Jawaban :1. 9000RH4500dFH = 04500 RH = 0 RH = 4500 KgFv = 0 Rv-9000 = 0 Rv = 9000 KgAngka geser = Rh/Rv = 4500/9000= 0.5 M ujung = 04500 x 1 9000 x 1.6 + 9000 x d = 0 d = 1.10m d lebih dari 0.8 (1/3 lebar dasar) jadi tidak terjadi tekanan negatif pada dasar Tekanan rata2 9000 / 2.4 = 3750kg/m2Momen eksentrisitas:1.2 x X/2 x 1.6= 9000x 0.1X = 940kg/m2Total gaya positip ujung= 940 + 3750=4690kg/m2Total gaya di hulu=3750-940=2810kg/m2 1.102.4x90001.60.1046902810
-
Jawaban :2. 9000RH45003600dFH = 04500 RH = 0 RH = 4500 KgFv = 0 3600+Rv-9000 = 0 Rv = 5400 KgAngka geser = Rh/Rv = 4500/5400= 0.83 M ujung = 04500 x 1 5400 x 1.6 + 5400 x d = 0 d = 0.76m d kurang dari 0.8 (1/3 lebar dasar) jadi terjadi tekanan negatif pada dasar Tekanan rata2 5400 / 2.4 = 2250kg/m2Momen eksentrisitas:1.2 x X/2 x 1.6= 5400x 0.44X = 2475Total gaya positip = 2250+2475=4725Total gaya negatip=2250-2475=-225kg/m2 0.762.4x54001.60.44
-
Jawaban :3. 9000RH45002400 2400dFH = 04500-500 RH = 0 RH = 4000 KgFv = 0 9000-4800+400-Rv = 0 Rv = 4600 KgAngka geser = Rh/Rv = 4000/4600= 0.87 M ujung = 04500 x 1 6600 x 1.6 + 2400x1.2 -400x0.27 -500x0.33 + 4600 x d = 0 d =0.75 m d kurang dari 0.8 (1/3 lebar dasar) jadi terjadi tekanan negatif pada dasar Tekanan rata2 4600 / 2.4 = 1917 kg/m2Momen eksentrisitas:1.2 x X/2 x 1.6= 4600x 0.45X = 2156Total gaya positip = 1917+2156=4073Total gaya negatip=1917-2156=-239kg/m2 0.752.4x46001.60.451917=2156Jawaban :3. 45000.45=2156 0.450.451917=21560.45
-
Jawaban :4a. 1201200RH450220dFH = 0450 +20 + 4.1X RH = 0 RH = 470 + 4.1XFv = 0 41.25 X - 7.5 X -Rv = 0 Rv = 33.75XAngka geser = Rh/Rv = 0.6 470 + 4.1x = 0.6 33.75 X X = 29 m M ujung = 0450x10+20x30+120 x11+ 980.d-980x19.3= 0 d = 13 m d lebih dari 10 m (1/3 lebar dasar) jadi tidak terjadi tekanan negatif pada dasar Tekanan rata2 980 / 29 = 34 t /m2Momen eksentrisitas:14.5 x X/2 x 19.3= 980x 1.5X = 10.5 t/m2Total gaya positip kanan= 34+10.5=44.5t/m2Total gaya kiri=34-10.5= 23.5 t/m2Xx98033302015Jawaban :4a. 1201200RH4503320220dX980Jawaban :4a. 1201200RH4503320
- Jawaban :4b. 785RH45072dFH = 0450 RH = 0 RH = 450Fv = 0 41.25 X 3.75 X -Rv = 0 Rv = 37.5XAngka geser = Rh/Rv = 0.7 450 = 0.7 X = 17 m 37.5 X M ujung = 0450x10+ 570.d-570x11.4= 0 d = 3.5 m tidak memenuhi syarat < 17/3 =5.7 mBila dianggap d = 1/3 X maka M ujung = 0450x10 + 37.5X x X/3 37.5X x 2/3X = 0 12 X2 = 4500 X = 19 mTekanan rata2 713/ 19= 37.5 t /m2Momen eksentrisitas:9.5 x X/2 x 12.67= 713x 3.2X = 37.5 t/m2Total gaya positip kanan= 37.5 + 37.5 =75t/m2Total gaya kiri= 37.5 - 37.5 = 0 t/m2 Cek = 450/713=0.63
-
5200 x24x3600=17.3 juta m3
Sheet1 (3)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
02000200
0.52200.520502000
130012250.52200.5
1.54001.525013001
260023001.54001.5
2.59002.535026002
3140034002.59002.5
3.517003.5475314003
4190045253.517003.5
4.519704.5600419004
5200059004.519704.5
5.519705.51200520005
619005.613505.519705.5
6.517505.751350619005.6
71550613506.517505.75
7.513506.51350715506
81150713507.513506.5
8.510007.51350811507
9850811508.510007.5
Day0-44-77-1010-1313-1616-19
IIIIIIIVVVI9.57208.51000Day00 -22 33 44 4.54.5-5.55.5-7.598508
S24010001882249628082868106209850IIIIIIIVVVI9.57208.5Day00 -22 33 44 4.54.5-5.55.5-7.5Day00 -22 33 44 4.54.5-5.55.5-7.5
S142404417.37605188235.5614.1518311.43.56010.55509.572003.71224.5142113106209IIIIIIIVVVIIIIIIIIVVVI
Q122.3083840742290590848993102110620 S016 x 10652 x 106105 x 10660X10690X10657X10610.55509.503.71224.514211303.71224.5142113
E l100.6102.5104.705106.2107.0107.210.5550S20 x 10636 x 10688 x 106193 x 106253 X 106343X 106400 X10610 S016 x 10652 x 106105 x 10660X10690X10657X106 S016 x 10652 x 106105 x 10660X10690X10657X106Day00 -22 33 44 4.54.5-55-6.5
