Transcript
Cumulative
Key Concepts
• Lean = reducing waste
• CFD = insights for the entire team
• Reducing WIP = faster, more agile development = superior
Lean = reducing waste
•muda ("non-value-adding work")
•muri ("overburden")
•mura ("unevenness")
A
B
C
D
A B C D
Long cycle time Short cycle time
WIP = 4 WIP = 1
Little WIP Lots WIP
Long cycle timeShort cycle time
Little WIP Lots WIP
Long cycle timeShort cycle time