Download - GROUP POWER - LINKER
![Page 1: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/1.jpg)
POWER - LINKER
GROUP
1
![Page 2: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/2.jpg)
POWER - LINKER
GROUP
2
Sep 02, 2020
![Page 3: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/3.jpg)
POWER - LINKER
GROUP
Engineering Office : ,
3
![Page 4: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/4.jpg)
POWER - LINKER
GROUP
Key persons :Who are holding post graduate qualification in the fieldof Electrical Engineering to conduct the business.These key person are,
1. Mr. H. C. Mehta (Since 1972)
M. Tech (I IT-B), FIE, Charted Engineer, DBM.
2. Dr. K Rajamani (Since 1975)
PhD - (I IT-B), Electrical Power System.
3. Mr. Jay Mehta (Since 2004)
M. Tech (VJTI, Mumbai).
![Page 5: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/5.jpg)
POWER - LINKER
GROUP
59/17/2020
![Page 6: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/6.jpg)
POWER - LINKER
GROUP
• Business Activities :• Electrical System Design.
• Power System Studies on ETAP
Software.
• EMTDC (Electromagnetic Transient
DC Simulation) Studies on PSCAD
Software.
• Project Electrical System Testing &
Commissioning.
This includes, Thermal, Gas or
DG based Power Plants Electrical
System. 6
![Page 7: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/7.jpg)
POWER - LINKER
GROUP
• Business Activities :
• Condition Monitoring & Diagnostic
Testing (Health Check, Asset
Management) of Major Power
equipments.
• Power Quality Management.
• Power Engineering Courses.This is a RARE combination ofservices being provided by oneorganization.This helps, plant, project to achievethe operational reliability. 7
![Page 8: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/8.jpg)
POWER - LINKER
GROUP
• Electrical System Design :For projects of fertilizers, petrochemicals, refineries,
power plants, steel plants, cement plant and cement
grinding units etc.
The services includes,
• Basic engineering
• Detail engineering
• Procurement services
• Inspection and expediting services
• Site erection-supervision services and
• Testing - commissioning.8
![Page 9: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/9.jpg)
POWER - LINKER
GROUP
Details of Business Activities :
● Power System Studies :
• Load Flow Study
• Short Circuit Study
• Relay Setting & Relay Co-ordination Study
• Transient & Steady State Stability Study
• Harmonic Study
• Engineering Grid Islanding & Load Shedding Schemes
• Engineering Load Sharing Schemes.
9
![Page 10: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/10.jpg)
POWER - LINKER
GROUP
● EMTDC Studies on,“Power System Computer Aided Design” (PSCAD) Software
● HVDC Modeling and Analysis
● SVC and FACTS Modeling and Analysis
● Sub-synchronous Resonances
● Ferro Resonances
● Capacitor Switching Transients
● Insulation Coordination
● Harmonic Analysis.
July -2013 10
![Page 11: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/11.jpg)
POWER - LINKER
GROUP
● EMTDC Studies on, “Power System Computer Aided Design” (PSCAD) Software
● Temporary Over Voltage (TOV)
● Switching Over Voltages
● Very Fast Transient Over Voltages (VFTO)
● Power Quality Studies
● Transformer Saturation and Inrush
● Grid Interconnection Studies
● Motor Starting
● Fast Bus - Transfer Studies.
11
![Page 12: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/12.jpg)
POWER - LINKER
GROUP
• Testing and Commissioning :
This includes testing and commissioning
of Project electrical system, equipment
and protection system from 400 kV to
415 Volts. This also includes retrofitting
of existing protection system with state-
of-the-art numerical and microprocessor
based protection scheme.12
![Page 13: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/13.jpg)
POWER - LINKER
GROUP
• Condition Monitoring and Diagnostic
Testing :
This includes condition monitoring and
diagnostic testing of high capacity power
equipments such as, Generators, Power
Transformers, HT Motors, EHV CT’s, PT’s,
LA’s, Power Cables etc.
13
![Page 14: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/14.jpg)
POWER - LINKER
GROUP
• Power Quality Management and Measurements :
This includes harmonic measurement of electrical
system and carrying out harmonic analysis.
• Conducting “Power Engineering Courses”: on
subjects of Power System Protection / Equipment
health Check up.
14
![Page 15: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/15.jpg)
POWER - LINKER
GROUP
159/17/2020
![Page 16: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/16.jpg)
POWER - LINKER
GROUP
Organization Structure,
• Conceived in 1981 by an elite team of
engineers from Tata Consulting Engineers,
Mumbai.
• Some of these engineers have published
papers in International and National
Journals. 16
![Page 17: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/17.jpg)
POWER - LINKER
GROUP
• Under the guidance of three key persons these are
Mr. H. C. Mehta, Dr. K Rajamani and Mr. Jay Mehta,
a group of app 40 Engineers and +15 supporting
staff members are working for various business
activities.
• All the operations of Power Linker Group are
centralized at Mumbai India office, whereas the
project groups are spread at various client’s
premises.17
![Page 18: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/18.jpg)
POWER - LINKER
GROUP
• We are having office in prime location in Mumbai,
Andheri – East, Marol, India.
