ID 02 CB Performance Indicators
Noureddine Filali B.GEO Work Plan Symposium
CB side eventGeneva, May 01, 2014
Genesis and historyGEOSS’ 10-Year Implementation Plan (2005): Within 6 years GEO will: … Produce monitoring and evaluation mechanisms for GEO capacity building efforts;
CB strategy (2006): stipulate the necessity to set in metrics for measuring the progress of CB objectives Task CBC 09-04-b (N. Filali, M.Andiswa, J.Berque)
WP : ID02 Expected achievement by 2015:“Develop qualitative and quantitative Performance Indicators for measuring the efficacy of institutional and individual capacity building programs”
Genesis and history•Report on CB PI for 2009-2011 GEO WP submitted to CB committee,•Poster presented during GEO plenary 2010 exhibition (CB boot).
ObjectivesCB Strategic Target
Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing countries, to produce and use Earth observations and derived information products.
Specific objectives:Networking activities that specifically build individual, institutional and infrastructure capacity.Leveraging resources for Earth observation capacity building efforts.Increased use of Earth observation in policy and decision making.Enhanced participation of developing countries in GEO and GEOSS.
PI problematicOutcome Rating Possible indicatorsNetworking activities that specifically build individual, institutional and infrastructure capacity.
Possibly measurable
Number of projects, infrastructures, institutions, people working on capacity building.
Leveraging resources for Earth observation capacity building efforts.
Possibly measurable
Monetary (and non-monetary?) commitments by other parties to earth observation capacity-building projects
Increased use of Earth observation in policy and decision making.
Not measurable
but examples may be
identified
Examples of users (Countries, International Institutions, Treaties and conventions,..) using earth obs data which did not use it previously.
Rate of use by current users.Enhanced participation of developing countries in GEO and GEOSS.
Likely measurable
Number of developing countries (how defined?) that are Members of GEO.
Number of developing countries participating in GEO tasks.
Methodological approach:Itterative process
Networking activities that specifically build individual,
institutional and infrastructure capacity.
Networking activities that specifically build individual,
institutional and infrastructure capacity.
AG-01-C1AG-01-C1
ID-02-C1ID-02-C1 ID-05-C1ID-05-C1
IN-04-C1IN-04-C1
IN-04-C2IN-04-C2
Leveraging resources for Earth observation capacity building
efforts.
Leveraging resources for Earth observation capacity building
efforts.
Increased use of Earth observation in policy and
decision making.
Increased use of Earth observation in policy and
decision making.
Enhanced participation of developing countries in GEO
and GEOSS
Enhanced participation of developing countries in GEO
and GEOSS
ID-02-C1ID-02-C1
ID-05-C1ID-05-C1
IN-04-C2IN-04-C2
ID-02-C1ID-02-C1
ID-05-C1ID-05-C1
IN-04-C2IN-04-C2
AG-01-C1AG-01-C1
ID-02-C1ID-02-C1
ID-05-C1ID-05-C1
IN-04-C2IN-04-C2
Methodological approach:Data collection online WP
Methodological approach:Data collection online WP
Using report generator tools of the online WP
Methodological approach:Data collection framework
Methodological approach:online survey questionnaire
Intermediate results
Did CB components within your task are?
What's the skills of the target people interested by CB activities?
Which Continent will be targeted by this CB activity?
Involvement of DCInvolvement of DCWhere CB Where CB
Achieved and planned CBAchieved and planned CB Achieved and planned CBAchieved and planned CB
steps before Next GEO plenaryContinue data collection :
Questionnaire on CB beside GEO task leaders (questionnaire to be sent by Geosec),Process GEO tasks sheet,Collecting any other information about CB
Data processing and analysis, CB PI report redaction and submission to ID02,Recommendations for the next phase.
2014 requirements
More informations from tasks leads about CB activities, especially quatitative informations, (aswers data collection questionnaire),
Help in data collection, task sheet processing, analysisAny contributors is welcome
Please fill the CB questionnaire