El10811813615516316717310.5S20 x 10636 x 10688 x 106193 x 106253 X 106343X 106400 X106S20 x 10636 x 10688 x 106193 x 106253 X 106343X 106400 X106IIIIIIIVVVI
Q200300410500540550570El108118136155163167173El10811813615516016717303.71224.5141211
650780Q200300410500540550570Q200300410500530550570 S016 x 10652 x 106105 x 10660X10651X10647X106
12001350650780650780S20 x 10636 x 10688 x 106193 x 106253 X 106304X 106351 X106
1200135012001350El108118136155160165169
Q200300410500530550570
6501180
11001750
47.3
Day00 -22 33 44 4.54.5-55-6.5
IIIIIIIVVVI
03.71224.5141211
S016 x 10652 x 106105 x 10660X10651X10647X106
S20 x 10636 x 10688 x 106193 x 106253 X 106304X 106351 X106
El108118136155160167169
Q200300410500540550570
7001180
12501750
Sheet1 (3)
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1 (2)
001
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
Sheet1
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Sheet3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Figure 6.2.2. Stage Hydrograph
Elevation (m)
0
0
0
0
0
0
0
0
0
0
0
0
0
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
0000
0000
0000
0000
0000
000
0
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
0200200
0.5220205
1300225
1.5400250
2600300
2.5900350
31400400
3.51700475
41900525
4.51970600
520001000
5.51970
619001600
6.517501740
715501750
7.51330
81150
8.51000
9850
9.5720Day00 -22 33 44 4.254.25-5.1
10620IIIIIIIVV
10.555003.71224.58.5
11500 S016 x 10652 x 106105 x 10637X10670X106
S20 x 10636 x 10688 x 106193 x 106230 X 106300 X 106
El108118136155160166
Q200300410500520540
650
1190
= 4.3 X 10 6 m3
I
II
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
= 4.3 X 10 6 m3
I
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
= 4.3 X 10 6 m3
I
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
= 4.3 X 10 6 m3
I
Time in days
Debit m3/sec
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
10.5
11
200
220
300
400
600
900
1400
1700
1900
1970
2000
1970
1900
1750
1550
1330
1150
1000
850
720
620
550
500
I
II
III
IV
V
VI
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
II
Outflow
Time in days
Debit m3/sec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
III
I
= 4.3 X 10 6 m3
1
II
III
IV
V
VI
= 17.3 X 10 6 m3
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
001
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Figure 6.2.2. Stage Hydrograph
Elevation (m)
0
0
0
0
0
0
0
0
0
0
0
0
0
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
0000
0000
0000
0000
0000
000
0
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
200200
220205
300225
400250
600300
900350
1400400
1700475
1900525
1970600
20001000
19701600
19001740
17501750
15500
13300
11500
10000
8500
7200
6200
5500
5000
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
Outflow
Time in days
Debit m3/sec
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
001;3
0.251.5100100Total infiltration : from canals : 61
0.52.25200200from infiltration 65
13300300from non irigation area 41
1.53.5400400Gambar 6.4.2167 cm
23.8750050080 % x 167 = 133
2.54.2100100167 -133 =34
34.45110105
3.54.62230200
44.8300245
4.54.9350275
55400300
500350
00
5050
10080
101200110
22300130
0.353400140
0.064500140
0.015
= 4.3 X 10 6 m3
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
0
0
0
0
0
0
0
0
0
0
0
0
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
0
0
0
0
0
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
6.5.Routing dibawah kurva A (Keadaan asli)6.6Pengaturan pengendalian banjir dengan elevasi
Luas danau = 26,200 Km2antara 101.30-101.70
