Download - GEORGE CV

Transcript
Page 1: GEORGE CV

GEORGE ALEXANDER Civil Engineer

Project Management - Construction Management

Mobile No: +971 50 8557251 Email: [email protected]

Professional Overview:

Result Oriented, energetic Construction Professional with Civil Engineering Degree, having 15+ years of experience (out of which 10+ years in UAE); of expertise in all facets of the industry. Possess good Managerial & Interpersonal skills to control large value projects. Experienced in full cycle of a construction project from Concept design stage to its execution, completion and handing over. Hand on experience in different types of projects such as Oil & Gas construction, High rise buildings, Mid-rise buildings, Buildings infrastructure works, Industrial buildings, factories, cluster of villas, Individual villas etc. Extensive Familiarity about safety codes at Project site and safe working practice in the industry.

Seek a senior level position with dynamic organization to contribute expertise in above said areas whilst catalyzing organizational excellence & Challenging position that enable me to demonstrate my Project Management skills with a growth oriented organization offering opportunity for advancement & Professional development.

EDUCATIONAL QUALIFICATION: Degree : Bachelor of Technology (B.TECH.)Specialization : Civil Engineering (1999 Passed)

Skills:• Familiar with AutoCAD.• Familiar with MS Project• Could operate effectively with Microsoft office tools, internet & email applications.• Efficient management and organizational abilities.• Excellent written and communication skills in English.• Excellent problem solving abilities.• Open minded and a good team player in projects.

Areas of Expertise:

Project Management & Construction Management:• Strategic Planning• Technical coordination• Feasibility Analysis• Project design document reviews• FIDIC conditions of contract• Tender documentation and Contract Management• Negotiation power• Tender analysis and awarding contract

_____________________________________________________________________________________________Professional CV of George Alexander Page 1 of 6

Page 2: GEORGE CV

• Project planning & Scheduling• Target setting &Achievement• Critical path management• QA &QC Management• HSE Management• Budgeting & Cost Control• Team building• Team Leadership• Preside and Coordinate Meetings• Subcontractor/Crew management• Variation analysis• Authority coordination• Completion & Handing Over

HVAC & MEP:• Coordination of the project with HVAC & MEP disciplines• Extensive familiarity with oil & Gas Piping works, Pumps functions and

installation.• Extensive Familiarity about Styrene Cooling System, District cooling system & all

type of HVAC system• Extensive Familiarity in Electrical Installation, Low current systems & DEWA

Coordination• Extensive Familiarity in Fire Detection and Fire Protection system in Oil & Gas

and Buildings construction.• Acquired knowledge for Instrumentation system in Oil & Gas field like PLC

Control System, radar gauging etc.• Familiarity with mechanical systems like vertical transport system, swimming

pool system and Building maintenance units• Very much familiar with Testing & Commissioning of various type of mechanical

equipment’s

Professional History:

M/S. Petrochem Middle East FZE,Dubai, UAE. (From May 2012 to January 2015) – Petrochem Established in the year 1995 in U.A.E. is the largest independent Chemical distributor in Middle East & 14 th largest in the World.

Position: Project Coordinator.

Key Responsibilities handled.• Project involved for Petrochem where Tank Farm for Chemical Bulk Storage, Styrene

Cooler System, Chemical Drum Storage Warehouse and other miscellaneous like Implementation of N2 generation system for the Chemical storage Terminal, Procurement & Installation of Drum filling machine.

_____________________________________________________________________________________________Professional CV of George Alexander Page 2 of 6

Page 3: GEORGE CV

• Major role in design stage of Tank Farm for Chemical Bulk storage in Coordination with Engineering Consultant M/s. W.S. Atkins and conveying Petrochem requirements for the Project by reviewing drawings and Technical specifications.

• Actively participated in awarding the Contract for Tank Farm Project, which was awarded in three different contracts namely Civil, Building & drainage works Contract, Mechanical, Piping & Vertical steel tanks works contract and Electrical & Instrumentation works contract.

• Major role in Construction phase of Tank Farm Project, coordinating with Engineering consultant and Three contractors at site for timely completion of project in line with project specification. Part of Testing & Commissioning of Tank Farm and Taking Over the same on behalf of Petrochem.

• Major role in Procurement, Technical evaluation, installation, Testing & Commissioning of Styrene Cooling system for Bulk storage of Styrene.

• Major role in procurement stage of Nitrogen generation system and its implementation including its Testing & Commissioning.

• Major role in procurement stage of Drum filling machine and its installation including its Testing & Commissioning.

