w
Balance Point Control
SnubbingThenew
Era
CSU-160
Theremotecontrolled
SnubbingUnit
IsYourRigprepared?
The remote controlled
Advantages· Easyfitonmostjack-uprigs.
· Minimalnon-productivetimewhenencounteringpressurizedwellconditions–theCSUcantakeoveranytime.
· Costsavingbecauserigcancontinueworkwithoutwaitingonsnubbingequipment.
· Fullintegrationintherigsystem
· Safewayofdealingwithpressurizedwellconditions.
· Freedrillfloor–noequipmentrequiredondrillfloor.
· Nochangestothejack-uprigneeded.
· Rigispreparedforallscenarios.
TheCSU-160 Unit belongstothelatest generationofcompletelyremotecontrolledrigassistSnubbingUnits.
Technical DataMax.pullcapacity: 800kN/180000lbs
Max.pushcapacity: 600kN/135000lbs
Throughbore: 203mm(8inch)
Technical Characteristics· Completelyremotecontrolledfromrigcontrolcabin.
· Integratedback-upsystemtokeepcontrolovertheunitatalltimes.
· SiemenscontrolsoftwarewithintegratedsafetysystemscompletewithslipandBOPinterlocks.
· Noimpactonrigsafetysystemandotherrigsystems.
· Easy,flexibleandsimpletouse.
· Installationinsiderotarytables>49.5”ID.
· Conventionalleveldrillfloorwhenthejackisscopedin.
· Noequipmentneededondrillfloor–freespace.
· Compatibletobothmanualandautomaticrigs.
· Automaticsuspensionsystemtoallowmovementbetweenjack-uprigandwellhead.
· Adjustableinheight–differentBOPstackheightspossible.
· Unitspeciallypreparedfortheoffshoreenvironment.
· Electric-hydraulic265kWPowerpack.
· AllowsfortheRCDelementtobechangedoutwhentheunitisrigged-up.
· ContainerizedZone2PurgedControlUnit.
· Smallcrew.
Itisdesignedtoextend the capabilitiesofconventionalandautomaticrigstoallowsafe working on pressurized wells.
Snubbing Unit
Certification· Unitcompletely
certifiedbyBureauVeritas.
· CE-marking
· MachineDirective2006/42/EC
· ATEX95
· DNVstandardsforoffshorecontainers
· Norsok
· API
· EN(EuropeanStandards)
w
Weperformbestunderpressure!Our enduring strength is our commitment to achieving the highest possible industry standards for Quality, Health, Safety and Environmental protection. By continuously developing best-in-class practices we provide clients with the best quality services.
Our equipment conforms to all regulatory requirements of the geographical areas in which we work in today – and we have plans for tomorrow.
Togetherwearestrong!
Wedonotcompromise!The right way, the safe way, 24 hours a day around the globe.
ISO 9001 / 14001 OHSAS 18001
SCC Petroleum
Balance Point Control B.V.
Karel Doormanstraat 4 7825 VT Emmen • The Netherlands T: +31-591-667-687 F: +31-591-667-680 E: [email protected] www.bpc.nl
Balance Point Control GmbH
Bruchkampweg 28 29227 Celle • Germany
T: +49-514-182-033 F: +49-514-186-069 E: [email protected] www.bpc.nl
Balance Point Control Ltd. Cumberland House, Endeavour Drive, Arnhall Business Park, Westhill Aberdeenshire AB32 6UF • United Kingdom
T: +44-1224-215-395 F: +44-1224-215-390 E: [email protected] www.bpc.nl
sund
erdi
ek.d
e
A SUPERIOR ENERGY SERVICES COMPANY
From live well Snubbing to dead well Hydraulic Workover, we are able to deliver and manage the entire package, from wireline to well control and engineering – no job too rough or too tough! We are proud of our distinguished operational performance and long track record of success with major companies providing:
• Well redevelopment projects
• Milling/Fishing/Well clean outs
• Sand screen deployment
• WL/TC Perforation
• Production-/Well Integrity Logging
• Pipe/Casing cutting
• Wellhead change-outs
• Abandonments
• UB/OB (casing) drilling
• Underbalance- (UB) Well deepening/Liner installation
• Velocity string installation
• ESP/Safety valve installation and change-outs
• Well clean outs and other services
• Completion Services
The leadingprovider of
HydraulicWorkover,Snubbing,Wireline,Completion
WellControlServicesand