1 m ketinggian diatas danau = 26,200,000,000 m3yang paling dibutuhkan elevasi 101.40
1 m3/det selama 1 bulan = 2,620,000 m3Tabel 6.6.1
Jadi 1 cm penyimpanan = 100 m3/det /bulan.BulanRata2 InflowElevasi QRata2 Outflow
m3/detmm3/detm3/det
Tabel 6.5.1101.4
BulanRata2 OutflowElevasi QRata2 InflowJ1100101.401100
m3/detmm3/detm3/detF900101.40900
101.4M700101.31000.00000000011700.0000000001
J2300101.28-12001100A2799.9999999999101.302799.9999999999
F2000101.17-1100900M3700101.33-3003400
M1800101.06-1100700J5000101.47-14003600
A1800101.16999.99999999992799.9999999999J6000101.67-20004000
M2000101.3317003700A3000.0000000001101.5611004100.0000000001
J2300101.627005000S1999.9999999999101.416003599.9999999999
J2900101.9131006000O1500101.401500
A3100101.9-99.99999999993000.0000000001N1300101.401300
S3000101.8-1000.00000000011999.9999999999D1200101.401200
O2800101.67-13001500
N2600101.54-13001300
D2400101.42-12001200
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
Run off
infiltration
Evaporation
Figure 7.2. Distribution of Rainfall
Monthly Rainfall in mm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
I
IV
14
16151090
-
Sheet1
6. Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100Storage in 108 m3100Debit 100 m3/det
0123456701234567
Gambar 1Gambar 2.Gambar 3
Sheet1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Sheet3
Sheet1
Flood Routing melalui Waduk
01
6.1.Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Sheet3
-
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Sheet3
-
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Sheet3
-
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
10
1.51.5
2.22.5
33.5
3.54
4.05
4.013.5
Jawaban :1 kotak = 24 x 3600 x100 m3= 8.640.000 m3
Pada akhir hari ke 5 Jumlah volume waduk = 9 kotak
= 9 x (24 x 100 x 3600) = 80.000.000 m3El 135400 m3 /det
Jadi outflow cocok
Total volume diantara inflow dan outflow hydrograf : 46 kotak
46 x 8.640.000 m3 = 400.000.000 m3Elevation 173.00
Pada elevasi tersebut debit yang lewat conduit 570 m3/det
Jadi spillway harus bisa melewatkan 3000 - 570 = 2430 m3/det
Dari gambar 4El diatas spillway H = 13.5 m
Bila puncak pintu 173 mMaka Crest Spillway =
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet3
-
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100Storage in 1006 m3100Debit 100 m3/det
0123456701234567
Gambar 1Gambar 2.Gambar 3
10
1.51.5
2.22.5
33.5
3.54
4.05
4.013.5
Jawaban :1 kotak = 24 x 3600 x100 m3= 8.640.000 m3
Pada akhir hari ke 5 Jumlah volume waduk = 9 kotak
= 9 x (24 x 100 x 3600) = 80.000.000 m3El 135400 m3 /det
Jadi outflow cocok
Total volume diantara inflow dan outflow hydrograf : 46 kotak
46 x 8.640.000 m3 = 400.000.000 m3Elevation 173.00
Pada elevasi tersebut debit yang lewat conduit 570 m3/det
Jadi spillway harus bisa melewatkan 3000 - 570 = 2430 m3/det
Dari gambar 4El diatas spillway H = 13.5 m
Bila puncak pintu 173 mMaka Crest Spillway =173 - 13.5 = 159.5 m
Sheet1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet3
-
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Sheet3
-
6.1
Sheet1
Flood Routing melalui Waduk
01
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity1.52
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.2.253
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.2.754
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi3.155
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.3.56
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk3.757
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,4.18
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 44.69
Untuk kondisi sedemikian :5.410
