates’ policy in Vehicles, Equipment and Machinery is to:

purchase and own all equipment to cover the project needs.

self-maintain these vehicles, equipment and machinery.

hire vehicles, equipment and machinery to prevent delays in the project execution.

51

Page 52: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

Contact Information

52

We hope that the information given and detailed in this Company Profile is sufficient to illustrate the

potential and capabilities of Lindenberg. We will be pleased to provide further information on your

request. Kindly contact us.

Lindenberg Emirates LLC Lindenberg Water & Drainage Division

Villa 101, Al Nahyan Camp Area, (A Division of Lindenberg Emirates LLC)

Muroor Road, P.O. Box 42630, Tel: +971 2 642 2576

Abu Dhabi, United Arab Emirates Fax: +971 2 642 2579

Tel: +971 2 642 2576 E-mail: [email protected]

Fax: +971 2 642 2591

E-mail: [email protected] Lindenberg Power Division

Website: www.lindenberg.ae (A Division of Lindenberg Emirates LLC)

Tel: +971 2 642 2576

Fax: +971 2 642 2571

E-mail: [email protected]

Page 53: Lindenberg Emirates Company Profile · Lead Cost Control Engineer Technical S ecretary S r. Planning Engrs. Planning Engineers S r. HS E Engineers HS E Engineers S r. S afety Officers

P.O. Box 42630, Abu Dhabi, United Arab Emirates Tel: +971 2 6811061, Fax: +971 2 6813655

E-mail: [email protected] Website: www.lindenberg.ae