Hall C MeetingSHMS Magnets and Support Structure
Design and Procurement Status
Paul BrindzaJanuary 26, 2009
![Page 2: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/2.jpg)
SHMS Magnets and Support Structure
• SHMS Spectrometer and Magnets • SC Magnet Procurement Status• SHMS Magnet Recent Progress• SHMS Support Structure• Conclusions
![Page 3: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/3.jpg)
SHMS
Target
Bender Q1 Q2 Q3 Dipole Detectors
Electronics RoomCryo
Transfer Line
Power Supplies
Shield House
![Page 4: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/4.jpg)
SHMS Q1 Quadrupole AssemblyJLAB Cold Iron Quad Design (CIQ)
SHMS Horizontal Bend DipoleWarm Iron SC “C” Magnet
SHMS Q3 Cosine 2Θ Quadrupole Assembly60 cm warm bore cryo-stable design
SHMS Cosine Θ Dipole Assembly60 cm warm bore- cryo-stable design
![Page 5: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/5.jpg)
Bo/Go Aperture J A/cm^2 Design
HB 3.10 T 35 x 36 28,900 “C” Type
Super Ferric
Q1 10.6 T/m 40 cm 23,430 JLAB Q1
Cold Iron
Q23 14.4 T/m 60 cm 5,800 Cosine (2Θ)
Dip 4.76 T 60 cm 5,000 Cosine (Θ)
SHMS Magnet Designs
![Page 6: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/6.jpg)
I (A) L (H) E (MJ) Wt.
HB 4500 0.029 0.290 3.9 t
Q1 3630 0.123 0.808 15 t
Q23 5855 0.638 10.94 70 t
Dip 4940 1.63 19.84 163 t
SHMS Magnets Stored Energy & Weight
![Page 7: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/7.jpg)
SHMS Requirements from Optics and SC Magnet Design Margin
Magnet Optics at 11GeV/c
Design Maximum
Design Margin
HB dipole TM1.929 2.345 17.7%
Q1 Quad (T/M)M14.752 19.905 25.9%
Q2 Quad (T/M)M19.429 23.210 16.3%
Q3 Quad (T/M)M12.917 23.210 44.3%
Dipole TM11.189 13.591 17.7%
![Page 8: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/8.jpg)
SHMS SC Magnet Procurement Strategy
• SC Magnets will be built by contractors• In a significant departure from HMS we will
provide major SC magnet components– Superconductor (SSC surplus)– Cryo-Control Reservoir( same as HMS Design)– DC Power System( same as HMS)– Magnet Control System( Same as HMS)– Warm Yoke Steel
![Page 9: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/9.jpg)
CryogenicControl
Reservoir
Fabricated Cryostated Magnet
RFPFixed Price
Procurement
Conductor Processing
Testing
SC Cable
DC Power System
Magnet Control System
Ship to JLAB
On Site Integration
& Assembly
Acceptance Testing
Magnet Support & Alignment
Warm Iron Yoke
SHMS SC Magnet System Plan
![Page 10: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/10.jpg)
Procurement Status of SHMS Magnets
• Q1 Magnet bids under evaluation-don’t ask/don’t tell
• Q1 Award plan date is March 15, 2009• Q2Q3 & Dipole RFP released Jan 26, 2009• Q2Q3D Bids due May 2009, Award Dec. 2009• HB magnet design review Feb. 10, 2009• MOU/Contract with NSCL ~ June 2009
![Page 11: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/11.jpg)
Horizontal BendDesign by NSCL/MSU
Warm Iron SC “C” Magnet
![Page 12: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/12.jpg)
HB Coil Drawing and 3D CAD of Winding Tooling
![Page 13: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/13.jpg)
HB Coil Winding ToolingHB Coil Winding Tooling
![Page 14: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/14.jpg)
11stst Full HB Coil – 90 Full HB Coil – 90 TurnsTurns
![Page 15: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/15.jpg)
Q1 Quad 3D CAD Model Cold Iron Quad Design like HMS Q1
Bids are IN!!
![Page 16: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/16.jpg)
Q1 Coil winding at SMI
![Page 17: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/17.jpg)
First Phase II Q1 Coil
![Page 18: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/18.jpg)
Q1 Coil Tests
![Page 19: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/19.jpg)
SHMS Support
Structure
![Page 20: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/20.jpg)
Mechanical Requirements
• SHMS Minimum Scattering Angle 5.5 degrees• SHMS-HMS angle 5.5+12 = 17.5 degrees• HMS Minimum Angle (present) 10.5 degrees• SHMS Max angle 40 degrees• HMS Max Angle(present ) 85 degrees• Hall C Radius at SHMS max 73 feet• Fit to beam pipe at 5.5 degrees ~ 5 mm• Fit to HMS at 17.5 degrees ~ 1 cm
![Page 21: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/21.jpg)
SHMS Support Structure Reference Design
• SHMS Support Structure Preliminary Design completed in 2007 by ALION, a local company with experience in large welded steel structures
• SHMS Support Structure Reference Design(RD) Completed by ALION January 28, 2009
• RD will be the technical elements for the bid packages for the SHMS support structure.
• SHMS Support Structure RD review was held in December 08 at JLAB
![Page 22: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/22.jpg)
SHMS General Arrangement
![Page 23: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/23.jpg)
SHMS Support Cross Sections
![Page 24: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/24.jpg)
SHMS Structure Preliminary Assembly Plan
![Page 25: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/25.jpg)
Top View SHMS & HMS Spectrometers
Bender
Q1Q2
Q3
Dipole
Target
Beamline
HMS Spectrometer
![Page 26: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/26.jpg)
Bottom View
HMS
SHMSBeamline stands
SHMS wraps around front of HMS
![Page 27: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/27.jpg)
Bender fit up to HMS Q1
Bender
HMS Q1
![Page 28: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/28.jpg)
Q3 & Dipole fit up
Beamline Stand
SHMS Q3
SHMS Dipole
24” Beamline
Q2
Shield House notch
![Page 29: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/29.jpg)
Shield House fit up
Shield House
Beamline
Shield House notch
Dipole
Q3
Q2
Q1
Bender
![Page 30: Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status](https://reader035.vdocuments.mx/reader035/viewer/2022062809/568159a7550346895dc70ca9/html5/thumbnails/30.jpg)
Conclusions• SHMS SC Magnet designs are sound, reviewed and
procurement has started• JLAB is a partner in the SHMS Magnet fabrication Superconductor, Cryogenic Interface, Iron Yokes DC systems and PLC based controls.• SHMS Support Structure Reference Design is complete detail design and fabrication begins FY10• Since we haven’t spent a dime yet We are still On time and On budget!!