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/detik kemudian konstant 400 m3/det711
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.810.6
3. Tentukan besaran volume air di waduk sampai puncak pintu99.5
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan108
mengurangkan dari puncak pintu akan didapat crest spillway10.757
11.56
12.45
13.54
15.53
162.8
20
190190Tinggi m
180Elevation in m.180Elevation in m.10
170170
1601600
150150123
140140Debit m3/det
130130Gambar 4
120120
110110
100100
0123456701234567
Gambar 1Gambar 2.Gambar 3
10
1.51.5
2.22.5
33.5
3.54
4.05
4.013.5
Jawaban :1 kotak = 24 x 3600 x100 m3= 8.640.000 m3
Pada akhir hari ke 5 Jumlah volume waduk = 9 kotak
= 9 x (24 x 100 x 3600) = 80.000.000 m3El 135400 m3 /det
Jadi outflow cocok
Total volume diantara inflow dan outflow hydrograf : 46 kotak
46 x 8.640.000 m3 = 400.000.000 m3Elevation 173.00
Pada elevasi tersebut debit yang lewat conduit 570 m3/det
Jadi spillway harus bisa melewatkan 3000 - 570 = 2430 m3/det
Dari gambar 4El diatas spillway H = 13.5 m
Bila puncak pintu 173 mMaka Crest Spillway =
Sheet1
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet2
Waktu Hari Gambar 5
Debit 100 m3/det
Sheet3
-
6.2.a
Sheet1 (3)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
02000200
0.52200.520502000
130012250.52200.5
1.54001.525013001
260023001.54001.5
2.59002.535026002
3140034002.59002.5
3.517003.5475314003
4190045253.517003.5
4.519704.5600419004
5200059004.519704.5
5.519705.51200520005
619005.613505.519705.5
6.517505.751350619005.6
71550613506.517505.75
7.513506.51350715506
81150713507.513506.5
8.510007.51350811507
9850811508.510007.5
Day0-44-77-1010-1313-1616-19
IIIIIIIVVVI9.57208.51000Day00 -24.5-5.55.5-7.598508
S24010001882249628082868106209850IIIIIIIVVVI9.57208.5Day00 -24.5-5.55.5-7.5Day00 -24.5-5.55.5-7.5
S142404417.37605188235.5614.1518311.43.56010.55509.572003.71224.5142113106209IIIIIIIVVVIIIIIIIIVVVI
Q122.3083840742290590848993102110620010.55509.503.71224.514211303.71224.5142113
E l100.6102.5104.705106.2107.0107.210.5550S1000Day00 -24.5-55-6.5
El10811813615516316717310.5SSIIIIIIIVVVI
Q200300410500540550570El108118136155160167173El10811813615516016717303.71224.5141211
650780Q200300410500530550570Q2003004105005305505700
12001350650780650780S
1200135012001350El108118136155160165169
Q200300410500530550570
6501180
11001750
47.3
Day00 -24.5-55-6.5
IIIIIIIVVVI
03.71224.5141211
0
S
El108118136155160167169
Q200300410500540550570
7001180
12501750
Sheet1 (3)
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1 (2)
1
Sheet1
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet2
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Sheet3
Figure 6.2.2. Stage Hydrograph
Elevation (m)
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
0200200
0.5220205
1300225
1.5400250
2600300
2.5900350
31400400
3.51700475
41900525
4.51970600
520001000
5.51970
619001600
6.517501740
715501750
7.51330
81150
8.51000
9850
9.5720Day00 -24.25-5.1
10620IIIIIIIVV
10.555003.71224.58.5
115000
S
El108118136155160166
Q200300410500520540
650
1190
= 4.3 X 10 6 m3
I
II
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
= 4.3 X 10 6 m3
I
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
= 4.3 X 10 6 m3
I
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
= 4.3 X 10 6 m3
Time in days
Debit m3/sec
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
10.5
11
200
220
300
400
600
900
1400
1700
1900
1970
2000
1970
1900
1750
1550
1330
1150
1000
850
720
620
550
500
I
II
III
IV
V
VI
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
II
Outflow
Time in days
Debit m3/sec
III
I
= 4.3 X 10 6 m3
1
II
III
IV
V
VI
