1. GENERAL
Purpose
The purpose o this directive is to ensure that
electricalinstallationsareoperatedandmaintainedinaccordancewith
current regulations and internal requirements
electricalinstallationsareinstalledinasafewayandinaccordancewithcurrent regulations and internal requirements
Domain
This directive applies to
allBP-operatedinstallationsandcontractedinstallations/vessels
on the Norwegian continental shel including onshore plants or the
petroleums activities.
OnshorefacilitiesorprojectswhereBPNorgeAShaveaparticularresponsibility and which are assessed being part o the petroleum
activities
allinstallations/projectsforwhichBPNorgeisthedeveloper
Reerences
Lovomtilsynmedelektriskeanleggogelektriskutstyr(El-tilsynsloven)
For oshore installations reerence to:
TheActivitiesRegulations:
Section 91 Work on and operation o electrical installations
TheFacilitiesRegulations:
Section 47 Electrical installations
Section 38 Emergency power and emergency lighting
Section77EMC
Section 78 ATEX
Technicaloperationalregulationsforthepetroleumspartof
onshoreplantsSection 15 Electrical installations
Section 38 Emergency power and emergency lighting
The Norwegian Petroleum Saety Authoritys (PSA) regulations
Regulationsrelatingtosafetyinworkonelectricalinstallations(FSE)
The Directorate or Fire and Electrical Saetys regulations
Regulationsrelatingtoqualicationsforprofessionalelectricalpersonnel
The Directorate or Fire and Electrical Saetys regulations 059Recommendedguidelinesforthecompetenceandtrainingof
electrical personnel
The Norwegian Oil Industry Associations guidelines
NorsokstandardZ-015NTemporaryequipment
1.70.007Controlofcontractorequipment
RequirementstipulatormatrixBPNorge
HSEDirectiveno.1-Workpermits
HSEDirectiveno.5-Energyisolation
-
8/6/2019 HSE Directive 8 Electrical Plants
3/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011266
Defnitions and abbreviations
Warning sign is a warning sign with black text on a yellow background
that warns o the danger o getting too close to or touching live parts o
the apparatus that can be dangerous
Work permit (WP) is a written permit to carry out a dened task in a
given place on an installation under given preconditions in a sae manner
Responsible or operations imply overall proessional supervision oelectrical installations, and ensuring that electrical installations are
planned, executed and operated in accordance with the regulations
High voltage installations are electrical installations with a nominal
voltage above 1000V alternate current or 1500V direct current
Earthed means that the electrical installation is short-circuited andconnected to the installations main earth so that electrical energy is
discharged quickly and saely in the event o short-circuiting
Condemned equipment is equipment that has been removed rom
operations permanently. The equipment has been electrically secured
(disconnected and earthed) and all labels have been removed.
Condemnedequipmentisnotbeingmaintainedasitisnolonger
consideredelectricalequipment.Condemnedequipmentismarked
Kondemnert(Condemned)
Low voltage installations are electrical installations with a nominalvoltage up to and including 1000V alternate current or 1500V direct
current
Preserved equipment is equipment that is out o operation temporarily,but which is expected to be used at a later date. Preserved equipment
is connected to the electrical distribution system. This equipment shall
be maintained to ull saety requirements according to the regulations.
Preserved equipment is marked Preservert
Saety card is a personal card issued by the responsible person
electrical installation, showing authorisation, access permit and
limitations or the individual. The responsible person electrical
installationskeeps an updated list o all saety cards Live equipment means that the equipment is electrically charged
Roles
Responsible person electrical systems has been appointed by BP
Norge to ensure that electrical installations at all times comply with
current regulations, including design/building o new installations and
contracting o installations and vessels
The deputy responsible person electrical installations is a BPemployee appointed by the responsible person electrical installation to
carry out the responsible personstasks when he or she is absent
An authorised person electrical is a BP employee appointed by
the responsible person electrical installation to ensure that electrical
installations and equipment are carried out in accordance with current
regulations within one installation
A deputy authorised person electrical is a BP employee appointed
by the responsible person electrical installation to carry out theauthorised persons tasks when he or she is absent
-
8/6/2019 HSE Directive 8 Electrical Plants
4/28
-
8/6/2019 HSE Directive 8 Electrical Plants
5/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011268
2. RESPONSIBILITIES
Person responsible or electrical system
is responsible or
technicalintegrity,operation,installationandmaintenanceofelectrical
installations belonging to BP Norge
ensuringthattherigownercomplieswithregulatoryrequirementsregarding electrical installations when rigs are contracted
ensuringthatallpersonnelinvolvedinoperationandmaintenance
o and modications to electrical installations are qualied according to
regulations and internal requirements
ensuringinternalcontrolofoperation,maintenance,documentation,
personnel qualications and electrical systems
beingupdated/involvedindesign,engineeringandinstallationofnew
