Introducing hub & spoke concept
SPOKE HUB
HUB
EASTSPOKE
WESTSPOKE
![Page 3: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/3.jpg)
1
2
5
3 4
21
78
1011
12
1314
16
17
18
18
20
22
24 23
25
9
15
42East SPOKE
Cikarang Dry Port(Customs Clearance &
Port Clearance)
HUB Tj. Priok Sea Port
(Port Handling)
West SPOKE(proposed)
Cikarang Dry Port work as spoke and hubwith Tanjung Priok Seaport
![Page 4: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/4.jpg)
62%
JABABEKA
MM 2100
EJIP LIPPO
HYUNDAI SURYA CIPTA
KIKCKIM
KBI
KIIC
GIIC
Connecting industries in the hinterland to the seaport
Port Code: IDJBK
![Page 5: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/5.jpg)
All formalities are
completed at Cikarang Dry Port
![Page 6: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/6.jpg)
Only vessel berthing and port handling need to be done at the seaport
![Page 7: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/7.jpg)
29 shipping lines
![Page 8: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/8.jpg)
Tanjung Priok(IDJKT)
CDP(IDJBK)
Import Process
By Consignee / Forwarder
Flow Chart
Shipper / Consignee
CDP/IDJBK asPlace of DeliveryOn Multimodal B/L By Carrier
Export Process
By Carrier By Shipper / Forwarder
CDP/IDJBK asPlace of ReceiptOn Multimodal B/L
BondedLogisticsCenter
SeaportAbroad
Cikarang Dry Port as place of receipt or delivery
![Page 9: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/9.jpg)
Under Multimodal Transport Bill of Lading
![Page 10: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/10.jpg)
Bonded transfer with electronic seal
![Page 11: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/11.jpg)
For monitoring & security measure
![Page 12: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/12.jpg)
12
200 ha of
integrated port & logistics facilities
To Tg Priok
To Surabaya
Mobile X-Ray
Physical Inspection
Reefer
Container Yard
Bonded Logistics Center 2(under construction)
Bonded Logistics Center
Empty DepotOffice: CDP, Customs, Quarantine, Banking
CFS
Gate
![Page 13: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/13.jpg)
Container Yard’s capacity
400,000 TEUs per annum
![Page 14: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/14.jpg)
128 reefer plugs available
![Page 15: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/15.jpg)
Physical Inspection Facilities
![Page 16: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/16.jpg)
Mobile X Ray for container scanning
![Page 17: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/17.jpg)
Empty Container Depot
![Page 18: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/18.jpg)
Special containers handling
![Page 19: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/19.jpg)
Operator:
Container Freight Station for Less than Container Load consolidation
Consolidators:
![Page 20: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/20.jpg)
Online Tracking
![Page 21: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/21.jpg)
Domestic Rail Freight Service
![Page 22: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/22.jpg)
Seaport – Dry Port Railway Connectivity22
![Page 23: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/23.jpg)
23
Old emplacement(For 20 cars of train)
Container Train Station Expansion
Emplacement Expansion(For 30 cars of train)
Railway: Tg Priok – Cikarang - Surabaya
To Surabaya
To Tg Priok
![Page 24: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/24.jpg)
Smart Port Solution
Data center
Customs & other government
agencies
CDP System Applications
Automation & integration order & manifest system
Fleet management system
TPS online comply
Integratedapplication
Local, mirror, cloudIntegrated data center
E-seal as integrated platform
TPS Online
CRM implementation
E-billing, mobile system
CDP integrated security systemComply to Customs auto-gate
Terminal Operator billing system (SP3B integrated, etc)e-DO
CDP cloud
![Page 25: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/25.jpg)
Terminal Tariff Comparison (in rupiah)
• Valid from 1 July to 31 Dec 2016• Terminal/port charges are settled in Cikarang Dry Port
Tanjung Priok Sea Port
20 ft 40ft
Handling
- Lift On / Lift Off 187,500 281,300
Storage
- Basic Tariff 27,200 54,400
Import
- Day 1 Free Free
- Day 2 81,600 163,200
- Day 3 163,200 326,400
- Day 4 and forth 244,800 489,600
Free Time Storage Import 1 day from ATA Priok
Free Time Storage Export 5 days counted 1 – basic tariff
Penalty
- After SPPB (Customs) 200%
-After SP2 (Port) 300%
Physical Check (Behandle) 1,015,000 1,390,000
Cikarang Dry Port
20 ft 40ft
Handling
- Lift On / Lift Off 187,500 281,300
Storage
- Basic Tariff 25,840 51,680
Import
- Day 1 - 5 Free Free
- Day 6 - 10 51,680 103,360
- Day 11 and forth 77,520 155,040
Seaport Storage Cost Recovery 163,200 326,400
Free Time Storage Import 5 days from ATA CDP
Free Time Storage Export 7 days from ETD Vessel
Penalty
- After SPPB (customs) Free
- After SP2 (Port) Free
Physical Check (Behandle) 1,015,000 1,390,000
![Page 26: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/26.jpg)
26
• Streamlined Process• One stop service• Reduce shipment time & cost• Better supply chain planning
• Expanding seaports reach to hinterland
• Developing new economic & production centers in hinterland
• Increasing sea port handling capacity
• Reduce dwelling time, congestion, & fuel consumption
• Lower road & highway maintenance cost
• Reduce berthing queue• Increased truck
utilization
Cargo Owner
Government&
Nation
Liner & 3PL
Benefits of Hub & Spoke
![Page 27: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/27.jpg)
Bonded Logistics Centerin Cikarang Dry Port
![Page 28: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/28.jpg)
Definition
Page 28
Bonded logistics center is similar to free trade zone concept where international traders could pile their stock at a designated warehouse or area in Indonesia.
