Disclosure to Promote the Right To Information
Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.
इंटरनेट मानक
“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda
“Invent a New India Using Knowledge”
“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru
“Step Out From the Old to the New”
“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan
“The Right to Information, The Right to Live”
“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam
“Knowledge is such a treasure which cannot be stolen”
“Invent a New India Using Knowledge”
है”ह”ह
IS 884 (1985): Specification for First-Aid Hose-Reel ForFire Fighting [CED 22: Fire Fighting]
Gr 3
IS: 884 -1985(Reaffirmed 2010)
Indian Standard
APECIFICATION FORFIRST-AID HOSE-REEL FOR FIRE FIGHTING
( First Revision)
First Reprint JUNE 2008(Including Amendment No I & 2)
© Copyright 1985
BUREAU OF INDIAN STANDARDSMANAK BHA VAN, 9 BAHADUR SHAH Z AFAR MARG
NEW DELHI 110002
December 1985
18 I At • 19113
Indian Standard
SPECIFICATION FORFIRST-AID HOSE-REEL FOR FIRE FIGHTING
( First Revision)
Fire Fighting Sectional Committee) BDG 22
IUpr'sIntinlGujarat El cctricity Board, Vadodara
Steel Authority of India (Bokaro Steel Plant).Bokaro Steel City
Oil and Natural Gas Commission, Debra Dun
The Institution of Fire Engineers (India). NewDelhi
"Vest Bengal Fire Services, Government of WestBengal. Calcutta
DEPu'rv IN8PECTon GENERAL Ministry of Railways(RPSF)
AsSISTANT SEOLRITY OFFIOER(FIRE), NOR1 JIE.RN RAILW A Y( Altern4U)
SURI V. P. DEWAN Ministry of Defence ( DOl)LT-COL V. R. Il~NABATl (Alttrnatl)
SURI s. K. OBERt Municipal Corporation of Delhi (Delhi FireService ), Delhi
SHRI R. K. BHJ~lU)WAJ ( Alt~rn(Jt, )SSRI R. R. DHOny"I:'{ Bhabha Atomic Research Centre, BombayDntECTOR Horne Department (Fire Service ), Government
of Tamil Nadu, MadrasDEPUTY DUlEC''')U ( Altemau )
DIREOTO:a GENEHAL OF 1" 1 R F: Home (Police) Department, GoverDm~bt ofSERVIOES Andhra Pradesh. Hyderabad
DE PUT Y D!'~BOTOJt ( FIRESEnVIOES) (Alt,rnatl )
SUB.IB.L.CHAUDBUYSUBI B. K. SIPltV ( Alurnat« )
SaRI K. -K. DA8 GUPTA
Chai,manSUBI G. B. MENON
M,m6"sSURI A. N. ARLUW,e.LIA
8HRX B. R. MEl:lTA ( Alt,rnat, )SURJ S. R. BANSAL
( Conlinu,d on /Jill' 2 )
C Copyright 1985
BIJREAU OF INDIAN STANDARDSThis publication 13 protected under the India Copyright Act ( XIV of 1957) andreprod uction in whole or in part by any mpanl except with written permisslon of thepubliJher shall be (leenlcd to be an infringement of copyright under the said Act.
IS I 884 • 1985
( Ctm';n",dfrom /JIJI' 1 )
R',"'s'ntingMinistry of Home AffainCentral Building Research Institute (CSIR),
RoorkeeSteelage Industries Limited ( Minimax Division).