= 4.3 X 10 6 m3
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
001
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Figure 6.2.2. Stage Hydrograph
Elevation (m)
0
0
0
0
0
0
0
0
0
0
0
0
0
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
0000
0000
0000
0000
0000
000
0
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
200200
220205
300225
400250
600300
900350
1400400
1700475
1900525
1970600
20001000
19701600
19001740
17501750
15500
13300
11500
10000
8500
7200
6200
5500
5000
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
Outflow
Time in days
Debit m3/sec
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
001;3
0.251.5100100Total infiltration : from canals : 61
0.52.25200200from infiltration 65
13300300from non irigation area 41
1.53.5400400Gambar 6.4.2167 cm
23.8750050080 % x 167 = 133
2.54.2100100167 -133 =34
34.45110105
3.54.62230200
44.8300245
4.54.9350275
55400300
500350
00
5050
10080
101200110
22300130
0.353400140
0.064500140
0.015
= 4.3 X 10 6 m3
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
0
0
0
0
0
0
0
0
0
0
0
0
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
0
0
0
0
0
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
6.5.Routing dibawah kurva A (Keadaan asli)6.6Pengaturan pengendalian banjir dengan elevasi
antara 101.30-101.70
yang paling dibutuhkan elevasi 101.40
Tabel 6.6.1
BulanRata2 InflowElevasi QRata2 Outflow
m
Tabel 6.5.1101.4
BulanRata2 OutflowElevasi QRata2 InflowJ1100101.401100
mF900101.40900
101.4M700101.31000.00000000011700.0000000001
J2300101.28-12001100A2799.9999999999101.302799.9999999999
F2000101.17-1100900M3700101.33-3003400
M1800101.06-1100700J5000101.47-14003600
A1800101.16999.99999999992799.9999999999J6000101.67-20004000
M2000101.3317003700A3000.0000000001101.5611004100.0000000001
J2300101.627005000S1999.9999999999101.416003599.9999999999
J2900101.9131006000O1500101.401500
A3100101.9-99.99999999993000.0000000001N1300101.401300
S3000101.8-1000.00000000011999.9999999999D1200101.401200
O2800101.67-13001500
N2600101.54-13001300
D2400101.42-12001200
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
Run off
infiltration
Evaporation
Figure 7.2. Distribution of Rainfall
Monthly Rainfall in mm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
I
IV
14
16151090
-
6.2.b
Sheet1 (3)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
02000200
0.52200.520502000
130012250.52200.5
1.54001.525013001
260023001.54001.5
2.59002.535026002
3140034002.59002.5
3.517003.5475314003
4190045253.517003.5
4.519704.5600419004
5200059004.519704.5
5.519705.51200520005
619005.613505.519705.5
6.517505.751350619005.6
71550613506.517505.75
7.513506.51350715506
81150713507.513506.5
8.510007.51350811507
9850811508.510007.5
9.57208.51000Day00 -24.5-5.55.5-7.598508
106209850IIIIIIIVVVI9.57208.5Day00 -24.5-5.55.5-7.5Day00 -24.5-5.55.5-7.5
10.55509.572003.71224.5142113106209IIIIIIIVVVIIIIIIIIVVVI
10620010.55509.503.71224.514211303.71224.5142113
10.5550S1000
El10811813615516316717310.5SS
Q200300410500540550570El108118136155163167173El108118136155160167173
650780Q200300410500540550570Q200300410500530550570
12001350650780650780
1200135012001350
Sheet1 (3)
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1 (2)
1
Sheet1
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet2
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Sheet3
Figure 6.2.2. Stage Hydrograph
Elevation (m)
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
0200200
0.5220205
1300225
1.5400250
2600300
2.5900350
31400400
3.51700475
41900525
4.51970600
520001000
5.51970
619001600
6.517501740
715501750
7.51330
81150
8.51000
9850
9.5720Day00 -24.25-5.1
