Download - FRIGI-TECH REFLECTIVE ROOF COATINGS
FRIGI-TECHREFLECTIVE ROOF COATINGS
MAIN BENIFITSMAIN BENIFITS INSULATESINSULATES – – Outperforms 7” of fiberglass insulation. Keeps interiors Outperforms 7” of fiberglass insulation. Keeps interiors
cooler and more cooler and more comfortable. CUTS COST of air conditioning by up to 40%. comfortable. CUTS COST of air conditioning by up to 40%. Increase in storage capacity Increase in storage capacity of fuel storage tanks.of fuel storage tanks.
INHIBITS RUSTINHIBITS RUST –– Prevents perforation and damage due to corrosion.Prevents perforation and damage due to corrosion. PROTECTSPROTECTS - - against UV, chemical damage. Is not affected by high winds against UV, chemical damage. Is not affected by high winds
or rain. Resists or rain. Resists MildewMildew and algae. and algae. REDUCES THERMAL SHOCKREDUCES THERMAL SHOCK - - by lowering roof by lowering roof
temperatures by as temperatures by as much as 60 degrees. This translates to less much as 60 degrees. This translates to less expansion/contraction and less stress and expansion/contraction and less stress and wear on fasteners and connections.wear on fasteners and connections.
WATERPROOF WATERPROOF – – Stops leaks and prevents moisture absorption on all Stops leaks and prevents moisture absorption on all surfaces. surfaces.
FIRE RETARDANTFIRE RETARDANT – – Zero flame spread.Zero flame spread. IMPROVES APPEARANCEIMPROVES APPEARANCE - - with an extremely durable with an extremely durable
elastomeric finish elastomeric finish that will not crack, chip, or peel. Can be tinted any that will not crack, chip, or peel. Can be tinted any color. Cuts your maintenance cost.color. Cuts your maintenance cost.
ENVIRONMENTALLY SAFEENVIRONMENTALLY SAFE – – No asbestos, lead, vinyl acetate, No asbestos, lead, vinyl acetate, plastics, plastics, oils, odors or gases. Wash with water.oils, odors or gases. Wash with water.
ENCAPSULATESENCAPSULATES - - asbestos surfaces and existing hazardous coatings.asbestos surfaces and existing hazardous coatings.
APPLICATIONSAPPLICATIONSAny surface that heat needs to stay in Any surface that heat needs to stay in
or out of.or out of.MetalMetal ConcreteConcreteAsphaltAsphaltRubberRubber
GlassGlassTar and Tar and GravelGravel
Wood Wood ShingleShingle
ENERGY STAR ENERGY STAR APPROVALAPPROVAL
ENERGY STAR ENERGY STAR is a U.S. is a U.S. government-government-backed program backed program helping helping businesses and businesses and individuals individuals protect the protect the environment environment through through superior energy superior energy efficiency. efficiency.
PRODUCTSPRODUCTS FRIGI-TECH FRIGI-TECH TOP COATTOP COAT FRIGI-TECHFRIGI-TECH TOP COAT II TOP COAT II FRIGI-TECHFRIGI-TECH PRIMER PRIMER POLYESTER MEMBRANEPOLYESTER MEMBRANE
TOP COATTOP COAT An Acrylic white coating with nearly An Acrylic white coating with nearly
400% elongation. Ideal for metal, built-400% elongation. Ideal for metal, built-up roofs with good drainage, shingles up roofs with good drainage, shingles and all types of walls. Produces a tough and all types of walls. Produces a tough washable coat that reduces dirt pick-up washable coat that reduces dirt pick-up and stays cool with ceramic ingredient.and stays cool with ceramic ingredient.
TOP COAT IITOP COAT II All of the qualities of TOP COAT All of the qualities of TOP COAT
original with the added ability to resist original with the added ability to resist standing water conditions. To be used standing water conditions. To be used on all surfaces in area that experience on all surfaces in area that experience high humidity. Can reduce heat gain as high humidity. Can reduce heat gain as efficiently as 7 inches of conventional efficiently as 7 inches of conventional insulationinsulation
PRIMERPRIMER 100% acrylic, Elastomeric roof 100% acrylic, Elastomeric roof
mastic formulated to exhibit hi-mastic formulated to exhibit hi-adhesion and flexibility. For use adhesion and flexibility. For use over most types of roof and wall over most types of roof and wall surfaces. Recommended for use surfaces. Recommended for use on all foam roofs.on all foam roofs.
