Download - Inspection Test Plan for Fabrication
-
7/28/2019 Inspection Test Plan for Fabrication
1/4
Client Projects Number: A : RKM Inspector
B : Client inspecto
Appl icable Codes: C : Third Party Insp
H : Hold Point
W : Witness Point
M : Monitoring
R : Review Docum
RI:
Report IssuancNSF Procedures: RT : Radiographic T
UT : Ultrasonic Test
MT : Magnetic Partic
PT : Liquid Penetran
HV : Hardness Test
VT : Visual Test
DT : Dimensional C
HT : Hydrostatic Tes
DFT : Dry Film Thickn
PWHT : Postweld Heat
Project :
INSPECTION AND TEST PLAN
References
Job No. : Client :
AWS D1.1
NSF-QCD-008 N.D.T control
NSF- MAT- 001 Store control
NSF-PRO- 001
NSF -QCD-005 Ultra sonic Examination
Weld control
NSF-TEC-001 Handling and Packing
NSF-QCD-007
NSF-GEN-001 Fabrication
Magnetic particle Examination
NSF-PRO-003 Painting Control
-
7/28/2019 Inspection Test Plan for Fabrication
2/4
Dwg No. : Rev. :
I
1 100%
2 100%
3 100%
II
1 100%
2100%
III
1 100%Correct Joint design
APPROVAL
Drawing approval
100% Material certificate check
WPS's,WPQ's,PQR AND NDT
100% Material check for confirmity and visual
Marking,Cutting,Rolling and Edge preparation
MATERIAL PREPARATION
FABRICATION ASSEMBLY
Ser.#
Acceptance Criteria Verifying Document
Job No. : Client : Project :
INSPECTION AND TEST PLAN
Type A
H
1
Drawing specs client approval
Activity Description %
H
AWS D1.1 client approval
WPS&Approved
DrawingsITP DT M
EN 10025 Material Certificate VT&DT H
WPS&ApprovedITP VT&DT H
EN 10025 client approval H
-
7/28/2019 Inspection Test Plan for Fabrication
3/4
Dwg No. : Rev. :
100%
50%
%
50% OF THE LENGTH UT FOR BUTT WELDS FULL
PENTRATION FOR THICKNESS 8 MM OF ALL WELDS (For
Dynamic Loads)
Activity Description
FOR DOUBLE WALL CJP < 8MM AT TWO STAGES : 1st step100% MT AFTER ROOT PASS DIRECTLY MAX 3 MM -2nd step
100% MT( AFTER FILLING + CAP )(Dynamic or static )
AWS D1.1 table 6.3
10% OF THE LENGTH UT FOR BUTT WELDS FULL
PENTRATION FOR THICKNESS 8 MM OF ALL WELDS
1000 MM , 5% OF THE LENGTH UT FOR BUTT WELDS FULL
PENTRATION FOR THICKNESS 8 MM FOR ALL WELDS