10620IIIIIIIVV
10.555003.71224.58.5
115000
S
El108118136155160166
Q200300410500520540
650
1190
= 4.3 X 10 6 m3
I
II
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
= 4.3 X 10 6 m3
I
II
III
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
IV
V
VI
Outflow
Time in days
Debit m3/sec
= 4.3 X 10 6 m3
I
II
III
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
1
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Figure 6.2.2. Stage Hydrograph
Elevation (m)
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
200200
220205
300225
400250
600300
900350
1400400
1700475
1900525
1970600
20001000
19701600
19001740
17501750
15500
13300
11500
10000
8500
7200
6200
5500
5000
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
Outflow
Time in days
Debit m3/sec
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
001;3
0.251.5100100Total infiltration : from canals : 61
0.52.25200200from infiltration 65
13300300from non irigation area 41
1.53.5400400Gambar 6.4.2167 cm
23.8750050080 % x 167 = 133
2.54.2100100167 -133 =34
34.45110105
3.54.62230200
44.8300245
4.54.9350275
55400300
500350
00
5050
10080
101200110
22300130
0.353400140
0.064500140
0.015
= 4.3 X 10 6 m3
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
0
0
0
0
0
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
6.5.Routing dibawah kurva A (Keadaan asli)6.6Pengaturan pengendalian banjir dengan elevasi
antara 101.30-101.70
yang paling dibutuhkan elevasi 101.40
Tabel 6.6.1
BulanRata2 InflowElevasi QRata2 Outflow
m
Tabel 6.5.1101.4
BulanRata2 OutflowElevasi QRata2 InflowJ1100101.401100
mF900101.40900
101.4M700101.31000.00000000011700.0000000001
J2300101.28-12001100A2799.9999999999101.302799.9999999999
F2000101.17-1100900M3700101.33-3003400
M1800101.06-1100700J5000101.47-14003600
A1800101.16999.99999999992799.9999999999J6000101.67-20004000
M2000101.3317003700A3000.0000000001101.5611004100.0000000001
J2300101.627005000S1999.9999999999101.416003599.9999999999
J2900101.9131006000O1500101.401500
A3100101.9-99.99999999993000.0000000001N1300101.401300
S3000101.8-1000.00000000011999.9999999999D1200101.401200
O2800101.67-13001500
N2600101.54-13001300
D2400101.42-12001200
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
Run off
infiltration
Evaporation
Figure 7.2. Distribution of Rainfall
Monthly Rainfall in mm
I
IV
14
16151090
-
6.3
Height of Dike mCost of Dike ($)Prob. of Exceedence (%)Average Annual Damage ($)Total Cost($)2.02.52.62.72.82.93.03.23.54.040.00065.00070.00080.00085.00092.000100.000120.000150.000220.0001.850.950.660.550.460.380.340.230.140.06185.00095.00066.00055.00046.00038.00034.00023.00014.0006.000225.000160.000136.000135.000131.000130.000134.000143.000164.000226.000
-
Sheet1 (2)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
Sheet1 (2)
200100
4001
7002
11003
2000122
31005
36006
3900290
40008
39609
3800590
340011
300012
2600849
220014
190015
1600993
140017
120018
10501022
900
800
700
600
540
470
400
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1
001
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
Sheet2
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet3
200
220
300
400
600
900
1400
1700
1900
1970
2000
1970
1900
1750
1550
1330
1150
1000
850
720
620
550
500
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Figure 6.2.2. Stage Hydrograph
Elevation (m)
101.4
101.29
101.15
101.1
101.2
101.35
101.6
101.9
101.85
101.75
101.65
101.55
101.45
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
101101101101
101.25101.25101.25101.15
101.5101.5101.35101.29
101.85101.6101.5101.52
102101.85101.82101.57
102102101.75
101.9