• Major role in design stage and construction stage of Chemical Drum Storage warehouse.

M/S. Al Huda Contracting L.L.C,Dubai, UAE. (From June 2011 to May 2012) – Company Established in 1976 in U.A.E. is a well know contracting company in Dubai, with expertise in undertaking wide range of project in Dubai.Position: Project Coordinator.

Key Responsibilities handled.• Major role in execution, handing over the project to the client including getting BCC in

lesion with the governmental authority.• To coordinate the works with all parties for final handing and involved in day to day

construction activities which is in construction stage.

M/S. Best Homes Emirates Construction L.L.C,Dubai, UAE. (From November 2007 to April 2011) – Company as part of Best Homes Emirates Real Estate Established in 2003 in U.A.E., who is a well-known developer who has Head office in Dubai and they are renowned Developer in Canada. Basic nature of Best Homes Emirates Construction was to provide Project Management services to all the projects undertaken by the Parent company.

Position: Projects Engineer / Coordinator.

Key Responsibilities handled.• Major role in execution of projects as project management staff for the Developer and

directly reporting to the Vice president cum Head of Engineering Department.• Coordinate the works & Meeting between the client, the consultant, main contractor &

subcontractors.• Monitoring the progress of work, the contract issues with the main contractor,

procurement and scheduling of Nominated subcontractors, coordination with the suppliers and approving of the PC items.

_____________________________________________________________________________________________Professional CV of George Alexander Page 3 of 6

Page 4: GEORGE CV

• Coordinate with the authorities during different stages of the projects including coordination with DEWA, Etisalat, Du etc. Coordination with DM and JAFZA for attaining the final completion certificate.

• Dealt with QA/QC procedures and performing QS responsibilities.• Part of handing over team looking into the technical aspects of the projects and

coordinating with the end users in handing over the units.• Was part of the team at the design stage of project involving in discussion with the

consultant, government authorities for approval of the drawing, main contract awarding etc.

• Took care of Facility Management for arranging the annual maintenance contracts, handling completed building during liability period, coordinating with the end users complaint and warranty issues etc.

• Was a part in handing over of completed building to Owner’s Association and dealing with the authorities like RERA and Dubai Land department.

M/S. Michel Aziz & Associates, Consulting Architects, Engineers.Dubai UAE. (From May 2004 to July 2007) – Company established in 1993 in U.A.E., Undertakes Engineering Consultancy service for mid-rise buildings, villas and industrial buildings.

Position: Project Engineer

Key Responsibilities handled:• Was actively involved during design stage of project and its authority approvals.• Was In charge of projects, handling independently all the projects and reporting directly

to the Project Manager.• Arranging and conducting meetings on site with contractors, subcontractors and

attending client’s meetings at site.• Reviewing and approval of shop drawings and material submittals.• Site inspection and approval of works executed at site.• Monitoring and follow up of site progress and updating project manager and client.• Taking full responsibility at the time of handing over of the project, preparing of snags,

going through de-snagging procedure and coordinating with government authorities for final completion certificate.

• Evaluation of variations, claims and monthly billing for contractors. • Handled construction of Industrial buildings like Glass & Aluminum factory, Block

factory, paint factory etc.

M/S. Aadarsh Builders, Contractor.Kerala, India. (From June 1999 to April 2004) – Company established in 1990 in India, undertakes contracting works for high rise, mid rise buildings and villas.

Organization Period Position

M/s. AAdarsh Builders Sept. 2002 To April 2004 Projects in-charge

M/s. AAdarsh Builders June 1999 To August 2002 Site Engineer

_____________________________________________________________________________________________Professional CV of George Alexander Page 4 of 6

Page 5: GEORGE CV

Key Responsibilities:

In the above mentioned company, I have handled Civil Works related to High Rise Buildings and was involved in Estimation, Project Execution and Handing Over of the projects including preparing bills, organizing meetings with Clients, Consultants, Subcontractors, etc.

PERSONAL DETAILS & Visa Status:

Nationality : IndianDate of Birth : 19th May 1977Marital Status : MarriedDriving License : Valid UAE driving license Visa status : Residence VisaAvailability : Immediate.Languages : English, Hindi, Malayalam

Major Project which I was involved in UAE:Sl. No

Job Description Client Consultant Stages Involved

1

Tank Farm for Bulk Storage of Chemicals (10 tanks of total 11,000m³ capacity and its associated infrastructure)

Petrochem Middle East

W.S. Atkins

Design, Awarding Contract, Construction Management, Testing & Commissioning,

Taking Over

2Styrene Cooling system for Styrene Tanks

Petrochem Middle East

W.S. Atkins

Procurement, Technical document review, Installation,

Testing & Commissioning, Taking over

3Class I Chemical Drum Storage Warehouse

Petrochem Middle East

Al Jassim Engineering Consultant

Design, Awarding Contract, Construction Management, Testing & Commissioning,

Taking Over

4Implementation of Nitrogen Generation system & Installation of Drum Filling Machine.

