Introduction toWork Breakdown Structure (WBS) &
SOW Templates for TWAs of GES-Chapter H
July 10, 2014
![Page 2: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/2.jpg)
GES-TWA vs. WOs
TWA WBS & SOW
TWA Examples
TWA SOW Templates7 (a)7 (b)7 (c)7 (d)7 (e)7 (f)
Questions & Comments
Discussion Items
![Page 3: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/3.jpg)
Watershed Management Plan
Watershed Management Plan Update
Drainage Improvement Study
Water Quality Assessment & BMPs
Stormwater Inventory
Peer Review
Misc. Engineering Support
ENG/GIS ReviewFEMA DFIRM SupportOther Support
The Nature of a GES-H Project Can be
![Page 4: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/4.jpg)
GES-TWA vs. Traditional Work Orders
TWA
WO#1WO#2WO#3WO#4WO#5
……
WatershedEvaluation
WO#1
WO#2
WO#3
WO#4
WO#5
……
WMP –Floodplain
Analysis
NTP
WO#1
WO#2
WO#3
……
WMP –SWRA,
WQ BMPs
NTP
WO#1
WO#2
WO#3
……
WMP –FPLOS,
Alternatives Analysis
NTP
?
![Page 5: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/5.jpg)
Project Development
Master Agreement Requires a “Proposal” for Each TWA
![Page 6: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/6.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
GES-TWA WBS & SOW
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.
7 (c)
7 (b)
7 (a)
7 (f)
7 (d) 7 (e)
![Page 7: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/7.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (c)
7 (b)
7 (a)
7 (d) 7 (e)
WMP/WMP Update – Full RangeExample Project: City of Williston WMP (FY15 CFI)
![Page 8: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/8.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (c)
7 (b)
7 (a)
WMP/WMP Update – Floodplain AnalysisExample Project: Mill Creek WMP (FY15 CFI)
![Page 9: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/9.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (d)
7 (a)
7 (e)
WMP – FPLOS, Alternatives Analysis, SWRA & BMPs of Water Quality
Example Project: Powell WMP
![Page 10: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/10.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (f)
WMP/WMP Update – Peer ReviewExample Project: Lake Stafford/Priest Prairie/W.
Marion WMP Peer Review
7 (a)
![Page 11: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/11.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Peer Review &
As-needed Engineering Support
GES-TWA WBS & SOW
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.
7 (c)
7 (b)
7 (a)
7 (f)
7 (d) 7 (e)
![Page 12: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/12.jpg)
District Defined Submittals, Stopping Points, and Reviews Generic WMP – Floodplain Analysis
![Page 14: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/14.jpg)
Project Development
Watershed Evaluation
Watershed Management Plan -Floodplain Analysis
Watershed Management Plan -FPLOS Determination, Alternatives
Analysis, and Recommendations
Watershed Management Plan -Surface Water Resource
Assessment (SWRA) & BMPs for WQ
7 (d)
7 (a)
Drainage Improvement StudyExample Project: Southway Villas BMP Alternatives Analysis (FY15
CFI)
![Page 15: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/15.jpg)
Stopping Points (i.e., District Notice)
![Page 16: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/16.jpg)
“Pre-submittal Meeting” in New SOWs
![Page 17: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/17.jpg)
Example List of Deliverables (Task 2.2.3)
![Page 18: Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062515/56649d085503460f949d98f7/html5/thumbnails/18.jpg)
Deliverables – Data Delivery Structure