POLYESTER MEMBRANEPOLYESTER MEMBRANE A spun bound and woven 100% A spun bound and woven 100%
polyester fabric, which is polyester fabric, which is embedded into the basecoat to embedded into the basecoat to prevent extreme movement by prevent extreme movement by greatly increasing the tensile greatly increasing the tensile strength of the system.strength of the system.
PROPERTIESPROPERTIESPRIMEPRIME
RRTC ITC I TC IITC II ASPHALASPHAL
TTViscositViscosityy
9090 105105 137137 110110
Total Total SolidsSolids
50%50% 50%50% 55%55% 53%53%
PermeaPermeancence
5.05.0 9.09.0 1717 3030
Tensile Tensile P.S.I.P.S.I.
9292 215215 395395 150150
ElongatiElongationon
600%600% 380%380% 400%400% 2000%2000%
Flex 0Flex 0FF PassPass PassPass PassPass PassPass
% Solar Reflective% Solar Reflective
ModifieModifiedd
BitumenBitumenBlackBlack
6.86.8
ModifiedModifiedBitumenBitumen
TOPCOATTOPCOAT
88.488.4
ConcreConcretete
PaintePaintedd
24.24.00
ConcreteConcretePainted w/Painted w/TOPCOATTOPCOAT
87.187.1
GalvanizedGalvanizedMetalMetal
29.429.4
GalvanizeGalvanizedd
MetalMetalTOPCOATOPCOA
TT
88.088.0
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
VISUAL INSPECTION and REPLACEMENT of VISUAL INSPECTION and REPLACEMENT of DAMAGED BUILDING MATERIALSDAMAGED BUILDING MATERIALSThe substrate to be coated must be in SOUND The substrate to be coated must be in SOUND condition. Physically inspect the surface area for condition. Physically inspect the surface area for missing or damaged building materials. Replace missing or damaged building materials. Replace and/or repair all damaged areas back to sound and/or repair all damaged areas back to sound and solid condition.and solid condition.Check for loose or missing fasteners (screws) Check for loose or missing fasteners (screws) and tighten or replace them.and tighten or replace them.Inspect for any existing leaks and be sure to Inspect for any existing leaks and be sure to repair leaks prior to the application of coating.repair leaks prior to the application of coating.Make sure roof is adequately vented. Check with Make sure roof is adequately vented. Check with a roofing contractor if necessary. a roofing contractor if necessary.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#:2 PRESSURE STEP#:2 PRESSURE CLEANINGCLEANINGHigh Pressure Blast entire High Pressure Blast entire roof surface with at least roof surface with at least 1500 P.S.I. of pressure 1500 P.S.I. of pressure using a water and chlorine using a water and chlorine solution (1 quart chlorine to solution (1 quart chlorine to 5 gallons of water). 5 gallons of water). Thoroughly remove all dirt, Thoroughly remove all dirt, oil, grease, residues, mold, oil, grease, residues, mold, mildew, algae and any mildew, algae and any other surface other surface contaminants. When roof is contaminants. When roof is completely cleaned, rinse completely cleaned, rinse with water only. Let roof with water only. Let roof surface dry before surface dry before continuing.continuing.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
First Spot Prime all First Spot Prime all rusted areas and let dry rusted areas and let dry at least 12 hours before at least 12 hours before applying the second coat applying the second coat of rust inhibitor to the of rust inhibitor to the effected area. Apply the effected area. Apply the rust inhibitor at a rate of rust inhibitor at a rate of 125-150 square feet per 125-150 square feet per gallon covering the gallon covering the entire rusted surface. entire rusted surface. Wet film thickness of 10-Wet film thickness of 10-12 mils wet resulting in 12 mils wet resulting in dry film thickness of 7-9 dry film thickness of 7-9 mils. Let the rust mils. Let the rust inhibitor dry at least 12 inhibitor dry at least 12 hours before continuing hours before continuing