Bombay
Steel Authority of India Ltd (Rourkela SteelPlant ), Rourkela
SBBJ J. S. JAJlSUEDll
SSRI C. GUAN ABAJ ( Altnnate )SURI P. KHANNASURI 8. N. KUNDUMANAGING DIRECTOR
Jaya Shree Textiles and Industries, RishraFire and Safety Appliances Co, CalcuttaAvon Services (Production &. Agencies ) Pvt
Ltd, BombayTECHNIOAL EXEOUTiVE ( Altlrnat, )
BRIO S. A. MOHILE Ministry of Defence ( R&D)SHRt A. K. SURI ( Alternate)
SHBI M. MUKHERJI
MemberJFIRE ADVISERSUBI A. K. GUPTA
SUBI P. N. PANCHAL
SHRI C. D. SHAIUIA ( Al'''natl )SURJ V. B. NIKAM Municipal Corporation of Greater Bombay
( Bombay Fire Brigade), BombayCentral Industrial Security Force (Ministry of
Home Affairs ), New DelhiSHRI P. H. SETHNA Kooverji Devshi and Co ( P ) Ltd, Bombay
SHa( N. T. PANJWANI ( Alternate )SHRI R. C. SllAItKA Directorate General of Supplies and Disposals,
New Delhi
Newage Industries, Surendranagar ( Gujarat )
Synthetics and Chemicals Ltd. BareillyZenith Fire Services, Bombay
Surex Production and Sales ( P ) Ltd, CalcuttaDirectorate General of Technical Development,
New DelhiTariff Advisory Committee, BombaySHJUJ. N. VAKIL
SURt K. RAV! ( Alt,rnal,)SURIS.VENKASWAKYSUBI B. V. WAGLB
SnUI D. S. N AltE8H (Alternate)SnRI D. K. SIl\KARSnnr CRANDUAKANT M. SHAH
SURl M. II. SHAll (Alternate)Snm ]. V. SHAH
SURI B. .1. SHAH ( Alternat« )SURI T ARIT SURSBRI SUSBIL KUMAR
Directorate General of Civil Aviation, New DelhiUrban Development, Public Health and Housing
Department, Government of Maharashtra,Bombay
SHRt V. H. MADKAIKAR ( AII,nUlI, )SSRI G. RAMAN, Director General, lSI ( &-ojfi.ciD MemIJ" )
Director ( Civ Engg )
SmetM.1SRBI K. M. MATHUR
Joint Director ( Civ EDgg ), lSI
( Conl'nUld onpOl' 10 )
2
AMENDMENT NO. 1 JULy 1987
TO
15:884-1985 SPECIFICATION FOR FIRST-AIDHOSE-REEL FOR FIRE FIGHTING
(First Revision)
(Page 4 J Table 1, col 3 and 4) - Add thefollowing matter under col 3 and 4:
SlNo.
(1)
i)
11)
iii)
Material
(2)
Mild steel sheetAluminium Sheet
Aluminium alloyMild steel sheet
Cas t Iron
Conforming toIndian Standard
(3)
15:513-1973+IS:737- 1974t
A-a WP ofIS~617" 1975*15:513-1973+
IS:210-1978§§
'§§Specification for grey iron castings (thirdrevision) •
(Page 1, clauses 5.2 and 5.2.1) - Substitutethe following for the existing clauses:
'5.2 Resistance to Leakage - The complete assemblyshall be capabfe of wit~tanding the hydrostaticpressure test of 21 kgf/cm for 5 min:
(Page 7, clause 5.4) - Add the followingsentence at the end of the existing clause:
'This shall be a type test'.
(BDC 22) 2
AMENDMENT NO. 2 MAY 2006'TO
IS 884: 1985 SPECIFICATION FOR FJRS1~-AID
IIOSE-REEL FOR FIRE F~IGHTING
( first Revision)
II~a~e 4. clause 3.1~ Tabte L ,SI No, (v) J ._- Substitute the following forthe existing:
(3)
v) Hose reel tubing:a) Rubberb) Thermoplastic hoses
(4)
IS 444 .198711IS 125~5 : ]98R~§
HSpecitil'ation for general purpose rubber water hose (fourth rl!VI.\lon)
~§Specification for thermoplastic hoses (textile reinforced) for water - General purpose.
(CED 22)
AMENDMENT NO.3 DECEMBER 2008TO
IS 884: 1985 SPECIFICATION FOR FIRST-AIDHOSE-REEL FOR FIRE FIGHTING
( First Revision)
[Page4, clause 2.I(g)] - Substitute 'shut' for 'shutt'.
