Great Lakes Tunnel Project
Lansing, Michigan
Design, Construction, and Operations Information Session
September 20, 2021
![Page 2: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/2.jpg)
Safety MomentLifesaving Rule #1: Hazard Management
![Page 3: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/3.jpg)
Enbridge Lifesaving Rules
• Each Lifesaving Rule
focuses on an area of
high risk and
consequence
• The rules are intended
to heighten awareness
![Page 4: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/4.jpg)
Life Saving Rule #1: Hazard Management
I will complete a hazard assessment prior to starting work and
reassess if conditions change and new hazards are introduced.
• The assessment is meant to identify, assess and control the field-based hazards of
the work being performed
• Examples of questions to be addressed:
• Have we identified hazards today? Is it documented?
• Did everyone on the crew have an opportunity to provide input?
• Have results from the assessments been communicated to all workers?
• Do we have effective controls in place and are they in compliance to the
Enbridge Safety Manual, local legislation and the Contractors Program?
![Page 5: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/5.jpg)
Line 5 Update
(1) Michigan Department of Environment, Great Lakes and Energy (2) Michigan Public Service Commission (3) U.S. Army Corps of Engineers
Committed to ensuring the safe and reliable delivery of essential energy supply
• Delivers on average 540 kbpd of crude and NGLs to 10 refineries in Michigan, Ohio, Pennsylvania, Ontario and Quebec
State Permitting:• EGLE1 Permits Awarded
• MPSC2 Approval (In Progress)
Federal Permitting: • USACE3 permit (In Progress)
Contracting:• Engineering & Design Phase
• Preparation for Construction Phase (Commencing)
Critical Infrastructure
WI
MI
ON
MNLine 5
QC
PA
OH
Superior
Sarnia
Great Lakes Tunnel Project
Tunnel Design
Additional Uses (e.g. Fiber Optics)
Pipeline
![Page 6: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/6.jpg)
Meet the Speakers
Liza DwyreWSP Owner’s
Engineer
Aaron DennisTunnel Project Lead Engineer
Jon HurtSubsurface Design
Lead
![Page 7: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/7.jpg)
Tunnel Animation
7
![Page 8: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/8.jpg)
Ground Conditions
![Page 9: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/9.jpg)
Regional Geologic Setting Ground Conditions
![Page 10: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/10.jpg)
Historical Data: Mackinac BridgeGround Conditions
![Page 11: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/11.jpg)
Marine Seismic Reflection/Refraction Survey (2018)Ground Conditions
• Data is interpreted to characterize the subsurface geologic conditions and geologic structure
![Page 12: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/12.jpg)
Boring LocationsGround Conditions
![Page 13: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/13.jpg)
Onshore, Nearshore, and Deepwater Borings
13
Ground Conditions
Dynamically-positioned Drill ShipSouth Shore Jack-up Barge
![Page 14: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/14.jpg)
Hydraulic Conductivity (permeability)
• Water is pumped out of the rock mass, from a pumping well
• Drawdown is measured in surrounding observation wells
Pump TestPacker Test
Ground Conditions
• Water is pushed into the rock formation under pressure
• Tests local zones, isolated between inflatable packers
![Page 15: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/15.jpg)
Borehole GeophysicsGround Conditions
Optical TeleviewerAcoustic Televiewer
![Page 16: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/16.jpg)
Laboratory Tests of Rock PropertiesGround Conditions
![Page 17: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/17.jpg)
Generalized Subsurface ProfileGround Conditions
PROFILE (TRUE SCALE)
PROFILE (10X VERTICAL EXAGGERATION)
![Page 18: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/18.jpg)
Mackinac BrecciaGround Conditions
St. Anthony's Rock
Located in St. Ignace, MI
![Page 19: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/19.jpg)
Generalized Subsurface ProfileGround Conditions
PROFILE (TRUE SCALE)
PROFILE (10X VERTICAL EXAGGERATION)
![Page 20: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/20.jpg)
Rock Core Examples from Each FormationGround Conditions
St IgnaceBois Blanc Pointe Aux Chenes
![Page 21: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/21.jpg)
• Deeper-than-expected buried valley
• Open voids (karst)
• Toxic/combustible gases
• Variable ground conditions
• Some fractured, more permeable zones
• Claystones in Point Aux Chenes - weak rock, slaking
• Borings most closely spaced in deep channel
– Increased confidence in top of rock elevation
Geotechnical EvaluationLow Likelihood Conditions Known Rock Conditions Sufficient Geotechnical Data
Not anticipated – but if they occur
can be managed with some
adaptations during tunneling
Rock parameters influence
cutting tool wear and tunneling
progress rates.