electrical installations/systems beingupdatedregardingtheuseofelectricalinstallations/systemson
contracted vessels
Authorised person electrical
is responsible or
ensuringthatdailyoperationandmaintenanceofandmodicationsto
electrical installations in the eld are carried out saely and in
accordance with the current regulations and internal requirements reportingstatusandincidentsinelectricalinstallationsontheeldto
the responsible person electrical installation
clarifyingnon-conformancevis--visthesetrequirementswiththe
responsible person or the operations engineer, electrical
Area authority or electrical installations
is responsible or
ensuringthatdailyoperationandmaintenanceofandmodicationstoelectrical installations on a specic acility and/or in a delimited area are
carried out saely and in accordance with current regulations and
internal requirements
reportingstatusandincidentsinelectricalinstallationsintheareatothe
authorised technician
Operations engineer, electrical
is responsible or
providingprofessionaloperationssupporttothefacilities,suchas
controlofdocumentationandelectricalequipmenttobesenttothe
acilities
follow-upofdailyoperationofelectricalinstallationsandequipment
preparationandfollow-upofmeasuresthatensuretheintegrityofthe
installations in the short and the long term
performingtheinstallerfunctionfortheresponsible person electrical
installation in the case o minor modications o electrical installations
reportingundesiredconditionsandincidentsandclarifynon-conormances rom internal requirements and regulations concerning
electrical installations to the responsible person electrical installation
-
8/6/2019 HSE Directive 8 Electrical Plants
6/28
269HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
verifyingandreportingactivitiesconcerningelectricalinstallationstothe
responsible person electrical installation
Lead electro engineer project
is responsible or
toprovideelectricalsupporttoprojectphaseslike:
o Design, choice o equipment and electrical installations conorm tostipulated requirements set ourth in the req. matrix
o electrical personnel involved in projects have the necessary
competencies
o Facilitate pre- and completion documentation rom designer and
installation personnel
o Maintain dialogue and clariy special topics aecting electrical and
re saety in liaison with Person responsible or electrical system
Qualitycontrolthatrentedequipmenttotheprojectconformto
prevailing requirements
Clarifyanddocumentareasofresponsibilitiesrelatedtoelectrical
systems during test and operational stages in the project
Reportseriousincidents,incidentsrelatedtoelectricalcurrentduring
project stages to Person responsible or electrical system
InformPersonresponsibleforelectricalsystemaboutactions,including
all meetings with the PSA / clarications / verications in advance to
such activities
Oshore installation manager (OIM)
is responsible or
directivesregardingelectricalinstallationsbeingknownandfollowed
within his area o responsibility
-
8/6/2019 HSE Directive 8 Electrical Plants
7/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011270
3. AUTHORITY AND COMPETENCE
Requirements or reviewing this document
All personnel involved in the operation o and/or work on electrical power
production, distribution and battery system
and
all personnel contracted or repairs and maintenance o electrical
installations
mustsignastatementtotheeffectthattheprovisionsinthisdirective
have been received, read and understood beore they can start the work
Authority
Aresponsiblepersonelectricalinstallationsmustbeappointedinaccordance with the regulations. The responsible person electrical
installations has overall responsibility and authority or operation,
installation and maintenance o electrical installations on all acilities and
contracted acilities/vessels on the Norwegian continental shel
operated by BP Norge
Theresponsiblepersonelectricalsystemmaydelegateauthority
in accordance with the regulations, by using saety cards. The person
responsible keeps a list o delegated authority
Theresponsiblepersonforelectricalinstallationswillifnothingelse
is stated be sakkyndig dritsleder or all BP Norge owned high voltage
installations and dritsansvarlig or all low voltage installations related
to the BP Norge petroleums activities.
Foroperationofthe300kVelectricalplantatListatheAlcoa
dritsleder is appointed as sakyndig dritsleder or the BP Norge
owned part inclusive the secondary transormer breaker supplying
the ABB Power rom shore building. The 300kV part shall be operated
according to the ollowing Alcoa instruksjons ( in Norwegian only) : Lederforkobling:Dokreferanser-0352VerkshndbokEAL-00.25.03
part 27, 01,16, 26, 25 .
Lederforsikkerhet:Dokreferanse-0352Verkshndbok
EAL -00.25.03.17
Ukentligkontrollrundehyspenningsvakt:Dokreferanser-0352
Verkshndbok EAL -00.25.03.part 15 og 01.
Personnelwithdelegatedauthoritymustcarrytheirsafetycardwhen
perorming the work Employeesofcontractorcompaniescarryingoutworkonelectrical
installations are under proessional supervision and report to the
authorised person electrical. The exception is personnel working under
an approved installer in connection with modications
-
8/6/2019 HSE Directive 8 Electrical Plants
8/28
271HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Automation technician
Anautomationtechnicianisauthorisedtocarryout,onhisown,
maintenance and simpler repairs in the low voltage installations/circuits
installations that orm part o automated and similar installations.
