/Garrison Elementary School Draft Schematic Design Modernization December 10 2015
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 1
JOINT VENTURE
/BUILDING
REF
.
REF.
UP
DW
Grade 3 Grade 3
Grade 2 Grade 2 Grade 1
Autism (3-5)
Grade 1
ResourceRoomSensory/De-Escalation
Room
Grade 4
Work Room
Autism (K-2)
Flexible Specials Room
StaffLounge
Mechanical
Admin
SecurityWelcomeCenter
Parent Resource
Center
Custodial
Elevator #1
Pre-K Pre-K Pre-K
Pre-KPre-K Autism (Pre-K)
Special Needs Offices
OT / PT
Health
Grade 4 Grade 5 Grade 5
Instructional Coaches
Art Music
LevelBook Room
MediaCenter Elevator #1
Elevator #2
SECOND FLOOR PLANOPTION C.2
T T
Elevator #2
810 sf 690 sf
955 sf 900 sf 880 sf 905 sf
150 sf
2575 sf 1380 sf 1125 sf320 sf
360 sf
1190 sf 1160 sf 1075 sf
1220 sf 1230 sf990 sf
1240 sf
390sf 970 sf
550 sf
85 sf615 sf
Food Service
Multi-Purpose
Room
Extended Day Office
170 sf1280 sf 1500 sf
Book Storage145 sfKindergarten Kindergarten
1250 sf
990 sf
1260 sf688 sf
435 sf
400 sf1155 sf
270 sf(+30 sf)
(+145 sf)
(+40 sf)
(+315 sf)
(-80 sf)
Early Childhood Special Needs Classroom (-950 sf)Learning Disabled Classroom (3-5) (-900 sf)
Ed Spec Program Elements not included, as per DGS/DCPS direction:
Sensory/De-Escalation Room 140 sf
230 sf
(+360 sf)
IT Storage
80 sf(+80 sf)
Speech
Work Room
(+70 sf)
(+140 sf)FIRST FLOOR PLAN
Sensory/De-Escalation Room 150 sf
(+150 sf)
245 sf
870 sf 820 sf 890 sf
810 sf 865 sf 880 sf
300 sf
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 2
JOINT VENTURE
/
The Garrison school site has served as the location of the neighborhood’s school since as early as 1903.
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 8
1888
1903
1911
1921
1951
1964
1965
1857
1928
Visioning process
SITE HISTORY
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 3
JOINT VENTURE
/
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 9
2012Visioning process
2012 AERIAL VIEW
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 4
JOINT VENTURE
/
CURRENT AERIAL VIEW
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 5
JOINT VENTURE
/
COMMUNITY VISIONING SESSION - MAY 30 2012
Participatory process engaging teachers, staff, parents, community, neighborhood institutions, DC government agencies and elected officials to create and implement a vision for the school grounds and building.
The site concept was the outcome of a six-month participatory process that drew the community into the school and involved Garrison teachers and staff in the development of the site development program of uses and its relationship to the school’s curricular goals.
The site concept responds to the following goals:
• Garrison will be a school where our relationship with nature is a key to learning and where the nature surrounding it will be a nurturing environment in which to learn.
• Garrison’s schoolyard will be an urban park, and a neighborhood park, meeting the needs of the school during school hours and the needs of the community outside school hours.
• By renovating the building to link with the re-envisioned schoolyard, the entire school (building and grounds) can become a more purposefully conceived community resource.
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 6
JOINT VENTURE
/
PATH, PORTAL, GATHERING & ACTIVITY
LIGHT & SHADESERVICE & ACCESS
VISIBILITY & SIGHTLINES SITE CIRCULATION
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 7
JOINT VENTURE
/ Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 16
PROGRAM NEIGHBORHOOD PARK
NEIGHBORHOOD PARKS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 20
PROGRAM OASIS / OUTDOOR CLASSROOM
OASIS / OUTDOOR CLASSROOM
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 21
PROGRAM PERFORMANCE SPACE
STODDERT SCHOOLPERFORMANCE SPACE
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 8
JOINT VENTURE
/Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 17
PROGRAM PORTALS
PORTALS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 18
PROGRAM PLAYGROUNDS
PLAYGROUNDS
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 19
PRECEDENTS SPRINKLER PLAZA
SPRINKLER PLAZA
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 22
PROGRAM COMMUNITY SQUARE
MOUNT PLEASANT
DUPONT CIRCLE
COMMUNITY SQUARE
Garrison Elementary SCHOOLYARD IMPROVEMENT PROJECTCONCEPTUAL DESIGN PRESENTATION - JUNE 12 2012 23
PROGRAM ENVIRONMENTAL CLASSROOM
STODDERT SCHOOLENVIRONMENTAL CLASSROOM
SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 9
JOINT VENTURE
/SITE
Garrison Elementary School DRAFT Schematic Design Modernization SIT Meeting | December 10 2015
page 10
JOINT VENTURE
/
SITE PLAN AND PROGRAM- 40 SPACES PROVIDED
1
2
3
4
5
N
SITE