12-026.10 • Lakehead University • Moksha YogaCover
Project No: 12-026.10
A0Date: 08/11/14
Lakehead University Moksha YogaCJ Sanders Fieldhouse - Sanders Drive - Thunder Bay - ON
Drawing List
Consultants
Sheet Name
CoverAssemblies, Door Schedule and PlanReflected Ceiling PlansCross SectionInterior ElevationsCeiling Insulation DetailsKGS - Door Opening DetailProfor - Partial & Key Plans,Electrical Demo and Renovation.Profor - Single Line Diagram and Electrical SpecificationsProfor - Partial Floor Plan, HVAC Demolition and RenovationProfor - Section and DetailsProfor - Mech Specs, Scope of work and sequence of Operations.
Sheet No.
A0A1A2A3A4A5
14-1829-003214060-E1214060-E2214060-M1214060-M2214060-M3
PROFOR Engineering Services#502- 200 S. Syndicate Ave.Thunder Bay, ONP7E 1C9, Canadat. 807.626.8463f. 807.626.8086
Lead Consultant
Brook McIlroy202-37 Cumberland St. S.Thunder Bay, Ontario, P7B 2T4www.brookmcilroy.comt. 807 683 8005f. (416) 504-5997
KGS Group ConsultingEngineers301A-1001 William StreetThunder Bay, ON P7B 6M1t. 807-623-2195 ext. 244f. 807-473-5671
Context Plan
P1 - Interior Wall Assembly
1. .5" Drywall2. 6 mil AVB3. 1.5" Rigid Insulation w/ 2x2 wood furring at 2' o/c
*Provide blocking for fastening of mirrors and ballet bar.
C1 - Interior Ceiling Assembly
1. Existing metal deck and OWSJ
2. R40 spray foam insulation w/ thermal barrier.
-Walltite Eco - Spray Polyurethane Foam Insulation / AirBarrier (or approved equal).
-AD Cementitious Thermal Barrier (or approved equal),22m thick. Suitable for exposure in supply and return airceiling conditions
3. Provide 1" coverage to OWSJ webs, see detail A5/2
31' -
9"
1
A1 A3
Floor: Sand exisiting floor(remove squash lines and abrasions)-Patch any damaged boards and holes.-Finish and apply sealant
BONA Sportive Finish (or equivalent)P1
P1
P1
P1
RWL Cleanout. Provide access panel to maintainaccess to the rainwater leader cleanout
A4
1
2
4
A1 A5
Remove metal squash pan, prior to newwall construction, patch floor if required.
-
A1 ---
6' Wall Mirror, provide blocking as req.
9' Vitavibe Ballet Barre, provide blockingas req.
-
D1
Remove exisiting door and infill w/ existing concrete blocks
-
-
Retain existing blocks from new opening and use forinfill of existing door.
4' - 0"
-
-
A1
2
+/- 2 ft, Start at joint in existing block wall+/- 2'
4' - 0" R.O.
7' -
0"
3' - 0" 1' - 0"1 1/2"
2' - 8 1/2"
PAINT FRAME AND STEEL LINTEL ABOVE(CONSULTANT TO PROVIDE COLOUR)
SOLID INFILL PANEL TO MATCH FRAME
12-026.10 • Lakehead University • Moksha YogaAssemblies and Plan
Project No: 12-026.10
A1Date: 08/11/14
1 : 10Assemblies1
1/8" = 1'-0"3 + / Floor
Lock:
Keyed Lock ND53PD-RHO-626
• Push-button locking: Pushing button locksoutside lever until unlocked by key or byturning the inside lever.
Hinges:
Interior Stanley FBB179 4.5" x 4"
FBB179 – (ANSI A8112)
Steel – polished and plated
1/2" = 1'-0"2 Entry Door with Opaque Sidelight
Notes:
Contractor to provide construction core and zero pinnedcylinder to LU for pinning. Keyway to be confirmed at shopdrawing submission to LU.BMI to confirm door closer provided.
Door Angle and paint color T.B.D.
1
A1 A3
18' - 2 3/4"
31' -
9"
6' -
1 1
/4"
4' -
11
1/4"
EQ
12' - 3 1/2"
6' - 2 1/2"
8' -
5 3
/4"
4' - 10 3 /4"
EQ
EQ
EQ
Provide unistrutsupport structure for
light suspension
Enerjoy Panels24.25" x 95.75"
18' - 2 3/4"
2' - 2 1/4" 2' - 2"
EQ EQ
2' -
2 1
/4"
7' -
11
3/4"
EQ7'
- 1
1 3/
4"EQ
7' -
11
3/4"
2' -
1 3
/4"
12-026.10 • Lakehead University • Moksha YogaReflected Ceiling Plans
Project No: 12-026.10
A2Date: 08/11/14
1/8" = 1'-0"1 Reflected Ceiling Plan 1/8" = 1'-0"3 50181 Callisto Pendant Lighting
1/8" = 1'-0"2 Enerjoy Heating Panels RCP
Note:*Dimensions are taken from existing wall
Note:*Dimensions are taken from existing wall
Note:*Dimensions are taken from existing wall
+ / Floor0"
Enerjoy Radiant Heating Panels
Top of 6' wall mirror on paralell wall
50181 Callisto Pendant Lighting
3
A5A3
Recessed Baseboard
R40 Spray foam insulation w/thermal barrier. (See assembly C1)
1
A5A3
3 3/
4"
11' -
11
3/4"
8' - 6 1/4"
Maintain access to rainwaterleader cleanout.
