    Huawei LTE eNodeB Site Solution &

    Installation Key Point

    V1.4

    2012-March 28

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 2

    LTE Network Topology

    Chapter2: Installation Key Point and Mistake

    CONTENTS

    Chapter1: Site Solution

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 3 Page 3

    RRU Power Cable Solution

    DCDU-11B RRU3232 < 45m

    0~45m

    46~100m

    46 RRU 100m

    DCDU-11B OCB 3.3

    RRU3232

    > 45m &

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 4

    BBU and DCDU install on the Transmission Cabinet

    1) Power cable of RRU from Sector A connected Load 0; Power cable of another RRU

    connected to Load 1; Power cable of BBU connected to Load 6.

    2) CPRI Fiber of RRU from Sector A connected to CPRI 0 on LBBP board; CPRI Fiber of

    another RRU connected to CPRI 1 on LBBP board.

    3) Transmission Fiber connected to SFP 0; Transmission Ethernet Cable connected to GE/FE

    0

    4) CPRI Fiber should be tied with Hook & Loop Mechanical Fastener.

    5) 1 U space should be reserved between BBU and DCDU.

    5

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 5

    Cable connection for RRU installed on Tower

    (Extended RET cable between two RCUs use 15m)

    Sector B Sector A Sector C

    ANT0 ANT1 ANT2 ANT3

    ANT0 ANT1

    ANT0 & ANT1 of RRU0 are connected to +45 & -45 port of sector A antenna; ANT2 & ANT3 of RRU0 are connected to +45 & -45 port of sector C antenna; ANT0 & ANT1 of RRU1 are connected to +45 & -45 port of sector B antenna.

    RRU 0 RRU 1

    -45 +45

    -45 +45

    -45 +45

    15M

    Extended

    RET cable

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 6

    RRU installed on Tower

    Sector A Sector B

    RRU0 is installed on the same pole with

    antenna of sector A;

    RRU1 is installed on the same pole with

    antenna of sector B.

    RRU and antenna can be installed as

    back to back.

    RRU can be installed on a pole near the

    pole for antenna.

    RRU should be grounded on tower.

    Sector C

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 7

    Cable connection for RRU installed on roof pole site

    (Extend RET cable between two RCUs use 30m)

    ANT0 ANT1 ANT2 ANT3

    ANT0 ANT1

    -45 +45

    -45 +45

    -45 +45

    Make the feeder to be shortest when you choose Sector 1 and 2 to share one RRU When the distance between two sectors is longer than 12m, and shorter than 40m. Use the

    7/8 feeder;

    Feeder

    Sector 3 Sector 1 Sector 2

    30M

    Extended

    RET cable

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 8

    Cable connection for RRU installed on roof pole site

    (Extend RET cable between two RCUs use 50m)

    ANT0 ANT1 ANT2 ANT3

    ANT0 ANT1

    -45 +45

    -45 +45

    -45 +45

    SBT must connected to ANT0 of RRU. The feeder to be shortest when you choose Sector 1 and 2 to share one RRU When the distance between two sectors is longer than 12m, and shorter than 40m. Use the

    7/8 feeder;

    When the distance between two sectors is longer than 40m, then use 13/8 feeder.

    Feeder

    Sector 3 Sector 1 Sector 2

    50M

    Extended

    RET cable

    0.5M RET

    cable

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 9

    1

    2

    1) CPRI fiber is connected to CPRI 0;

    2) The metal shield of RRU power cable should

    be cut and grounding on clip inside RRU

    cabling cavity;

    3) The water plugs should be filled in the vacant

    troughs of the RRU cabling cavity.

    Cable connection inside RRU cabling cavity.

    3

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 10

    Antennas cable connection

    23

    1) RCU is connected to the TILT as the picture.

    2) +45 is the port 0 for antenna.

    3) - 45 is the port 1 for antenna.

    4) The vacant port of the antenna should be

    waterproofed.

    5) The TILT cover of vacant port should be

    fasten.

    5

    1

    4

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 11

    Antennas Labeling

    Sector A Sector B Sector C

    ANT_0A

    ANT_1A

    ANT_0B

    ANT_1B

    ANT_0C

    ANT_1C

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 12

    GPS installation

    GPS Antenna

    Arrestor

    GPS antenna is suggested to installed on the cable tray.

    Arrestor is not allowed to touch the cable ladder.