• This business island is one of the busiest commercial
area in Mumbai.
• The office is spread across an area of 8100 sq. ft.
The office is well equipped with all modern amenities
and is manned by total staff strength of app 55 Nos.
18
![Page 19: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/19.jpg)
POWER - LINKER
GROUP
Business is organized and conducted in verticals off,
• Design Engineering & Power System Studies
Group.
• Testing and Commissioning Group.
• Condition Monitoring & Diagnostic Group.
• Support Group consisting of HR, Administration,
Accounts & Finance Group.
19
![Page 20: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/20.jpg)
POWER - LINKER
GROUP
Software’s : We are holding licenses for following
Commercial Engineering software’s with adequate
nos. of License Copy.
• ETAP 19.5 (5 License) (Electrical Transient
Analysis Program) The Power System studies
are carried out on Power System Simulation
Software like ETAP. This software is nuclear
certified by international Standards, IEC, ANSI
etc. This software is found extremely versatile
for solving majority of Power System Analysis
problems . 20
![Page 21: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/21.jpg)
POWER - LINKER
GROUP
• PSCAD : (Power System Computer Aided Design)
PSCAD is the professional simulation tool for
analyzing power systems transients. PSCAD is
suitable for simulating time domain instantaneous
responses, also popularly known as
electromagnetic transients of electrical systems.21
![Page 22: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/22.jpg)
POWER - LINKER
GROUP
• Secondary injection testing kit : 5 Nos.
• Primary injection test set : 3 Nos.
• Measuring (phase shifting) relay test set : 3 Nos.
• Three phase current and voltage injection test
set : 1 No.
• High voltage testing set : 2 Nos.
• Frequency generator : 3 Nos.
22
![Page 23: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/23.jpg)
POWER - LINKER
GROUP
• Instruments for Testing & Commissioning Services
(T & C) :
• 3 phase Power System Simulator : 3 Nos.
Make : Doble USA, Type: F6150.
• T3000 : Sub-station Test System : 3 Nos.
Make : ISA Italy.
• Power quality analyzer : 1 No.
Make : Fluke USA.23
![Page 24: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/24.jpg)
POWER - LINKER
GROUP
• C.T Knee point voltage check test set : 1 No.
• Turns ratio test set : 1 No.
• Digital low resistance micro - ohm meter : 8 Nos.
• Digital time interval meter : 4 Nos.
• Circuit breaker operating time interval meter : 3 Nos.
• Accessories for Testing Team : minimum 5 sets.
• Live Phasing rod up to 33kV : 2 set.
24
![Page 25: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/25.jpg)
POWER - LINKER
GROUP
• Instrument for Conditioning Monitoring & Diagnostic
Testing Services :
• Automatic Insulation Analyzer : (Capacitance and
Tan delta test set) :
Make : Doble USA, Type : M 4000 : 2 Nos.
• Sweep Frequency Response Analyzer (SFRA) : For
Transformer Core and Winding Movement Diagnosis.
Make : Doble USA, Type : M5200 : 2 Nos.25
![Page 26: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/26.jpg)
POWER - LINKER
GROUP
• HV/MV Power Cables testing by : Very Low Frequency
(VLF) test method : 3 Nos.
• Make : HVDSA, Austria
• Make : Baur, Austria
• Cable Partial Discharge Measurement Test Set,
Make : Baur Austria : 1 No.
• AC High Voltage PD Free Source,
Make : Phenix USA : 1 Nos. 26
![Page 27: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/27.jpg)
POWER - LINKER
GROUP
• Partial Discharge Measurement Equipment ,
Make : NDB Canada : 1 No.
• RSO Test Set : For Generator main rotor winding Earth
Fault and Inter Turn Fault Detection,
Make : Convex UK : 2 Nos.
• Lightning Arrester Test Set : For ON line health check
up of Lightning Arresters : 1 No.
27
![Page 28: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/28.jpg)
POWER - LINKER
GROUP
• Digital Dual Channel Storage Oscilloscope,
Make : Tektronix, USA : 2 Nos.
• Digital Megger with variable voltage range,
Make : Kyoritsu Japan : 5 Nos.
• Winding Resistance Meter,
Make : Prestige : 4 Nos.
28
![Page 29: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/29.jpg)
POWER - LINKER
GROUP
• Power Linker’s reputation for quality engineering output
along with its specialized expertise in high-tech areas of
Electrical Design has helped create a diverse customer
base comprising, leading
• Fertilizer,
• Petrochemicals, Refinery,
• Oil , Gas, LNG,
• Power,
• Cement and Other Industrial plants in Indian corporate
such as,299/17/2020
![Page 30: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/30.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 31: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/31.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 32: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/32.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 33: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/33.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 34: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/34.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 35: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/35.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 36: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/36.jpg)
POWER - LINKER
GROUP
From year 1994, Power Linker Group expanded their
services in international arena.
By now Group has worked in following countries,
Gulf Region. This includes,
Kuwait ● Oman
Bahrain ● Saudi Arabia
369/17/2020
![Page 37: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/37.jpg)
POWER - LINKER
GROUP
Africa Region. This includes,
Democratic Republic of Congo
Far East. This includes :
Indonesia,
FIJI Islands,
Malaysia.