(Page 7, clause 5.3.1):
a) In the title substitute 'Impact Resistance Test (Strength Test)' for'Impact Test.
b) Insert the following after first sentence:
·The length of the steel bridge shall be such that it extends by at least 10mm on either side of the two round plates when kept on them. The steelbridge shall have two numbers of suitable parallel grooves, say 10 mmwide and 5 rnm deep to ensure that the bridge shall not slip and falldown during the conduct of Impact resistance test. '
c) Substitute '5.4.1' for '5.2.1' in line 6.
d) Insert the following before last sentence:
'As a result of single impact due to free fall of 25 kg mass from aheight of 300 mm the reel shall not get deformed and the distancebetween the parallel round plates shall not change. '
(Page 7, clause 5.3.2):
a) In the title, substitute 'Load Resistance Test' for 'Load Test'.
b) Substitute the following for the existing first sentence:
'A mass of 80 kg is suspended using steel wire ropes on the top edge offront round plate (with clamps) constituting one side of the hose reel.'
c) Substitute •5.4.1 ' for' 5.2.1' in line 4.
Amend No.3 to IS 884 : 1985
(Page 7, clause 5.4.1, line 2) - Substitute '0.7 ± 0.01 MPa' for '7 :i: 0.1bar'.
(Page 7, clause 5.4.1) - Add the following new clauses:
'5.5 Swinging - In case of Type A Hose Reel swivel joint(s) shall beincorporated in the construction to enable the users to swing the hose reel by180degreeswhile pullingthe hose in either direction.
5.6 Reel Action - In case of both Type A and Type B hose reels it shall bepossible to easily and smoothly unwind the hose by pullingthe hose end havingnozzle fitted to it. Also it shall be easy to wind up the hose when done with. '
(Page 7, clause 6) - Add the following new clauses and renumber theexistingclauses:
'6 WORKMANSHIP - The construction of the hose reel shall be such thatthere shall be no sharp end jagged edges or surface, etc, so as to cause physicalinjury to the personnel handling the hose reel.
7 PAINTING - All the internal and external surface of the ferrouscomponents of the hose reel shall be coated with epoxy polyester powder to50 p, Min thickness to protect it against rusting. The colour of the powdercoating shall be fire red conforming to Shade No. 536 or 538 of IS S.'
(Page 8, Fig. 3, Captions) - Substitute 'DETAIL OF IMPACT REISTANCETEsT ON TYPE A HOSE REEL' for 'DETAIL OF IMPACT TEST'.
(Page 9, Fig. 4, Captions) - Substitute 'DETAIL OF Loxn RESISTANCETEST ON TYPE A HOSE REEL' for 'DETAIL OF LOADTEST'.
(CEO 22)
Rcprography Unit, BIS, New Delhi, India2
IS I 884. 1985
Indian StandardSPECIFICATION FOR
FIRST-AID HOSE-REEL FOR FIRE FIGHTING
( First Revision)
o. FO REWORD
0.1 This Indian Standard (First Revision) was adopted by the IndianStandards Institution on 16 May 1985, after the draft finalized by the FireFighting Sectional Committee had been approved by the Civil EngineeringDivision Council.
0.2 Hose-reels are recommended for use in fixed installations for variouspremises and also as an equipment to the fire engines. It is an equipmentconsisting of the reel, water inlet pipe, shut off nozzle, stop valve withhose reel tubing and provide a most effective fire fightmg facility. Thisstandard was first published in 1969. This revision has been prepared so asto cover hose reel in addition to fixed installations for the use in the fireengine besides making the requirements specific and up to date,
0.3 For the purpose of deciding whether a particular requirement of thisstandard is complied with, the final value, observed or calculate d e.xpressing the result of a test or analysis, shall be rounded off in accordancewith IS: 2..1960*. The number of significant places retained in the foundedoff value should be the same as that of the specified value in this standard.
I. SCOPE
1.1 This standard lays down the requirements for materials, constructionaldetails and tests for first-aid hose reels intended for installation in buildingsand for mounting on fire engine.
2. GENERAL
2.1 The hose reel shall consist of following components:
a) Hub,b) Two sides,
·Rules for rounding off numerical values ( revised ).
3
IS I 884 • 1985
c) Swivel joint,d) Pipe with fitting,e) Wall bracket,f) Hose reel,g) Nozzle with shutt off arrangement, andh) Stop valve.