The authorisation does not apply to work on the electrical distribution
system. The distribution system includes also battery systems as ar
as circuit saety. I in doubt on borderline cases, consult the authorisedperson electrical
Generel competence requirements
Allpersonnelthataretocarryouttasksrelatedtooperation,
maintenance, repairs and modications o electrical installations and
equipment must be amiliar with the installation where the work will be
done and be competent according to
o Regulatons relating to proessional qualications or electrical
technicians
o OLF - 059 Recommended guidelines or the competence and
training o electrical personnel
BPpersonnelinvolvedinoperationofelectricalinstallationsmust
bequaliedinaccordancewithCompetencedescriptionforoffshore
personnel
Contractedpersonnelmusthaveundergonetraininginaccordancewith
Training plan or contractor employees
Non-competent personnel
Personswithoutthenecessarycompetencemustunderno
circumstances
o carry out repairs o electrical equipment
o correct aults on electrical equipment
o perorm any connections in the electrical distribution system,
reset electrical relays or operate switches which is part o the
electrical distribution system, except when special acceptance isgiven
performanyconnectionsintheelectricaldistributionsystem,reset
electrical relays or operate switches which is part o the electrical
distribution system, except when special acceptance is given
The denition competent is not valid or automation personal working on
automation plants- competency requirement or this should be claeried
by relevant disipline responible -instrument, meetering, kommunicationetc. The denition competent person does not cover repair o 3 party
equipment taken care o by the equipment owner.
First aid
Alloperationandmaintenancepersonnelwhomaybeexposedto
receiving an electrical injury must have undergone the necessary
training to give rst aid in such situations
Firstaidtrainingforelectricalinstallationaccidentsmustberefreshedevery year in accordance with Regulations relating to saety in work on
electrical installations (FSE)
-
8/6/2019 HSE Directive 8 Electrical Plants
9/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011272
4. OPERATION AND MODIFICATIONS
General requirements
Alloperationofandworkonelectricalinstallationsmustbecarriedout
in accordance with Regulations relating to saety in work on electrical
installations (FSE)
In all new hiring o electrical personnel, the electrical responsible personor electrical competent person given delegated authority rom
responsible person, shall be involved in the hiring process. The reason is
based on the responsibility o the electrical responsible person.
Approval o work
Allworkonelectricalinstallationsrequiresanapproved work permit
level 2except or
o work on live equipment (AUS work) where an approved work permitlevel 1 is required
o reconnection ater a blackout, where an approved operations
procedure is required
o connection o high and low voltage power and isolating switches in
relation to an accident where no work permit is required
o operation o remote-controlled stations or control o high and low
voltage motors, where no work permit is required
o work not requiring a work permit according to the HSE directive or
work permits
Opening o enclosures in a classifed area
Openingofenclosurestoliveequipmentinclassiedareasrequire
o an approved work permit level 1
except or
o opening o enclosures that cannot cause the ignition o any gas
mixturepresent.Ref.IEC60079-17
Work on explosion-proo equipment
Maintenanceofexplosion-proofandintrinsicallysafeequipmentmust
only be carried out by a qualied person with the necessary knowledge
and inormation about the equipment and its protection
Reporting o aults and incidents
Allelectricalfaultsandincidentsmustbereportedtothe authorised
person electrical on the acility The authorised person electricalmust immediately inorm the
responsible person electricalinstallationsor his deputy o serious
accidents and undesirable incidents in the electrical installation,
including incidents where a person receives an electric shock
Modifcation / new installation
Forbuildingnewinstallations,andformodicationstoexistingelectrical
installations or equipment when there is an obligation to report, theinstallermust give notice o this in advance on the orm Notication o
electrical installation beore the work and purchases begin
-
8/6/2019 HSE Directive 8 Electrical Plants
10/28
273HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Responsiblepersonfordesignofplantsdescibedaboveshallalsosend
Notication or approval prior to purchace o equipment starts when the
design o is extension or redesign o electrical plant under operation.
Locationofnewequipmentinelectricalswitchgearroomsshallbe
approved by responsible electrical engineer.
TheinstallationsauthorisedPersonElectroshallbeinvolvedinthe
approval process and issue written acceptance prior to use o new /modied electrical installations
Approvalforcommencementofoperationsfornewelectrical
installations in major projects shall be issued by Person responsible or
electrical system. Basis or subject approval is a compliance document
issued and signed by competent engineering / installation personnel.
The installation shall conorm to BPs requirements related to electrical
design and installations
Accident precautions
Inallareaswithelectricalequipment,instructionsapprovedbythe
Directorate or Fire and Electrical Saety must be posted on the walls,
giving instructions or what to do regarding accidents caused by
electricity
Switchboard rooms and switch systems
Allelectricalswitchboardroomsroomsmustbelockedwheneverno
work is taking place. Exemptionsfromtheruleregardinglockingoflowvoltageroomscan
be made on old installations where there is a combined switchboard
and a LER room i there is an instructed (not authorised) person
onboard the platorm/ installation concerned.
