LAC DEPT. BEACHES & HARBOR
MARINA DEL REYPARKING LOT 9
LAC DEPT. PUBLIC WORKSWATER QUALITY ENHANCEMENT PROJECT CONCEPT
PROJECT SITE BACKGROUNDEXISTING CONDITION:• Parking Lot 9 encompasses 1.5 acres of
impervious asphalt concrete• Two catch basin inlets that directly discharge
into Basin E.• 187 parking spots• Two accessiblehandicap parkingareas.
BASIN E
MARINA BEACH
PARKING LOT 9
Existing Parking Lot 9 Catch Basin
Existing Parking Lot 9 Handicap parking
Existing Promenade and Fencing
Proposed Water Quality Enhancement
5 5
6PARKING ISLAND WIDENING
Proposed Water Quality Enhancement
5
1. Bioswale2. Parklet3. Interpretive Sign
4. Modular Wetland Unit5. Catch Basin6. Planter7. Trench Drain
1 64 4
2
16 3
2
7
Low Flow Treatment
BASIN E
Proposal Parklet Components1. Stamped Concrete Paving2. Bioswale3. Benches4. Bike Rack5. Modular Wetland Unit6. Catch Basin7. Planter Pots8. Ramps9. Planter10. Interpretive Sign11. Trash Receptacle
56
132
4
87
Basin E9
10
11
Proposed Parklet Components1. Exposed Aggregate Paving w/ Cool Gray Concrete2. Seeded Aggregate Paving w/ Dark Gray Concrete3. Bioswale4. Bike Rack5. Modular Wetland Unit6. Trench Drain7. Woodgrain Concrete Paving8. Fencing
5
4
6
21 13
2 7
View from Parking Lot
8
Proposed Site Furnishing
Bench
Planter PotBike Rack
Trash Receptacle
Proposed Promenade Fencing
Proposed Paving
Composite Wood DeckTrex Island Mist
Seeded Concrete Band w/ Crushed Aggregate
Exposed Aggregate Concrete Paving
Stamped ConcreteWoodplank Pattern
Proposed Interpretive Signage
Plant List
HEMEROCALLIS HYBRIDDAYLILY
CAREX PRAEGRACILLISCALIFORNIA FIELD SEDGE
JUNCUS PATENSCALIFORNIA GRAY RUSH
SEDUM ‘AUTUMN JOY’AUTUMN JOY SEDUM
IRIS ‘DOUGLASIANA’ DOUGLAS IRIS
DIETES BICOLORFORTNIGHT LILY
DIANELA CAERULEA ‘ CASA BLUE’BLUE FLAX LILY