3. MATERIALS3.1 The details of materials for the various components are given inTable I.
CONJ'OBIIINO TOINDJAN STAlfDAKD
(4)A-8 WP of IS: 617-J975
IS : 513..1973tIS : 737 ..1974t
IS : 513-1973tGrade L 'rn-z of IS : 318
1981§IS : 444-198011IS : 8090-1976'
Rubber
(3)Aluminium alloyMild steel sheetAluminium sheettvlild steelLeaded t in bronze
(2)
TABLE 1 DETAILS OF MATERIALS FOR VARIOUSOOMPONENTS OF HOSE REEL
COKPONBNT8 ~ATBRIAL
Hose reel tubing
Nozzle with branchpipe and coupling
Stop valvePipe with fitting
HubSides
Wall braeketSwivel joint
SLNo.(1)i)ii)
iii)iv)
v)vi)
vii)viii)
IS: 778-1979-.IS : 1239 ( Part 1 )
1979ttIS : 1239 ( Part 2 )..
1969tt·Specification for aluminium and aluminium alloy ingots and castings for general
engineering purposes ( secondrevision ).tSpecjfication for cold rolled carbon steel sheets ( seeo"d revision).:Spccification for wrought aluminium and aluminium alloys, sheet and strip ( for
general engineering purposes ) (stcol,d reoision ).~Spt-cifif.~ation for leaded tin bronze jn~ots and castings (second ,eV;J;Dn ).IISpecificalion for rubber water hose (third rsuision ).~Specificatjon for coupling, branch pipe, nozzle used in hose reel tubing for fire
fighting•••Specification for copper alloy gatp, globe and check valves for water works purposes
(third ,..vis.iDll ).ttSpp.cification for mild steel tubes, t ubu lars and other wrought steel fitting. : Part 1
J979 Mild steel tubes ( fourth "vision ).t:Specification for mild stflC) tubes, tubu.lars and other wrought steel fittings : Part 2...
1969 Mild steel tubulars and other wrought steel pipe fittings ( $I&ond r,visitln ).--------------------------------4. TYPES4.1 The reel shall be made in two types as below :
Type A - Swinging ( IRO" ) wall mounting type (ree Fig. 1 ).Type B - Horizontal type used for installation on fire cng.n(~s
( sre Fig. 2 ).
All
dim
ensi
on
sin
mil
lim
etre
s,
Fla
.1
HO
SE
RE
BL
SW
ING
ING
TY
PE
.... C'n
eo : • i
§ E o o '" &
SID
ES
~r I
I-
.,
HU
BC
P200
mit
:
1I
II
j
/:
PIP
E'A
rTH
FIT
TIN
G
I
OU
TL
ET
;-;
,~,:r-
I
32S
fT\I
n..1
t.. "':~~~KET
SW
WE
LJO
INT
WA
LL
BRA
CKET
ME
T.W
ITH
.20
mm
STO
PV
ALV
E---
"HR
EA
DS
AS
PE
RIS
26
43
(Pt
l)-,
g?S
)
0=-:
_-_-
_-.:------
~::----
--==t
=:.
r:--
---"""
r----:..-
=.==.1
"=:.
II
E'
Il
__~_
01,~
~I
,~--r
+I
--&
----
-I
I•
•I
;:
::
C"_
-:x
s:=-=
-==
.:':-
----
-=:~-
k".,.~~
=---=_
--=::-
:--::.-
::--:::=~~
---f
}-~~
.,'
.,
c-=~
~F~"
'}--
;-!:
-::-:.~:
---~
-~-=
-~~_
::-:
_-~:
:-)'
V\
;; .. I
c E o III
It)
INLE
T,W
ITH~
20m
mST
OP
VALV
E{T
HR
EA
DS
AS
PER
G:¥
L.IS
'26'
3(p
tll-
!a7
5
OU
TLE
T,,"
JJ
...-R
EE
LS
IDE
S
HU
B~
200
m.n
--=:-,=~...:
.-=
--
• ...I..
625
mo.
_I!
MO
UN
TIN
GBRACKET~
I.70
0m
ax..I
C\
All
dim
ensi
ons
inm
illi
met
res,
FIG
.2H
osB
RE
EL
HO
RIZ
ON
TA
LT
YP
E
IS I 884 • 1985
5. RI~Q,UIREMENT
5.1 The essential dimensions of the two types are given in Fig. 1 and 2. Itshall be designed so as to comply with the requirements given in 5.2to 5.4.5.2 ResistaDce to Leakage - The complete assembly shall be capableof operating at 10 bar maximum working pressure without leakage, whentested in accordance with 5.2.1.