    The Arrestor should be grounded.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 13

    RRU Label Rules

    RRU Label Rules

    Sector: A BC Path: 0123

    RRU 0

    AN

    T_

    0A

    AN

    T_

    1A

    AN

    T_

    0C

    AN

    T_

    1C

    RRU 1

    AN

    T_

    0B

    AN

    T_

    1B

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 14

    LTE Network Topology

    Chapter2: Installation Key Point and Mistake

    CONTENTS

    Chapter1: Site Solution

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 15

    Safety belt and cap is extremely needed.

    Wrong Right

    Notes Safety cap is needed for the working on the site. And the safety belt is needed for working on the tower or poles.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 16

    Connect the power cable to the right port

    Wrong Right

    Notes 1. Power cable of RRU0 should be connected to LOAD0, label with LTE PWR RRU0

    2. Power cable of RRU1 should be connected to LOAD1, label with LTE PWR RRU1

    3. BBU should be connected to LOAD6, label with PWR BBU

    PS: RRU0 is connected to the sector A antenna

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 17

    Remove the shield of the power cable near connector

    Wrong Right

    Notes The black shield of the power cable near the power connector of DCDU should be cut and tied up.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 18

    The CPRI fiber should be tied.

    Wrong Right

    Notes The CPRI fiber should be tied with Hook & Loop Mechanical Fastener. Dont use cable tie.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 19

    Put the redundant fiber on the Transmission Rack bottom

    Wrong Right

    Notes The redundant fiber should be circled and put on the bottom of the transmission rack. Dont put it outside the tower or on the cable tray.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 20

    The heat-shrink tube is used and shrink well.

    Wrong Right

    Notes The power cable should use the heat-shrink tube. And it should be done well.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 21

    Ground the DCDU on the Transmission Cabin

    Wrong Right

    Notes Ground the DCDU on the Transmission cabin. ( Use 6mm grounding cable. )

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 22

    Installed the bracket assembly on the right direction

    Wrong Right

    Notes:

    Follow the label on the bracket assembly carefully. And make sure the bracket assembly of the RRU is installed

    on the right direction.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 23

    The metal shield of RRU power cable is wrongly cut.

    Wrong Right

    Notes The metal shield of RRU power cable should be cut and grounding on clip inside RRU cabling cavity. The metal

    shield can not be cut too long and it go outside the cabling cavity.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 24

    The waterproof plugs are filled in the vacant troughs

    Wrong Right

    Notes The water plugs should be filled in the vacant troughs of the RRU cabling cavity.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 25

    The vacant RF ports of the RRU are waterproofed.

    Wrong Right

    Notes Vacant RF ports of RRU are covered with waterproof caps and the caps are tightened.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 26

    Labeling the Jumpers of the RRU with the correct Label

    Wrong Right

    Notes Use Label ANT_0A and ANT_1A for Sector A;

    Use Label ANT_0B and ANT_1B for Sector B;

    Use Label ANT_0C and ANT_1C for Sector C.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 27

    The vacant RF ports of the antenna are waterproofed.

    Wrong Right

    Notes Vacant RF ports of antenna are covered with waterproof caps and the caps are tightened.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 28

    The RF cable of GPS cant be circled.

    Wrong Right

    Notes The redundancy RF cable of GPS should be cut. Dont circle it if it is too long.

    GPS_0

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 29

    Remove the oil paint of the tower for grounding point

    Wrong Right

    Notes Oil paint of tower is not removed on earth grounding point.

    electric ability surge protection will be decreased.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 30

    The power cable are grounded beside the Roxtec

    Wrong Right

    Notes The power cables of the RRU should be grounded by the grounding clip on the grounding bat before routed into the Roxtec.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 31

    The power cable should be grounded in the OCB.

    Wrong Right

    Notes The metal shield of the power cable should be grounded inside the OCB.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 32

    BBU and DCDU should be fixed with screws.

    Wrong Right

    Notes BBU and DCDU should be fixed with screws. Cable ties is forbidden to use for fixing equipment.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 33

    OCB should be grounded

    Wrong Right

    Notes The OCB should be grounded.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 34

    The waterproof cover of OCB should be fasten.

    Wrong Right

    Notes

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 35

    Keep the environment of the site neat and clean

    Wrong Right

    Notes Keep the environment of the site neat and clean. Dont leave any boxes, cables, bottles inside and outside the shelter. Take all the garbage away the site.