SwitchboardroomscontainingonlyLVinstallationsorHVinstallations
which are secured separately (enced in and equipped with a separate
locked gate) are dened as low voltage switchboard rooms. I the room
only contains a transormer with an IP degree o IP44 or more, theroom can also be dened as a LV room.
Roomswithelectricalinstallationspoweredby3phase400Vsystems
with series-connected protection up to and including 63A or single-
phase 230 supply are not regarded as electrical switchboard rooms and
do not need to be locked.
Keystotheswitchboardroomareonlyhandedouttopersonswhohave
an access permit according to their saety card
Onlypersonnelwithanaccesspermittohighvoltageroomshaveaccess to high voltage rooms on their own
Onlypersonnelwithanaccesspermittolowvoltageroomshave
access to low voltage rooms on their own
Switchboardrooms,transformerroomsetc.mustnotbeusedas
secondary storerooms. The foor and the space above/behind the
switchboard must be clean and ree o requisites and other obstructions
Allentrancestoswitches,fusesandotherequipmentnotinusemust
be blocked or closed o. All covers, cover bolts and nuts must be put intheir correct position and tightly secured
-
8/6/2019 HSE Directive 8 Electrical Plants
11/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011274
5. SECURING HIGH VOLTAGE SYSTEMS
General operation
Alloperationofhighvoltageinstallationsmustbecarriedoutin
accordance with the Regulations relating to saety in work on electrical
installations (FSE)
Onlytheauthorised person electricalhas the authority to carry outconnections in a high voltage installation on the relevant acility
Connectionofhighvoltagepowerandisolatingswitchesrequires
detailed instructions and a permit rom the authorised person electrical
expect in an emergency (arc re/injuries )
Normaloperation(start/stop)ofremote-controlledelectricalhighvoltage
users (pumps, compressors, etc.) may be carried out by Instructed,
non-authorisedpersonnel.Checkbeforestartthatthenecessary
generator capacity is available
Precautions, work on high voltage systems
Allworkonhighvoltageinstallationsmustbecarriedoutinaccordance
with the Regulations relating to saety in work on electrical installations
(FSE)
Forworkonahighvoltagesystem,the authorised person must appoint
a person to be in charge o connection and a person to be in charge o
saety. The appointment may take place by word or mouth. The
authorised person may appoint himsel as the person in charge o
connection or the person in charge o saety
Personnelappointedtobeinchargeofconnectionorsafetymustbe
approved by the Operations manager or high voltage installations (the
responsible person electrical installation)
Forworkonhighvoltageinstallations,thepersoninchargeof
connection must ollow the Instructions or person in charge o
connection
Forworkonhighvoltageinstallations,thePersoninchargeofsafetymust ollowing Instructions or person in charge o saety
Iftheworkrequiresmorethanonehighvoltageswitchtobeisolated,a
connection order must be used
Whenatelephoneorradioisusedforoperationoforworkonahigh
voltage installation, all messages must be conrmed by repeating the
message. The messages should be logged i this is possible
Planning the work Allworkonhighvoltagesystemsmustbeplannedinaccordancewith
the Regulations relating to saety in work on electrical installations
(FSE). I installation is preparred or remote operation this shall
preerrable be used.
Consequence-reducingmeasuressuchasthosebelowmustbe
considered:
o inspection o and availability o rst aid equipment
o having an isolated rescue hook ready at the work placeo identiying all switches that must be taken out in the event o an
accident
o inspection o and availability o a hand-held re extinguisher
-
8/6/2019 HSE Directive 8 Electrical Plants
12/28
275HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Everyoneinvolvedintheworkmustbeinformedoftheimplemented
measures beore the work begins
Work on cables and conductors
The person in charge o saetyshall ensure that the cable is not live,
and that it has been insulated, short-circuited, earthed and identied
beore the work is started that will lead to cutting into the high voltagecable
Ifthereisanyuncertaintyinidentifyingthecorrectcable,witheither
high or low voltage, the cable must be shot and pigged with an
approved apparatus
-
8/6/2019 HSE Directive 8 Electrical Plants
13/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011276
6. SECURING LOW VOLTAGE SYSTEMS
General operation
Alloperationoflowvoltageinstallationsmustbecarriedoutin
accordance with the Regulations relating to saety in work on electrical
installations (FSE)
Theauthorisedpersonelectricalhasswitching authority or connectionsin the low voltage systems on the installation
Connectionoflowvoltagepowerandisolatingswitchesrequires
detailed instructions and a permit rom the authorised person electrical
expect in an emergency
Normaloperation(start/stop)ofremote-controlledusers(pumps,
compressors, etc.) may be carried out by non-authorised personnel.