5.2.1 Connect the hose reel to a water supply at a pressure of 10 barand with the hose fully wound into the drurn. Close the nozzle for 5 min,subjecting the reel to a pressure of 10 bar. Unwind the hose completely,maintaining the pressure of 10 bar for a further 5 min.
5.3 Strength
5.3 .. 1 Impact Test - Rest a steel bridge 100 X 25 rom cross-sectioncentrally across the two reel side plates vertically above the centre line ofthe spindle. Mount a steel cylindrical hammer of25 kg mass and with flatfaces in guides above the steel bridge so th at it falls freely through a heightof 300 mm to strike the steel bridge midspan between the two plates. Aftera single impact, test the reel in accordance with 5.2.1. The arrangementof the impact test is shown in Fig. 3. This shall be a type test.
5.3.2 Load Test - Suspend a mass of 80 kg from the spindle in case ofType i\ reels and froru the point midway between the supports, in caseof Type B. Remove the mass after 72 h and test the reel in accordancewith 5.2.1. The arrangement of the load test is shown in Eig. 4. This shallbe a type test.
5.4 Range and Water Flow Rate - When tested in accordancewith 5.4.1, the water flow rate shall be not less than 2·1 l/min and the rangeof tile jet shall be not less than 6 m.
5.4.1 Rang- and ~Vatrr Floto Test --. Measure the range and water flowrate of the reel at inlet pressure of 7 ± 0-1 bar. The ra nge is the distancefrom the nozzle to the point on the ground beyond which 50 percent ofthe discharge falls. Mrasure the range with the nozz le 1 m above floorlevel at an angle of elevation to give maximum range.
6. MARKING
6. t Each first-aid hose-reel shall be clearly and permanently marked withthe following information:
a) Manufacturer's Name or trade-mark,
b) Year of manufacture, and
c) Type of reel.
7
IS I 884 • 19856.1.1 The product may also be marked with Standard Mark.
6.1.2 The use of the Standard Mark is governed by the provisions of the Bureauof Indian Standards Act, 1986 and the Rules and Regulations made thereunder.The details of conditions under which the licence for the use of Standard Markmay be granted to manufactures or producers may be obtained from the Bureauof Indian Standards.
7. CRITERIA FOR CONFORMITY7.1 Each equipment shall be checked, for the requirement given in thisstandard.
meSTEEL HAMMER25 kg MASS
~ 'I> 125 mm
100x 25 mmFLAT
I-f------ ...... ---.
II
FIG. 3 I)ETAIL OF IMPACT TEST
8
IS : 884 • 1985
LOAD SUSPENDED BY 80 kg SUSPENoeo
WIRE ATTACHED TO MASSTOP EDGE OF FRONTPLATE WITH CLAMPSIN POSITION SHOWN
Flo. 4 DETAIL OF LOAD TBST
9
IS I 884 • 1985
( C."linu,d from /Jag, 2 )
Water Fittings for Fire Fighting Purpose Subcommittee, BDC 22 : 1
Conoell.' Reprtsenting8HRI V. P. DEWAN Ministry of Defence (DGI)
M,mbers
LT-COL V. R. BANAHA'l'l ( Alternat« toShri V. P. Dewan )
SHItI J. K. CUAKRABOftTY Tariff Advisory Committee, BombaySUItr V. KHURANA ( Alternat« )
CUIEF FIItE OFFICER Municipal Corporation of Delhi (Delhi FireService), Delhi
Snnr R. K. BHARDWAJ ( Alternate )FlUK AOVISER MInistry of Home Affair»SllRI H. S. GAur,AuT The Institution of Fire Engineers (India), New
Delhi
Municipal Corporation of Greater Bombay( Bombay Fire Service), Bombay
Jaya Shree Textiles and Industries, RishraMather & Platt Ltd, BombayMinistry of Defence ( R&D)
SHIH T. L. VERMA ( Alternate ]HYDR. A.UJ"JO ENGINEER
SURI V. B. NnCAM: ( Alternate)SURI P. KHANNASHU.1 M. R. KAMAT
BInG S. A. MOHILESH1U A. K. SURl ( Alternate )
SHltJ H. V. RAG Engineers India Ltd, New DelhiSHRI K. V. BrrAr(OWAJ ( Alternate)
SHRl.J. V. SHAH Ncwage Industries, Surendranagar ( Gujarat)SURI B. J. SHAll ( Alternate)
SUUI J. R. SHAll .Laxmi Sprinklers, BombaySaar H. J. NEGANDHI (Alternate)
SHRl P. H. S:BTHNA Koove rji Devshi & Co Pvt Ltd, BombaySHRt N. T. PANJWANI ( Alurnat» )
10
M(flPF-- - 161 Deptt of BIS/2008-- 100 Books.
