Download - Fp tools 2010-11-29
![Page 1: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/1.jpg)
www.fp-tools.eu
![Page 2: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/2.jpg)
Complete product family
Scientific reporting
Financial reporting & financial proposal writing
Public and private projectwebsite
Project proposal writing
![Page 3: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/3.jpg)
Traditional FP reporting
Coordinator
Partner 1 Partner 2 Partner n..
WP-leader x
WP-leader 1
Disadvantages:• Many versions, little
overview• No logging of changes• No picture of progress
![Page 4: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/4.jpg)
EU-xpert concept
Workpackage leader
Participants
Navigation tree of entire reportNon-editable text printed in report
Editable text printed in report
Instructions not printed in report
![Page 5: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/5.jpg)
EU-xpert assignments
Coordinator instructs WP leaders
Assigning EU-xpert assignments
Assigning EU-xpert assignments
Title assignment
Instruction for assignee
select assignee(s)
, create
Default assignment status = openDue date for assignmentSend email with deeplink to assignee
Save & send assignment
![Page 6: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/6.jpg)
EU-xpert document editing
In mailbox assignee
Partner can enter text by typing …… or pasting Word document
![Page 7: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/7.jpg)
EU-xpert document editing
adjust import settings if needed before importing
Inserting picture from desktop
![Page 8: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/8.jpg)
EU-xpert track changes
See previous edits of other authors … and compare modifications
![Page 9: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/9.jpg)
EU-xpert assignment status
Inform assigner that work is done …
…and change the assignment status to Done
![Page 10: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/10.jpg)
A assignement can have four states:
1. Open: the edit assignment has been assigned to a participant and is in progress
2. Done: the Participant has finished editing
3. Sign-off: the Workpackage leader has checked the work and OK’s it
4. Closed: the Project management office closes the edit assignment
Project Management
Office
Workpackage leader
participant
EU-xpert assignment status
![Page 11: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/11.jpg)
EU-xpert WP-leader view
![Page 12: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/12.jpg)
EU-xpert Word document generation
![Page 13: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/13.jpg)
EU-xpert benefits
Ease to use, easy to navigate
Only one version of content: No version control needed
One click report creation, no layout troubles
Significant reduction of logistical handling for all users
According to customers: Saves time, reduces stress
![Page 14: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/14.jpg)
EU-fin
Financial management and
Monitoring with EU-fin
![Page 15: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/15.jpg)
Support coordinator responsibilities:
• Financial planning• Project cost reporting• Distribute EC-contribution• Financial management
EU-fin goal
![Page 16: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/16.jpg)
Setting up your EU-fin project:– By Coordinator– Support FP-Tools
How does EU-fin work
Step 1: Setting up EU-fin
![Page 17: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/17.jpg)
Settings & Parameters
Flexible Parameters:● Project type ● Work Packages● Periods ● Beneficiaries● Type of ● Link Beneficiaries & WP’s Expenditures ● Requested Contribution
Fixed Parameters (Linked to funding scheme)● Activity types● Funding rates
Step 1: Setting up EU-fin
![Page 18: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/18.jpg)
– Coordinator invites beneficiaries to EU-fin (financial contact persons)
Financial Planning
Step 2: Inviting Partners
EU-fin
![Page 19: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/19.jpg)
Financial Planning
Step 3: Entering Financial Planning
• Contact person of each beneficiary enters financial planning
• Using personalized web based forms
EU-fin
• Coordinator monitors process
![Page 20: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/20.jpg)
Demo entering planning
Choose WP
Enter planning
Indirect cost are calculated automatically
Enter person months
Click < Save >
Whole duration column: open or closed
Totals are calculated automatically
![Page 21: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/21.jpg)
Periodic reporting
• After each reporting period the actual costs have to be reported in EU-fin
• Per work package & type of expenditure• On the basis of own financial administration of
beneficiary• Explanation is very important, part of periodic
report
![Page 22: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/22.jpg)
Click on ‘project costs’ in the navigation panel
Select work packageSelect periodPlanned budgets and person months are shown
Actual costs and person months have to be entered
And, if necessary, the adjustments to previous periods
Save the entered information
Repeat for each work package
Reporting of actual costs
![Page 23: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/23.jpg)
Click on ‘Explanation costs’ in the navigation panel
Select WPSelect periodActual costs appearEnter explanation of the actual costsClick on <Save> to save the entered explanation
Repeat for each work package
Reporting of actual costs
![Page 24: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/24.jpg)
Generating reports
• Coordinator generates necessary reports
A3.1
EU-fin
Various other reports
Distribution of EC-contribution
Explanation of use of resources
Summary financial report
Step 4: Generating reports
![Page 25: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/25.jpg)
• Form C calculations are generated by EU-fin• Form C now submitted with FORCE• EU-fin and FORCE are complementary,
no overlap!
Form C and FORCE
![Page 26: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/26.jpg)
• Coordinator can generate overview queries at any moment
• Using PivotTable
Continuous: Monitoring
Monitoring
![Page 27: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/27.jpg)
Continuous: Monitoring
Select parameters and location in table
The overview is generatedSelect page
Change columns shown
Select the relevant periods
The new overview is generated
The overview adjusts automatically
Change the location of the parameter
Hide parameters
Export overview to Excel or PDF
Monitoring: pivot table
![Page 28: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/28.jpg)
EU-fin is flexible: Project interface can always be modified
EU-fin is complete: Project interface can be used in each project phase
EU-fin is accurate: Up-to-date data is available for all users anytime anywhere
EU-fin benefits
![Page 30: Fp tools 2010-11-29](https://reader035.vdocuments.mx/reader035/viewer/2022070321/558e31871a28ab3b618b47b7/html5/thumbnails/30.jpg)
making Science possible
www.fp-tools.eu