Isolation Beforeanyworkisdoneonalowvoltageinstallation,itmustbe
isolated electrically in accordance with Electrial Isolation in HSE
directive no. 5 Energy Isolation
Work on live low voltage equipment
Allworkonliveequipmentrequiresanapprovedwork permit level 1
Ifitprovesnecessarytocarryoutworkonlivelowvoltageinstallations
or equipment, the work must be perormed by a qualifed person
The person doing the work must protect himsel against direct contact
with earth through the use o:
o protective equipment in accordance with Section 14 o the
Regulations relating to saety in work on electrical installations (FSE)
o AUS tools
Forworkon
o live installations above 250V
or
o live installations below 250V and series-connected protection above63A
there must be at least two persons with qualications within electrical
saety (FSE) and the necessary amiliarity with the installation
In case the circuit is secured with series-connected protection o no more
than 30mA current trip or earth aults.
o saety goggles may be used instead o a ace shield
o the assistant does not need electrical qualications, but shall beinstructed and have rst aid competency
-
8/6/2019 HSE Directive 8 Electrical Plants
14/28
277HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Planning the work
Allworkoflowvoltageinstallationsmustbeplannedinaccordancewith
the Regulations relating to saety in work on electrical installations (FSE)
Inaddition,consequence-reducingmeasuressuchasthosebelowmust
be considered
o inspection and availability o rst aid equipment
o having an isolated rescue hook ready at the work placeo identiying all switches that must be taken out in the event on
accident
o inspection and availability o a hand-held re extinguisher
Everyoneinvolvedintheworkmustbeinformedoftheimplemented
measures beore the work begins
Resetting the overload protection
Resettingtheoverloadprotectionforoutgoingcircuits,with
voltage up to and including 690V must be done by a
competent person. I the circuit(s) is/are part o an
automation system, the resetting can be done by an
automation technician
Resettingtheoverloadprotectionshouldonlybedoneonce.
I the overload protection alls out repeatedly, the competent
person electrical shall search or /repair the ault beore
resetting is repeated. But, i equipment has Auto start, anisolation test shall be done beore the protection relay is
reset i not special designed to stop /delay the auto start
until reset relay work
Allresettingoftheoverloadprotectionmustbereportedto
the authorised person, who must log the incident
-
8/6/2019 HSE Directive 8 Electrical Plants
15/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011278
7. ENERGIZING ELECTRICAL CIRCUITS
General rules or energising a system
Electricalcircuitsorequipmentmustnotbemadelivebeforethe
person who is appointed to carry out the connection is convinced it can
be done saely.
The person who requests the connection shall ensure that the ollowing
precautions have been taken beore the system is de-isolated and made
live:
1. All work on the circuit has been completed, and the isolation
conrmationcerticate(ICC)hasbeensignedbyaqualiedperson
2. A notication o electrical installation or a voltage connection certicate
has been issued or the circuit in question3. Other non-electrical equipment such as pumps, compressors, ans
etc, connected with the electrical circuit that may be aected by the
connection to live voltage, have been conrmed by relevant discipline to
be ready or start-up.
4. Temporary barriers, warning signs, etc. are put up around or on the
equipment to be connected
5. Saety gear and tools are easily accessible
6. Special consideration has been paid to the area classication (danger o
explosion)
7. Fire protection and detection is ready or use
8. Qualied personnel are available to carry out connections, check
potential resets and remove saety earthing
For high voltage, the person in charge o connection and the
person in charge o saety must both be present
Making the system live ater modifcations
Beforethecurrentisreconnectedfollowingmodicationstoelectricalcircuits or equipment, a representative o the electrical installer and the
electrical Authorised person or his delegation, must sign or completion/
acceptance on notication o electrical installation. Beore signing
the authorised person shall ensure that the ollowing documentation is
available:
1.CompleteMechanicalcompletion(MC)andcommissioning
documentation where relevant points have been signed out by a
competent proessional2. All presented remarks (punch lists), non-conormance lists, dispensation
lists, acceptances, etc.
3. Drawings that clearly show the scope and interace or the new
installation
4. The notication o electrical installation has been signed by the
perorming installersresponsible person on the acility
Nocircuitsmustbemadeliveifthereareregulationnon-conformancesthat have not been accepted by the PSA. Other non-conormances
should be processed by the responsible person electrical installations
-
8/6/2019 HSE Directive 8 Electrical Plants
16/28
279HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Oncethesystemislive,theauthorisedpersonmustsubmitadated
andsignedcopyoftheVoltageConnectionCerticateand/ora
notication o electrical installation to the responsible person electrical
installations
Temporary connection o voltage
Ifthereisaneedtomakepartsoftheelectricalinstallationlivetemporarily, or a test etc., notication o electrical installation may be
used
Whenvoltageisconnectedtemporarily,thecircuitsmustbemarked
with warning signs reading LIVE in a strategic, easily visible place
Connecting a heat cable to live voltage
Priortomeggingandmakingacablelive,the competent person
electricaltogether with the isolatorshall physically check that all parts
o the heat cable are suciently covered and protected. End point shall
be clearly marked and visible.
