![Page 1: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/1.jpg)
Glider control work
QA/QC work
Instrument control
Visualization/integration with modeling, satellite, other obs
![Page 2: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/2.jpg)
QA/QC software from NRL
![Page 3: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/3.jpg)
Adaptive AUV controlDecision-making based on:
Real-time and historical observations Glider-based, satellite, etc.
Avoidance, mapping, tracking strategies
Ocean model forecasts
Glider-measured chl-a
![Page 4: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/4.jpg)
Fumin slides
![Page 5: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/5.jpg)
Glider operations
Piloting – shore and ship teams
Hardware maintenance
Dockserver runs at UNC
Deployment/recovery teams
![Page 6: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/6.jpg)
Other thoughts
Glider = ship = profiler
Controlled Lagrangian particle tracking – differences between ship vs glider (vs ecomapper?)
Integration of modeling sim with satellite, other obs
3rd glider – possible front tracking strategy
![Page 7: Glider control work QA/QC work Instrument control Visualization/integration with modeling, satellite, other obs](https://reader033.vdocuments.mx/reader033/viewer/2022051517/56649e755503460f94b76619/html5/thumbnails/7.jpg)
Timeline
Jan-Mar - sim glider flight, sim currents Apr-May - sim glider comms, scripting,
integration with dockserver
- comparison of simulated, observed performance (R4 2006)
Summer - glider field trials, CLPT experiments
Winter - major field effort