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
1;3
0.251.5Total infiltration : from canals : 61
0.52.25from infiltration 65
13from non irigation area 41
1.53.5Gambar 6.4.2167 cm
23.8780 % x 167 = 133
2.54.2167 -133 =34
34.45
3.54.62
44.8
4.54.9
55
101
22
0.353
0.064
0.015
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
0
0
0
0
0
0
0
0
0
0
0
0
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
0
0
0
0
0
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
6.5.Routing dibawah kurva A (Keadaan asli)
Tabel 6.5.1
BulanRata2 OutflowElevasi QRata2 Inflow
m
101.4
J2300101.28-12001100
F2000101.17-1100900
M1800101.06-1100700
A1800101.16999.99999999992799.9999999999
M2000101.3317003700
J2300101.627005000
J2900101.9131006000
A3100101.9-99.99999999993000.0000000001
S3000101.8-1000.00000000011999.9999999999
O2800101.67-13001500
N2600101.54-13001300
D2400101.42-12001200
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
-
Sheet1 (2)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
200
205
225
250
300
350
400
475
525
600
1000
1600
1740
1750
Day00 -2
IIIIII
0
0
S
El108
Q200
Sheet1 (2)
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1
001
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
0
0
0
0
0
0
Sheet2
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet3
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Figure 6.2.2. Stage Hydrograph
Elevation (m)
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
200200
220205
300225
400250
600300
900350
1400400
1700475
1900525
1970600
20001000
19701600
19001740
17501750
15507
13307.5
11508
10008.5
8509
7209.5
62010
55010.5
50011
Gb. 6.2.1.Inflow Hydrograph
Outflow Hydrograph
Outflow
Time in days
Debit m3/sec
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
1;3
0.251.5Total infiltration : from canals : 61
0.52.25from infiltration 65
13from non irigation area 41
1.53.5Gambar 6.4.2167 cm
23.8780 % x 167 = 133
2.54.2167 -133 =34
34.45
3.54.62
44.8
4.54.9
55
101
22
0.353
0.064
0.015
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
0
0
0
0
0
0
0
0
0
0
0
0
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
0
0
0
0
0
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
6.5.Routing dibawah kurva A (Keadaan asli)6.6Pengaturan pengendalian banjir dengan elevasi
antara 101.30-101.70
yang paling dibutuhkan elevasi 101.40
Tabel 6.6.1
BulanRata2 InflowElevasi QRata2 Outflow
m
Tabel 6.5.1101.4
BulanRata2 OutflowElevasi QRata2 InflowJ1100101.401100
mF900101.40900
101.4M700101.31000.00000000011700.0000000001
J2300101.28-12001100A2799.9999999999101.302799.9999999999
F2000101.17-1100900M3700101.33-3003400
M1800101.06-1100700J5000101.47-14003600
A1800101.16999.99999999992799.9999999999J6000101.67-20004000
M2000101.3317003700A3000.0000000001101.5611004100.0000000001
J2300101.627005000S1999.9999999999101.416003599.9999999999
J2900101.9131006000O1500101.401500
A3100101.9-99.99999999993000.0000000001N1300101.401300
S3000101.8-1000.00000000011999.9999999999D1200101.401200
O2800101.67-13001500
N2600101.54-13001300
D2400101.42-12001200
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
-
Irrigation (Diversion Requirement)
-
Irrigation (Water Budget)
-
IrrigationWater BalanceRain : 134 8 to run evap-transp,13 to run offLeaves 113 72 to crops, 41 to infiltrCrop.req. 169 72 from rain,97 from irrigationFarm delivery requirement 121 97 to crops, 24 to infiltration (20 %)Irrigation filtration losses 61 + 24 = 85Recover 80 % by pumping : 80 % x 85 = 68Hence losses out of district : 85 68 = 17Plus filtration from rain : 41 + 17 = 58
Sheet1
Cropwater Req.
D1version Req.Waste8
Rain134
13
134202121
PumpingFiltr.Filtr.Filtr.
