INTEGRATING MEP MODULARISATION
DECEMBER 2020
![Page 2: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/2.jpg)
Innovation - Standardisation,- DfMA ‘kit of parts’ approach
Exceptional team to deliver strategy
Experienced offsite contractor
Demonstrable capability and capacity
KEY DRIVERS
![Page 3: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/3.jpg)
TECHNICAL CAPABILITIES
Dedicated in-house BIM development
team
BSI Kitemark certified to ISO 19650BIM Level 2
![Page 4: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/4.jpg)
Mechanical riser modules
OFFSITE KIT OF PARTS
Horizontal MEP Modules
![Page 5: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/5.jpg)
STANDARDISATION / KIT OF PARTS
• 2-storey flat frame• 2 catalogue items (serving PHE)• Standardise pipe sizes – Header arrangement • Flexible / Future Proof• Option to be fed from bottom OR top (future buildings)• Welded stainless steel – lighter, longevity, extrusions,
standard sub-assemblies / ‘kit of parts’• Saving on BIM design• Standard structural frame design• Generate Revit family – with configurable parameters
– Expansion bellows / Anchoring points
Type 2 • LTHW - ø100 mains + ø50mm BSP branches• CHW - ø125 mains + ø65mm PN16 branches• Including Flushing and Control circuits
Type 1 • LTHW - ø100 mains + ø50mm BSP branches• CHW - ø125 mains + ø65mm PN16 branches
![Page 6: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/6.jpg)
DEVELOPMENT REQUIREMENT
• Optimum pipe sizing working with MEP consultant• Cost evaluation on standardising pipe sizes• Cost evaluation of pump efficiency gains• Industrialisation for manufacture / repetition efficiencies• Logistics• Installation methodology• Fixings to primary structure – eliminate on site drilling• Interfaces at floor levels• Fire stopping• Development of Revit family• Development of output schedule for manufacture• Development of manufacturing drawing + sub assemblies +
assemblies• Finished product inspection criteria
– Pneumatic Testing Offsite– SnagR
![Page 7: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/7.jpg)
VALVESETS – CONTROL VALVES
• One family containing the following options:– Line sizes 15mm to 54mm– 2-port PICV– 3-port– Optional strainer– Valve selection– Materials
• Copper Pressfit• Stainless Steel Pressfit • Carbon Steel Screwed
• Outputs Cobie data required for the valveset• Outputs schedule for build configuration• Allows specific control valve details to be entered• Simplified view in Revit to allow correct space allocation• Auto selects valves based on flow rate / pressure drop Offsite Standards Catalogue
![Page 8: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/8.jpg)
HORIZONTAL MEP MODULES: TYPICAL FLOOR PLATE
![Page 9: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/9.jpg)
HORIZONTAL MEP MODULES:
Primary Ductwork Primary Ductwork
Primary Pipework Primary Pipework
Primary Pipework
Primary Pipework Primary PipeworkOptimise service routes where practical for standardisation
Primary DuctworkPrimary Ductwork
![Page 10: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/10.jpg)
HORIZONTAL MEP MODULES: TYPICAL FLOOR PLATE
9m x 9m grid
A typical area where modular and traditional will be utilised
![Page 11: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/11.jpg)
HORIZONTAL MEP MODULES: TYPICAL FLOOR PLATE
92 modules (4.5m x 3m)
![Page 12: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/12.jpg)
HORIZONTAL MEP MODULES:
C A A B B B B E
EBBBBBBD
E B
AF
C
A A A C
EB
A A A A A A A A F36 FCU modules
6 Catalogue items
![Page 13: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/13.jpg)
HORIZONTAL MEP MODULES:
B
C J A J A J L B L L B 0 L B 0 L B 0 L E
EMNBMNBMNBMMBMHBHBHD
E H K B H
J
K
GAJGF
C
A
P
M A G A C
EPHL
A J A A J A A J A A J A F56 non FCU modules
13 Catalogue items
Q S R SR R R S R R S R R T
![Page 14: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/14.jpg)
HORIZONTAL MEP MODULES: TYPICAL FLOOR PLATE
Kit of PartsType A
Type B
Type C Type D
Type E
Type F Type K
Type J
Type H
Type G
Type O
Type N
Type RType L Type M
Type S
Type P
Type T
Type Q
![Page 15: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/15.jpg)
STANDARDISATION / KIT OF PARTS• 2-tier light weight frame (4.5m x 3m)• Unistrut or similar• Standard fixing strategy• Saving on BIM design• Standard frame designs• Pressfit pipework and valves• Generate Revit family – with configurable parameters
– Expansion bellows / Anchoring points– FCU model
Type H • Ductwork to grille• Acoustic Panel• Elec Containment (modular wiring)
Type A • FCU• LTHW and CHW pipework• Valve-sets• Insulated Ductwork • Elec Containment (modular wiring)
Type A
Type H
![Page 16: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/16.jpg)
DEVELOPMENT REQUIREMENT
• Optimum pipe sizing and coordination to minimise number of catalogue items
• Cost evaluation on standardising pipe sizes• Selection of FCU Manufacture and model• Valveset fitted on drip tray• Condensate consideration• Industrialisation for manufacture• Option for removable bottom section and return for reuse • Logistics / Installation methodology• Fixings to primary structure – eliminate on site drilling• Development of Revit family• Development of output schedule for manufacture• Development of manufacturing drawing • Finished product inspection criteria
– SnagR– QC requirements
![Page 17: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/17.jpg)
IN SUMMARY
Innovation - Standardisation,- DfMA ‘kit of parts’ approach
Exceptional team to deliver strategy
Experienced offsite contractor
Demonstrable capability and capacity
Extensive support network
‘Game Changer’ opportunity for construction
![Page 18: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/18.jpg)
Video Links to Offsite Projects
https://youtu.be/GEk-7e9JmqwNightingale projects (Health)
https://youtu.be/ZMYMsGRDg8ANew Street CHP (Rail infrastructure)
https://youtu.be/rHQHWnXDpEkBirmingham New Street Spine (Rail)
https://youtu.be/9dAZtsYkYNQIBRB: Warwick University
https://youtu.be/G-U4vHpoJaAHeathrow T5 (Aviation Modular Building)
![Page 19: INTEGRATING MEP MODULARISATION - CIC](https://reader031.vdocuments.mx/reader031/viewer/2022021308/62085fb36b26a15d946a5804/html5/thumbnails/19.jpg)
https://www.architecture.com/-/media/GatherContent/Test-resources-page/Additional-Documents/2020RIBAPlanofWorktemplatepdf.pdf
RIBA Plan of work