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#:4 CAULKING STEP#:4 CAULKING SCREWSSCREWSPatch and Caulk all Patch and Caulk all screws or fastener screws or fastener heads, cracks, crevices, heads, cracks, crevices, fractures, holes, valleys, fractures, holes, valleys, vents, voids, etc., with a vents, voids, etc., with a Water Proofing caulk. Water Proofing caulk. Use a trowel or stiff Use a trowel or stiff brush to apply. Multiple brush to apply. Multiple coats are better than coats are better than one thick coat if one thick coat if possible. possible.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#: 5 TAPING STEP#: 5 TAPING SEAMSSEAMS Tape all visible seams, Tape all visible seams, large cracks and fractures large cracks and fractures prone to water intrusion prone to water intrusion on roof surface. Apply a on roof surface. Apply a liberal coat of liberal coat of PRIMERPRIMER at 10-12 mils wet film at 10-12 mils wet film thickness, directly to the thickness, directly to the affected area using brush, affected area using brush, roller or airless spray and roller or airless spray and lay the lay the POLYESTER POLYESTER MEMBRANEMEMBRANE directly directly into the into the WET PRIMER. WET PRIMER.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#:6STEP#:6 PRIME PRIME COATCOATApply Apply PRIMERPRIMER using 1- brush, 2- at using 1- brush, 2- at least a one inch nap least a one inch nap roller, or 3- at least a roller, or 3- at least a 1 gallon per minute, 1 gallon per minute, 3,000 P.S.I. piston 3,000 P.S.I. piston type airless sprayer type airless sprayer with a minimum tip with a minimum tip size of .027 tip. size of .027 tip.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
Apply the Apply the PRIMERPRIMER at at a rate of 125-150 a rate of 125-150 square feet per gallon square feet per gallon covering the entire covering the entire roof surface. Wet film roof surface. Wet film thickness of 10-12 thickness of 10-12 mils wet resulting in mils wet resulting in dry film thickness of dry film thickness of 7-9 mils. Let 7-9 mils. Let PRIMERPRIMER dry at least 12 hours dry at least 12 hours before continuing. before continuing.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#: 7 FIRST COAT of STEP#: 7 FIRST COAT of FINISH/TOP COATFINISH/TOP COATWhen Spraying or Rolling When Spraying or Rolling TOPTOP COATCOAT the first coat of the first coat of TOPTOP COATCOAT must be applied must be applied perpendicular to the coat ofperpendicular to the coat of PRIMERPRIMER to achieve a to achieve a checkerboard pattern. Apply checkerboard pattern. Apply the first coat of the first coat of TOPTOP COATCOAT at at a rate of 100-125 square feet a rate of 100-125 square feet per gallon per coat over the per gallon per coat over the entire roof surface. Wet film entire roof surface. Wet film thickness of 12-15 mils thickness of 12-15 mils resulting in dry film thickness resulting in dry film thickness of 8-10 mils. of 8-10 mils.
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#: 8 SECOND STEP#: 8 SECOND COAT of FINISH/TOP COAT of FINISH/TOP COATCOATApply the second coat Apply the second coat of of TOPTOP COATCOAT at a rate at a rate of 100-125 square feet of 100-125 square feet per gallon per coat over per gallon per coat over the entire roof surface. the entire roof surface. Wet film thickness of Wet film thickness of 12-15 mils resulting in 12-15 mils resulting in dry film thickness of 8-dry film thickness of 8-10 mils. Let dry at least 10 mils. Let dry at least 24 hours before your 24 hours before your Final Evaluation Final Evaluation
METAL ROOF METAL ROOF APPLICATIONAPPLICATION
STEP#: 9 FINAL EVALUATIONSTEP#: 9 FINAL EVALUATIONA detailed evaluation of the completed job A detailed evaluation of the completed job will determine the quality of the will determine the quality of the workmanship and whether strict application workmanship and whether strict application specifications have been met. Be sure to specifications have been met. Be sure to check that all roof areas are completely check that all roof areas are completely coated and sealed under permanently placed coated and sealed under permanently placed roof items such as roof top air conditioning roof items such as roof top air conditioning units. Divide roof into 1,000 square feet units. Divide roof into 1,000 square feet sections and randomly check one spot in each sections and randomly check one spot in each section for a dry film thickness of at least 20 section for a dry film thickness of at least 20 mils. If specifications have not been met, mils. If specifications have not been met, determine how much material will be determine how much material will be required to meet specifications and recoat. required to meet specifications and recoat.
EXAMPLESEXAMPLES
EXAMPLESEXAMPLES
BEFORE AND AFTERBEFORE AND AFTER