Documentation
Whenvoltageisconnectedfollowingmodications,aprotocolshallbe
kept that shows status or circuits that have been connected
The responsible person electrical installationsshall keep a protocol
or all issued advance/completion notications regarding electrical
installations,aswellasVoltageConnectionCerticatesforeachinstallation in his le.
Oshore team leder modifcations (OTLM)/ Oshore team leder
maintenance (OTLV)shall ensure that the necessary systems and
protocols have been established beore the work starts oshore.
Asystemmustbeestablishedthatensuresthenecessaryas-built
documentation o modications within acceptable deadlines.
Measuresmustbetakentomakesuretherequiredoperations
documentation is available until the as-built documentation is in place Electricalisolatorshallissueacompliancedecorationaftercompletion
o the change.
-
8/6/2019 HSE Directive 8 Electrical Plants
17/28
-
8/6/2019 HSE Directive 8 Electrical Plants
18/28
281HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
Modicationsthatmustbereported,mustbenotiedtoandapproved
by the responsible person electrical installations using the orm
Notication o electrical installation
Temporary equipment belonging to a contractor
Contractorswiththeirowncontainerwith
o their own electrical equipment ttedor
o who are connected to electrical eld equipment must ollow the
instructions in this directive
Repairs,maintenanceormodicationstothecontractorsown
equipment must be approved by the operations engineer electrical
Repairs,maintenanceormodicationstothecontractorsown
equipment that are carried out oshore must also be approved/veried
by the authorised person electrical, In addition, such work must be
registered in Workmate
Repairs,maintenanceormodicationstothecontractorsown
equipment that are carried out onshore must be veried by the installer,
who must report changes to the responsible person electrical
installations
9. PORTABLE ELECTRICAL EQUIPMENT AND
TOOLS
Approval
Allportableelectricaltools,equipmentandextensioncordsmustbe
approved by a competent person electricalbeore use
Theowneroftheequipmentmustensureanddocumentthatall
portable electrical equipment is inspected and maintained regularly and
in accordance with the regulations
Marking
Allportableelectricalequipmentmustbelabelledwithausebydate.
Equipment which is not labelled or past its use-by date, must not be
used
Pre-use inspection
Beforeuse,theusermustcheckthattheequipmentisingoodorder,
that there is a use-by date and that it has not been exceeded. Do notuse equipment with obvious aults or where deects are suspected
Damageduetokinkingorcrushing,damagetotheoutercablesheet
and knotting must be treated as damage requiring repairs
Equipmentwithfaultsordefectsmustbereportedtothecompetent
person electrical
Use o cable
Themaximumpermittedlengthfor1-phaseextensioncordsis25m
Themaximumpermittedlengthfor3-phaseextensioncordsis40m
Extensioncordsmustnotbepulledthroughdoorways
-
8/6/2019 HSE Directive 8 Electrical Plants
19/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011282
Splicingextensioncords,includingwithaplugandsocket,arenot
permitted
Whenitisused,thecablemustbehungonplastichooksorsimilarto
protect it rom mechanical damage and water penetration
Whenyouleavetheworkplace,plugsmustbepulledoutandacover
put on the socket
Battery-run tools
Battery-runtorchesforgeneralusemustbecertiedforuseinZone1
Equipmentforuseinzone0shallbeapprovedforzone0.
Battery-runtoolsthatneedagreatdealofpowershouldnotnormallybe
used. I there is a need to use such equipment, this must be agreed
with the authorised person electrical, when equipment is on the
installation or with the operations engineer electricali the equipment is
not yet sent oshore.
Otherequipmentequippedwithbatteries(i.e.batteriesmoreadvanced
than typical batteries in watches) must be cleared beore brought
into a classied area. Any charging o such batteries must be done via
permanent installation and be done in an unclassied area
Use o portable lamps in tanks
Beforeanylightsourceisusedinatank,thetankmustbedeclaredfree
o fammable gases
Whenusingportablelampsinatank,onlylampsapprovedforusein Zone1mustbeused
Limitationsonthemaximumvoltagepermittedmustbeconsidered
during the saety evaluation. Normally, lamps with a higher voltage than
50V should not be used
Washing with water
Equipmentthatisprotectedagainstwaterpenetrationshouldnormally
be washed by hand Washingonornearelectricalequipmentrequirestheequipmenttobe
protected against water penetration in accordance with IP 54
Hosingonornearelectricalequipmentrequirestheequipmenttobe
protected against water penetration in accordance with IP X6. (IP X7 is
not sucient.)