Provide new access panel.
6' -
0"
6' - 0 3/4"
2' - 1 1/2"7' - 11 3/4"
Electrical outlet, typ.
6' -
4 1
/2"
6' -
4 3
/4"
Approximate duct location, see mechanicaldrawing. Consult with engineer/architect priorto installation to determine location.
1" Spray foam insulation w/ thermalbarrier on OWSJ (See assemblyC1)
9' Vitavibe Single Traditional Wood Ballet Barre
31' - 9"
EQ EQ EQ EQ 7" 9' - 0" 3' - 0"
3' -
5 3
/4"
U/S Existing Ceiling
12-026.10 • Lakehead University • Moksha YogaCross Section Scale 1/4"=1'-0"
Project No: 12-026.10
A3Date: 08/11/14
6' Wall Mirror
Recessed baseboard
Enerjoy Panels
Calisto Lighting to becentered on bottom faceof enerjoy panels
3 1/
2"
R40 Spray foaminsulation w/ thermalbarrier.(See assembly C1)
1" continous sprayfoam insulation w/thermal barrier onOWSJ (See assemblyC1)
6' -
0"
2' - 10" EQ
Unistrut support structure
11' -
11
3/4"
6' -
0"
2' - 0 1/2"
Recessed baseboard
Calisto lighting to becentered on the bottomface of enerjoy panels
Enerjoy Panels
36” door steel framedoor with opaqueside light(BMI TO CONFIRM)
9' Vitavibe Ballet Barre
3 3/
4"
R40 Spray foam insulationw/ thermal barrier.(See assembly C1)
1" continous spray foaminsulation w/ thermal barrieron OWSJ (See assemblyC1)
Dashed line denotesexisiting door to beremoved.
Duct coordinatedby Profor
4' - 0" R.O.2' - 8 1/2"
12' -
0"
Unistrut support structure
Review location where ductenters room
12-026.10 • Lakehead University • Moksha YogaInterior Elevations
Project No: 12-026.10
A4Date: 08/11/14
1/4" = 1'-0"2 West Interior Elevation - Ballet Barre 1/4" = 1'-0"1 North Interior Elevation - Entry
1/2" Durock Next Gen, cementboard. Tight to web(mechanically fasten to OWSJ)
R 40 Spray Insulationw/ thermal barrier(See Assembly C-1)
1' -
4"1" continous spray foam insulation
w/ thermal barrier on OWSJ(See assembly C-1)
Birch Baseboard.Same finish as floor
Rigid Insulation
1/2" Fry Reglet "Z" reveal
Exisiting Wall
3 1/
2"
1/2" Gypsum Board
Adhere V.B. at floor
2 x 6 Framing @ Base
Solid wood blocking to suit
Existing block
Steel angle, see structural.Paint to match frame
Recessed foam backer rodand caulking, All sides
Adhere VB to frame
Recessed caulking
7'-0"
2 x 2 Furring
3/4"
1/4"
12-026.10 • Lakehead University • Moksha YogaDetails Continued
Project No: 12-026.10
A5Date: 08/11/14
1" = 1'-0"1 Section Detail at wall / OWSJ Connection 1" = 1'-0"2 Section Detail Spray Insulation at OWSJ
R40 Spray Insulationw/ thermal barrier(See Assembly C-1)
1" continous spray foam insulationw/ thermal barrier on OWSJ(See assembly C-1)
3" = 1'-0"3 Recessed Baseboard Detail
3" = 1'-0"4 Entry Door Head Detail
Overlap V.B. w/ spray foam
GENERAL HVAC NOTES:
LAKEHEAD UNIVERSITY FIELDHOUSE - KEY PLAN
PARTIAL MAIN FLOOR PLAN - DEMOLITION ENLARGED LOWER YOGA STUDIO PLAN - RENOVATION
ENLARGED MECHANICAL RM. 2 PLAN - RENOVATIONPARTIAL MAIN FLOOR PLAN - RENOVATION
- HUMIDIFIER INSTALLATIONDETAIL1M2
- ENERGY RECOVERY VENTILATOR INSTALLATIONDETAIL2M2
- RENOVATIONSECTIONAM2
MECHANICAL SPECIFICATIONSGENERAL
PLUMBING
VENTILATION
EQUIPMENT LIST SCOPE OF WORK SEQUENCE OF OPERATIONSENERGY RECOVERY VENTILATOR ERV-1, DUCT HEATER DH-1 & HUMIDIFIER H-1