With fiscal facilitation import taxes or duty on the stockpile would be deferred, until the stock is bought by a buyer and leaves the warehouse. In several countries it’s known as non resident inventory.
![Page 29: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/29.jpg)
Legal Frameworks
Page 29
2nd Economic Policy PackageSeptember 2015
Gov’t RegulationNr. 85/2015
November 2015 MoF RegulationNr. 272/PMK.04/2015December 2015
11 PLB inaugurated by President(including CDP’s)March 2016
![Page 30: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/30.jpg)
Goods Ownership in PLB
Page 30
Goods are entitled to PLB Operator
Supplier-owned goods are consigned to PLB (consignment). Transaction has not yet occurred upon entering PLB
Goods have been entitled to importer in domestic, and importer stored it temporarily in PLB. Transaction has occurred.
PLB
PLB owned1
Supplier owned2
Importer owned3
![Page 31: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/31.jpg)
Existing Cotton Supply Chain
STORAGEPORT
Farmer Grading Warehouse
DistributionCenter
Origin Country
RegionalDistribution Center
DistributionCenter
Buyer
Middle Country Destination Country
![Page 32: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/32.jpg)
New Scheme Cotton Supply Chain
Farmer Grading Warehouse
DistributionCenter
Origin Country
RegionalDistribution Center
DistributionCenter
Buyer
Middle Country Destination Country
STORAGE
PORT
DOMESTIC
![Page 33: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/33.jpg)
Logistics Park• Warehouses• TPP
Railway:• Domestic• International
Port (70 Ha):• Customs• Quarantine• Physical Check• Container Yard• Reefer Plugs• CFS
Location in Cikarang Dry Port
Page 33
Bonded Logistics Center 2(under construction)Bonded Logistics Center
![Page 34: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/34.jpg)
Bonded Logistics Center: Cotton
Page 34
![Page 35: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/35.jpg)
Page 35
Bonded Logistics Center 2 (construction progress)
![Page 36: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/36.jpg)
Page 36
1st Cotton Shipment June 9th, 2016
![Page 37: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/37.jpg)
Page 37
1st Cotton Delivery August 15th, 2016
![Page 38: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/38.jpg)
Page 38
Ministers Visit Sept 23rd, 2016
![Page 39: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/39.jpg)
Page 39
• Saving warehouse cost• Saving transportation cost• Closer to buyer
• Increasing logistics efficiency• Increasing local industry
competitiveness• Becoming logistics hub of SE Asia
• Certainty in supply• Faster lead time• Reducing inventory and
working capital
Shipper
Government&
Nation
Buyer
Benefits Bonded Logistics Center
![Page 40: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/40.jpg)
PT. Cikarang Inland Port
Cikarang Dry Port
@CikarangDryPort
+6221 2908 2908
Jl. Dry Port Raya, Kota Jababeka, Cikarang, Bekasi 17530, West Java, Indonesia
www.cikarangdryport.com
Thank You
![Page 41: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/41.jpg)
Stakeholders and Customers
TerminalOperator
(5)
LandTransporter
(2)PT Mustika Alam Lestari
Logistics Service
Provider(40+)
Page 41
Terminal 3
![Page 42: Intermodal Connectivity through Hub & Spoke€¦ · •Valid from 1 July to 31 Dec 2016 •Terminal/port charges are settled in Cikarang Dry Port Tanjung Priok Sea Port 20 ft 40ft](https://reader036.vdocuments.mx/reader036/viewer/2022070910/5f9bfe46dc661b70280f4656/html5/thumbnails/42.jpg)
Stakeholders and Customers
Shipper Consignee
(400+)
Page 42