Greatest Quality Challenge
Michael J Skwira
![Page 2: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/2.jpg)
• The Challenge – I was tasked with taking over the ownership of dysfunc>onal group of individuals that were uncoopera>ve, unsuppor>ve and divided.
Situa>on
![Page 3: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/3.jpg)
Situa>on
• Divided by Company • Divided Process (NCMR, MRP & Document Control)
• Divided as a Team
Receiving Inspection
Company 1 Company 2
Inspector MRB Coordinator Inspector MRB
Coordinator
![Page 4: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/4.jpg)
Situa>on
Receiving Inspec,on Group Before
• “Uncoopera>ve group of prima donnas” – VP Opera9ons
• “They won’t get us our parts and they make us wait” – Senior Manufacturing Manager
• “A divided group of individuals” – HR Manager
![Page 5: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/5.jpg)
System
Process People
What I Needed To Do
![Page 6: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/6.jpg)
Ini>al State System
Receiving Inspec>on
Company 1 5 Systems
Company 2 3 Systems
System
Process People
![Page 7: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/7.jpg)
Re>rement Paper/Excel NCMR System
Single NCMR Database System
Re>rement MRP System
Single MPR System
Re>rement Document
Control Systems
Single Document
Control System
Technology Ac9on -‐ Result
System Standardiza>on
System
Process People
![Page 8: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/8.jpg)
Ini>al State Process
Inconsistent Process
Inconsistent Results
System
Process People
![Page 9: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/9.jpg)
Incorporated Z1.4 Sampling Methods
Labor Reduc>on
Strategy Deployment Ac9on -‐ Result
System
Process People
![Page 10: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/10.jpg)
Redesign First Ar>cle
Inspec>on Process
Reassigned Responsibility
Value Added FAI Reports
Strategy Deployment Ac9on -‐ Result
Initial Revision (A) or New Supplier = Full First Article All notes & dimensions must be included and verified as part of the First Article Inspection.
Revision Changes = Partial First Article Only the notes & dimensions impacted shall be included and verified as part of the First Article Inspection.
System
Process People
![Page 11: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/11.jpg)
Inline QA Inspec>on
Moved from QA to
Produc>on
Implemented to Support
30% Increase
Incoming Inspec>on Swim
Lanes
First In First Out (FIFO)
Established Flow of Incoming Material
Strategy Deployment Ac9on -‐ Result
System
Process People
![Page 12: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/12.jpg)
Ba`ery Test Capacity Simulator
Predictable Schedule Hours/People
Elimina>on of Ba`ery Tes>ng
Labor Reduc>on
336 Hrs/Month
• Worked collaboratively to achieve agreement and implementation
• Provided $1Million in savings Annually • Improved Customer Fulfillment Velocity
Ba`ery Tes>ng Ac9on -‐ Result
System
Process People
![Page 13: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/13.jpg)
Tracking Disposi>on
Average Weekly Decrease 5.5%
Initial MRB value was just over $4.5 Million
Revitalized MRB Ac9on -‐ Result
System
Process People
![Page 14: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/14.jpg)
Ini>al State People
System
Process People
![Page 15: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/15.jpg)
Consolidated the Number of
Systems Func>on Flexibility
Eliminated Time
Disrup>ve Processes
Focus on Value Added Tasks
The Team Ac9on -‐ Result
Everyone is Cross Trained
System
Process People
![Page 16: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/16.jpg)
Departures &
Addi>ons Simplified to Cri>cal Few
Personal Development
Opportuni>es to Help Make Staff More Employable
Promo>ons Upward Transi>ons
The Team Ac9on -‐ Result
System
Process People
![Page 17: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/17.jpg)
Consistent Vision
Aftude Transi>ons
Commi`ed to Removing Obstacles
Created Focus
Empowerment Self Repriori>za>on
The Team Ac9on -‐ Result
System
Process People
![Page 18: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/18.jpg)
Receiving Inspec>on
Company 1 5 Systems
Company 2 3 Systems
Summary
Receiving Inspec>on
Company 1 & 2 3 Systems
Before
After
System
Process People
![Page 19: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/19.jpg)
Summary
Inconsistent Process
Inconsistent Results
Standard Process
Consistent Results
Before
After
System
Process People
![Page 20: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/20.jpg)
Summary
Receiving Inspec>on
Company 1
MRB Coordinator
Inspectors
Company 2
MRB Coordinator
Inspectors
Receiving Inspec>on
Company 1 & 2
MRB Coordinator
Inspectors
Before
After
System
Process People
![Page 21: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/21.jpg)
Summary
Current Receiving Inspec,on Team • Func>ons are no longer individuals • We are a cross trained, customer service focused team • Func>on flexible rather than company specific • Ability to flex and respond to unpredictable inputs • Empowered individuals make quality decisions
System
Process People
![Page 22: Greatest Quality Challange - Michael Skwira](https://reader031.vdocuments.mx/reader031/viewer/2022030220/5884c7041a28ab767c8b46fb/html5/thumbnails/22.jpg)
Ques>ons