BUREAU OF INDIAN STANDARDSHeadquarters:Manak Bhavan, 9 Bahadur Shah Zatar Marg, NEW DELHI 110002Telephones 23230131,23233375,23239402 Fax 91+01123239399,23239382E-Mail Info@bls org In website http I/wwwbrs org In
Central Laboratory.Plot No 20/9, Site IV, Satubabad Industnal Area, SAHIBABAD 201010
RegIonal Offices:Central Manak Bhavan, 9 Bahadur Shah Zatar Marg, NEW DELHI 110002
"Eastern 1/14 CIT SchemeVIl M, V I P Road, Kankurgachl, KOlKATA 700054Northern SCD 335-336, Sector 34-A, CHANDIGARH 160022Southern CIT Campus, IV Cross Road, CHENNAI600113tWestern Manakalaya, E9, MIDC, Behind MarotTelephone Exchange,
Andhen (East), MUMBAI400093
Branch Offices:'Pushpak', Nurmohamed Shaikh Marg, Khanpur, AHMEDABAD 380001
Peenya Industnal Area, 1st Stage, Bangalore-Tumkur Road BANGALDRECornmercial-cum-Otnce Complex, Opp Dushera Maldan, Arera Colony,
BntanMarket. BHOPAL 46201662-63, Ganga Nagar, UnttVI, BHUBANESHWAR 7510015th Floor, Koval Towers, 44 Bala Sundaram Road, COIMBATORE 641018SCQ 21, Sector 12, Fandabad 121007Savitn Complex, 116 G T Road, GHAZIABAD 20100153/5 Ward No 29, R G Barua Road, 5th By-lane, Apurba Sinha Path,
GUWAHATI7810035-8-56C, L N Gupta Marg, Nampally Station Road, HYDERABAD 500001Pnthavt Raj Road, Opposite Sharat Overseas Bank, C-Scheme, JAIPUR 302001
11/418 B.Sarvodaya Nagar, KANPUR 208005Sethi Shawan, 2nd Floor, Behind Leela Cinema, Naval Kishore Road,
LUCKNOW 226001H No 15, sector-a, PARWANOO, Distt Solan (H P) 173220Plot No A-20-21. Institutional Area, Sector 62, Goutam Budh Nagar, NOIDA 201307
Pathputra Industnal Estate, PATNA 800013Plot Nos 657-660, MarketYard, Gultkdl, PUNE 411037"SahaJanand House- 3,d Floor, Bhaknnaqar Circle, 80 Feet Road,
RAJKOT 360002T C No 2/275 (1 &2), Near Food Corporation ot India, Kesavadasapuram-Ulloor Road,
Kesavadasapuram, THIRUVANANTHAPURAM 6950041" Floor, Udyog Bhavan, VUDA, SmpurarnJunction, VISHAKHAPATNAM-03
·Sales Office IS at 5 Chownnghee Approach. PO Pnncep Street, KOLKATA 700072tSales Office (WRO) Plot No E-9, MIDC, Rd No 8, Behind Telephone Exchange,
Andhen (East), Mumbal-400 0093
PRINTED BY THE MANAGER GOVERNMENT OF INDIA PRESS FARIDABAD
Telephone277 0032
23237617
233786622609285
22541984
28329295
5601348
83949552423452
2403139221 0141229217528614982456508
2320108422232822233012261 8923
2354362402206
226280824274804
2378251
25579142712833
23553243
28329295