Hosingofhighvoltageequipmentisnotpermitted
-
8/6/2019 HSE Directive 8 Electrical Plants
20/28
Attachment 1:
Notication o electrical installations
Attachment 2:
Connectionorder
Attachment 3:
Connectiontopowercerticate
Attachment 4:
Connectiontopowerregister
Attachment 5:Isolation register
Attachment 6:
Instructions or connection supervisor
Attachment 7:
Instructions or saety supervisor
HSE DIRECTIVE 8
ELECTRICAL INSTALLATIONSATTACHMENTS
-
8/6/2019 HSE Directive 8 Electrical Plants
21/28
285HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
ATTACHMENT 1: NOTIFICATION OF
ELECTRICAL INSTALLATIONS
PROCEDURE FOR NOTIFICATION OF ELECTRICAL INSTALLATION
Notication must be submitted to Responsible Person electrical system
prior to commencement o:
a) all changes/modications to emergency and UPS power systems.
b) new installations (modules, major changes and demolition).
c) any changes to high voltage equipment (always).
d) motorstarters(MCC),panelsanddistributionboardsnewand
replacements.
e) extension o panels and distribution boards.) changes made to the main generator system.
g) electrical motors, transormers new and replacements.
Attachment 1 HSE Directive 8 Electrical installationsbp
Notification of electrical installations
W.O. mod/AFA nr.
Project IO GENERAL DATA
Authorised installer:
Date: BP Responsible Person:
Nofific. of commencement Signature: Date:
Start date: Completion date: Sign.
Project engineer:
Other drawings:
Circuit form:
Layout drawing:
Area classification drawing:
Notification of completion
DELIVERY/MATERIAL INSPECTION
El. installer Comments:
Date:
Signature:
Inspection Place Report no. Date/Sign. Place Report no. Date/Sign.
Delivery 1 Pre-insp. 1
Delivery 2 Pre-insp. 2
Delivery 3 Pre-insp. 3
Delivery 4 Pre-insp. 4
Date:
Date:
Repair deadline:
Non-conf. accepted:
Respective discipline:
Responsible person
Documentation
approved
BP El. inspector
Signature:
Date:
INSTALLATION/MC/COMMISSION Resistance to earth: Ohm Isolation resistance: Mohm Electricity to earth: mA Comments:
Accepted data
El. installer
BP el. techn.
SignatureName Date
COMPLETION/APPROVALNotification of completion Name Date Signature Comments:
Electrical installer (deputy)
BP electrical deputy
Inspector
FINAL APPROVAL/DOCUMENT HANDOVEROnshore, original document updated Name Date Signature Comments
Electrical installer
BP Responsible Person:
Authority:
-
8/6/2019 HSE Directive 8 Electrical Plants
22/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011286
The orm is issued in a set o 4 copies. 1 original, 1 copy to installer,
1 copy to Responsible Person, 1 copy to job le.
Notication o commencement (upper part) must be completed and
submitted to Responsible Person or signature prior to commencement
o work.
Notication o completion (lower part) must be completed and submitted
to Responsible Person on completion o the whole installation.
For minor installations where drawings are not available the notication
o commencement shall contain a sketch and a single line diagram o
the intended work. The installer is responsible or checking the material,
equipment and installation are checked by a skilled person and delivered
according to regulations beore system is live.
All inspection reports a non-conormance reports together with as
built documentation shall be available shall be available to responsible
contractor, electrician and responsible BP electrician beore system I, live.
BP responsible electrician (deputy) will take necessary spot checks o the
installation and documentation beore permission is given to make system
live.
DEFINISJONER/DEFINITIONS
Ansvarshavende:
BP responsible person or electrical installations.
Ansvarshavende or elektriske anlegg.
Elektrisk kontraktr:
Contractorcompanysresponsiblefortheelectricalinstallation.Ansvarlig installatr.
BP elektrisk stedortreder:
Appointed responsible senior electrician on actual el. distribution
system (platorm). Ansvarlig BP - /Autorisert person elektro, utpekt som
stedortreder til ansvarshavende or aktuell anleggsdel (plattorm).
-
8/6/2019 HSE Directive 8 Electrical Plants
23/28
287HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
ATTACHMENT 2: CONNECTION ORDER
CONN
ECTION
ORDER
INSTALL
ATION
WORKDESCRIPTION
ConnectionSupervisor:
SafetySupervisor:
CONNEC
TIONNO.
PANELTAG
NO.
SWITCHFIELD
NO.
GROUND
ESTABLISHED
COMMENTS
Date:
Issuedby:
Authorisedperson:
-
8/6/2019 HSE Directive 8 Electrical Plants
24/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011288
ATTACHMENT 3:
CONNECTION TO POWER CERTIFICATE
CONNECTION TO POWER CERTIFICATE
No:
Construction site/Field:
Module:
WON/AFA no:
Date for connection to
power:
Date: Sign:
Section 1. Mechanical Completion
To: Representative of person in charge (Authorised Person)From: Offshore Construction Engineer. Project Mgr. El.
Construction and pre-commissioning of the electrical circuits that are detailedbelow have been completed and the circuit is ready for connection to a powersource.
COURSE REFERENCE : EQUIPMENT: TAG NO:
LOCATION: CABLE NO: AUTHORISED PERSON:
PUNCH LISTS:
REF. DRAWINGS:(APPENDICES)
Section 2. Approval
Til: Offshore Construction Engineer. Project Mgr. El.Fra:. Representative of person in charge (Authorised Person)
The circuit described above and the associated equipment have beenconnected to a power source and are ready for commissioning.
