![Page 1: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/1.jpg)
Integrated Sustainable DesignA Paradigm Shift
James CrawfordBusiness Development Executive
Lagan Construction Group
![Page 2: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/2.jpg)
Lagan Construction Group
![Page 3: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/3.jpg)
A Personal Journey• First attended University of Ulster in September 1994 to study
Economics, graduated top of class with 2:1 Honours in 1997
• Returned again in September 2002 to study MSc Computing, graduated top of class with Distinction in 2005
• Accepted onto MSc Infrastructure Engineering in September 2012, so far so good…
![Page 4: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/4.jpg)
Integrated Sustainable Design - Context
CIV805Integrated
Design
Education Needs
Energy
Civils
Sustainability
Design
Social Issues
ChallengeThe Delivery of Design & Sustainability, Integrated Together within the Context of Education
ContextInvolvement in a ‘Live’ Project Environment to RICS Stage 3 (Initial Planning Appraisal) within a Shared Education Complex
VisionContribute to Policy Debate on Shared Education using Engineering Principles.
![Page 5: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/5.jpg)
Integrated Sustainable Design - ProcessDevelopment of a Shared Education Complex
Through Sound Processes from the University of Ulster
Teamwork
Mutual Respect
Engagement
Design Review
Reflective Log
Concept Posters
![Page 6: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/6.jpg)
Integrated Sustainable Design - Progress
Shared Education Complex
Armagh
BelfastBallymena
Craigavon
Location of Shared Education Complex within existing Crumlin Road Gaol
/Girdwood Barracks site
![Page 7: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/7.jpg)
North Belfast Shared Education ComplexMaking Vision a Reality
4 schools re-located into new ‘core’ buildings – Each Identity retained
Modern Shared Facilities Comprising Sports Centre Technology Centre Learning Resource Centre Science Building
Gaol refurbished into Shared Arts & Drama Zone, complete with Auditorium and Workshop space
All Shared spaces open to local community outside school hours
![Page 8: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/8.jpg)
North Belfast Shared Education ComplexMaking Vision a Reality
Parking ? Retain façade of Courthouse and
construct multi-storey carpark
Access ? Users of the carpark access the
Education Complex through existing tunnel
Traffic ? Drop off points around perimeter
of education Complex Entire centre of Education
Complex landscaped with walkways
![Page 9: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/9.jpg)
North Belfast Shared Education ComplexA Paradigm Shift
An education complex for use by everyone in the local community
Instil a sense of pride, youth keen to learn 16+
Alleviate education skills deprivation
Improve employment prospects
Enhance income opportunities
Relieve housing stress
Improve social environment
Not so much ‘Why’ but rather ‘Why Not’
![Page 10: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/10.jpg)
Conclusion A concept developed by 4 Masters students at University of Ulster, Jordanstown
Additional support from our new colleague Chigbo Uchegbu from Nigeria Final report amassed 55,000 words ! Peer Design Review by industry education specialists in Architecture and
Engineering
Full support from Academic staff at UUJ
A vision I believe could turn into reality
![Page 11: Integrated Sustainable Design (James Crawford)](https://reader034.vdocuments.mx/reader034/viewer/2022052303/54935382b47959260f8b480b/html5/thumbnails/11.jpg)
Thank You