Petrochem Middle East

Al Jassim Engineering Consultant

Procurement, Technical document review, Installation,

Testing & Commissioning, Taking over

5Jumeirah part villas, Package # 3.(289 No. G+1 Villas)

Nakheel Dar – al handasah Construction & Handing Over

65B+G+35 Storied Residential building, JLT, Dubai.

Venus International Holding

W.S. AtkinsConstruction, Handing over &

Facility Management

72B+G+25 Storied Residential building, Dubai Sports City, Dubai

Bay View Investment

Dimensions Design stage, Enabling works ,

Super structure works

82B+G+25 Storied Residential building, Dubai Sports City, Dubai.

Cliff Dwelling Enterprises

DimensionsDesign stage, Enabling works,

super structure works

93B+G+20 Storied Residential Cum Commercial building, Dubai Sports City, Dubai.

Rescom Properties

Arkiplan Consulting Architect

Design stage & Enabling works stage.

102B+G+36 Floor Residential Building, Jumeirah Village, Dubai.

Paramount Real Estate

Arkiplan Consulting Architect

Design stage & Enabling works stage.

11 3B+G+19 Floor Commercial Building, Sun Valley Arkiplan Consulting Design stage, Enabling work

_____________________________________________________________________________________________Professional CV of George Alexander Page 5 of 6

Page 6: GEORGE CV

Business Bay, Dubai. Investments Architect stage and super structure works

122B+G+10 Floor Residential Building, International City, Dubai.

Seracom Holding Ltd.

DimensionsDesign stage, Enabling works

stage and super structure works

132B+G+10 Floor Residential Building, International City, Dubai.

Reviera Holding Ltd.

Arkiplan Consulting Architect

Design stage, Enabling works stage and super structure works

142B+G+10 Floor Residential Building, International City, Dubai.

Venus International Holding

Arkiplan Consulting Architect

Defect Liability period, Facility Management & Handing over

to Owners Association.

15B+G+8 Residential Building, Al Barsha, Dubai.

Local OwnerMichel Aziz & Associates

Design, Construction Management and handing over

16Glass Factory, Bonding Factory & Steel Factory for Alumco Alumin., DIP, Jebal Ali.

Alumco Aluminum

Michel Aziz & Associates

Design, Construction Management and handing over

175 Nos. Cluster of Villas, B+G+1, Al Khawaneej, Dubai.

Local OwnerMichel Aziz & Associates

Design, Construction Management and handing over

18Renovation of Hatta Palace for H.H. Rashid Bin Al Maktoum

Rulers officeMichel Aziz & Associates

Renovation and handing over

_____________________________________________________________________________________________Professional CV of George Alexander Page 6 of 6

Page 7: GEORGE CV

Business Bay, Dubai. Investments Architect stage and super structure works

122B+G+10 Floor Residential Building, International City, Dubai.

Seracom Holding Ltd.

DimensionsDesign stage, Enabling works

stage and super structure works

132B+G+10 Floor Residential Building, International City, Dubai.

Reviera Holding Ltd.

Arkiplan Consulting Architect

Design stage, Enabling works stage and super structure works

142B+G+10 Floor Residential Building, International City, Dubai.

Venus International Holding

Arkiplan Consulting Architect

Defect Liability period, Facility Management & Handing over

to Owners Association.

15B+G+8 Residential Building, Al Barsha, Dubai.

Local OwnerMichel Aziz & Associates

Design, Construction Management and handing over

16Glass Factory, Bonding Factory & Steel Factory for Alumco Alumin., DIP, Jebal Ali.

Alumco Aluminum

Michel Aziz & Associates

Design, Construction Management and handing over

175 Nos. Cluster of Villas, B+G+1, Al Khawaneej, Dubai.

Local OwnerMichel Aziz & Associates

Design, Construction Management and handing over

18Renovation of Hatta Palace for H.H. Rashid Bin Al Maktoum

Rulers officeMichel Aziz & Associates

Renovation and handing over

_____________________________________________________________________________________________Professional CV of George Alexander Page 6 of 6


Top Related