Managed with the specified TBM and construction methods
Geologic understanding and
subsurface data provides a
sufficient basis for tunnel design
and state-of-the-practice
TBM specifications
Understanding of the geotechnical conditions shaped the design approach
Ground Conditions
![Page 22: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/22.jpg)
Overall Design
![Page 23: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/23.jpg)
Tunnel Boring Machine (TBM)Overall Design
Image courtesy of Chesapeake Bay Bridge Tunnel Project
~500 ft
Hydraulic rams push against newly-placed
concrete segments to drive machine forwards
Rotating
cutter headThe machine is operated from the control room
Pre-cast concrete segments
delivered to rotating arm
Excavated material removed
through slurry pipes
Rotating arm adds pre-cast concrete
tunnel segments to form a ring
Pressure is maintained
in the cutting chamber
![Page 24: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/24.jpg)
TBM InterventionsOverall Design
![Page 25: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/25.jpg)
Vertical AlignmentOverall Design
PROFILE (TRUE SCALE)
PROFILE (10X VERTICAL EXAGGERATION)
![Page 26: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/26.jpg)
Horizontal AlignmentOverall Design
![Page 27: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/27.jpg)
Tunnel DiameterOverall Design
SPACE FOR THIRD-PARTY UTILITIES
![Page 28: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/28.jpg)
Mackinaw Station PortalOverall Design
![Page 29: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/29.jpg)
North Straits ShaftOverall Design
![Page 30: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/30.jpg)
Tunnel Lining
![Page 31: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/31.jpg)
Precast Concrete Tunnel Lining (PCTL)Tunnel Lining
![Page 32: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/32.jpg)
Precast Concrete Tunnel LiningTunnel Lining
Ring length – 6ft
Tunnel Direction
Lining thickness – 15”
Typical Rebar
![Page 33: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/33.jpg)
GasketsTunnel Lining
![Page 34: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/34.jpg)
Break – 10mins
![Page 35: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/35.jpg)
Tunnel Construction
![Page 36: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/36.jpg)
The shield of the TBM prevents water, soil and rock
from entering the tunnel during construction
The concrete segments are assembled into a water-
tight lining inside the shield; under the protection of
the shield. No water, soil or rock enters the tunnel
during construction
As the shield advances during tunneling three seals
prevent water from leaking inside the TBM
TBM Tunneling Tunnel Construction
![Page 37: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/37.jpg)
Tunnel Grouting
• As the TBM advances, it pushes forward off the lining and simultaneously fills the void behind the lining with grout
Tunnel Construction
![Page 38: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/38.jpg)
TBM Face Pressure
Earth pressure
Water pressure
Tunnel Construction
Bentonite slurry in
the excavation
chamber is
pressurized to
counterbalance the water and earth
pressures that may
act on the TBM face
The TBM has been designed to prevent any impact to the water in the Straits
![Page 39: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/39.jpg)
Separation Plant Tunnel Construction
2nd Separation
Plant
1st Separation
Plant
Water Treatment
Plant
Discharge
Filtered water
Tank Surplus
slurry tank Driving tank
Primary Solids SeparationPrimary Solids
Separation
Secondary
SeparationWater Treatment
2nd separation sludge
1st separation sludge
Dosage of Flocculant
& Coagulant
Return Slurry
Water refiling
Feed Slurry
Spoil slurry
Tank
1st stage separation solid materials
2nd stage separation solid materials
![Page 40: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/40.jpg)
Other Construction Activities
• Interventions
• Water Treatment
• Hazardous Gases
• Inspections
• Schedule
• Disposal of Excavated Material
Tunnel Construction
![Page 41: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/41.jpg)
Operations
![Page 42: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/42.jpg)
Mackinaw StationOperations
Existing security
fence
![Page 43: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/43.jpg)
Mackinaw Station Section ViewOperations
Ground level
![Page 44: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/44.jpg)
North StraitsOperations
![Page 45: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/45.jpg)
North Straits Shaft Section View
45
Operations
Ground level
![Page 46: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/46.jpg)
Space Proofing & Maintenance
• Pipeline
• Tunnel Systems & Third-Party Utilities
• Third Party Utilities
• Maintenance Area – accessed using Tunnel Service Vehicle (TSV)
SPACE FOR THIRD-PARTY UTILITIES
SPACE FOR THIRD-PARTY UTILITIES
Operations
![Page 47: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/47.jpg)
Tunnel Systems Operations – Minimize Entry
KEY: North Strait Shaft (Push-only Mode)Mackinaw Station Portal (Push-only Mode)
Mackinaw Station Fan Plant
Straits TunnelMS ShaftNS Shaft
Tunnel Ventilation
Operations
![Page 48: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/48.jpg)
Operations - Other Tunnel Systems Operations
Tunnel Systems
• Gas & leak detection
• Electrical & Communications
• Mine Phone
• Low point sump
![Page 49: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/49.jpg)
Normal Operations and Maintenance ActivitiesOperations
![Page 50: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/50.jpg)
RFP Process
![Page 51: Great Lakes Tunnel Project](https://reader034.vdocuments.mx/reader034/viewer/2022042405/625dd42de3389e41371f2f17/html5/thumbnails/51.jpg)
• In Jan 2019, Awarded Engineering and Pre-Construction Services contracts
• Constructability input received and incorporated into the design
• Delivery model provides for an opportunity to contract with the Pre-Construction services phase contractor or go to market
• Earlier this year expression of interest issued and submittals reviewed
• RFP is organized into two sections:
1. Commercial
2. Technical
• Key documents included in contractors RFP:
✓ Instructions
✓ Project scope description
✓ Permit conditions
✓ Specifications
✓ Construction drawings
✓ Geotechnical Reports
✓ Other reference documents
Request For Proposal (RFP) Process
The Process to Date The RFP Package The Next Step
• Obtain MSCA concurrence