Goal:
• To support the mission of the College by enhancing teaching and learning
• Vision: described in Connections: Enhancing the Wells Experience through Information Technology
• “Computers no longer merely compute….they help communicate.”
![Page 3: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/3.jpg)
Vision:
• Enhancing Campus-wide Communication and Collaborative Learning
• Enhancing Wells’ Access to the World and the World’s Access to Wells
• Enhancing Access to the Library’s Resources
• Enhancing Learning in the Classroom and Beyond
![Page 4: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/4.jpg)
Means:
Expand information technology resources in four areas:
• I. Network services
• II. Network infrastructure (fiber optic backbone and interior wiring)
• III. Computers and other equipment for students, faculty, and staff
• IV. Support and training
![Page 5: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/5.jpg)
I. Network Services (1)
Accomplished by 1998:
• Leased-line access to the Internet
• Email server (c. 500 accounts)
• Web servers
• Dial-in server for faculty and staff
![Page 6: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/6.jpg)
I. Network Services (2)
Accomplished 1998-99:
• Revised Web site (www.wells.edu) to reflect look of College print publications; award-winning site
• Upgraded Internet connection from 56k to 256k
• Installed new Web & email server to assure reliability and performance
• Installed firewall & other security measures
• Built Windows NT network for part of Administration
![Page 7: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/7.jpg)
I. Network Services (3)
Underway:
• Interactive Web services, such as online application (Summer/Fall 1999)
• More internal uses of Web technology (intranet), including in classes
• Library online catalog (part of Library integrated library automation system), ready May, 2000. (Server already installed and wiring complete.)
![Page 8: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/8.jpg)
II. Network Infrastructure: Campus Backbone (1)
Accomplished by 1998:
• Central hub in Main Building Server Room
• Fiber optic connections to four campus buildings
• Conduit for fiber to other buildings
![Page 9: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/9.jpg)
II. Network Infrastructure: Campus Backbone (2)
Accomplished 1998-99:
• Extended fiber optic backbone to Morgan, Smith, Bellinzoni, Maintenance, Weld, Leach, Glen Park, and Dodge; fiber to the Library (previously coax)
• Increased backbone speed of Academic network from 10 Mbps to 100 Mbps
![Page 10: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/10.jpg)
II. Network Infrastructure: Campus Backbone (3)
To do:
• Add fiber optic connections to Barler, Campbell, Student Union (music, visual arts, dance)
![Page 11: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/11.jpg)
II. Network Infrastructure: Interior Wiring (1)
Accomplished by 1998:
• Wired Library (partial), Macmillan, Pettibone, Cleveland, Zabriskie
![Page 12: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/12.jpg)
II. Network Infrastructure: Interior Wiring (2)
Accomplished 1998-99:
• Wired Morgan, Smith, Bellinzoni, Maintenance, Weld, Main, Leach, Glen Park, Dodge; expanded wiring in the Library including for laptops
• To do:
• Barler, Campbell, Student Union
![Page 13: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/13.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (1)
OVERALL:
Accomplished by 1998:
• c. 300 computers, most on the campus network and the Internet
• Two labs in Macmillan completely refurbished
• New labs in Main (two) and Cleveland
![Page 14: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/14.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (2)
FOR STUDENTS:
Accomplished 1998-99 (1):
• 73 computers in general computer labs; all on the Internet (64 new since January, 1999: 450 MHz Pentium IIs/IIIs; translucent Mac G3s)
• Two new labs in Weld (summer, 1998)
• Zabriskie lab completely rebuilt and refurbished (summer, 1999)
![Page 15: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/15.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (3)
FOR STUDENTS:
Accomplished 1998-99 (2):
• Two labs in Main completely upgraded
• New specialized labs in Morgan and Macmillan (digital imaging and digital video)
• Installed high-speed laser printers in all labs
![Page 16: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/16.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (4)
FOR FACULTY:
Accomplished 1998-99:
• Provided high-end computers to all faculty
• Created computer projection systems for fourteen classrooms (most are portable for flexible use: carts with computers, projection, and sound)
![Page 17: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/17.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (5)
FOR FACULTY:
Underway:
• Installing high-end computer and video projection capability in Cleveland Auditorium (summer, 1999)
![Page 18: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/18.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (6)
VIDEO AND SATELLITE
Accomplished:
• Installed VCR & large monitor in every classroom in Cleveland and a number of classrooms in Macmillan & other buildings
• Began to use satellite dish on Cleveland for videoconferences (downlink)
![Page 19: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/19.jpg)
III. Computers and Other Equipment for Students, Faculty, Staff (7)
STAFF
Accomplished:
• Provided a computer for every staff member who needs one
![Page 20: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/20.jpg)
IV. Support and Training (1)
Accomplished:
• Two full-time Microcomputer Support Technicians (since December, 1997)
• Training workshops and workshop series
![Page 21: Information Technology at Wells Progress Report, Summer, 1999: Highlighting Work since Report to Board of Trustees in January, 1998 Prepared by Kenneth](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649e4e5503460f94b45668/html5/thumbnails/21.jpg)
IV. Support and Training (2)
To do:
• Increased training opportunities for both faculty and staff
• Support for faculty members wishing to experiment with new technologies to enhance teaching and learning