Kirklees Neighbourhood Housing
Ground Source Heat Pump Scheme
2010
Presented by
Tom O’Sullivan Energy Officer
Kirklees Neighbourhood Housing November 2010
Coule Royd and Cow Heys Scheme
Coule Royd and Cow Heys Scheme
Coule Royd and Cow Heys Scheme
Coule Royd and Cow Heys Scheme
Kirklees Mayor officially Opens First Drilling Site
Main Contractors Site for Fern Scheme
Borehole Drilling In Operation
Second Drill Utilised to Recoup Time Lost Due to Bad Weather
Wet Conditions Protective Matting Used
Protective Matting Keeping the Site Safe
Installed Ground Loops
Trench for Ground Loop to Base
Bedding Ground Loop into Backfill
Backfilling Trench
GSHP Base Shuttering
Concrete Base Setting
Ground Loop Pump and Gauges
GSHP in Situ Awaiting Final Connection
GSHP Completed – Internal View
GSHP in External Cabinet
Hot Water Cylinder
Hot Water Cylinder
Typical Heating Controls
Typical Heating Controls
Wet Central Heating System Radiator With TRV and Pipe Boxing
Typical Wet Central Heating Radiator
Handing Over One of the First
GSHP to the Tenant
Mr Cunningham - Tenant
Tom O’Sullivan - KNH Energy Officer John Walsh - E.ON Key Account Manager
Configuration for Bungalows (PV panels fitted under past LCBP programme)
Completed GSHP & Recovered Ground
Configuration Used for Flats
Black Box Riser for Flow and Return Pipes to Top Floor
Coule & CowConstructor Site Awaiting Final Landscaping
Ground Conditions at Coule & Cow Were as Bad as Fern Sites
Coule & Cow are similar to Fern Schemes Flagging extended to provide access to bins etc.