Date:
Authorised person.
Distribution:
Original Representative of person in charge (Authorised Person)Copy (1) Central Control Room.Copy (2) Offshore Construction Engineer. Project Mgr. El.
-
8/6/2019 HSE Directive 8 Electrical Plants
25/28
289HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
ATTACHMENT 4:
CONNECTION TO POWER REGISTER
INSTRUCTIONS FOR LEAKAGE TESTING
Before work begins
Check- that the pressure gauge and other test equipment has been calibrated and will
withstand the pressure that is to be tested- that the connected equipment will withstand the pressure that is to be tested- that any possible energy reservoirs such as accumulators, pulsation dampers,
etc. have been isolated
When using water as a test medium
- that the foundation and supports for the equipment to be tested will withstand thecombined weight of the equipment and water used during the test
Performance of pressure testing
When using water, the equipment shall be filled to 100% first - ensure that the gas is ventedat the highest point.
1. Increase the pressure to approx. 10% of the test pressure maximum 10 bar.2. Check for possible leaks (flanges, plugs, etc.).3. Increase the pressure gradually to 50% of the test pressure.4. Check for possible leaks (flanges, plugs, etc.).5. Increase the pressure gradually to the test pressure.6. Maintain the pressure for an adequate period of time in order to perform a thorough check
for leaks
- Avoid shock loads- Avoid passing in front of possible leakage points- Monitor any possible temperature variations that can influence the pressure
After pressure testing
1. Reduce the pressure gradually to atmospheric pressure
2. In the event of drainage :
- refill nitrogen at the highest point avoid creating a vacuum
- check that the drainage system is not overloaded
3. Check that all parts of the tested system have been depressurised/drained
low points, check valves, etc
-
8/6/2019 HSE Directive 8 Electrical Plants
26/28
HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011290
ATTACHMENT 5:
ISOLATION REGISTER
ISOLATION REGISTER
Construction Site
/Field:
Module:
WO/AFA no: Sheet no.: of
Certificate details Approval details
Cert. no. Date Description / Tag. No. Date Signature
-
8/6/2019 HSE Directive 8 Electrical Plants
27/28
291HEALTH, SAFETY & ENVIRONMENT HANDBOOK 2011
ATTACHMENT 6: INSTRUCTIONS FOR
CONNECTION SUPERVISOR
Applies to:
All work on high-voltage systems with the exception o the operation o
switches to start/stop high-voltage motors
The connection supervisor shall:
Ensurethatthereismorethanonewrittenconnectionordersignedby
an authorised person when more than one switch is to be operated.
Ensurethatthepersonnelperformingtheconnectionsarecompetent.
The connection supervisor is not required to perorm the connection
operations himsel.
Ensurethattheconnectionsareperformedproperlyandinaccordance
with the current provisions o the HSE directive and regulations.
Ensurethatvoltagecontrolandestablishmentofterminalgroundingat
the disconnection sites is perormed. There must be at least 2 persons
to perorm the voltage control and establishment o terminal grounding.
GivenoticationinpersontotheSaety Supervisorthat the specieddisconnection, voltage control and grounding have been perormed.
I this is reported over a radio/telephone, then the recipient must
conrm the message by repetition.
Connectthehigh-voltagesystemsuponreceiptofnoticationfromthe
Saety Supervisorthat the installation is ready or connection
-
8/6/2019 HSE Directive 8 Electrical Plants
28/28
ATTACHMENT 7:
INSTRUCTIONS FOR SAFETY SUPERVISOR
Applies to:
All work on or in the proximity o high-voltage systems with the exception
o the operation o switches to start/stop high-voltage motors
The Saety Supervisor shall:
Informtheworkteamoftheirdutiesandtheactualworktobe
perormed
ReceivenoticationinpersondirectlyfromtheConnection Supervisor
that the necessary disconnection, labelling, saeguards against
connection have been perormed. I this is reported over a radio/
telephone, then the recipient must conrm the message by repetition.
Ensurethatvoltagecontrolandestablishmentofshorting/
grounding at thedisconnection sites are perormed. There must be at
least 2 persons to perorm the voltage control and shorting/grounding.
Establishthenecessarysafetydistanceattheworksiteandinformthe
work team o the nearest work position that is allowed.
Ensurethattheworksiteiscordonedoffandshieldedasnecessary
Monitortheworkandensurethathedoesnotgetinvolvedinthework
so that it aects his duties as Saety Supervisor. I he must leave the
work site, he must appoint and instruct a competent person to monitor
the work.
Whentheworkisnished,hemustinformallthoseinvolvedinthework that the saety measures will be discontinued
Ensurethatthesafetymeasuresarediscontinued
GivenoticationinpersontotheConnection Supervisorwhen the work
site is ready or connection