Gr.Water
Losses
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
Sheet2
Sheet3
-
Total infiltration : from canals : 61 from infiltration 65from non irigation area 41 167 cm80 % x 167 = 133167 -133 =34
Sheet1 (2)
Flood Routing melalui Waduk0200
14000100
Sebuah waduk untuk penanggulangan banjir direncanakan dengan bendungan gravity27001
yang mempunyai pipa (conduit) bawah dan spillway berpintu lihat gambar 1.311002
Banjir rencana dengan kemungkinan terjadi 1 % pertahun seperti pada gambar 3.420003
Untuk keperluan hilir outflow maksimum 400 m3/detik, Perencanaan spillway dapat menanggulangi531004122
banjir dengan kemungkinan terjadi sebesar 0.01 % pertahun sebesar 3000 m3/det.636005
Selama banjir diusahakan tidak melewati puncak pintu sektor. Kurva hubungan elevasi dan volume waduk739006
pada gambar 2. Hubungan elevasi dengan debit conduit pada gambar 3,840007290
hubungan ketinggian muka air diatas spillway bila dibuka penuh dapat dilihat pada gambar 4939608
Untuk kondisi sedemikian :1038009
1. Gambarlah outflow hidrograph dengan kurva naik dari 100 ke 400 m3/dt kemudian konstant 400 m3/dt11340010590
2. Cek kenaikan kurva tersebut dengan gambar 2 dan 3.12300011
3. Tentukan besaran volume air di waduk sampai puncak pintu13260012
4. Kurangi kapasitas conduit dari rancangan banjir spillway dan tentukan ketinggian air dengan14220013849
mengurangkan dari puncak pintu akan didapat crest spillway15190014
16160015
17140016993
18120017
19105018
20900191022
2180020
22700
23600
24540IIIIIIIVVVI
19025470S2401001.21883.5249828092870
180Elevation in m.26400 S14242.24417.3761.251882.335.5614.1518311.43.560.55
170Q122.30838407422905908499931022
160E l100.6102.5104.70875106.2107.0107.2
1700101
020002000101.42000101.25
19014000.52201101.292400101.5
180Elevation in m.270013002101.153000101.85
170311001.54003101.13300102
1604200026004101.2
531002.59005101.351900101
63600314006101.62350101.25
739003.517007101.92800101.5
84000419008101.853000101.6
939504.519709101.753500101.85
1038005200010101.653800102
1134005.5197011101.55
1230006190012101.452300101
1326006.517502800101.25
142200715503000101.35
1519007.513303300101.5
161600811504000101.82
1714008.510004400102
1812009850
1910509.57202700101
20900106203000101.15
2180010.55503300101.29
22700115003850101.52
236004000101.57
245504500101.75
255005000101.9
26400
Sheet1 (2)
1
II
III
IV
V
VI
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet1
2001001
4001
7002
11003
2000122
31005
36006
3900290
40008
39609
3800590
340011
300012
2600849
220014
190015
1600993
140017
120018
10501022
90020
800
700
600
540
470
400
Sheet2
Waktu Hari Gambar 5.2. Reservoir Inflow
Debit m3/det
Sheet3
200
220
300
400
600
900
1400
1700
1900
1970
2000
1970
1900
1750
1550
1330
1150
1000
850
720
620
550
500
Gb. 6.2.1.Inflow Hydrograph
Time in days
Debit m3/sec
Figure 6.2.2. Stage Hydrograph
Elevation (m)
101.4
101.29
101.15
101.1
101.2
101.35
101.6
101.9
101.85
101.75
101.65
101.55
101.45
MonthsFigure 6.5.1. Stage Hydrograph
Elevation (m)
101101101101
101.25101.25101.25101.15
101.5101.5101.35101.29
101.85101.6101.5101.52
102101.85101.82101.57
102102101.75
101.9
A
B
C
D
A = Natural Conditions,B = $5M Excavation schemesC= $1MExcavation schemes,D = $2M Excavation scheme
A
B
C
D
Discharge m3/secFigure 6.5.2. Outflow Rating Curves
Cropwater Req.?
D1version Req.Waste8II
Cropwater Req.Rain134100 m
D1version Req.Waste8135mlI
Rain134_
13692021215.00m
134202121AABB
PumpingFiltr.Filtr.Filtr.
Gr.Water
PumpingFiltr.Filtr.Filtr.LossesGambar 6.4.1
Gr.Water
Losses
Gambar 8.2.1. b
Gambar 8.2.1. a
3 m
Ifreeboard 1 m
1;3
0.251.5
0.52.25
13
1.53.5Gambar 6.4.2
23.87
2.54.2
34.45
3.54.62
44.8
4.54.9
55
101
22
0.353
0.064
0.015
20
field
169
113
68
61
24
41
Ground Water Reservoir
58
Biaya Tahunan $100,000Gambar 6.3.2.
Tinggi Tanggul (m)
Gambar 6.3.3
Kemungkinan terjadi (%) pertahun
Elevasi Banjir (m)
20
field
169
113
133
61
65
41
Ground Water Reservoir
34
-
Possible pattern of diversion requirement:
Main canalDiversion Req.Pumping ReqJFMAMJJASOND3539352517000081825101210990000091025272516800008915Total20269133