● Some of the international Clients are,
379/17/2020
![Page 38: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/38.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 39: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/39.jpg)
POWER - LINKER
GROUP
9/17/2020
![Page 40: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/40.jpg)
POWER - LINKER
GROUP
PT MSWIndonesia
9/17/2020
![Page 41: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/41.jpg)
POWER - LINKER
GROUP
(Republic of Congo), AFRICA
9/17/2020
![Page 42: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/42.jpg)
POWER - LINKER
GROUP
• Experience & Major Projects :
Our services covering a wide range of plants & projects are
detailed in Web links given below.
• Electrical Project Design Engineering
• Current Jobs Under Execution :
http://www.powerlinker.org/htm/currentproeng.htm
• Reference List of Projects :
http://www.powerlinker.org/htm/refpdeg.htm
42
![Page 43: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/43.jpg)
POWER - LINKER
GROUP
• Power System Studies
• Current Jobs Under Execution :
http://www.powerlinker.org/htm/currentelectsys.htm
• Reference List of Projects :
http://www.powerlinker.org/htm/refesys1.htm
http://www.powerlinker.org/htm/refesys2.htm
43
![Page 44: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/44.jpg)
POWER - LINKER
GROUP
• ELECTRICAL SYSTEM TESTING & COMMISSIONING
• Services Current Jobs Under Execution :
http://www.powerlinker.org/htm/currenttestcom.htm#top
• Reference List Projects :
http://www.powerlinker.org/htm/reftcj.htm
44
![Page 45: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/45.jpg)
POWER - LINKER
GROUP
• CONDITION MONITORING & DIAGNOSTIC TESTING
• Current Jobs Under Execution :
http://www.powerlinker.org/htm/currentcmd.htm
• Reference List Projects :
http://www.powerlinker.org/htm/ref.cmd.htm
45
![Page 46: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/46.jpg)
POWER - LINKER
GROUP
• SWEEP FREQUENCY RESPONSE ANALYSIS :
• Current Jobs Under Execution :
http://www.powerlinker.org/htm/currentSFRA.htm
• Reference List of Projects :
http://www.powerlinker.org/htm/REf.SFRA.htm
46
![Page 47: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/47.jpg)
POWER - LINKER
GROUP
• CABLE CONDITION MONITORING BY VERY LOW FREQUENCY
TESTING:
Current Jobs Under Execution :
http://www.powerlinker.org/htm/VLF1.htm
• POWER ENGINEERING COURSES
http://www.powerlinker.org/htm/currenttraining.htm
47
![Page 48: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/48.jpg)
POWER - LINKER
GROUP
Code of Ethics
The staff members, in recognition of the importance of
our technologies in detecting the quality of life
throughout the world, and in accepting a personal
obligation to our profession, its members and the
communities hereby commit themselves to the highest
ethical and professional conduct and agree :
48
![Page 49: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/49.jpg)
POWER - LINKER
GROUP
Code of EthicsTo Accept Responsibility in making engineering decisions
consistent with the safety, health and welfare of the public and to
disclose promptly factors that might endanger the public or the
environment
To Avoid real or perceived conflicts of interest whenever possible,
and to disclose them to affected parties when they do exist
To be Honest and Realistic in stating claims or estimates based on
available data
To Reject bribery in all its forms
49
![Page 50: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/50.jpg)
POWER - LINKER
GROUP
Code of EthicsTo Improve me understanding of technology, its appropriate
application and potential consequences
To Maintain and improve technical competence and lo undertake
technological tasks for others only it qualified by training or
experience, or after full disclosure of pertinent limitations
To Seek, Accept, and Offer honest criticism of technical work, to
acknowledge and correct errors and to credit properly the
contribution of others.
To treat fairly all persons regardless of such actors as race, religion,
gender, disability, age national origin
50
![Page 51: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/51.jpg)
POWER - LINKER
GROUP
Code of EthicsTo Avoid Injuring others their property, reputation, or employment
by false malicious action.
To Assist colleagues and co-workers in their professional
development and to support them in following this code of ethics.
X-X-X
51
![Page 52: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/52.jpg)
POWER - LINKER
GROUP
52G:\powersystemconsultants Webpage (Internally Linked)\Final Jobs list\POWER LINKER, COMPANY PROFILE_New.pptx
![Page 53: GROUP POWER - LINKER](https://reader031.vdocuments.mx/reader031/viewer/2022020623/61f1edd83215217fc01e5a6f/html5/thumbnails/53.jpg)
GROUP
POWER-LINKERPOWER LINKERS
TIMES SQUARE, 602B, ‘B’ WING,
NR. MAROL METRO STN., ANDHERI ( EAST ),
MUMBAI : 400 059 , INDIA.
E-MAIL : [email protected]
WEBSITE : www.powerlinker.org53
POWER - LINKER
GROUP
G:\powersystemconsultants Webpage (Internally Linked)\Final Jobs list\POWER LINKER, COMPANY PROFILE_New.pptx
Sep 02, 2020